WEEKLY CONSTRUCTION PROGRESS REPORT

No.: 07
Contractor: Amecor Construction Corporation Project: Floridablanca Enviro Park Project
Type of Work: Landfill Location: Lots 85,124 and 336 Brgy. Pabanlag
Week Ending: December 28,2019 Floridablanca, Pampanga
EW

K
7
E
1.1 Workers Accommodation (Barracks) 1. Temporary Facilities

100%
100%
1.4 Site Office (Amecor’s) 1.3 Comfort Rooms 1.2 Water Access (Deepwell)

100% 100% 100%


2.2 Survey 2.1 Excavation 2. Construction of Bridge A
1.5 Amecor Site Warehouse (Container Van)

33% 25% 24.5 % 100%


2.4 Form Fabrication 2.3 Rebar Fabrication

20%
20%
Prepared By: Approved By:

Engr. Julie Fe Taluban ___________________________


Quantity Surveyor