You are on page 1of 14

DAY SHIFT ACTIVITY& PERFORMANCE REPORT

FULA CPF, MOGA, FNE, JAKE, KEYI, HADIDA& Sufyan EPF


Date: Jan,10,2018
Report Number: 10,01,2018
Report Prepared By: Ahmed Tajeldin
Report Approved by: Amir Hamad

CPF
Site personnel:-

Name Company Position


Dayshift Personnel
Malik Siddig P.E CPF Supervisor
Abdelrahman Hussein P.E Operation Coordinator
Amir Hamad P.E CPF Foreman
Esmail Elshafie P.E CPF S. Operator
Ahmed Tajeldin P.E CPF C.R Operator
Mutaz Abdalmonim P.E CPF C.R Operator
Khalid Tajeldin P.E CPF Operator
Eltahir Okasha P.E CPF Operator
Ahmed Mohamed Ali P.E CPF Operator
Mohamed Elshami P.E CPF Operator
Nightshift Personnel
Almaki Hamid P.E CPF Foreman
Bashir Abdalla P.E CPF C.R Operator
Anwar Mohammed P.E CPF C.R Operator
Siddig Abdelrahman P.E CPF Operator
Hassan Elmogtaba P.E CPF Operator
Ongoing Operations and Evaluation
CPF: Dayshift Activities
1. Patrol check for all production facilities has been done, monitor & record the parameters.
2. MOGA pig received and removed with good condition and 3 Kg sand.
3. Cooperate with mechanic crew to install new valve for sample of oil outlet TK-1201B.
4. Water drained from TK-1202/3, TK-1501/2/3/4/5/6 and TK-1507.
5. Average flow rate to CPF: 230Sm3/hr., PS#1 248Sm3/hr., BV2:120Sm3/hr.

Shipping Tanks level


TK-1507 (mm) TK-1506 (mm) TK-1505 (mm) TK-1504 (mm) TK-1503 (mm) TK-1502 (mm) TK-1501 (mm)

14127 6923 11422 10696 11672 11926 10210


Chemical and Heater Operation Activities:.
1. Routine check for all chemical pumps and heaters has been done.
2. Feed chemical:
1000 L RSA3952 to New Reverse Demulsifier
1000 L KT-1903 to Old Heavy Demulsifier
1000 L DCP3 to old light Demulsifier
3. Evaporation pond:
1. Reclaiming oil from retention pond by reclaim oil pump P-1602.
2. Reclaiming oil from evaporation pond NO#1 by E. pond pump.
Star Oil Ongoing Operations:-
1. Metering skid stream (A/B) online
Metering skid and line parameters:

Time Pressure (K Pa) Temperature (C°) Flow rate(m3/h) 1.7


CPF
06:00 119 37.0 20.549 AGR:
12:00 109 37.0 20.765
Site Personal
Dayshift Personnel
Name Company Position
Mohamed Hassan P.E AGR Operator
Wala Omer P.E AGR Operator
Nightshift Personnel
Ahmed Ali P.E AGR Operator
Waleed Mohamed P.E AGR Operator
Activities of AGR
1. Patrol check for engines, vessels and compressors have been done, monitor &
record its parameter.
2. Units A, B& C are running normally.
CPF AGR daily running and performance report:
AGR Units Running (hr) Outlet Pressure (Mpa) Flow Rate (m3/hr.)
1409-A 15 7.14 3689
1409-B 15 7.14 3768
1409-C 15 7.14 4165
Natural Gas treatment Package Outlet Pressure (Mpa) Total Flow Rate
1420-A Not lined up - -
1420-B Stopped - -
FNE 4.04 0
Total Outlet Gas Volume (m3)
174326

1.4Fula Field
1.4.1 Site Personnel:

Name Company Position


Dayshift Personnel
Abdoelrahim
P.E Field Foreman
Mohammed
Fakery Mohammed P.E Field Operator
Mohamed Hamid P.E Field Operator
Yasir Fathelrhman P.E Field Operator
Nightshift Personnel
Abdorhman G.Alden P.E Field Foreman
Salah Gadelrab P.E Field Operator

Fula Field:-

1. Patrol check has been done normal and carefully.


2. Restarted FN-158 after finish work over at 10:00.
3. Shut-in FN-108 due to belt broken at 14:00.
4. Re –open WI#90 due to instruction at 15:00.
Reclaim oil of three wells by vacuum truck

Moga FPF:
1.1 Site Personnel:

Name Company Position


Dayshift Personnel
Mohammed Elkhalifa P.E FPF Foreman
Khatim Abdalla P.E C.R Operator
Mohammed Hashim P.E FPF Operator
Elrafie Eltigani P.E FPF Operator
Nightshift Personnel
Moawia Mohammed P.E FPF Foreman
Momen Mohammed P.E C.R Operator
Hassan Eltoum P.E FPF Operator

1.2 Ongoing Operations and Evaluation


1.3 Day Shift Activities
1.3.1 FPF
1. Patrol check for all production facilities has been done, monitor & record the
parameter.
2. Cooperated with DCS team to check and repair monitor system.
3. Cleaned around FPF.
Surge tank level: 3.5m.
Average transit line pressure: 0. 55Mpa
Average transit line flow rate: 44m3/h

1.3.3 Field:
1.3.4 Field personnel:

Name Company Position


Dayshift Personnel
Ibrahim Mohamed P.E Field Operator
Alamin Altayib P.E Field Operator
Nightshift Personnel
Abdelkarim Osman P.E Field Operator

1. Routine check for all production wells and OGMs has been done.
2. Tested M33-4 and M17.
3. Drained sand traps of OGM 3&5 and reclaimed oil by vacuum to CPF.

AGR Activities:
Name Company Position
Dayshift Personnel
Abdelmunem Alamin P.E AGR Operator
Night shift
Ehab Abdelftah Khalifa P.E AGR Operator

1. Patrol check for engines, vessels and compressors has been done, monitor & record
its parameters.
2. Unit A (PK-2409A) stopped on Feb.03, 2015 due to compressor 2nd stage
piston damage.
3. Unit B (PK-2409B) running normal.
4. Stopped unit B on Jan.09 for routine maintenance (on going).

FNE FPF
1Site Personnel:
Name Company Position
Dayshift Personnel

Mohammed Khidir P.E FPF Foreman

Mohamed Mahjoub P.E CR Operator


Ali Abdalla P.E FPF Operator

Nightshift Personnel

Rashid Mahdi P.E FPF Foreman

Osama Eltahir P.E FPF Operator

Mirghani Belal P.E FPF Operator

1.2 FPF Activities:

1. Patrol check for production facilities has been done, monitor & record its
parameters.
2. Drained sedimentation tanks TK-8201-A, TK-8201B & storage tank for 2Hrs.
3. Reclaimed oil from retention pond.
4. Tested FNE-8.
5. Cleaned sewage pit by vacuum truck.
6. Housekeeping inside FPF.

Tanks Level:

TK-8201-A TK-8201-B TK-8477


15493 mm 15005 mm 5594mm

2.0 Field:-
2.1 Field personnel:

Mohammed Alaa P.E Field Operator


Name Company Position
Gorashi Ahmed P.E Field Operator

Dayshift Personnel
Nightshift Personnel

Abu Obaida Basheer P.E Field Operator

Nimir Abdalsalam P.E Field Operator


2.2 Field Activities:

1. Routine check for all production wells and OGMs has been done.
2. Shut in FNE-7 from 08:00 to 14:00 due to low Pump submergence.
3. Shut in FNE-42 from 08:00 to 20:00 due to low Pump submergence.
4. FNE-128 shut-in at 09:00 due to motor abnormal noise.
5. Increased frequency of 4 wells at 15:00.
6. Cooperated with DCS staff to detect cable of FNE-104.
7. Reclaimed oil from FNE-16 unloading pit.
8. Tighten stuffing box for some wells.
9. Updated parameters for some wells.

