Government of Nepal

National Reconstruction Authority


Central Level Project Implementation Unit (Education)
District Level Project Implementation Unit (Education),Gorkha
Emergency School Reconstruction Project (ESRP), JICA Loan No. : NE-P11
Contract Bills
FINAL INTERIM PAYMENT CERTIFICATE
Period: 15th November 2018 to 14th November 2019
Name of School: Shree Jal Devi S. School Payment Voucher no:
Name of Contractor:Sharma-A.M Joint Venture Date of payment:
Contract Number:ESRP/MOE/CLPIU/074/075-GORKHA-15 Page no of measurement book:
Serial no. of payment bills: 7 .
Voucher no.of previous payment bills:
Date of order for commencement of work: 15th November, 2018
Date of work to be completed: 14th November, 2019
Date of completion of work:
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
GENERAL
MOBILIZATION AND DEMOBILIZATION
L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 0.50 250,000.00 0.50 250,000.00 100.00%
1 Mobilization of the construction by constructing
temporaty
2. SITE OFFICE acomodation for labours and site staff with Per
ESTABLISHMENT
required suitable facilities Site and Office
keepingofthe 12.00 25,000.00 300,000.00 12.00 300,000.00 12.00 300,000.00 - - 100.00%
2 Providing and Maintaining twosame Rooms in Month
good hygenic
having total Area condition
20 sq.m for forentire
the project
use of completion
Client and
3. PROJECT INFORMATION BOARD
3 time. Demolition
Consultant and including of the same and cleaning the site
file nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
Providing Fixingoffice chair, Table,
of Project Lockable
Information board
after
cabinet,completion
Stationery ofItemsthe construction
(Ink, Paper, activities
Pen,including
Pencilsall
with
4. approved
SAFETY Text
SIGN50% in
BOARD appropriate location
complete.
etc.), [Note:
1 Computer and 1payment
Printer with shallallbenecessary
made after set
4 all required
Providing and fixing
Fixing accessories
of Safety as Sign
per drawing
Board all nos.
with
1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
completion
up. all complete of mobilization
as per instructionand remainingof engineer.50% afterThe
complete.
approved Text and Sinage including required fixing
5. BARRICADING
completion
Specification ofofworks
computerWORKS
as pershallcontract]
not be less than (19.5" R.m
accessories asbetween per drawing all complete. 50.00 2,000.00 100,000.00 48.00 96,000.00 48.00 96,000.00 - - 96.00%
5 Barricading the School
led monitor with Core i5, 7th Generation, 500 gb Hdd, Academic area and
Construction
6.
8gb ddr DISMANTLING
4 ram), area Printer
with 1.8should mOF highfunction
CGI Sheet
COMPLETELY fixed of
at least to
Bamboo sq.m 186.29 3,000.00 558,870.00 180.00 540,000.00 180.00 540,000.00 - - 96.62%
6 Printing, support
DAMAGED frame
BUILDING
Scanning and all complete
Photocopyas of per instruction
A4 size
of Engineer. of existingand
Demolition
documents. damaged building safelyitems
and
7. SAFETYProviding MATERIALS Maintaining
& SITE all above
SAFETY
handover
on Rental Basis ofand the reusable
forMaintaining
entire project materials to thetime.
completion school L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 0.92 92,000.00 0.08 8,000.00 100.00%
7 Providing Construction Safety
authority, in
Measures storing them to the
Construction Sitelocation shown by
with proper the
Safety
8. CONSTRUCTION OF NEW TLC
8 school andtodisposing
measures debris including transportation
Shoes, sq.m 186.29 3,000.00 558,870.00 - - 0.00 - - - 0.00%
Construction person of and newworkTemporaryarea (Helmet, Learning
of debris
First Aid ,cleaning
Kit, with site etc.
Clothing, Glove, as perGuardspecification
Rail for (CGI and
edge
Centre(TLC),
9. LAB TEST(WATER Locally TEST) Available materials
instruction
protection, of Engineer.
Safety Net,etc.),
Safetyrate rope, Fallinclude
Protection job 1.00 7,500.00 7,500.00 - - 0.00 - - - 0.00%
9 Sheet
Testing and Providing Lab Test Report for Quality all
and Bamboo shall of
etc.) as required
Materials with fixingby the Contract Clause GCC 24 and
charge.
Water in Water
10. TEMPORARY Stream TOILET(Up and Down streem) located
Specification division 1 "GENERAL nos. 2 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 - - 100.00%
10 near by Construction
Construction
REQUIREMENT of temporary
CLAUSE
site toilet
before with
8(C)".
Starting
CGI Sheet
The
and fixed
number
after
of
completion
to Bamboo ofsupport
construction work.
frameMAINTENANCE
and This Test has items
all necesary to be
11. ROAD
Safety REPAIR
Materials AND
Personal Protecting Equipments
done to mark
including Septic thepit,
affect of construction
Pipeline, Toilet Pan work
etc. in entire
for water
Providing
(PPE) shalland be Maintaining
minimum but thenotroads as necessary
limited to 35 sets. to
stream. completion time all complete as per Instruction Km 11.00 50,000.00 550,000.00 11.00 550,000.00 8.25 412,500.00 2.75 137,500.00 100.00%
11 project
avoid
Payment blockage
shall bebymade Landslides
in Prorata andBasis
Rockfallfor entire for
of Engineer.
regular
duration Rate of
transport
of project. shall include all materials
construction Material cost and withsite
fixing, construction
inspection during overallcharges and demolition
construction period. Rate &
BILL NO.of2.
cleaning CIVIL WORKS - BUILDING - -
shall include the all same
Material aftercost completion
with demolition of the
SITE CLEARANCE
construction activities &
all MOBILIZATION:
complete.
charges, cleaning, fixing & construction charges of the sq.m 317.05 100.00 31,705.00 314.75 31,475.12 312.00 31,200.00 2.75 275.12 99.27%
12 Clearing
same afterand grubbingofthe
completion thesite for construction
construction activities all by
removing
1.2 EARTHWORK 150mm thick top soil including
IN EXCAVATION : bushes,
13 complete.
small trees, leveling of undulated ground, shorting and cu.m 148.01 400.00 59,204.00 152.77 61,107.24 133.34 53,335.20 19.43 7,772.04 103.21%
Excavation in foundations in all type of soils for
stacking/storing
foundation, selected toppitssoil for reuse in
1.3 EARTHtrenches, BACK FILLING footing, : etc. to the required
landscaping works, disposing manual unsuitablemechanical
materials cu.m 98.39 300.00 29,517.00 106.83 32,048.85 96.69 29,007.75 10.14 3,041.10 108.58%
14 depth including
Back filling
from site,
in dewatering
foundation by and sides or of foundation
means etc. asetc.,
withBOULDER
approved per
soil
all complete with
specifications
obtained
as percontractor’s
from theallexcavation
drawings,
at
1.4
specifications SOLING
andandinstructions : of theproviding
Engineer.crossing cu.m
own machinery equipment's, 46.14 6,000.00 276,840.00 48.25 289,480.62 37.71 226,288.50 10.53 63,192.12 104.57%
15 site and
Providing
of track,
stacked
and laying
shoring,
at site or brought
uncoursed
strutting, timbering
frompacked
hand outsideDry
and (compacted
buttressing
in
layer not exceeding 15 cm
Rubble Stone soling in foundation, under floor plinth thick
with appropriate
thickness) including materials
transportationand allof such measures
soil, spreading
with out any special dressing of stone including filling
necessary
in requiredwith to
lineretain
and level, in position
sprinkling thewater,
sides of the
interstices suitable quarry waste or stoneramming,
chips or
foundation
compacting pit and including refilling the excavated
quarry sand,with mechanical
watering, rammers,
compacting testing,
using etc., all
appropriate
material
completewithas watering,
per drawing,ramming, leveling the site and
specification and
Prepared mechanical
by contractor
disposing
instructions
compaction
offofthe
means Checked
thesurplus/unusable
Engineer.
with all contractors
earth toby Consultant,
outside the DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
materials, handling, placing etc. all complete as per
construction premises, etc. all complete as per
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
