PROJECT: East Gate 3/13/2019

NARJES VILLA TYPE


BOQ

Item Unit Cost Total Cost


Div. Description of Material Unit Quantity Remarks
No. S.R S.R

Mechanical Works
All items including Supply, Installation, Operation,
Testing, Commissioning and the approval from the
Authoroties for all mechanical equipments & works
and complete with civil works as per specs, drawings
and Engineer instructions

WATER SUPPLY
Supply, Install and Test Cold Water Pipes P.P.R PN-6
Including all necessary Fixing Accessories, Valves,
Fittings "Elbow, Tee, Reducer, … etc", Excavation,
Backfilling, Cleaning & Flushing to the pipe, Civil
works if needed, and Automatic air vent with isolation
valve as specified and as shown on Drawings and
Engineer instructions:
1 20 mm diameter. L.m 144.00 0.00
2 25 mm diameter. L.m 65.00
3 32 mm diameter. L.m 20.00
4 40 mm diameter. L.m 2.00
5 160 mm diameter. L.m 3.00
6 20 mm diameter Gate valve. No 5.00
7 25 mm diameter Gate valve. No 2.00
8 32 mm diameter Gate valve. No 1.00
9 25 mm diameter check valve. No 1.00
10 20 mm diameter Isolation valve. No 14.00
11 20 mm diameter hose bibb No 1.00

Supply, Install and Test Hot Water Pipes P.P.R PN-6


Including all necessary Fixing Accessories, Valves,
Fittings "Elbow, Tee, Reducer, … etc", Excavation
inside walls, Cleaning & Flushing to the pipe and Civil
works if needed complete as specified and as shown on
Drawings and Engineer Instructions:
12 20 mm diameter. L.m 25.00
13 20 mm diameter Isolation valve. No 7.00

Transfer pump 1.7 l/s, 18 m head Including two level


switches complete with the suction pipe from UPVC
14 No 1.00
class 5, electrical works & breaker as specified and as
shown on drawings and Engineer Instructions

Overhead water tank from fiberglass 3 m3 capacity


with all all accessories and Civil works if needed
15 No 1.00
complete as specified and as shown on Drawings and
Engineer Instructions:

Mechanical BOQ
Div.15 Page 1 of 4 SITE CONSTRUCTION
PROJECT: East Gate 3/13/2019
NARJES VILLA TYPE
BOQ

Item Unit Cost Total Cost


Div. Description of Material Unit Quantity Remarks
No. S.R S.R

DRAINAGE
Supply, Install and Test Drainage & Vent UPVC Sch-
40 Including all necessary Fixing Accessories Fire
Stops, Fittings "Elbow, Tee, Y branch, Reducer, Roof
vent cap, … etc", Excavation, Backfilling, Cleaning &
Flushing to the pipe, Rain Draing Accessories with
downspot and Civil works if needed complete as
specified and as shown on Drawings and Engineer
Instructions:
16 50 mm diameter. m 70.00
17 75 mm diameter. m 55.00
18 110 mm diameter. m 65.00
19 160 mm diameter. m 9.00

Valve Box
Supply, Install and Test water meter 60*60 cm with
cast iron cover & gate valve & srainer and all required
20 No 1.00
excavation, backfilling, concrete & civil works
complete as Specified and as Shown on Drawings

Gully Trap
Supply, Install and Test gully trap 3'' with light cast
21 No 3.00
iron cover

Manholes
Manholes Constructed of Reinforced Concrete
Including concrete works, Excavation, Backfill,
Isolating Coating, Medium Cast Iron Cover and Frame
Complete as Specified and as Shown on Drawings:
22 600x600 No 1.00

Floor Drain
Supply, Install and Test floor drain PVC type including
mesh & cover made of Bronze coated with Nickel
23 No 9.00
Chrome 75 mm diameter Specified and as Shown on
Drawings

Floor Cleanout
Supply, Install and Test floor cleanout PVC type
including mesh & cover made of Bronze coated with
Nickel Chrome as Specified and as Shown on
Drawings

24 75 mm diameter No 5.00
25 110 mm diameter No 6.00

Mechanical BOQ
Div.15 Page 2 of 4 SITE CONSTRUCTION
PROJECT: East Gate 3/13/2019
NARJES VILLA TYPE
BOQ

Item Unit Cost Total Cost


Div. Description of Material Unit Quantity Remarks
No. S.R S.R

Scupper Drain
Supply, Install and Test Scupper drain cast iron body
Specified and as Shown on Drawings
26 75 mm diameter No 3.00

Sanitary Fixture
Supply, Install, Test the Following Sanitary Fixtures
Complete with all required Accessories as per
Engineer instructions

Water closet.
Supply, Install, Test Vitreous china European water
closet Complete with cover, flush tank 3 lit, flush hose
27 1.3 m length, Angle Valves, Flexible Connections and No 5.00
all Fittings and Accessories as Specified and as Shown
on the Drawings & Engineer instructions

Wash basin
Supply, Install, Test Vitreous china wash basin
complete with all Fittings and Accessories, valves,
28 No 7.00
mixers as Specified and as Shown on the Drawings &
Engineer instructions

Kitchen sink
Supply, Install, Test kitchen sink from stainless
including all accessories, mixers, drainage complete
29 No 1.00
with all required work as Specified and Shown on the
Drawings & Engineer instructions

Shower Tray
Supply, Install, Test Vitreous china Shower Tray
complete with all Fittings and Accessories, valves,
30 No 2.00
mixers as Specified and as Shown on the Drawings &
Engineer instructions

Bathtub
Supply, Install, Test Vitreous china Bathtub complete
with all Fittings and Accessories, valves, mixers as
31 No 1.00
Specified and as Shown on the Drawings & Engineer
instructions

HVAC
Supply, Install first fix works for split units including
condenseate drain pipes 25 mm connected to nearest
FD and all Accessories
32 UPVC Class 4 pipes 75 mm diameter m 50.00

Mechanical BOQ
Div.15 Page 3 of 4 SITE CONSTRUCTION
PROJECT: East Gate 3/13/2019
NARJES VILLA TYPE
BOQ

Item Unit Cost Total Cost


Div. Description of Material Unit Quantity Remarks
No. S.R S.R

Fans
Supply, Install and Test ventlating glass mounted axial
fan with shutter dumper, electrical works and all
required accessories as Shown on the Drawings &
specification.

33 EXF - 01 No 5.00

34 EXF - 02 No 1.00

TOTAL Mechanical 0.00

Mechanical BOQ
Div.15 Page 4 of 4 SITE CONSTRUCTION