Dayshift Activities (10-Jan.2018)
Dayshift Activities (10-Jan.2018)
CPF
Site personnel:-
1.4Fula Field
1.4.1 Site Personnel:
Fula Field:-
Moga FPF:
1.1 Site Personnel:
1.3.3 Field:
1.3.4 Field personnel:
1. Routine check for all production wells and OGMs has been done.
2. Tested M33-4 and M17.
3. Drained sand traps of OGM 3&5 and reclaimed oil by vacuum to CPF.
AGR Activities:
Name Company Position
Dayshift Personnel
Abdelmunem Alamin P.E AGR Operator
Night shift
Ehab Abdelftah Khalifa P.E AGR Operator
1. Patrol check for engines, vessels and compressors has been done, monitor & record
its parameters.
2. Unit A (PK-2409A) stopped on Feb.03, 2015 due to compressor 2nd stage
piston damage.
3. Unit B (PK-2409B) running normal.
4. Stopped unit B on Jan.09 for routine maintenance (on going).
FNE FPF
1Site Personnel:
Name Company Position
Dayshift Personnel
Nightshift Personnel
1. Patrol check for production facilities has been done, monitor & record its
parameters.
2. Drained sedimentation tanks TK-8201-A, TK-8201B & storage tank for 2Hrs.
3. Reclaimed oil from retention pond.
4. Tested FNE-8.
5. Cleaned sewage pit by vacuum truck.
6. Housekeeping inside FPF.
Tanks Level:
2.0 Field:-
2.1 Field personnel:
Dayshift Personnel
Nightshift Personnel
1. Routine check for all production wells and OGMs has been done.
2. Shut in FNE-7 from 08:00 to 14:00 due to low Pump submergence.
3. Shut in FNE-42 from 08:00 to 20:00 due to low Pump submergence.
4. FNE-128 shut-in at 09:00 due to motor abnormal noise.
5. Increased frequency of 4 wells at 15:00.
6. Cooperated with DCS staff to detect cable of FNE-104.
7. Reclaimed oil from FNE-16 unloading pit.
8. Tighten stuffing box for some wells.
9. Updated parameters for some wells.
3.2 Sand
Clean Activities:
Jake FPF
Site Personnel:-
Field Activities:-
1. Alwathig Mohammed P.E Field Operator
Nightshift Personnel
Mohammed Issa P.E Field Operator
3. JAKE AGR:-
3.1 Site Personnel:-
KEYI FPF
1.1Site Personnel:-
Name Company Position
Dayshift Personnel
1.2
Sirag Omer P.E FPF Foreman
Saad Abdelazem P.E FPF Operator
Yousif Ahmed P.E FPF Operator
Nightshift Personnel
Mohammed Mahdi P.E FPF Foreman
Assad Almosalami P.E FPF Operator
Ahmed Hassan P.E FPF Operator
Ongoing Operations and Evaluation:
1.3 Day Activities:
1. Patrol check for all FPF equipment’s has been done.
2. Continue draining water from Storage Tank TK-6501A&B.
3. Cooperated with DCS staff to solve the water outlet control valve problem of first
separator V-6201-A (ongoing).
1 Patrol check for engines, vessels and compressors has been done, monitor& record
parameters.
2 Added hydraulic oil to Unit B&C.
5 Unit A stopped.
Engine No. Running Status Outlet Pressure (Mpa) AV-Flow rate (m3/hr.)
A Stopped - -
B Standby - -
C Running 7.7 5456
Total Flow rate (m3/hr.) 5456
Remark
Vehicle Quantity Company Job Description Work Time Standby Time Remarks
Vacuum 1 ZPEB Reclaimed oil from retention pond. 2 Hrs
Truck
1.5HADIDA FPF :-
Site Personnel:-
Dayshift Personnel
Faroug Abuagla P.E Operation Supervisor
Muaz Awad P.E FPF Foreman
Omer Osman P.E CR Operator
Ahmed Ali Obaid P.E Field Operator
Abdalla Omer P.E FPF Operator
Nightshift Personnel
Alamin Awad P.E FPF Foreman
Ahmed Ali P.E FPF Operator
Farah Nasir P.E FPF Operator
Hosam Musa P.E FPF Operator
Field:
1. Patrol check for all production wells has been done.
2. Cooperated with mechanic staff to add lube oil for H3-3 well drive head.
3. Tested H-1.
1. Patrol check has been done, monitor & record the parameter.
2. Mud pumps- A runing for 3 hrs & B stand by.
3. Cooperated with mechanic staff to repair the leakage of air line supply to engine
of mud pump B.
Sufyan FPF
Site Personnel:-