1.5 SAND FILLING :
cu.m 2.49 6,000.00 14,940.00 2.45 14,700.00 2.49 14,940.00 (0.04) (240.00) 98.39%
16 Providing and filling sand in soak pit. all complete as
perCONCRETE
2. drawings, specifications
WORKS and instruction of the
Engineer. cu.m 7.10 14,000.00 99,400.00 7.32 102,527.25 7.32 102,527.25 - - 103.15%
17 P.C.C (1:3:6)
Providing
2.1.2 P.C.Cand laying
(1:2:4) WORKS machine mixed Plain Cement
18 Concrete of nominal mix 1:3:6 (1 cement : 3 sand : 6 cu.m 11.82 16,000.00 189,120.00 12.16 194,580.00 8.65 138,400.00 3.51 56,180.00 102.89%
Providing and laying machine mixed Plain Cement
coarse
Concrete aggregate ) for leveling course in foundations
2.2 P.C.C.ofFOR nominal R.C.C.mix 1:2:4 (1
WORKS cement
: : 2 sand : 4
and
coarse under floor )offorbuilding,
aggregate etc. in in all level with cu.m 136.70 20,000.00 2,734,000.00 137.54 2,750,793.13 132.28 2,645,588.13 5.26 105,205.00 100.61%
19 Providing and laying inleveling
positioncourse machinefoundations
mixed and
broken stone
and undervibrated aggregate
floor of of
building, size not
etc. ofmore
in mix than
all level 25 with
mm
machine
2.3 SILICA CEMENT cement concrete
ADMIXTURE 1:1.5:3 (1
of approved
broken stone quality including
aggregate of size notformwork
more than wherever
25 mm kg 1,367.00 300.00 410,100.00 1,375.40 412,618.97 1322.84 396,852.00 52.56 15,766.97 100.61%
cement:1.5and
20 Providing sand:mixing3 coarseSilica aggregate)
Cement M20 grade
Admixture offor
in
necessary,
of approved dewatering,
quality batching, mixing,
including formwork transporting,
wherever
reinforced concrete
structural cement atconcrete the rate of work2.50% using
by approved
weight of
2.4 STEEL
placing,
necessary, REINFORCEMENT
compacting,
dewatering, curing,
batching, including all
mixing,crushed lead and
transporting,
cement
the with
cement 20 mm
for fixing graded
promoting machine
workability, stone
improving Mt. 21.88 130,000.00 2,844,400.00 22.97 2,986,100.00 21.67 2,817,317.29 1.30 168,782.71 104.98%
21 Providing
lift, etc.
placing,
aggregate
all and
complete
compacting,
of approved
as inper position
curing,
quality in
drawings,
including
various
Fe all500lead steel
specifications
locations and
and
strength,
reinforcement
and the achieving waterproofing
of various diameterproperties,
confirmingbleeding to
2.5
heightsetc.instructions
lift, FORM all WORKS
complete
including
of the
as per
transportation
Engineer.
drawings,
of concrete specifications
to site of
prevention,
relevant ISetc. Silica
code Cement
in Admixture
R.C.C.shuttering shall
works ofincluding be the sq.m 963.95 800.00 771,160.00 953.62 762,898.56 907.04 725,634.76 46.58 37,263.80 98.93%
22 Supplying
and the
product
and
instructions
placing, ofcompaction,
Silica
laying of
Japan
centering,
the Engineer.
finished
or to and
superior required
shall
various
line
meet and
the
straightening,
pattern formworks cutting, with bending,
19/12etc. binding
mm thickwithwater20 SWG
3. BRICK
level,
requirements MASONRY
protection as and WORKS
curing,
mentioned inall specification
complete asproof
per
of
annealed
ply woodwire for
& MASONRY
steel tying the reinforcement
adjustable props barskinds
at each
3.1 BRICK
drawings,
materials specifications
and Workmanship, WORKS
and the (for
1–: all
44:c/s
instructions
Division )ofONE
Concrete
of
the cu.m 43.74 20,000.00 874,800.00 -
junctions
RCC works (binding
for excluding wire
foundations, shall not
columns, be measured
shear walls,
SIDE
Engineer,FAIRFACE
Works, Article but 2.4 the cost of centering,
23 separately)
beams,
Providing
shuttering, slab,and
including
andstaircase,
laying
all waste
lintel, sill,
first class
reinforcement,
and cutincluding
all pergola,
selected
complete factory
pieces,
as per
provision
7.2.3 nails, for adequate
propping numbers of supporting
spacers, chairs,
CLEAR
pressed
drawings, SILICON
wire cutscaffolding,
FairWATER-REPELENT
specifications Face brick staging,
and (machine
instructions COATING and
madeofbrick) the sq.m - -
providing
8.1.1 bracing
POINTING in and
proper
WORK placing
lines
IN cement
and
BRICK level, mortar
sealing
MASONARY (1:1)
the cover
joints sq.m - -
one or more brick thick wall in cement mortar 1:4
Engineer. (1
blocks
with to keep
heavy duty the
brown barsself in adhesive
intendedtape, position
aligning at all
to
cement
BOQ Total : 4coarse
of items sand) in ,superstructure and other - -
levels
line and alllevels
complete as3.1.,
including
7.2.3 & 8.1.1:
per Ties,
drawings,
PVClevelspecifications
Spacer, Providingand
specified
Replaced items places in all heights
3.1,Engineer. and
7.2.3 and (Authorized including
8.1.1 with following the
instructions
openings/ of
cutouts/the pockets, applying lap length
cost
items of single or multi stage self standingDe-shuttering
scaffolding, - -
and forforthe
chemical,
3-6C(S)
bar length exceeding
De-shuttering 10 meter the in length
soaking bricks, curing, as approved
raking joints,by provisionEngineer for
Brickbe
shall
etc., Masonry
measured
complete Worksfor the
at (1:4
all payment,
c/s)
levels except
as per to column).
drawing, cu.m 18,000.00 - -
recesses, openings, toothing etc., all complete as per
Cement Plaster
specifications
drawing, Works
and on Outer
instructions
specifications andofWall (1:6)
the Engineer.
instructions of the sq.m 600.00 - -
Exterior Weather Coat Paint
Engineer. sq.m 350.00 - -
- -
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s )
3.2 cu.m 36.51 18,000.00 657,180.00 74.21 1,335,720.15 69.82 1,256,726.25 4.39 78,993.90 203.25%
Providing and laying first class chimney fired brick
3.3 one
HALF or more
BRICK brick thick wall
WORKS ( 1 :in4 cement
c/s ) mortar 1:4 (1 sq.m 11.07 1,500.00 16,605.00 11.04 16,566.60 11.06 16,596.60 (0.02) (30.00) 99.77%
cement : COMB
4 coarse sand) WORKS
in foundation up to plinth,
3.4 HONEY BRICK (1:3 c/s)
superstructure and other specified places in all heights cu.m 0.24 9,000.00 2,160.00 0.24 2,119.50 0.24 2,160.00 (0.00) (40.50) 98.13%
4 and
DOORSlevel&including
WINDOWS the cost
WORKSof single or multi stage
scaffolding, soaking bricks, curing, raking joints,
4.1 METAL FRAME
provision for recesses, openings, toothing etc., all
Door Frameas per drawing, specifications and
4.1.1 complete r.m 89.94 1,100.00 98,934.00 89.94 98,934.00 89.94 98,934.00 - - 100.00%
4.1.2 instructions
Window Frame of the Engineer. r.m 223.8 1,100.00 246,180.00 223.80 246,180.00 223.80 246,180.00 - - 100.00%
4.2 METAL SHUTTER
4.2.1 WINDOW SHUTTER sq.m 47.66 7,500.00 357,450.00 39.21 294,075.00 47.66 357,450.00 (8.45) (63,375.00) 82.27%
4.3 WOODEN SHUTTER
4.3.1 FLUSH DOOR SHUTTER (32MM) sq.m 34.25 8,000.00 274,000.00 31.03 248,240.00 34.25 274,000.00 (3.22) (25,760.00) 90.60%
4.5 WINDOW GRILL sq.m 25.61 2,500.00 64,025.00 39.77 99,425.00 25.61 64,025.00 14.16 35,400.00 155.29%
4.6 COLLAPSIBLE GATE sq.m 7.55 10,000.00 75,500.00 7.55 75,500.00 7.55 75,500.00 - - 100.00%
5 FLOORING WORKS - - - 0.00 - - -
5.1 HARDENED CEMENT CONCRETE FLOOR sq.m 427.81 900.00 385,029.00 433.94 390,546.00 324.56 292,104.00 109.38 98,442.00 101.43%
5.2 NEAT CEMENT SKIRTING r.m 231.36 100.00 23,136.00 228.46 22,846.00 231.36 23,136.00 (2.90) (290.00) 98.75%
5.3 TERRAZZO CAST-IN SITU DADO sq.m 3.51 1,500.00 5,265.00 2.40 3,600.00 3.51 5,265.00 (1.11) (1,665.00) 68.38%
6 ROOFING/TERRACING WORK
6.1 METAL WORKS (TRUSS) kg 3099.90 220.00 681,978.00 3,545.29 779,963.80 3545.29 779,963.80 - - 114.37%
6.2 CGI SHEET ROOFING sq.m 202.35 2,000.00 404,700.00 205.50 411,000.00 202.35 404,700.00 3.15 6,300.00 101.56%
6.3 CGI SHEET ROOFING RIDGE r.m 17.75 1,200.00 21,300.00 17.90 21,480.00 17.75 21,300.00 0.15 180.00 100.85%
6.4 GI FACIA (EAVES) kg 151.03 250.00 37,757.50 143.91 35,978.75 177.30 44,325.00 (33.39) (8,346.25) 95.29%
6.5 CEMENT BOARD FALSE CEILING sq.m 168.65 1,500.00 252,975.00 174.90 262,356.00 168.65 252,975.00 6.25 9,381.00 103.71%
7 PLASTERING/WALL FINISHING WORK
7.1 CEMENT PLASTER WORK

