MATERIAL SUBMITTAL FORM

From: Arabian International Contracting Co. WLL To: Aluminium Bahrain B.S.C

Project Title: SPL processing facility external utility work Date: 17.10.2020

Previous Ref.No.: Approval required by: Immediate Ref. No. MS-MECH-0002-R0

We request approval of the following material to be used in the above works

Arch. Civil Structural Elec.

Piping Mech. Inst. B.S

1. Material Paint materials

2. Location to be used Natiural gas line & potable water line


s
3. Drawing ref. 100104-03036-7372-Cl-DW-0011

4. Manufacturer Berger Paints Bahrain WLL.

5. Local Supplier/Agent & Ph. No. Berger Paints Bahrain WLL.

6. Estimated delivery period 3 Days.

7. Estimated date required at site 05/11/2020

Datasheet
8. Enclosures Sample
Mock up
Contractor's Comments/ Signature
Ajay Sajeev

Client's Comment/ Signature

Approved Approved with comments Revise & Resubmit Rejected

Signature: Date:

Note: This approval does not relieve the Contractor of his contractual obligations and proper supervision of his works.