Professional Documents
Culture Documents
Saudi Aramco Inspection Checklist: Air Handling Unit (AHU) Installation SAIC-K-4005 15-Dec-09 Hvac
Saudi Aramco Inspection Checklist: Air Handling Unit (AHU) Installation SAIC-K-4005 15-Dec-09 Hvac
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Casings shall include doors to provide maintenance and removal access SAES-K-001
A8
for all fans, motors, coils, filters, and humidifiers. Para 4.8.8.5
REFERENCE DOCUMENTS:
Page 1 of 2
Quality Record Approved:
Name, Organization,
Name, Sign and Date:
Initials and Date:
Page 2 of 2