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
7.1.1 ON INNER WALL sq.m 549.50 600.00 329,700.00 557.11 334,267.16 549.50 329,700.00 7.61 4,567.16 101.39%
7.1.2 ON CEILING (1:4) sq.m 153.38 500.00 76,690.00 288.40 144,201.00 153.38 76,690.00 135.02 67,511.00 188.03%
7.1.3 ON OUTER WALL (1:6)
7.1.3.1 EXTERNAL PLASTER sq.m 197.53 600.00 118,518.00 372.47 223,479.99 345.46 207,278.55 27.00 16,201.44 188.56%
PAINTING WORKS
7.2.1 7DISTEMPER PAINT 174,306.00 1,020.42 204,084.00 177,384.00 133.50 26,700.00 117.08%
sq.m 871.53 200.00 886.92
7.2.2 EXTERIOR WEATHER COAT PAINT sq.m 213.36 350.00 74,676.00 372.47 130,364.50 360.53 126,185.50 11.94 4,179.00 174.57%
7.2.3 CLEAR SILICON WATER-REPELLANT COATNG sq.m 214.68 550.00 118,074.00
7.2.4 ENAMEL PAINT sq.m 224.26 400.00 89,704.00 258.43 103,372.00 224.26 89,704.00 34.17 13,668.00 115.24%
8 MISCELLANEOUS
8.2 CEMENT BOARD WALL sq.m 15.39 6,500.00 100,035.00 14.55 94,575.00 15.39 100,035.00 (0.84) (5,460.00) 94.54%
8.3 RAILING kg 982.18 220.00 216,079.60 992.98 218,455.60 892.89 196,435.80 100.09 22,019.80 101.10%
8.4 PUMP SHED nos. 1.00 80,000.00 80,000.00 1.00 80,000.00 1.00 80,000.00 - - 100.00%

3 ELECTRICAL WORKS
A Common Installation
1 Stand Alone 40 A DP MCB with Enclosure no. 1.00 12,000.00 12,000.00 1.00 12,000.00 1.00 12,000.00 - - 100.00%
2 CABLES & WIRES
1.1 2 Nos 10 Sq mm Multistranded Cu Wire + 1 No 6 Sq rm 60.00 800.00 48,000.00 61.00 48,800.00 60.00 48,000.00 1.00 800.00 101.67%
B mm Multistranded
SCHOOL BLOCKS Cu wire
1 DISTRIBUTION BOARDS
1.1 Ground Floor nos. 1.00 32,000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 - - 100.00%
1.2 First Floor nos. 1.00 25,000.00 25,000.00 1.00 25,000.00 1.00 25,000.00 - - 100.00%
1.3 Second Floor nos. 1.00 25,000.00 25,000.00 1.00 25,000.00 1.00 25,000.00 - - 100.00%
2 CABLES & WIRES
2.1 2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq rm 10.00 600.00 6,000.00 11.00 6,600.00 10.00 6,000.00 1.00 600.00 110.00%
2.2 mm
2 Multistranded
Nos Cu wire Cu Wire + 1 No 2.5 Sq
4 Sq mm Multistranded rm 15.00 500.00 7,500.00 14.00 7,000.00 7,500.00 (1.00) (500.00) 93.33%
15.00
2.2 mm Multistranded
2 Nos Cu wire
2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 rm 30.00 250.00 7,500.00 28.00 7,000.00 7,500.00 (2.00) (500.00) 93.33%
30.00
3 Sq mm Multistranded
General Cu wire
service light point wiring pts.
3.1 one way light point pts. 40.00 700.00 28,000.00 40.00 28,000.00 40.00 28,000.00 - - 100.00%
3.2 Two Way Light Point pts. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 - - 100.00%
3.3 Ceiling Fan Point pts. 4.00 900.00 3,600.00 4.00 3,600.00 4.00 3,600.00 - - 100.00%
4 6A Universal pin Light power point wiring pts. 55.00 700.00 38,500.00 55.00 38,500.00 55.00 38,500.00 - - 100.00%
5 Switch Socket Outlets nos.
5.1 6A Universal power Switch Socket nos. 55.00 900.00 49,500.00 55.00 49,500.00 55.00 49,500.00 - - 100.00%
6 Light Fixtures/Luminaires & Accessories
6.1 24 W LED Recessed Mounted Square type nos. 4.00 4,500.00 18,000.00 4.00 18,000.00 4.00 18,000.00 - - 100.00%
6.2 18 W LED Surface Mounted Square type nos. 16.00 2,700.00 43,200.00 16.00 43,200.00 16.00 43,200.00 - - 100.00%
6.3 18 W LED Recessed Mounted Square type nos. 4.00 2,700.00 10,800.00 4.00 10,800.00 4.00 10,800.00 - - 100.00%
6.4 12 W LED Surface Mounted Cylindrical type nos. 9.00 2,400.00 21,600.00 9.00 21,600.00 9.00 21,600.00 - - 100.00%
6.5 12 W LED Recessed Mounted Crrcular type nos. 5.00 2,400.00 12,000.00 5.00 12,000.00 5.00 12,000.00 - - 100.00%
6.6 LED Wall Light nos. 1.00 1,800.00 1,800.00 1.00 1,800.00 1.00 1,800.00 - - 100.00%
7 Pull Box nos. 3.00 700.00 2,100.00 3.00 2,100.00 3.00 2,100.00 - - 100.00%
8 External post top light pole nos. 3.00 7,500.00 22,500.00 3.00 22,500.00 3.00 22,500.00 - - 100.00%
9 Post Top External Light Fixtures nos. 3.00 9,800.00 29,400.00 3.00 29,400.00 3.00 29,400.00 - - 100.00%
10 Earthing and Lightning protection nos.
10.1 Chemical Earhting nos. 3.00 45,000.00 135,000.00 3.00 135,000.00 3.00 135,000.00 - - 100.00%
10.2 Earthing Bar nos. 3.00 2,200.00 6,600.00 3.00 6,600.00 3.00 6,600.00 - - 100.00%

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
11 GI Strip/Cu wire Earthing
11.1 25*3mm GI Strip mtr. 65.00 300.00 19,500.00 66.00 19,800.00 65.00 19,500.00 1.00 300.00 101.54%
11.2 12 SWG Cu wire mtr. 15.00 200.00 3,000.00 14.00 2,800.00 15.00 3,000.00 (1.00) (200.00) 93.33%
12 Earth Test link nos. 1.00 1,500.00 1,500.00 1.00 1,500.00 1.00 1,500.00 - - 100.00%
C SOLAR PV SYSTEM
1 Solar PV Panel nos. 8.00 26,000.00 208,000.00 8.00 208,000.00 8.00 208,000.00 - - 100.00%
2 Tubular Deep cycle Battery nos. 4.00 30,000.00 120,000.00 4.00 120,000.00 4.00 120,000.00 - - 100.00%
3 Hybrid Inverter nos. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 - - 100.00%
D FIRE EXTINGUISHER
Fire extinguisher ABC stored Pressure 5.0kg size
a ABC stored pressure type Fire extinguisher. nos. 3.00 8,000.00 24,000.00 3.00 24,000.00 24,000.00 - - 100.00%
3.00
b Dry Powder Fire Extinguisher nos. 1.00 8,000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 - - 100.00%

4 SANITARY WORKS
A PIPING WORKS
1 WATER SUPPLY INSTALLATION
- 40 mm rm. 110.00 1,600.00 176,000.00 112.00 179,200.00 110.00 176,000.00 2.00 3,200.00 101.82%
- 15 mm rm. 2.00 500.00 1,000.00 1.80 900.00 2.00 1,000.00 (0.20) (100.00) 90.00%
b Galvanised Iron Pipe
- 40 mm rm. 6.00 1,600.00 9,600.00 6.50 10,400.00 6.00 9,600.00 0.50 800.00 108.33%
- 25 mm rm. 6.00 1,000.00 6,000.00 6.00 6,000.00 6.00 6,000.00 - - 100.00%
c CPVC Ball Valve
- 40 mm nos. 3.00 2,000.00 6,000.00 3.00 6,000.00 3.00 6,000.00 - - 100.00%
- 25 mm nos. 1.00 900.00 900.00 1.00 900.00 1.00 900.00 - - 100.00%
d Electric Centrifugal Water Pump of 0.50 HP set 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 - - 100.00%
e 1000 litres capacity water storage tank nos. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 - - 100.00%
f MS Overhead Tank Stand nos. 1.00 25,000.00 25,000.00 1.00 25,000.00 1.00 25,000.00 - - 100.00%
2 SEWER, RAIN AND WASTE WATER
INSTALLATION
- 75 mm ED 6 kg/sqcm rm. 12.00 1,200.00 14,400.00 12.50 15,000.00 14,400.00 0.50 600.00 104.17%
12.00
- 50 mm ED 6 kg/sqcm rm. 2.00 350.00 700.00 3.00 1,050.00 2.00 700.00 1.00 350.00 150.00%
B SCHOOL BLOCKS
1 SANITARY INSTALLATION
a Stainless Steel Kitchen Sink set 1.00 35,000.00 35,000.00 1.00 35,000.00 1.00 35,000.00 - - 100.00%
b CP self closing bib cock nos. 1.00 4,000.00 4,000.00 1.00 4,000.00 1.00 4,000.00 - - 100.00%
c PVC Multi-floor trap with cover nos. 1.00 600.00 600.00 1.00 600.00 1.00 600.00 - - 100.00%
CP Waste Coupling and PVC bottle trap for water
d trough nos. 1.00 1,500.00 1,500.00 1.00 1,500.00 1,500.00 - - 100.00%
1.00

