Water Supply Project
Water Supply Project
CIV222
May -August Semester
2019-2020
To prepare schemes of Water Supply, the duties of engineers are to collect all
information that may prove useful for preparing the estimate of the project. The
objective of this project is to design the required Supply Water Works of an
assumed City.
Firstly
Given
For a city of population 300,000 capita and an average water consumption as
following:
d) Design Period is 30 years for ID 2016; and Design Period is 40 years for ID
2017 and
2018.
Requirements
The water supply works include: an intake on the River Nile, water treatment
plant transmission pipelines, distribution networks and elevated storage tanks.
It is required to Design:
• Pipe Intake (conduit pipes)
• Low Lift Pump
• Flash Mixing Tanks
Page 3 of 5
• Clari-flocculators
• Rapid Sand Filters
• Ground Storage Tanks
• Draw a plan for the designed water treatment plant
• High Lift pumps
• Elevated Tanks
• Plan a complete water network for the city
• Design the main pipelines using Method of section
Page 4 of 5
Secondly
Write a report not less than 10 pages in English language (at least 5 references
should be included) in any three of the following topics:
1. Types of Intakes
2. Conduit pipes
3. Low Lift Pumps
4. Sedimentation
5. Filtration
6. Disinfection
7. Ground Storage
8. High Lift Pumps
9. Elevated Tank
10.Pipe Networks
Page 5 of 5