3.0 Sand Cleaning


3.1 Sand Cleaning Personnel:

Name Company Position


Sand cleaning Personnel

Mohammed Ahmed Bakheet P.E Sand clean Operator

Ahmed Awadelkreem P.E Sand clean Operator

3.2 Sand
Clean Activities:

1. Flushed OGM-9 Trunk line by pumped hot water.

Jake FPF
Site Personnel:-

Name Company Position


Dayshift Personnel
Mohammed Operation
P.E
Abdalla Supervisor
Hussien Hassan P.E FPF Foreman
Subhi Amin P.E FPF Operator
Emad Ibrahim P.E C.R Operator
Ezzeldin Hamid P.E FPF Operator
Nightshift Personnel
Mohammed Mahmoud P.E FPF Foreman
Osama Yahya P.E FPF Operator
Mohammed Fawzi P.E FPF Operator
1.2 Ongoing Operations and Evaluation
FPF Activities:-
1. Patrol check for production facilities has been done.
2. Fed 1000 kg of DCP-3.
3. Cooperated with maintenance team to as following:
 Repair to reset fault alarm in heater unit (A) P-7971-H-1(under
monitoring).
4. Average flow rate to FPF 65.20 M³/hr. and to CPF 61.93 M³/hr.
Storage Tank parameter:-.

Tank Number Level (M) Temp (˚C)


TK-7501 7.8 62
2. Field:-
2.1 Site personnel:-

Field Activities:-
1. Alwathig Mohammed P.E Field Operator
Nightshift Personnel
Mohammed Issa P.E Field Operator

Routine check for all production wells has been done.


2. Stopped MP gas injection to JS-15 at 06:30 and started N2 lifting by (&
PSNI#2).
3. Continue N2 injection for JS-18 by (PSNI#1).
4. Continue N2 injection for JS-19 by (PSNI#3).
5. Cooperated with Ram company to install Cathodic protection for JS-38 flow
line (ongoing)

Wells parameters (HP, MP& N2)


No. TP CP FLP T Choke Open Gas Close Gas Daily Injectio
(Mpa) (Mpa) (Mpa (˚C) Size Injection Injection injectio n Type
) (mm) Total (m3) Total n And
(15:00) (m3) (M3) AGR
(15:00) (HP
,MP or
N2)
JS-1 9.1 N/A 0.83 64 50/50 97514650 97579090 64440 MP
JS-2 1.1 N/A 1.05 52 50 MP
JS-3 1.3 5.1 0.85 70 50 MP
JS-4 7.7 1.2 0.91 65 50 MP
JS-10 N/A N/A 1.25 63 50/50 76243080 76339590 96510 MP
JS-14 1.2 N/A 0.85 73 50
JS-15 1.4 N/A 1.15 60 50 35061690 - - N2
JS-22 8.4 N/A
JS-26 1.5 1.05 0.75 56 50 MP
JS-28 1.5 9 1.1 62 50 MP
JS-35 7.8 0.9 1.1 66 40 30379710 30441700 61990 MP
JS-29 0.95 4.5 0.9 37

3. JAKE AGR:-
3.1 Site Personnel:-

Name Company Position


Dayshift Personnel
Albarra Almubarak P.E AGR Operator
Mohamed Dalil P.E AGR Operator
Nightshift Personnel
Altayeb Ibrahim P.E AGR Operator
Almukashfi Karrar P.E AGR Operator

3.2 Jake M.P AGR Performance Report:-


Activities:-
1. Patrol check for engines, vessels and compressors has been done, monitor &
record its parameter.
2. Unit (C) stopped at 06:30 due to serious leakage in PSV Line.
3. Unit (A) tripped at 08:30 due to detonation cylinder#1 and restarted at 09:00.
4. Cooperated with mechanic team to replace the packing seal parts for AGR unit
(B) compressor stages. (Ongoing).
5. Units (A & D) running normally.