B CIVIL WORKS : SITE DEVELOPMENT


1 SITE CLEARANCE AND MOBILIZATION Sq.m 150.60 100.00 15,060.00 124.95 12,495.00 150.60 15,060.00 (25.65) (2,565.00) 82.97%
2 EARTHWORK IN EXCAVATION Cu.m 87.28 400.00 34,912.00 25.31 10,124.00 74.84 29,936.00 (49.53) (19,812.00) 29.00%
3 EARTH BACK FILLING : Cu.m 20.94 300.00 6,282.00 5.63 1,689.00 5.63 1,689.00 26.89%
4 BOULDER SOLING Cu.m 22.42 6,000.00 134,520.00 18.75 112,500.00 30.82 184,920.00 (12.07) (72,420.00) 83.63%
5 P.C.C (1:3:6) Cu.m 0.54 14,000.00 7,560.00 0.53 7,435.68 8.60 120,400.00 (8.07) (112,964.32) 98.36%
6 P.C.C (1:2:4) Cu.m 12.11 16,000.00 193,760.00 18.74 299,880.00 6.78 108,480.00 11.96 191,400.00 154.77%
7 P.C.C FOR R.C.C WORK Cu.m 0.99 20,000.00 19,800.00 0.99 19,766.20 0.99 19,800.00 (0.00) (33.80) 99.83%
8 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 2,970.00 9.89 2,967.00 9.90 2,970.00 (0.01) (3.00) 99.90%
9 STEEL REINFORCEMENT Mt. 0.10 130,000.00 13,000.00 0.10 12,740.94 0.10 13,000.00 (0.00) (259.06) 98.01%

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
10 FORM WORKS Sq.m 9.12 800.00 7,296.00 11.33 9,064.00 9.12 7,296.00 2.21 1,768.00 124.23%
13 BRICKS MASONRY WORKS Cu.m 0.22 18000.00 3,960.00 0.72 13,032.72 0.57 10,260.00 0.15 2,772.72 329.11%
14 NEAT CEMENT SKIRTING r.m 4.72 100.00 472.00 4.40 440.00 4.72 472.00 (0.32) (32.00) 93.22%
15 METAL WORKS FOR FENCE k.g 1697.69 220.00 373,491.80 1,241.66 273,165.20 1227.30 270,006.00 14.36 3,159.20 73.14%
16 METAL WORKS FOR GATE k.g 130.78 220.00 28,771.60 123.31 27,128.20 118.89 26,155.80 4.42 972.40 94.29%
17 PLASTER ON OUTER WALL Sq.m 7.92 600.00 4,752.00 7.80 4,680.00 7.80 4,680.00 - - 98.48%
18 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 3,104.50 8.28 2,898.00 8.28 2,898.00 - - 93.35%
19 CHAIN LINK FENCE Sq.m 184.58 1000.00 184,580.00 168.00 168,000.00 168.00 168,000.00 - - 91.02%
20 FLAG POLE nos. 2 25000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 - - 100.00%

CIVIL WORKS-RESERVOIR TANK


1 EARTH WORK
1.1 SITE CLEARANCE AND MOBILIZATION sq.m 22.31 50.00 1,115.50 22.31 1,115.50 22.31 1,115.50 - - 100.00%
1.2 EARTHWORK IN EXCAVATION cu.m 24.58 400.00 9,832.00 24.57 9,828.72 24.57 9,828.00 0.00 0.72 99.97%
1.3 EARTH BACK FILLING cu.m 4.02 300.00 1,206.00 4.01 1,202.85 4.01 1,203.00 (0.00) (0.15) 99.74%
1.4 BOULDER SOLING cu.m 2.08 6,000.00 12,480.00 2.08 12,462.00 2.08 12,480.00 (0.00) (18.00) 99.86%
2 CONCRETE WORKS
2.1 P.C.C (1:3:6) cu.m 0.78 14,000.00 10,920.00 0.78 10,904.25 0.78 10,920.00 (0.00) (15.75) 99.86%
2.2 P.C.C FOR R.C.C WORKS cu.m 7.42 20,000.00 148,400.00 7.41 148,295.00 7.41 148,200.00 0.00 95.00 99.93%
2.3 SILICA CEMENT ADMIXTURE kg 74.2 300.00 22,260.00 74.15 22,244.25 74.15 22,245.00 (0.00) (0.75) 99.93%
2.4 STEEL REINFORCEMENT Mt 1.46 130,000.00 189,800.00 1.58 204,902.61 1.56 202,800.00 0.02 2,102.61 107.96%
2.5 FORMWORKS sq.m 54.93 800.00 43,944.00 56.46 45,170.80 56.46 45,168.00 0.00 2.80 102.79%
3 PLASTERING/WALL FINISHING WORKS
3.1.1 INTERNAL PLASTER ON WALL (1:4) WITH sq.m 33.66 700.00 23,562.00 35.46 24,824.45 35.46 24,822.00 0.00 2.45 105.36%
4 CEMENT PUNNINGWORKS
WATERPROOFING 18,513.00 35.46 19,504.93 19,503.00 0.00 1.92 105.36%
sq.m 33.66 550.00 35.46

FURNITURE WORKS lot 1 3,000,000.00 3,000,000.00 1.00 3,000,000.00 1.00 3,000,000.00 - - 100.00%

Previous Bill Adjustment (214,373.09) 214,373.09


Total 22,277,307.50 - 21,854,071.08 20,507,189.58 1,346,881.50

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-6C(S)-E & Site development works
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha
Abstract of Cost
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount (NRs) Remarks
BOQ Quantity
No. 3-6C(S)-E Site Development Water Tank
GENERAL
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 12.00 25,000.00 12.00 300,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 50.00 2,000.00 48.00 96,000.00
6 DISMANTLING OF COMPLETELY DAMAGED BUILDING sq.m 186.29 3,000.00 180.00 540,000.00
7 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
8 CONSTRUCTION OF NEW TLC sq.m 186.29 3,000.00 - -
9 LAB TEST(WATER TEST) job 1.00 7,500.00 - -
10 TEMPORARY TOILET nos. 2 150,000.00 2.00 300,000.00
11 ROAD REPAIR AND MAINTENANCE Km 11.00 50,000.00 11.00 550,000.00

BILL NO. 2. CIVIL WORKS - BUILDING


1.1 SITE CLEARANCE & MOBILIZATION: sq.m 317.05 100.00 314.75 314.75 31,475.12
1.2 EARTHWORK IN EXCAVATION : cu.m 148.01 400.00 152.77 152.77 61,107.24
1.3 EARTH BACK FILLING : cu.m 98.39 300.00 106.83 106.83 32,048.85
1.4 BOULDER SOLING : cu.m 46.14 6,000.00 48.25 48.25 289,480.62
1.5 SAND FILLING : cu.m 2.49 6,000.00 2.45 2.45 14,700.00
2. CONCRETE WORKS
2 P.C.C (1:3:6) cu.m 7.10 14,000.00 7.32 7.32 102,527.25
2.1.2 P.C.C (1:2:4) WORKS cu.m 11.82 16,000.00 12.16 12.16 194,580.00
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 136.70 20,000.00 137.54 137.54 2,750,793.13
2.3 SILICA CEMENT ADMIXTURE kg 1,367.00 300.00 1,375.40 1,375.40 412,618.97
2.4 STEEL REINFORCEMENT Mt. 21.88 130,000.00 22.97 22.97 2,986,100.00
2.5 FORM WORKS sq.m 963.95 800.00 953.62 953.62 762,898.56
3. BRICK MASONRY WORKS
3.1 BRICK MASONRY WORKS ( 1 : 4 c/s ) ONE SIDE FAIRFACE cu.m 43.74 20,000.00
3
7.2.3 CLEAR SILICON WATER-REPELENT COATING sq.m
8.1.1 POINTING WORK IN BRICK MASONARY sq.m
BOQ Total of items 3.1., 7.2.3 & 8.1.1:
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for 3-6C(S)-E
Brick Masonry Works (1:4 c/s) cu.m 18,000.00
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00
Exterior Weather Coat Paint sq.m 350.00

3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 36.51 18,000.00 74.21 74.21 1,335,720.15
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 11.07 1,500.00 11.04 11.04 16,566.60
3.4 HONEY COMB BRICK WORKS (1:3 c/s) cu.m 0.24 9,000.00 0.24 0.24 2,119.50
4 DOORS & WINDOWS WORKS
4.1 METAL FRAME

