Typical Case 1 & Case 2 Outside edge of Approach Slab (Coping) Longitudinal Const. Joint (Preferred 1. SURFACE TREATMENT: As an option to Class 4 Floor Finish (Bridge
shall match and conform with alignment location is at edge of lane, see Floor Grooving) per Section 400 a hand tined or heavy broomed finish
3"
of Left & Right Copings shown on Note 3 and Detail) (Typ. Cases 1 & 2) may be permitted on the concrete portion of the riding surface. Sidewalk
Edge adjacent
Superstructure Sheets (Typ.) areas shall receive a broomed finish. The top surface of the concrete
to flexible
pavement beneath the asphalt overlay shall be raked.
Edge adjacent to 2. CONDUIT: If required, see Structures Plans for Conduit Details.
Gutter Line Construction Joint
* flexible pavement 3. When a longitudinal construction joint is necessary or allowed by the
Bars 5C Gutter Line Permitted
Begin or End Bridge Engineer, the transverse steel shall be extended as shown in the
(Typ.) *
Limits of Asphalt Overlay (Front Face of Backwall Bars 5C Limits of Longitudinal Construction Joint Detail.
2'
-
if applicable) (Typ.) Asphalt Overlay 0" 4. The plan view for CASE 1 applies when the skew angle (Ø) = 0°.
Bottom of Slab)
Top of Slab) Back Face of
Backwall or angle at end The slab shown represents a skew to the right for an approach slab at
Edge of Bent of bridge begin bridge; approach slab at the end of bridge or a left skew shall be
Geometric Control Ø treated similarly.
Cap
Line Geometric Control 6. Welded Wire Reinforcement (WWR) for the edge of Approach Slabs on
Line retaining walls is not included in the estimated quantity for reinforcing
B
-0" M ax. (
90° (Typ.) steel and is considered incidental to the work. WWR must consist of Deformed
B
9" M ax. (
9" Ba
Bars 8A2 @
rs @ Edge of Bent approach slab with edge barriers and no sidewalks. Provide railings, parapets
Dim . N (
* 5B 1'
-
@ 0"
Ba 9" Ma Cap and raised sidewalks as detailed in the Contract Plans.
rs Ma x.
(Pl 5C x. (
To
ac @ (Bo p Begin or End
ed 1' t of
be -0" tom Sl
twe ab Bridge (Front
Ma of )
en x. Sl
Ba (
To ab Face of Backwall
Construction Joint rs p ) 3"
Field Bend 5B of if applicable)
Permitted ,T Sl
Limits of Asphalt op ab
as required of )
Limits of Asphalt Overlay
Overlay 2'-0" Sl
(Typ.) ab
) 9" A
Gutter Line Gutter Line
Dim .
3"
M2
B B
3" Bars 5B @ 1'-0" Max. (Top of Slab) 3" PLAN VIEW (CASE 2)
For Section B-B, Longitudinal Construction Joint
Bars 5B @ 9" Max. (Bottom of Slab)
* Detail and Approach Slab Details see Sheet 2.
NOTE: Bars 5C are required as shown when either the
Dim. L2 = 30'-0" Min. 32" or 42" F-Shape Traffic Railings or the Traffic
Railing/Noise Wall are used at the edge of the
-134"
-0"
)
M in.
1'
1'
1'
(
9"
45°
Optional Base
Construction Joint
4" Cover (except (See Note 7) 2 Layers of 30 Lb. Smooth
2" Cover
Bars 5A1 Permitted
2" over wall panels) Roofing Paper
(Typ.)
02 PM
Bars 5B (Top
55:
3" M in.
Bars 5B Bridge
W all
* Bars 5C
Coping)
* Bars 5C Deck
Retaining Wall Coping
-0" (
SECTION B-B
±
(as Reqd.)
-1"
Beam or
APPROACH SLAB WITH MEDIAN TRAFFIC RAILING ƀ " Thick Expanded
1'
2'
9"
Expanded Polystyrene Girder
45° Polystyrene
shown hatched (3" top
3"
Cheekwall
Traffic Railing (Type varies, & ƀ " each side)
D Face of Retaining Wall
32" F-Shape shown)
Retaining Wall (See Wall
** 5ƀ " (Min.) 5ƀ " (Min. thickness) lug on End 6"
Sheets for Details) Front Face
Pedestrian/Bicycle Bent to retain and conceal
Optional Base 6ƀ " of Backwall
Const. Joint Const. Joint Railing ** edge of Retaining Wall
Asphalt Overlay (See Sheet 1, Note 7) Actual location & width
Required Required Back Face of
vary depending on type
10ƀ " ± 6" ** Backwall
of Retaining Wall used
SECTION THRU APPROACH SLAB VIEW D-D AT BEGIN OR END BRIDGE (BEAM
AND RETAINING WALL BRIDGE SHOWN, FLAT SLAB BRIDGE SIMILAR)
Raised Sidewalk (geometry & reinforcement varies, 32" Vertical 3" Min. CROSS REFERENCES:
Coping
-0"
Coping
-3"
to match superstructure sheets) Shape shown)
Const. Joint 1'-9" Min.
2'
2'
Bars 5A1 For location of Section B-B and Longitudinal
Required lap Reqd.
Construction Joint see Sheet 1.
Asphalt Overlay
3"
ƀ" Preformed