Engine No. Running Status Outlet Pressure Average Flow


(Mpa) Rate(m3/h)
PK-7402-A Running 10.9 7568
PK-7402-B Stopped - -
PK-7402-C Stopped - -
PK-7402-D Running 10.9 6802
Total Flow Rate 14370

3.3 Jake H.P AGR:


Activities:-
1. HP units (A&B) stopped for maintenance due to malfunctions.
2. Handover AGR unit (B) to contractor for 16000hrs (engine) routine
maintenance, (ongoing).

Engine Running Outlet Pressure Suction Average


No. Status (Mpa) (Mpa) Rate(m3/hr)
PK7403- Stopped - -
-
A
PK7403- Stopped - -
-
B
Total Flow Rate -

4. Reclaim System and retention pond progress:-


1. Level at evaporation pond#1 approximately 90%.

KEYI FPF
1.1Site Personnel:-
Name Company Position
Dayshift Personnel
1.2
Sirag Omer P.E FPF Foreman
Saad Abdelazem          P.E FPF Operator
Yousif Ahmed P.E FPF Operator
Nightshift Personnel
Mohammed Mahdi P.E FPF Foreman
Assad Almosalami P.E FPF Operator
Ahmed Hassan P.E FPF Operator
Ongoing Operations and Evaluation:
1.3 Day Activities:
1. Patrol check for all FPF equipment’s has been done.
2. Continue draining water from Storage Tank TK-6501A&B.

3. Cooperated with DCS staff to solve the water outlet control valve problem of first
separator V-6201-A (ongoing).

4. Reclaimed oil from retention pond by vacuum truck.


1.4 .Tanks level:

Tank Number Level (m) Temp. (˚C)


TK-6501-A 9.8 65
1.
TK-6501-B 7.5 56 Field:
2.1. Site
Total Flow rate to CPF (m3/hr.) 32 m3/h
Personnel:

Day shift Personnel


Name Company Position
Faiz Elsidig P.E Field Operator
Night shift Personnel
Name Company Position
2.2. Day
Wail Abbas P.E Field Operator
Activities:
1. Routine check for all wells & OGMs has been done.
2. Checked status of ESDV’s for Gas lifting wells & OGMs.
3. Cooperated with Petro need staff for flow line of K-N-11 Radiography test from 12:00 to
13:00 (done).
4. Cooperated with Viacom staff to terminate the power cable of K-N-4.
5. Cooperated with DCS staff to install new pressure switch, tubing & flow line pressure
gauges for K-N-4.
6. Released the casing pressure of K-N-4 & K-N-7 to zero.
7. Shut in K-S-03 due to no production at 15:30.
2. AGR:
3.1 Site Personnel:

Name Company Position


Day shift Personnel
Ahmed Hassan P.E AGR Operator
Telal Hussein P.E AGR Operator
Night shift Personnel
3.2 Day Activities:
Omer Mohamed P.E AGR Operator

1 Patrol check for engines, vessels and compressors has been done, monitor& record
parameters.
2 Added hydraulic oil to Unit B&C.

3 Unit C is running normally.

4 Unit B under maintenance.

5 Unit A stopped.

5.1 Units Performance:

Engine No. Running Status Outlet Pressure (Mpa) AV-Flow rate (m3/hr.)

