STRUCTURE KDC RHS By: Abhinav Sheet no.

Design of Shear Reinforcement of Pile


ULS

Force-X Force-Y Force-Z Moment- Moment- Moment- Horizontal


L/C Mton Mton Mton X MTon-m Y MTon-m Z MTon-m Resultant
Max Horz 1003 4.609 346.065 -12.281 -49.537 -1.696 -13.747 13.12

Shear Force Vu = 13.12 Mton


Pile Dia = 800 mm
Equivalent Square = √(0.7854 x 8002)
= 709 mm

Nominal Shear Stress, τv = Vu/bd


4
= 13.117387 x 10
709 x (709-60)

= 0.29 N/mm2

From Table 19 IS 456 from Table 19 IS 456


For 50% pt requirement i.e. 50% of 1.00 % pt τc (M35)
= 0.50 % 0.25 0.37
for M 35 0.5 0.5
τc = 0.500 N/mm2 N/mm2
∵ τc > τv
Shear Reinforcement NOT Required

Shear to be carried by = Vu - τcbd


shear reinforcement = -9.90 Mton

For 2 legged 10mm Dia Ties


Asv = 157 mm2
for spacing 150 mm c/c
Strength, Vus = 0.87fy x Asv x d
sv

= 29.5 Mton
∵ Strength is > Shear to be carried

Provide 10mm Dia @ 150 c/c

19-06-20