EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Receiving
Schedule “Q”
A1 Visually inspect all incoming material /equipment for damage.
Para 7.1 , Att. IV
Mixing plenum shall include baffles or other provisions to insure complete SAES-K-001
A7
mixing of outside and return air streams at all flow rates* Para 4.8.8.4
Casings shall include doors to provide maintenance and removal access SAES-K-001
A8
for all fans, motors, coils, filters, and humidifiers. Para 4.8.8.5
The entire AHU shall be minimum two inch, double wall construction.
Casing panels shall be fabricated with a minimum of G-90 galvanized SAES-K-001
B2
steel or aluminum with all necessary reinforcements to prevent pulsation Para 4.8.8.7 b
and bulging*
Page 1 of 3
AHU panels shall have galvanized steel with pre-painted backed enamel SAES-K-001
B3
finish or aluminum exterior skin and a solid aluminum inner lining.* Para 4.8.8.7 d
Page 2 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Air Handling Unit (AHU) Receiving, Handling, Storage and
SAIC-K-4004 15-Dec-09 HVAC
preservation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAES-K-001
B5 Casing panels shall be airtight without caulking.*
Para 4.8.8.7 d
SAES-K-001
B6 Insulation shall be secured with 100% coverage of waterproof adhesive.
Para 4.8.8.7 d
SAES-K-001
B7 Casing shall completely enclose all AHU components
Para 4.8.8.7 e
The AHU shall have a structural steel base with cross members
adequate to support all AHU components. The unit floor shall consist of SAES-K-001
B8
a minimum 18 gauge galvanized steel or 0.040" aluminum outer panel, Para 4.8.8.7 f
three inches of glass fiber insulation and a 0.063" aluminum inner panel*.
Drain pans shall extend completely under the coil sections and shall SAES-K-001
B9
have minimum 1-¼ inch threaded drain connections. Para 4.8.8.7 g
Drains pans shall be sealed, double wall steel construction with rigid SAES-K-001
B10
glass fiber insulation and Type 316 stainless steel inner pan*. Para 4.8.8.7 g
REMARKS:
REFERENCE DOCUMENTS:
1-Schedule "Q" -- Saudi Aramco Quality Requirements
Page 3 of 3