Material Receiving Inspection Procedure Date: 01-03-2019
ASF-QC-MRI-001 Page: 1 of 8
LIST OR REVISIONs
Approved By Reviewed By Prepared By Comment Date .Rev
Ahmed Safwat Ahmed Safwat Ahmed Essam For Implementation 01-01-2019 0
Ahmed Safwat Ahmed Safwat Ahmed Essam Change in the procedure number 01-03-2019 1
INDEX
No. DESCRIPTION PAGE
1 OBJECTIVE 4
2 SCOPE 4
3 REFERENCE 4
4 RESPONSIBILITIES 4
5 DEFINITION 4
6 PROCEDURE 4
7 RECORD 8
8 ATTACHMENT 8
1. OBJECTIVE
This procedure describes Material Receiving inspection for Steel plates, profiles, … etc.
2. SCOPE
The aim is to identify the process carried out during the material inspection during the receiving.
3. REFERENCES
- Client Specification
- EN 1090-2 – edition 2018
- EN 10021 – General technical delivery conditions for steel products
- EN 10024 – Hot rolled taper flange I sections - Tolerances on shape and dimensions
- EN 10204 – Metallic products - Types of inspection documents
- EN 10025-1 – Hot rolled products of structural steels - Part 1: General technical delivery conditions
- EN 10025-2 – Hot rolled products of structural steels - Part 2: Technical delivery conditions for non-alloy structural
steel
- EN 10025-3 – Hot rolled products of structural steels - Part 3: Technical delivery conditions for
normalized/normalized rolled weldable fine grain structural steels
- EN 10025-4 – Hot rolled products of structural steels - Part 4: Technical delivery conditions for thermomechanical
rolled weldable fine grain structural steels
- EN 10025-5 – Hot rolled products of structural steels - Part 5: Technical delivery conditions for structural steels
with improved atmospheric corrosion resistance
- EN 10025-6 – Hot rolled products of structural steels - Part 6: Technical delivery conditions for flat products of
high yield strength structural steels in the quenched and tempered condition
- EN 10029 – Hot-rolled steel plates 3 mm thick or above - Tolerances on dimensions and shape
- EN 10034 – Structural steel I and H sections - Tolerances on shape and dimensions
- EN 10056-1 – Structural steel equal and unequal leg angles - Part 1: Dimensions
- EN 10056-2 – Structural steel equal and unequal leg angles - Part 2: Tolerances on shape and dimensions
- EN 10163 – (all parts), Delivery requirements for surface condition of hot-rolled steel plates, wide flats and
sections
4. RESPONSIBILITIES
4.1. MATERIAL ENGINEER shall be responsible for review the purchase orders in order to insure the compliance with
the project specification and relevant standard
4.2. MATERIAL INSPECTOR shall be responsible for ensuring that the material has been delivered in a proper way,
tested, inspected and accepted in accordance with the governing standards.
5. DEFINITION
MSR Material Store Requisition
WE Welding Engineer
PR Purchase Request
6. PROCEDURE
6.1. MATERIAL STORE REQUISITION
6.1.1. MSR for any material are prepared by the Design Engineer, except for welding material is prepared by the WE
6.1.2. The MSR shall include the material specification, type, class or grade selected from the applicable and
relevant standard.
6.1.3. MSR shall also include marking and Material Test Report and/or Certificate of Compliance, if required, and
any supplementary or additional requirements of Code, such as special testing, Charpy impact tests at
minimum design metal temperature, grain size, methods of forming Rolling and subsequent heat treatment,
if any.
6.1.4. Completed MSR are signed and dated by the Design Engineer. The MSR are then forwarded to the Material
Control Engineer to verify the material available on stock to establish the quantity required to be purchased.
6.1.5. Material specifications as requested by the Code/Standard shall be attached to any material PR and shall be
strictly adhered to.
TABLE 2 - PRODUCT STANDARDS FOR SHEET AND STRIP SUITABLE FOR COLD FORMING
7. RECORDS
All the data concerning the material inspection shall be stored and maintained in the material receiving inspection report
form no. ASF-QC-MRI-002
8. ATTACHMENTS
8.1. Material Receiving Inspection Report – form no. ASF-QC-MRI-002
8.2. Welding Material Receiving Inspection Report – form no ASF-QC-MRI-003
8.3. Material Traceability Report – form no. ASF-QC-MRI-004
8.4. HOLD inspection area – for no. ASF-QC-MRI-005