Professional Documents
Culture Documents
Assy. Dia. Threaded Lift **Final Setting Standard Load Full Stroke
Part # (in.) Connection Load For Field Use For Testing Length
(in.) (Tons*) (Tons) (Tons*) (in.)
Outside Inside Shop Only
(Nom.)
* 2,000 lb/ton**.
This field uses setting loads chosen to provide a good trip load over a wide range of hole conditions.
There is a tendency, however, for the BHA required to trip to increase with depth and mud weight. It may be necessary
in deeper holes to increase the trip load or lower the load at a faster rate.