Prepared By: Checked By: Approved By:


Sharma AM JV Bimal Bahadur Thapa DLPIU
DME, DSC
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount (NRs) Remarks
BOQ Quantity
No. 3-6C(S)-E Site Development Water Tank
4.1.1 Door Frame r.m 89.94 1,100.00 89.94 89.94 98,934.00
4.1.2 Window Frame r.m 223.8 1,100.00 223.80 223.80 246,180.00
4.2 METAL SHUTTER
4.2.1 WINDOW SHUTTER sq.m 47.66 7,500.00 39.21 39.21 294,075.00
4.3 WOODEN SHUTTER
4.3.1 FLUSH DOOR SHUTTER (32MM) sq.m 34.25 8,000.00 31.03 31.03 248,240.00
4.5 WINDOW GRILL sq.m 25.61 2,500.00 39.77 39.77 99,425.00
4.6 COLLAPSIBLE GATE sq.m 7.55 10,000.00 7.55 7.55 75,500.00
5 FLOORING WORKS
5.1 HARDENED CEMENT CONCRETE FLOOR sq.m 427.81 900.00 433.94 433.94 390,546.00
5.2 NEAT CEMENT SKIRTING r.m 231.36 100.00 228.46 228.46 22,846.00
5.3 TERRAZZO CAST-IN SITU DADO sq.m 3.51 1,500.00 2.40 2.40 3,600.00
6 ROOFING/TERRACING WORK
6.1 METAL WORKS (TRUSS) kg 3099.90 220.00 3,545.29 3,545.29 779,963.80
6.2 CGI SHEET ROOFING sq.m 202.35 2,000.00 205.50 205.50 411,000.00
6.3 CGI SHEET ROOFING RIDGE r.m 17.75 1,200.00 17.90 17.90 21,480.00
6.4 GI FACIA (EAVES) kg 151.03 250.00 143.91 143.91 35,978.75
6.5 CEMENT BOARD FALSE CEILING sq.m 168.65 1,500.00 174.90 174.90 262,356.00
7 PLASTERING/WALL FINISHING WORK
7.1 CEMENT PLASTER WORK
7.1.1 ON INNER WALL sq.m 549.50 600.00 557.11 557.11 334,267.16
7.1.2 ON CEILING (1:4) sq.m 153.38 500.00 288.40 288.40 144,201.00
7.1.3 ON OUTER WALL (1:6)
7.1.3.1 EXTERNAL PLASTER sq.m 197.53 600.00 372.47 372.47 223,479.99
PAINTING WORKS
7.2.1 7DISTEMPER PAINT 1,020.42 1,020.42 204,084.00
sq.m 871.53 200.00
7.2.2 EXTERIOR WEATHER COAT PAINT sq.m 213.36 350.00 372.47 372.47 130,364.50
7.2.3 CLEAR SILICON WATER-REPELLANT COATNG sq.m 214.68 550.00
7.2.4 ENAMEL PAINT sq.m 224.26 400.00 258.43 258.43 103,372.00
8 MISCELLANEOUS
8.2 CEMENT BOARD WALL sq.m 15.39 6,500.00 14.55 14.55 94,575.00
8.3 RAILING kg 982.18 220.00 992.98 992.98 218,455.60
8.4 PUMP SHED nos. 1.00 80,000.00 1.00 1.00 80,000.00

3 ELECTRICAL WORKS
A Common Installation
1 Stand Alone 40 A DP MCB with Enclosure no. 1.00 12,000.00 1.00 1.00 12,000.00
2 CABLES & WIRES
1.1 2 Nos 10 Sq mm Multistranded Cu Wire + 1 No 6 Sq mm Multistranded Cu wire rm 60.00 800.00 61.00 61.00 48,800.00
B SCHOOL BLOCKS
1 DISTRIBUTION BOARDS
1.1 Ground Floor nos. 1.00 32,000.00 1.00 1.00 32,000.00
1.2 First Floor nos. 1.00 25,000.00 1.00 1.00 25,000.00
1.3 Second Floor nos. 1.00 25,000.00 1.00 1.00 25,000.00
2 CABLES & WIRES
2.1 2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded Cu wire rm 10.00 600.00 11.00 11.00 6,600.00
2.2 2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm Multistranded Cu wire rm 15.00 500.00 14.00 14.00 7,000.00

Prepared By: Checked By: Approved By:


Sharma AM JV Bimal Bahadur Thapa DLPIU
DME, DSC
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount (NRs) Remarks
BOQ Quantity
No. 3-6C(S)-E Site Development Water Tank
2.2 2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm Multistranded Cu wire rm 30.00 250.00 28.00 28.00 7,000.00
3 General service light point wiring pts.
3.1 one way light point pts. 40.00 700.00 40.00 40.00 28,000.00
3.2 Two Way Light Point pts. 2.00 900.00 2.00 2.00 1,800.00
3.3 Ceiling Fan Point pts. 4.00 900.00 4.00 4.00 3,600.00
4 6A Universal pin Light power point wiring pts. 55.00 700.00 55.00 55.00 38,500.00
5 Switch Socket Outlets nos.
5.1 6A Universal power Switch Socket nos. 55.00 900.00 55.00 55.00 49,500.00
6 Light Fixtures/Luminaires & Accessories
6.1 24 W LED Recessed Mounted Square type nos. 4.00 4,500.00 4.00 4.00 18,000.00
6.2 18 W LED Surface Mounted Square type nos. 16.00 2,700.00 16.00 16.00 43,200.00
6.3 18 W LED Recessed Mounted Square type nos. 4.00 2,700.00 4.00 4.00 10,800.00
6.4 12 W LED Surface Mounted Cylindrical type nos. 9.00 2,400.00 9.00 9.00 21,600.00
6.5 12 W LED Recessed Mounted Crrcular type nos. 5.00 2,400.00 5.00 5.00 12,000.00
6.6 LED Wall Light nos. 1.00 1,800.00 1.00 1.00 1,800.00
7 Pull Box nos. 3.00 700.00 3.00 3.00 2,100.00
8 External post top light pole nos. 3.00 7,500.00 3.00 3.00 22,500.00
9 Post Top External Light Fixtures nos. 3.00 9,800.00 3.00 3.00 29,400.00
10 Earthing and Lightning protection nos.
10.1 Chemical Earhting nos. 3.00 45,000.00 3.00 3.00 135,000.00
10.2 Earthing Bar nos. 3.00 2,200.00 3.00 3.00 6,600.00
11 GI Strip/Cu wire Earthing
11.1 25*3mm GI Strip mtr. 65.00 300.00 66.00 66.00 19,800.00
11.2 12 SWG Cu wire mtr. 15.00 200.00 14.00 14.00 2,800.00
12 Earth Test link nos. 1.00 1,500.00 1.00 1.00 1,500.00
C SOLAR PV SYSTEM
1 Solar PV Panel nos. 8.00 26,000.00 8.00 8.00 208,000.00
2 Tubular Deep cycle Battery nos. 4.00 30,000.00 4.00 4.00 120,000.00
3 Hybrid Inverter nos. 1.00 100,000.00 1.00 1.00 100,000.00
D FIRE EXTINGUISHER
a Fire extinguisher ABC stored Pressure 5.0kg size ABC stored pressure type Fire nos. 3.00 8,000.00 3.00 3.00 24,000.00
b extinguisher.
Dry Powder Fire Extinguisher nos. 1.00 8,000.00 1.00 1.00 8,000.00

4 SANITARY WORKS
A PIPING WORKS
1 WATER SUPPLY INSTALLATION
- 40 mm rm. 110.00 1,600.00 112.00 112.00 179,200.00
- 15 mm rm. 2.00 500.00 1.80 1.80 900.00
b Galvanised Iron Pipe
- 40 mm rm. 6.00 1,600.00 6.50 6.50 10,400.00
- 25 mm rm. 6.00 1,000.00 6.00 6.00 6,000.00
c CPVC Ball Valve
- 40 mm nos. 3.00 2,000.00 3.00 3.00 6,000.00
- 25 mm nos. 1.00 900.00 1.00 1.00 900.00
d Electric Centrifugal Water Pump of 0.50 HP set 1.00 12,500.00 1.00 1.00 12,500.00
e 1000 litres capacity water storage tank nos. 1.00 34,000.00 1.00 1.00 34,000.00
f MS Overhead Tank Stand nos. 1.00 25,000.00 1.00 1.00 25,000.00

Prepared By: Checked By: Approved By:


