You are on page 1of 5

REPORT ON QUARRY WORKS

LEASEHOLD VALIDITY OF PERMISSIBLE AVAILABILITY OF EQUIPMENTS& STAFF REQURED FOR PRESENT STATUS OF AVAILABLE
QUARRIE AREA LEASE RATE OF RESERVE PRODUCTION OF 1000MT PER DAY EQUIPMENTS
S↓ MINING
SHIV QUARRY 02 Hec. 05.06.2013 20000 Core-bore data is not EXCAVATOR 04 for development, EXCAVATOR 02
Renewal has MT/month available. MDPL had segregation, loading & breaking DRILLING MACHINE 01 (Hired
been done. given tentative date for DRILLING MACHINE 02 for development & when required & demanded)
Some issues 33 Trips/day. it till 30th Sept but still production DUMPERS 02
with mining (@20 MT/day not initiated. From DUMPERS 03 for stockpiling & OB removal. WATER TANKER 00
dept. Royalty is 30days/month visual inspection upto WATER TANKER 01 SUPERVISING STAFF 02
being ) 2 lakhs MT may be SUPERVISING STAFF 05 SAFETY PERSON 00
generated. estimated. SAFETY PERSON 01
SAHYOG 02 Hec. 11.10.2035 700 MT/Month Core-bore data is not EXCAVATOR 04 for development, EXCAVATOR 02
INDUSTRIES available.From visual segregation, loading & breaking DRILLING MACHINE 01
QUARRY 1 Trip/day inspection upto 2 lakhs DRILLING MACHINE 02 for development & DUMPERS 02
MT may be estimated production WATER TANKER 00
DUMPERS 03 for stockpiling & OB removal. SUPERVISING STAFF 02
WATER TANKER 01 SAFETY PERSON 00
SUPERVISING STAFF 05
SAFETY PERSON 01
ASHAPURA 01 Hec. 14.02.2010 3000 Core-bore data is not EXCAVATOR 04 for development, EXCAVATOR 02
QUARRY Applicationdone MT/Month available. From visual segregation, loading & breaking DRILLING MACHINE 01 (Hired
for Renewal. inspection upto 1 lakhs DRILLING MACHINE 02 for development & when required & demanded)
Some issues MT may be estimated production DUMPERS 02
with mining DUMPERS 03 for stockpiling & OB removal. WATER TANKER 00
dept. Royalty is 5 Trips/day WATER TANKER 01 SUPERVISING STAFF 02
being SUPERVISING STAFF 05 SAFETY PERSON 00
generated. SAFETY PERSON 01
SITARAM 06.5002Hec 25.12.2036 16500 Approx. 20 lakhs MT. EXCAVATOR 04 for development, Not yet Approved, yet
QUARRY . MT/Month Core-bore data is segregation, loading & breaking transportation has been started
available. DRILLING MACHINE 02 for development & from 06.10.2018.
27 Trips/day production PQ is in code C, waiting for reply
DUMPERS 03 for stockpiling & OB removal. from contractor
WATER TANKER 01
Supervising staff 05
Safety person 01
HARESHBHAI 02 Hec. 01.07.2021 5000 Core-bore data is not EXCAVATOR 04 for development, Not yet started. Quarry is
NAJBHAI MT/Month available. From visual segregation, loading & breaking approved in code B
KHUMAN inspection upto 3 lakhs DRILLING MACHINE 02 for development &
(KATAR) 8 Trips/day MT may be estimated production
DUMPERS 03 for stockpiling & OB removal.
WATER TANKER 01
SUPERVISING STAFF 05
SAFETY PERSON 01
DHARSHAN Estimated 7 lakhs MT Approval Status ‘C’.
QUARRY Revision-1 Documents awaited.

HEMAL QUARRY Estimated 15 lakhs MT Not approved yet.


Documents awaited.

ROYAL QUARRY Estimated 7 lakhs MT Not approved yet.


Documents awaited.

BHAVNAGAR Estimated 3.5 lakhs MT Location :Stack yard is located inside Juna Not approved yet.
STACKYARD Port. Documents awaited.
Stack Details : As per stack inspection it has
been observed that it is a non segregated
Stack,hence segregation to de done prior
loading.
Tide :HT:10.3 & LT:1.3 Avg.
Segregation: Excavators – 04 nos and
Dumper : 02
Loadout point: Vessel capacity of
2000MT,only on vessel can be cast alongside
for loading.Dumpers used for loading should
be in a range of 10 to 15 nos to complete
loading with in 5 to 6 hrs.
Navigation :From Bhavnagar port (Juna
Bandar) to Jafrabad is 87nm,Hence if the
vessel heading speed is 8Knots then the
number of days at sea will be 0.5.
No of barge required is 02 nos for 4000MT
output.
Estimated 3 lakhs MT Location :Stack yard is located inside Alang Not approved yet.
GHOGHA Marine Limted. Documents awaited.
STACKYARD Stack Details : As per stack inspection it has
been observed that there are two grade of
stack pile.
a. Under layer – It has been observed
that approximately 4 to 5% of
laterite , weathered & Pre-matured
stones mixed with basalt rocks.
b. Quarry Run – It is a non segregated
stack and fine content is high,hence
segregation to be done prior
transportation.

Tide :HT:10.3 & LT:1.3 Avg.


Segregation: Excavators – 03 nos and
Dumper : 02
Loadout point:
a. Load out point is under the process
of construction.
b. Vessel capacity of 2000MT,only on
vessel can be cast alongside for
loading.Dumpers used for loading
should be in a range of 10 to 15 nos
to complete loading with in 5 to 6
hrs.
Navigation :From Ghogha (Alang Marine
Limited) to Jafrabad is 90nm,Hence if the
vessel heading speed is 8Knots then the
number of days at sea will be 0.55.
No of barge required is 02 nos for 4000MT
output.
TOTAL
ESTIMATED 63.5 lakhs MT
QNTY.

MAJOR CONCERNS:
 Quarries are not running in planned way to produce required quantity of rock per day. A monthly weekly and daily plan needs to be prepared and
implemented to achieve at least a daily production of 1000 MT/day from each quarry.
 At least 03 faces needs to be opened in order to plan a blast every day in each quarry. For this O/B removal work needs to be accelerated.
 Stock piling is not being done in proper way which is resulting transportation stop every now-a-days in all quarries.
 Haul road condition in Ashapura Quarry is not good (high gradient), thus in spite of very good quality rock raising of material is slow, it needs
tomaintained.
 More Quarries needs to be started in order to achieve required quantity.
 Contractor needs to keep at least one mining professional in each quarry in order to plan & execute the work in proper way. At present only 02
mining professional is available.

ROCK QUALITY:
 SHIV QUARRY – Rock quality is not even and very good hence much time&energy is being consumed in segregation. Rock seam being quite
fractured, due to which armour production is not possible, only core rock (0.1-500kg) is possible.
 SAHYOG QUARRY – Rock quality is quite good but seam is fractureddue to which armour production is not possible, only core rock (0.1-500kg) is
possible.
 ASHAPURA INDUSTRIES QUARRY- Rock quality is very good having columnar joints at wide spacing, hence good for armour production. And
remaining can be used as core rock (0.1-500kg).
 HARESHBHAI NAJBHAI KHUMAN QUARRY – Rock quality is very good, both armour and core rock (0.1-500kg) may be planned from this quarry.
 SITARAM QUARRY - Rock quality is very good, both armour and core rock(0.1-500kg) may be planned from this quarry.

You might also like