A Stopped - -
B Standby - -
C Running 7.7 5456
Total Flow rate (m3/hr.) 5456

Remark

3. Vehicles & Utilities:

Vehicle Quantity Company Job Description Work Time Standby Time Remarks
Vacuum 1 ZPEB Reclaimed oil from retention pond. 2 Hrs
Truck

1.5HADIDA FPF :-
Site Personnel:-

Name Company Position

Dayshift Personnel
Faroug Abuagla P.E Operation Supervisor
Muaz Awad P.E FPF Foreman
Omer Osman P.E CR Operator
Ahmed Ali Obaid P.E Field Operator
Abdalla Omer P.E FPF Operator

Nightshift Personnel
Alamin Awad P.E FPF Foreman
Ahmed Ali P.E FPF Operator
Farah Nasir P.E FPF Operator
Hosam Musa P.E FPF Operator

1.2 Ongoing Operations and Evaluation


1.3 Day shift Activities
FPF:
1. Patrol check for all production facilities has been done, monitor & record the
parameters.
2. Continue draining bottom water from storage tanks.
3. Water injection pump running for 24 hrs.
4. Centrifugal pump P-4501B running for 24 hrs.
5. Screw pump P-4501C stand by.
6. Clean and cut the dried bushes inside and around FPF (ongoing).

Storage tank level A:6.08m. B:6.28m.

Transit line pressure 3569Kpa


Average flow rate 78m3/h

Field:
1. Patrol check for all production wells has been done.
2. Cooperated with mechanic staff to add lube oil for H3-3 well drive head.
3. Tested H-1.

Mud Pump Activity

1. Patrol check has been done, monitor & record the parameter.
2. Mud pumps- A runing for 3 hrs & B stand by.
3. Cooperated with mechanic staff to repair the leakage of air line supply to engine
of mud pump B.
Sufyan FPF
Site Personnel:-

Name Company Position


Dayshift Personnel
Mohammed Nasr P.E Operation Supervisor
Mansour Eltoum P.E FPF Foreman
Asem Fatihalaleem P.E C.R Operator
Mohammed Alfatih P.E FPF Operator
Osman
Hosam Alden Ahmed P.E FPF Operator
Nightshift Personnel
Ayman Mohammed P.E FPF Foreman
Hassan Abaker P.E C.R Operator
Ali Mohamed Ali P.E FPF Operator
1.2
Ongoing Operations and Evaluation:
1.3 Day Shift Activities:
FPF:
1. Patrol check for all production facilities have been done, monitor & record the
parameters.
2. Drain the condensate from fuel gas scrubber (continuously).
3. Compressors 5921-A & 5921-B lube oil filled up by mechanical staff.
4. Air compressor shifted from PK-5921A to B.
5. 18m3 of hot water loaded from EPF to well site.
6. 18m3 of diesel Received from hadida warehouse.
7. Installed fence around sludge oil pit by mechanical staff.
8. Cooperated with DCS &PSI team to check & repair solenoid valve of dryer B
at instrument air compressor (ongoing).
1.4 Parameters:-

Storage tank level A:5.0m B: 5.0m


Transit line pressure 2500Kpa
Transit line temperature 70°C
Average flow rate 11.9m3/h
2.0 Field:
2.1 Field personnel:

Name Company Position


Dayshift Personnel

Omer Himadan P.E Field


Operator
Mohammed Bashir Khalid P.E Field
Operator
2.2 Activities:

1. Routine check for all production wells have been done.


2. Suf-N3 flow line flushed by hot water throw CNLC test separator.
3. Final graiding started in OGM-3 (on going).
4. OGM-2 singal screw transfer pump running normal in auto position
(under observation).
5. OGM-3 singal screw transfer pump running normal in auto position
(under observation).
6. Cooperate with RAM CO to repair the problems of OGM-2&3 test
separator (ongoing).

Transfer Pump parameters OGM-2 OGM-3 OGM-4


Suction Pressure 0.76 Mpa 0.90 Mpa 1.39Mpa
Discharge pressure 2.5Mpa 2.2Mpa 2.48 Mpa
Differential Pressure (DP) N/A - 0.01Mpa
Temp. 34°C 28°C 46°C
Set point 0.80 Mpa 0.9 Mpa 1.4 Mpa
Freq. 10 Hz 18 Hz 18.6Hz