Sharma AM JV Bimal Bahadur Thapa DLPIU
DME, DSC
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount (NRs) Remarks
BOQ Quantity
No. 3-6C(S)-E Site Development Water Tank
2 SEWER, RAIN AND WASTE WATER INSTALLATION
- 75 mm ED 6 kg/sqcm rm. 12.00 1,200.00 12.50 12.50 15,000.00
- 50 mm ED 6 kg/sqcm rm. 2.00 350.00 3.00 3.00 1,050.00
B SCHOOL BLOCKS
1 SANITARY INSTALLATION
a Stainless Steel Kitchen Sink set 1.00 35,000.00 1.00 1.00 35,000.00
b CP self closing bib cock nos. 1.00 4,000.00 1.00 1.00 4,000.00
c PVC Multi-floor trap with cover nos. 1.00 600.00 1.00 1.00 600.00
d CP Waste Coupling and PVC bottle trap for water trough nos. 1.00 1,500.00 1.00 1.00 1,500.00

B CIVIL WORKS : SITE DEVELOPMENT


1 SITE CLEARANCE AND MOBILIZATION Sq.m 150.60 100.00 124.95 124.95 12,495.00
2 EARTHWORK IN EXCAVATION Cu.m 87.28 400.00 25.31 25.31 10,124.00
3 EARTH BACK FILLING : Cu.m 20.94 300.00 5.63 5.63 1,689.00
4 BOULDER SOLING Cu.m 22.42 6,000.00 18.75 18.75 112,500.00
5 P.C.C (1:3:6) Cu.m 0.54 14,000.00 0.53 0.53 7,435.68
6 P.C.C (1:2:4) Cu.m 12.11 16,000.00 18.74 18.74 299,880.00
7 P.C.C FOR R.C.C WORK Cu.m 0.99 20,000.00 0.99 0.99 19,766.20
8 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 9.89 9.89 2,967.00
9 STEEL REINFORCEMENT Mt. 0.10 130,000.00 0.10 0.10 12,740.94
10 FORM WORKS Sq.m 9.12 800.00 11.33 11.33 9,064.00
13 BRICKS MASONRY WORKS Cu.m 0.22 18000.00 0.72 0.72 13,032.72
14 NEAT CEMENT SKIRTING r.m 4.72 100.00 4.40 4.40 440.00
15 METAL WORKS FOR FENCE k.g 1697.69 220.00 1,241.66 1,241.66 273,165.20
16 METAL WORKS FOR GATE k.g 130.78 220.00 123.31 123.31 27,128.20
17 PLASTER ON OUTER WALL Sq.m 7.92 600.00 7.80 7.80 4,680.00
18 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 8.28 8.28 2,898.00
19 CHAIN LINK FENCE Sq.m 184.58 1000.00 168.00 168.00 168,000.00
20 FLAG POLE nos. 2 25000.00 2.00 2.00 50,000.00

CIVIL WORKS-RESERVOIR TANK


1 EARTH WORK
1.1 SITE CLEARANCE AND MOBILIZATION sq.m 22.31 50.00 22.31 22.31 1,115.50
1.2 EARTHWORK IN EXCAVATION cu.m 24.58 400.00 24.57 24.57 9,828.72
1.3 EARTH BACK FILLING cu.m 4.02 300.00 4.01 4.01 1,202.85
1.4 BOULDER SOLING cu.m 2.08 6,000.00 2.08 2.08 12,462.00
2 CONCRETE WORKS
2.1 P.C.C (1:3:6) cu.m 0.78 14,000.00 0.78 0.78 10,904.25
2.2 P.C.C FOR R.C.C WORKS cu.m 7.42 20,000.00 7.41 7.41 148,295.00
2.3 SILICA CEMENT ADMIXTURE kg 74.2 300.00 74.15 74.15 22,244.25
2.4 STEEL REINFORCEMENT Mt 1.46 130,000.00 1.58 1.58 204,902.61
2.5 FORMWORKS sq.m 54.93 800.00 56.46 56.46 45,170.80
3 PLASTERING/WALL FINISHING WORKS
3.1.1 INTERNAL PLASTER ON WALL (1:4) WITH CEMENT PUNNING sq.m 33.66 700.00 35.46 35.46 24,824.45
4 WATERPROOFING WORKS sq.m 33.66 550.00 35.46 35.46 19,504.93

FURNITURE WORKS lot 1 3,000,000.00 1 1.00 3,000,000.00

Prepared By: Checked By: Approved By:


Sharma AM JV Bimal Bahadur Thapa DLPIU
DME, DSC
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount (NRs) Remarks
BOQ Quantity
No. 3-6C(S)-E Site Development Water Tank

Previous Bill Adjustment 214,373.09


Total 22,068,444.17

Prepared By: Checked By: Approved By:


Sharma AM JV Bimal Bahadur Thapa DLPIU
DME, DSC
Project Name : Emergency School Reconstruction Project (ESRP)
School Name : Shree Basuki Lower Secondary School
Location : Aaruarbang, Gorkha

Length Breadth Height


S.No Description No. Qty. Unit Remarks
(m) (m) (m)
1 Mobilization and Demobilization 1 1 L.S.

2 Site Office Establishment 1 12 Per month

3 Project Information Board 1 1 No.

4 Safety Sign Board 1 1 No.

5 Barricading Works 1 37 37 Rm

Dismantling of completely damaged


6
building
Building 1 1 15.00 8.00 120.00 sq.m

7 Safety materials and site safety 1 1 L.S

8 Construction of new TLC

Building 1 ( 5 Class room) 1 18.5 3.95 73.075 sq.m

10 Construction of Temporary Toilet 2 2 Nos.

11 Road Repair and maintenance km

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-6C(S)-E
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha

Breadth Height
S.No Description No. Length (m) Qty. Unit Remarks
(m) (m)
1 Earthworks
1.1 Site Clearance and Mobilization
3-6C(S) Bldg 1 21.95 13.95 306.20
Soak Pit 1 8.55 Area 8.55
Total 314.75 Sq.m

1.2 Earthwork in excavation


For Footing
Grid 1
Footing (F2) 2 2.50 2.50 1.50 18.75
Footing (F3) 2 2.80 2.80 1.50 23.52
Grid 2
Footing (F3) 2 2.80 2.80 1.50 23.52
Footing (F4) 2 3.10 3.10 1.50 28.83
Grid 3
Footing (F1) 4 1.80 1.80 1.50 19.44
Excavation for lower tie beam
Grid 1 1 7.40 0.60 0.90 4.00
Grid 2 1 6.50 0.50 0.90 2.93
Grid 3 1 10.10 0.60 0.90 5.45
Grid A & Grid D 2 3.55 0.60 0.90 3.83
Grid B 1 3.10 0.60 0.90 1.67
Grid C 1 3.10 0.50 0.90 1.40
Front Steps/Drain 1 10.03 1.50 0.15 2.26
1 10.03 0.60 0.05 0.30
Back Drain 1 15.95 0.98 0.15 2.33
1 15.95 0.60 0.05 0.48
Side Drain 2 6.45 0.98 0.15 1.89
2 6.45 0.60 0.05 0.39
Side Steps 1 2.43 0.75 0.15 0.27
1 2.50 0.75 1.15 2.16
Ramp
For Slope 1 3.50 1.03 0.28 0.99
For Front wall 3-AB 1 6.50 0.55 0.45 1.61
For Side wall -3B 1 1.33 0.55 0.45 0.33

Soak Pit small 1 4.15 Area 1.55 6.44


Total 152.77 Cu.m

1.3 Earth Back filling


Excavated earthwork 143.41
Boulder soling -1 14.65 -14.65
PCC -1 7.32 -7.32
RCC -1 28.76 -28.76
Brick masonry work below plinth tie beam -1 6.28 -6.28
Class room 2 5.70 5.70 0.18 11.37
Staircase 1 3.20 5.70 0.18 3.19
Corridoor 1 14.60 2.20 0.18 5.62

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Below Ramp 1 1.40 1.30 0.14 0.25
Total 106.83 Cu.m

1.4 Boulder Soling


For Footing
Grid 1
Footing (F2) 2 2.20 2.20 0.20 1.94
Footing (F3) 2 2.50 2.50 0.20 2.50
Grid 2
Footing (F3) 2 2.50 2.50 0.20 2.50
Footing (F4) 2 2.80 2.80 0.20 3.14
Grid 3
Footing (F1) 4 1.50 1.50 0.20 1.80

For Lower Tie Beam


Grid 1,3 2 12.95 0.45 0.10 1.17
Grid 2 1 12.95 0.35 0.10 0.45
Grid A,B,D 3 6.80 0.45 0.10 0.92
Grid C 1 6.80 0.35 0.10 0.24

Building Floors
Classroom
Class Room 2 5.75 5.75 0.20 13.23
Corridor 2 5.75 2.25 0.20 5.18
1 3.25 2.25 0.20 1.46
Below Staircase 1 3.25 5.75 0.20 3.74

Front Steps/Drain 1 10.03 1.50 0.10 1.50


1 10.03 0.60 0.05 0.30
Back Drain 1 15.95 0.98 0.10 1.56
1 15.95 0.60 0.05 0.48
Side Drain 2 6.45 0.98 0.10 1.26
2 6.45 0.60 0.05 0.39
Side Steps 1 2.43 0.60 0.10 0.15
1 2.50 0.60 0.10 0.15

