You are on page 1of 4

Inspection and Test Plan (ITP) Rev.: 1.

0 Status: IFU

Document No.: Page: 1 of 4


BAZ-KSA-FOR-231

Project Name :

S/No Sample Submission


Activity People Review
Inspecti Requireme Each unit
Frequency As per
Acceptance Prior to
Stages Approved
Records
- Materials –In– on nt type Specification
Criteria Start Work Submission
- Equipments Charg Method Reference
- Tools e
1 - Pipes Submission (Site Drawing / Method Statement)
- Pumps
1.1 Drawings Review Each unit As per Prior to Approved
- Irrigation Parts
type Specification & Start Work Submission
- Spare Parts
Approved
Drawings
1.2 Method Statement Review Each unit As per Prior to Approved
type Specification Start Work Submission

1.3
Prepared By: Verified By: Approved By

Date: Date: Date:


Inspection and Test Plan (ITP) Rev.: 1.0 Status: IFU

Document No.: Page: 2 of 4


BAZ-KSA-FOR-231

S/No Activity People Inspection Requirement Frequency Acceptance Stages Records


–In– Method Reference Criteria
Charge
2 Incoming Material Inspection
2.1 Types of Material Delivered Visual / Each Delivery As per Prior to Delivery
Specifications Specification Start Document
Work

2.2 Storage and Handling of Material Visual / Each Delivery As per Prior to Delivery
Specifications Specification Start Document
Work

2.3 Selection of Material for Testing Visual / Testing Random As per Prior to Delivery
Selection Specification Start Document
Work

Prepared By: Verified By: Approved By

Date: Date: Date:


Inspection and Test Plan (ITP) Rev.: 1.0 Status: IFU

Document No.: Page: 3 of 4


BAZ-KSA-FOR-231

S/N Activity People Inspection Requirement Frequenc Acceptanc Stages Records


o –In– Method Reference y e Criteria
Charge
S/N Activity People Inspection Requirement Frequenc Acceptanc Stages Records
3 o –In– Method Preparation
Reference y e Criteria
3.1 Method of Installation Charge Visual / Each As per Prior to Start Approved
Specifications Location approved Work Submission
4 Installation submission
3.2 4.1 ApplyUpAggregate
Mock Unit Visual
Visual / / Each Each As per Prior to Before
As per Start Checklist
Approved
Specifications
Measurement Location approved
Location approved Work InstallationSubmission
submission
submission
3.3 4.2 Prepare
Surface Foundatuion
Preparation Check Visual
Visual / / Each Each As per
As per BeforeBefore Checklist
Checklist
Specifications
Measurement Delivery
LocationSpecification
approved Installation
Installation
submission
4.3 Lay Pipes Visual / Each As per Installation Checklist
3.4 Setting Out Check Visual /
Measurement EachLocation As perapproved Before Checklist
Measurement Location approved
submission Installation
submission
4.4 Install Irrigation System Visual / Each As per Installation Checklist
3.5 Cleanliness of Site Visual /
Measurement EachLocation As per
approved Before Checklist
Measurement Location approved
submission Installation
submission
4.5 Protection Visual / Each As per Installation Checklist
Prepared By: Verified By: Measurement LocationApproved By
approved
Date: Date: Date: submission
4.6 Install Skirting Visual / Each As per Installation Checklist
Measurement Location approved
submission
4.7 Quality Checks Visual / Each Unit As per Quality Checklist
Measurement Specificatio Check
n
Prepared By: Verified By: Approved By

Date: Date: Date:


Inspection and Test Plan (ITP) Rev.: 1.0 Status: IFU

Document No.: Page: 4 of 4


BAZ-KSA-FOR-231

You might also like