You are on page 1of 9

Summary

Code Description Materials Labor Equipment Subcontract Total


01-000 General Requirements
01-300 Supervision
01-500 Temporary Utilities
01-510 Temporary Phone
01-520 Temporary Facilities
01-700 Cleanup
02-000 EXISTING CONDITIONS
02-400 Demolition
03-000 CONCRETE
03-200 Rebar
03-300 Footing and Foundation-Labor
03-310 Footing and Foundation-Concrete
03-320 Slab/Floor-Labor
03-330 Slab/Floor-Concrete
03-340 Concrete Pump
03-400 Pre-cast Concrete
03-500 Light-weight Concrete
04-000 MASONRY
04-200 Masonry
05-000 METALS
05-100 Structural Steel
05-200 Joist and Deck
05-500 Metal Fabrications
05-900 Erection
06-000 WOOD, PLASTICS, AND COMPOSITES
06-100 Rough Carpentry
06-110 Lumber
06-120 Trusses
06-200 Finish Carpentry
06-210 Wood Trim
06-400 Cabinetry and Counter Tops
06-410 Counter Tops
07-000 THERMAL AND MOISTURE PROTECTION
07-100 Waterproofing
07-200 Insulation
07-210 Rigid Insulation
07-220 Stucco
07-400 Siding
07-500 Roofing
07-600 Sheet Metal
07-700 Roof Specialties
07-710 Rain Gutters
07-800 Fireproofing
07-900 Caulking and Sealants
08-000 OPENINGS
08-100 Metal Doors and Frames
08-110 Wood Doors
08-300 Overhead Doors
08-400 Store Fronts
08-500 Windows
08-700 Hardware
08-800 Glass and Glazing

10/21/2020 11:07:22 1 of 9 Prepared by:__________


file:///conversion/tmp/scratch/495871241.xlsx Checked by:__________
Summary

Code Description Materials Labor Equipment Subcontract Total


09-000 FINISHES
09-200 Drywall
09-210 Metal Studs
09-300 Ceramic Tile
09-500 Acoustic Ceilings
09-600 Flooring
09-700 Wall Coverings
09-900 Paint
10-000 SPECIALTIES
10-100 Signage
10-200 Toilet Partitions
10-210 Toilet and Bath Accessories
10-400 Fire Extinguishers and Cabinets
11-000 EQUIPMENT
11-300 Appliances
12-000 FURNISHINGS
12-200 Window Treatments
14-000 CONVEYING EQUIPMENT
14-200 Elevators
21-000 FIRE SUPPRESSION
21-100 Fire Sprinklers
22-000 PLUMBING
22-100 Plumbing
23-000 HVAC
23-100 HVAC
26-000 ELECTRICAL
26-100 Electrical
27-000 COMMUNICATIONS
27-100 Communications
31-000 EARTHWORK
31-100 Clearing and Grubbing
31-200 Grading and Excavation
32-000 EXTERIOR IMPROVEMENTS
32-100 Asphalt
32-110 Site Concrete-Labor
32-120 Site Concrete-Concrete
32-130 Rebar
32-300 Fencing
32-310 Retaining Walls
32-320 Dumpster Enclosures
32-330 Signage
32-340 Outside Lighting
32-900 Landscaping
33-000 UTILITIES
33-100 Water Line
33-300 Sanitary Sewer
33-400 Storm Drain
33-500 Gas Lines
33-700 Power Lines
33-800 Telephone Lines
SUBTOTAL
Building Permit
Bond
SUBTOTAL
Profit and Overhead Markup
Profit and Overhead
TOTAL

10/21/2020 11:07:22 2 of 9 Prepared by:__________


file:///conversion/tmp/scratch/495871241.xlsx Checked by:__________
Detail

MATERIALS LABOR EQUIPMENT


ITEM QUANTITY $/UNIT COST LHR/UNIT LHR $/LHR COST $/LHR COST Total

10/21/2020 11:07:22 3 of 9 Prepared by: __________


file:///conversion/tmp/scratch/495871241.xlsx Checked by: __________
COUNTED ITEMS