Below ramp
For Slope 1 6.82 1.18 0.20 1.61
For Front wall 3-AB 1 6.50 0.45 0.10 0.29
For Side wall -3B 1 1.33 0.45 0.10 0.06
Inside of soak Pit 1 1.13 Area 2.00 2.26
Total 48.25 Cu.m

1.5 Sand Filling


Periphery ot Soak pit 1 1.88 Area 1.30 2.45
Total 2.45 cu.m

2 Concrete Works
2.1 PCC
2.1.1 PCC work (1:3:6)
For Footing
Grid 1
Footing (F2) 2 2.20 2.20 0.10 0.97
Footing (F3) 2 2.50 2.50 0.10 1.25
Grid 2

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Footing (F3) 2 2.50 2.50 0.10 1.25
Footing (F4) 2 2.80 2.80 0.10 1.57
Grid 3
Footing (F1) 4 1.50 1.50 0.10 0.90

For Lower Tie Beam


Grid 1,3 2 12.95 0.45 0.05 0.58
Grid 2 1 12.95 0.35 0.05 0.23
Grid A,B,D 3 6.80 0.45 0.05 0.46
Grid C 1 6.80 0.35 0.05 0.12
Total 7.32 Cu.m

2.1.2 P.C.C.(1:2:4) Works


Entire Building Floors 1 14.60 7.90 0.08 8.65
Below staircase 1 1.50 0.06 0.08 0.01
Ramp
Below Ramp 1 6.80 1.30 0.08 0.66
Ramp Side Support 1 6.80 0.45 0.05 0.15
1 6.80 0.13 0.05 0.04
Ramp Front Side Support 1 1.33 0.45 0.05 0.03
1 1.33 0.25 0.05 0.02

Front Steps/Drain 1 10.03 1.50 0.05 0.75


Back Drain 1 15.95 0.98 0.05 0.78
Side Drain 1 6.45 0.98 0.05 0.31
Side Steps 1 2.43 0.60 0.05 0.07
1 2.50 0.60 0.05 0.08
Above exterior steps 1 13.50 0.90 0.05 0.61
Total 12.16 Cu.m

2.2 PCC for RCC Work 1:1.5:3


For Footing
Footing F1 4.00
Square portion 1.50 1.50 0.20 1.80
Trapezoid portion Area 1.49 0.25 1.49
Footing F2 2.00
Square portion 2.20 2.20 0.20 1.94
Trapezoid portion Area 2.78 0.25 1.39
Footing F3 4.00
Square portion 2.50 2.50 0.20 5.00
Trapezoid portion Area 3.49 0.25 3.49
Footing F4 2.00
Square portion 2.80 2.80 0.20 3.14
Trapezoid portion Area 4.28 0.25 2.14
Lower Tie Beam
Grid 1,2,3 3.00 14.15 0.25 0.30 3.18
Grid A,B,C,D 4.00 7.60 0.25 0.30 2.28

Column
From lower to plinth tie beam 12.00 0.45 0.45 1.20 2.92
Plinth tie beam
Grid 1,2,3 3.00 14.15 0.30 0.53 6.69
Grid A,B,C,D 4.00 7.60 0.30 0.53 4.79
Ground Floor
For column 12 0.45 0.45 3.00 7.29

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
G.F Staircase
Landing beam 1 3.05 0.25 0.38 0.29
Landing 1 1 3.20 1.50 0.15 0.72
Landing 2 1 3.20 1.85 0.15 0.89
First flight
Waist Slab 1 3.35 1.50 0.15 0.75
Riser 9 Area 0.02 1.50 0.30
Second Flight
Waist Slab 1 3.40 1.50 0.15 0.77
Riser 10 Area 0.02 1.50 0.34
Staircase gap
Waist Slab 1 1.30 0.20 0.15 0.04
Riser 3 Area 0.02 0.45 0.03
First floor beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.53 6.69
Grid A-B-C_D 4 7.60 0.30 0.53 4.79
Secondary Beam
Grid A1-C1 2 7.90 0.25 0.43 1.68
Grid 1a 2 5.45 0.25 0.43 1.16
Grid 1b 1 3.20 0.25 0.43 0.34
F.F. Slab
Class room 8 2.73 2.73 0.13 7.43
Corridoor 4 2.73 2.20 0.13 3.00
1 3.20 2.20 0.13 0.88
Slab between beam 1b & 2B-2C 1 0.49 3.20 0.13 0.20
Staircase top slab 1 0.39 3.20 0.15 0.18
Lintel Bands, Ground floor level
Along grid A,B,C,D 4 5.55 0.23 0.13 0.64
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 11.10 0.23 0.13 0.32
Sill Bands, Ground floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 11.10 0.23 0.08 0.19
Along grid 2 1 11.10 0.23 0.08 0.19
At store 1 1.30 0.12 0.08 0.01
Vetical Band 4.00 2.48 0.25 0.08 0.19

First Floor
For column 12 0.45 0.45 3.00 7.29
F.F Staircase
Landing beam 1 3.05 0.25 0.38 0.29
Landing 2 1 3.2 1.85 0.15 0.89
First flight
Waist Slab 1 3.35 1.5 0.15 0.75
Riser 9 Area 0.02 1.50 0.30
Second Flight
Waist Slab 1 3.40 1.50 0.15 0.77
Riser 10 Area 0.02 1.50 0.34
Second Floor Beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.53 6.69
Grid A-B-C_D 4 7.60 0.30 0.53 4.79
Secondary Beam
Grid A1-C1 2 7.90 0.25 0.43 1.68

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Grid 1a 2 5.45 0.25 0.43 1.16
Grid 1b 1 3.20 0.25 0.43 0.34
S.F. Slab
Class room 8 2.73 2.73 0.13 7.43
Corridoor 4 2.73 2.20 0.13 3.00
1 3.20 2.20 0.13 0.88
Slab between beam 1b & 2B-2C 1 0.49 3.20 0.13 0.20
Staircase top slab 1 0.39 3.20 0.15 0.18
Lintel Bands, First floor level
Along grid A,B,C,D 4 5.55 0.23 0.13 0.64
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 11.10 0.23 0.13 0.32
Sill Bands, First floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 11.10 0.23 0.08 0.19
Along grid 2 1 11.10 0.23 0.08 0.19
Vetical Band 4.00 2.48 0.25 0.08 0.19

Second Floor
For column 12 0.45 0.45 2.60 6.32
Second Floor Truss Beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.40 5.09
Grid A-B-C-D 4 7.60 0.30 0.40 3.65
Lintel Bands, Second floor level
Along grid A,B,C,D 4 5.55 0.23 0.13 0.64
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 14.15 0.23 0.13 0.41
Sill Bands, Second floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 11.10 0.23 0.08 0.19
Along grid 2 1 11.10 0.23 0.08 0.19
Lab Partition Wall 2.00 3.60 0.23 0.08 0.12
Vetical Band 4.00 2.48 0.23 0.08 0.17

Deduction of Doors For Sill


Ground floor level
D1 -4 1.10 0.230 0.08 -0.08
First floor level
D1 -4 1.10 0.230 0.08 -0.08
Second floor level
D1 -4 1.10 0.230 0.08 -0.08

Pedestal in corridor 8 0.50 0.25 0.25 0.25


Bench Slab 2 2.50 0.60 0.08 0.23
Kitchen Slab
Slab 1 2.40 0.65 0.10 0.16
Deduction 0.00
Sink -1 0.92 0.50 0.10 -0.05

Soak Pit
RCC slab 1 2.27 Area 0.13 0.28
Total 137.54 Cu.m

2.3 Silica Admixture

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
10 Kg per cu.m. of R.C.C. M20 10 137.54 1,375.40
Total 1375.40 kg
2.5 Form Works
For Footing
Footing F1 4 6.00 0.20 4.80
Footing F2 2 8.80 0.20 3.52
Footing F3 4 10.00 0.20 8.00
Footing F4 2 11.20 0.20 4.48
Lower tie beam
Grid 1,2,3 3 14.15 0.60 25.47
Grid A,B,C,D 4 7.60 0.60 18.24
For Column
From lower to plinth tie beam 12 1.80 1.20 25.92
Deduction1 at beam and column junction at -34 0.25 0.30 -2.55
LTB
Deduction1 at beam and column junction at -34 0.30 0.53 -5.36
UTB
For Plinth Tie Beam
Grid 1,2 & 3 3 14.15 1.05 44.57
Grid A,B,C &D 4 7.60 1.05 31.92
Landing Beam 1 3.20 1.01 3.23
Ground floor
For column 12 1.80 3.00 64.80
Deduction for Beam opening part -34 0.30 0.53 -5.36
Staircase Area
First flight
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
Riser 10 1.50 0.15 2.25
Side 2 3.35 0.30 2.01
1 4.00 0.15 0.60
Second flight
Waist slab 1 3.40 1.50 5.10
Riser 10 1.50 0.15 2.25
Side 2 3.40 0.30 2.04
First floor beam
Main beam
Grid 1 (A-B & C-D) 2 5.55 1.23 13.60
Grid 1 (B-C) 1 3.05 1.35 4.12
Grid 2 1 14.15 1.10 15.57
Grid 3 1 14.15 1.23 17.33
Grid A & D 2 7.60 1.23 18.62
Grid B & C (1-2) 2 5.55 1.23 13.60
Grid B & C (2-3) 2 2.05 1.10 4.51
Secondary beam
Grid A1-C1 2 7.65 0.85 13.01
Grid 1a 2 5.70 0.85 9.69
Grid 1b 1 3.20 0.85 2.72
Deduction on main beam and secondary beam
-14 0.30 0.25 -1.05
junction
Slab
Class room 8 2.73 2.73 59.41
Corridoor 4 2.73 2.20 23.98
1 3.20 2.19 7.01

