Item # Description Qty U.P. $ T.P. $


RINA Annual renewal surveys
RINA Annual Hull and Machinery surveys - Final price will be confirmed
1 1 2,750.00 2,750.00
once the survey date is set
Dry dock fees
Dry dock fees in La Marina Dbayeh for 7 days - Invoice should be settled
1 1 5,764.00 5,764.00
directly with La Marina Dbayeh
Bottom works
1 Antifouling (International Paint - Interspeed Ultra) in 2.5Ltrs Gallons 20 225.00 4,500.00
2 Primer (Interprotect) in 2.5Ltrs Gallons (please refer to remark no.2) 3 145.00 435.00
3 Metal t-coat (Petit) in 1 Kg Cans 2 85.00 170.00
4 Metal Primer (Petit) in 1 Kg Cans 2 85.00 170.00
5 Metal Antifouling (Petit) in 1 Kg Cans 4 85.00 340.00
Labor for pressure washing and cleaning hull and transmission
6 components, sanding old antifouling, applying primer and 2.5 coats of new 1 4,250.00 4,250.00
antifouling and replace zinc anodes

Labor for removing / installing bow and stern thrusters propellers and fin
7 4 75.00 300.00
stabilizers rudders
8 Zinc anode kit 1 2,250.00 2,250.00
Labor and material for machine polish and hand wax hull topsides and
9 1 4,000.00 4,000.00
superstructure and polishing s/s accessories
Water leaks in superstrucre
Labor for removing / installation of Jacuzzi - fixing water leaks and
1 3 450.00 1,350.00
relaminating FRP and wood supports
2 Misc material used and crane fees if needed 1 250.00 250.00
Gangway new repair
1 Manufacturing of a new s/s ram for in-out piston with machine shop 1 245.00 245.00
2 Manufacturing of bushings in bronze 3 65.00 195.00
3 Manufacturing of s/s ropes 1 176.00 176.00
4 Seal kit 1 85.00 85.00
5 Labor for removal / reinstallation and overhauling piston 3 75.00 225.00
6 Gangway rope 7 35.00 245.00
Swim ladder repair
Labor for overhauling swim ladder piston and servicing mechanism
1 (removing swim ladder carriage, replacing piston seals and gaskets, repaint 2 450.00 900.00
piston and re-installation of carriage box)
2 Seals and gaskets kit 1 125.00 125.00
3 Machine shop of swim ladder mechasim bushings 1 65.00 65.00
Bilge pump testing and valves replacement
1 Labor for replacing worn valves and testing complete bilge system 2 450.00 900.00
Teak / carpentry works
1 Manufacturing of fly bridge cabinets according to the originals 2 2,750.00 5,500.00
2 Reconditioning fly bridge tables 2 750.00 1,500.00
Paint works
1 Labor and material for repainting specific areas 1 2,500.00 2,500.00
Misc. Works
1 Fashion plate silicone caulking repair 4 75.00 300.00
2 Material used for silicone repair 1 65.00 65.00
3 Labor for Main deck rope lighting replacement 6 75.00 450.00
4 Material used for rope lighting replacement 1 85.00 85.00
Labor for dismantling and re-assembly of main sliding door mechanism for
5 1 650.00 650.00
repair
6 Manufacturing of bushing for door mechanism and misc. material used 1 125.00 125.00
Labor for troubleshooting Naviop comm. Error and re-routing Naviop
7 2 75.00 150.00
power cables
Labor and material for repairing fridge on top deck by replacing
8 1 850.00 850.00
compressor and filling refrigerant
Water system repair
1 Labor for replacing faulty bladder and testing fresh water system 3 75.00 225.00
Fuel system repair
Labor for removal / reinstallation of fuel transfer pumps. Cleaning tray
1 1 750.00 750.00
and fixing leaks
2 Fuel pumps overhaul 2 225.00 450.00
A/C works
Labor for flushing chiller's condensers unit and A/C sea water cooling
1 1 750.00 750.00
pipes
2 Flushing products 3 55.00 165.00
Labor for removal / reinstallation of A/C pumps for checks and replacing
3 1 450.00 450.00
water valves as required, cleaning trays and fixing leaks
4 1 1/4 fitting 4 65.00 260.00
Generator relocation works

Labor for temporarily moving and stowing upper generating set into the
passageway in front of the current gensets chassis. Works will involve
1 dismantling and re-assembly of fuel feed lines and water connections from 5 650.00 3,250.00
/ to the manifold and moving the unit with pulling winches.
Estimate working time of 5 full days for a team of 3 technicians
Labor and material for manufacturing steel structures and wood supports
2 1 850.00 850.00
for supporting upper generator in its temporary location
3 Misc. consumables used 1 150.00 150.00
Anchor chain replacement
1 Transportation of anchor chain drums 2 150.00 300.00
2 Crane rental fees 1 350.00 350.00
3 Labor for installation of anchor chain while yacht in water 1 650.00 650.00
4 Customs clearance charges - Transit procedure 1 850.00 850.00

Total Material and Labor $51,315.00


V.A.T. $5,131.50
Total $56,446.50

Item # Description Qty U.P. EUR T.P. EUR


Parts
1 Soap dispenser 6 195.00 1,170.00
2 One way valve 12 65.00 780.00
3 Hot water circulation pumps 2 185.00 370.00
4 Boiler elements 3 275.00 825.00
5 Thermostat 2 165.00 330.00
6 Fresh water expansion tank membrane 1 350.00 350.00
7 Fuel pumps overhaul kits 2 255.00 510.00
8 Anchor swivel 1 1,125.00 1,125.00
Shipping costs / customs duties (estimate, effective amount will be
9 1 1,650.00 1,650.00
charged)

Total 7,110.00 €

NB: 1- Antifouling and primer paint quantities shown above are only an estimate.
The effective quantities used will be charged.
2- Item 2 (Primer) quantity was calculated assuming that the hull will not be completely primed.
The old antifouling will not be completely stripped down up to the gel coat.
3- Marina Dry docks and lifting charges should be settled directly with La Marina Dbayeh.
4- Works out of the scope of the above will be charged separately.
5- Payment terms are 50% on approval and 50% after work completion.
6- VAT will be added where applicable.