Distance = 4 Make sure that the units of Distance and


INPUT Note:
Spacing = 1 Spacing are the same

<1> Number of Counted Items = 5 g 5 pcs


<2> Number of Counted Items = 4 g 4 pcs
<3> Number of Counted Items = 3 g 3 pcs

Note:
<1> Includes a repetitive member at both ends
<2> If a repetitive member is only needed at one end
<3> If a repetitive member is not needed at either end

LINEAR COMPONENTS

Length = 240 Note: Make sure that the units are the same
INPUT Lengthpiece = 20
Lap = 1.5

<1> Number = 12 g 12 pcs


<2> Number = 12.97297 g 13 pcs

Note:
<1> Butt-jointed pieces
<2> Lapped pieces
SHEET AND ROLL GOODS

AREA METHOD

Area = 400 Note: Make sure that the units are consistent
Size of the Length = 15.625
piece Width = 7.625
INPUT LapLength = 0.4
If Lapped
LapWidth = 0.4
SpaceLength = 0.5
If Spaced
SpaceWidth = 0.5

<1> Number of pieces needed = 3.357377 g 4 pcs


<2> Number of pieces needed = 3.636343 g 4 pcs
<3> Number of pieces needed = 3.053071 g 4 pcs

Note:
Consider the Block Layout in
<1> Butt-jointed pieces Note: order to identify the required
<2> Lapped pieces pieces
<3> Spaced pieces

ROW & COLUMN METHOD

Height = 8 Note: Make sure that the units are consistent


Length = 50
Heightpiece = 7.625
INPUT Lengthpiece = 15.625

Lap = 0.4
Space = 0.5

<1> Number of pieces needed = 3.357377 g 4 pcs


<2> Number of pieces needed = 3.636343 g 4 pcs
<3> Number of pieces needed = 3.053071 g 4 pcs

Note:
<1> Butt-jointed pieces
<2> Lapped pieces
<3> Spaced pieces

WASTE

Quantity = 135.8
INPUT
Waste % = 10

Quantity 149.38 g 150


with waste

Quantity without waste = 123.5


INPUT
Quantity with waste = 138

Waste % = 11.740890688 g 12 %
units are consistent
Spread Footing Continuous Footing
No. of Footings 10 ea Length 108 ft
Width 1 3 ft 6 in
2 in Width 2 ft
Width 2 3 ft 6 in
2 in Thickness 1 ft
Thickness 1 ft - in
- in Concrete Waste 8 %
Concrete Waste 10 % Volume 10.85 cyd
Forms 126.67 ft
Volume 4.09 cyd

Rectangular Column Round Column


No. of Columns 10 ea No. of Columns 10 ea
Width 1 - ft Width 1 - ft
16 in 16 in
Width 2 - ft Height 8 ft
16 in Concrete Waste 5 %
Height 8 ft Volume 4.34 cyd
Concrete Waste 5 %
Forms 426.67 sft
Volume 5.53 cyd

Foundation Wall
Length 110 ft
4 in
Width - ft
8 in
Height 8 ft
- in
Concrete Waste 5 %
Volume 22.88 cyd

Slab on Grade with Rebar Wire Mesh-Reinforced Slab on Grade


Slab Length 100 ft Slab Length 100 ft
Slab Width 40 ft Slab Width 40 ft
Slab Thickness 4 in Slab Thickness 4 in
Waste 12 % Waste 12 %
Bar Spacing 18 in Wire Mesh Length 150 ft
Bar Size 4 # Wire Mesh Width 5 ft
Bar Length 20 ft Wire Mesh Lap 6 in
Lap 36 # of dia.
Area 4000 sft
Area 4000 sft Volume 55.31 cyd
Volume 55.31 cyd Wire Mesh 7 each
No. of Bars 299 each