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Stair case area 1 3.20 0.49 1.57
1 3.20 0.39 1.23
First Floor
For column 12 1.80 3.00 64.80
Deduction on beam and column junction -34 0.30 0.53 -5.36
F.F.Staircase Area
First flight
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
Riser 10 1.50 0.15 2.25
Side 2 3.35 0.30 2.01
1 1.47 0.15 0.22
1 1.94 0.15 0.29
1 1.25 0.15 0.19
Second flight
Waist slab 1 3.40 1.50 5.10
Riser 10 1.50 0.15 2.25
Side 2 3.40 0.30 2.04

Second Floor Beam


Main beam
Grid 1 (A-B & C-D) 2 5.55 1.23 13.60
Grid 1 (B-C) 1 3.05 1.35 4.12
Grid 2 1 14.15 1.10 15.57
Grid 3 1 14.15 1.23 17.33
Grid A & D 2 7.60 1.23 18.62
Grid B & C (1-2) 2 5.55 1.23 13.60
Grid B & C (2-3) 2 2.05 1.10 4.51
Secondary beam
Grid A1-C1 2 7.65 0.85 13.01
Grid 1a 2 5.70 0.85 9.69
Grid 1b 1 3.20 0.85 2.72
Deduction on main beam and secondary beam
-14 0.30 0.25 -1.05
junction
Slab
Class room 8 2.73 2.73 59.41
Corridoor 4 2.73 2.20 23.98
1 3.20 2.19 7.01
Stair case area 1 3.20 0.49 1.57
1 3.20 0.39 1.23
Second Floor
For column 12 1.80 3.00 64.80
Deduction on beam and column junction -34 0.30 0.53 -5.36
Second Floor Beam
Truss beam
Grid 1-2-3 3 14.15 1.10 46.70
Grid A-B-C-D 4 7.60 1.10 33.44
Lintel Bands
Ground floor level
Along grid A,B,C,D 8 5.55 0.13 5.55
Along grid 1 2 11.10 0.13 2.78
Along grid 2 2 11.10 0.13 2.78
First floor level
Along grid A,B,C,D 8 5.55 0.13 5.55

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Along grid 1 2 11.10 0.13 2.78
Along grid 2 2 11.10 0.13 2.78
Second floor level
Along grid A,B,C,D 8 5.55 0.13 5.55
Along grid 1 2 11.10 0.13 2.78
Along grid 2 2 11.10 0.13 2.78
Sill Bands
Ground floor level
Along grid A,B,C,D 8 5.55 0.08 3.33
Along grid 1 2 11.10 0.08 1.67
Along grid 2 2 11.10 0.08 1.67
At store 2 1.30 0.08 0.20
First floor level
Along grid A,B,C,D 8 5.55 0.08 3.33
Along grid 1 2 11.10 0.08 1.67
Along grid 2 2 11.10 0.08 1.67
Second floor level
Along grid A,B,C,D 8 5.55 0.08 3.33
Along grid 1 2 11.10 0.08 1.67
Along grid 2 2 11.10 0.08 1.67
Lab Partition Wall 2.00 7.45 0.075 1.12
Vetical Band
Ground Floor 4.00 2.48 0.38 3.76
First Floor 4.00 2.48 0.38 3.76
First Floor 4.00 2.60 0.38 3.95

Deduction of Doors For Sill


Ground floor level
D1 -8 1.10 0.08 -0.66
First floor level
D1 -8 1.10 0.08 -0.66
Second floor level
D1 -8 1.10 0.08 -0.66
Pedestal in corridor 8 1.25 0.25 2.50
Bench
Bench Top Slab 2 5.80 0.125 1.45
Bottom 2 1.90 0.25 0.95
Kitchen Slab
Slab 1 2.40 0.65 1.56
Border 1 6.10 0.10 0.61
Sink Border 1 2.83 0.10 0.28
Deduction
Sink -1 0.92 0.50 -0.46

Soak Pit
RCC slab
Base Area 1 1.13 1.13
Along Sides 1 5.34 0.15 0.80
side formwork for void and Removable Cover 2 2.44 0.15 0.73
Total 953.62 sq.m

3 Brick works
3.2 Brick Masonary Work (1:4 c/s)
Foundation upto plinth

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Grid 1,2,3 3 14.15 0.23 0.38 3.66
Grid A,B,C,D,E 4 7.60 0.23 0.38 2.62

Ground floor
Along grid A,B,C,D/(1-2) 4 5.55 0.23 2.33 11.87
Along grid 1 1 11.10 0.23 2.33 5.94
1 3.05 0.23 2.02 1.42
Along grid 2 1 10.80 0.23 2.33 5.78
Sink Support Wall 2 0.50 0.23 0.65 0.15

Deduction for doors and windows


Ground floor plan
W1 -8 1.10 0.23 1.13 -2.28
V1 -8 1.10 0.23 0.53 -1.06
W3 -1 1.50 0.23 0.37 -0.13
D1 -4 1.10 0.23 2.33 -2.35

First floor level


Along grid A,B,C,D 4 5.55 0.23 2.33 11.87
Along grid 1 1 11.10 0.23 2.33 5.94
1 3.05 0.23 2.05 1.43
Along grid 2 1 10.80 0.23 2.33 5.78

Deduction for doors and windows


First floor plan
W1 -8 1.10 0.23 1.13 -2.28
V1 -8 1.10 0.23 0.53 -1.06
W2 -1 1.50 0.23 1.00 -0.35
D1 -4 1.10 0.23 2.33 -2.35

Second floor level


Along grid A,B,C,D 4 5.55 0.23 2.45 12.51
Along grid 1 1 11.10 0.23 2.45 6.25
1 3.05 0.23 2.53 1.77
Along grid 2 1 10.80 0.23 2.45 6.09
Lab Partition Wall 2 3.60 0.23 1.13 1.86

Deduction for doors and windows


Second floor plan
W1 -8 1.10 0.23 1.13 -2.28
V2 -8 1.10 0.23 0.65 -1.32
W2 -1 1.50 0.23 1.00 -0.35
D2 -4 1.10 0.23 2.45 -2.48

Drain 1 33.40 0.23 0.15 1.15


Below ramp
For Front wall 3-AB 1 6.50 0.35 0.30 0.68
For Side wall -3B 1 1.33 0.35 0.30 0.14
Above ramp
For Front wall 3-AB 1 1.40 0.23 0.38 0.12
1 4.25 0.23 0.19 0.18
For Side wall -3B 1 1.33 0.23 0.59 0.18

External Steps 1 13.50 0.48 0.10 1.35

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
1 13.50 0.18 0.15 2.03
1 13.50 0.08 0.10 1.35
Grid 2A 1 0.60 0.50 0.45 0.14
Grid 3A 1 0.53 0.40 0.45 0.09
Grid 2D 1 0.60 0.50 0.45 0.14
Total 74.21 Cu.m

3.3 Half brick work (1:4 c/s)


Storeroom below staircase 1 3.00 1.35 2.03
1 0.20 1.35 0.27
1 0.90 1.50 1.35
1 1.50 1.65 2.48
Deductions D3 -1 1.00 1.55 -1.55
Ramp
Grid 3AB
1 1.40 0.22 0.31
1 5.12 0.22 1.13
Bench
4 2.15 0.53 4.52
4 0.25 0.53 0.53
Total 11.04 Sq.m

3.4 Honey Comb Brick (350 mm) Works (1:3c/s)


Soak Pit Brick work 1 0.20 1.20 0.24
Total 0.24 cu.m

4 Doors and Windows


4.1 Metal Frame
4.1.1 Door Frame
D1 8 7.07 56.56
D2 4 7.32 29.28
D3 1 4.10 4.10
Total 89.94 R.m

4.1.2 Window Frame


W1 24 5.58 133.80
W2 2 5.00 10.00
V1 16 3.25 52.00
V2 8 3.50 28.00
Total 223.80 R.m

4.2 Metal Shutter


4.2.1 Window Shutter
W1 24 1.01 1.04 25.09
W2 2 1.41 0.91 2.57
V1 16 1.01 0.44 7.03
V2 8 1.01 0.56 4.52
Total 39.21 Sq.m

4.3 Flush Door Shutter


D1 8 1.01 2.46 19.84
D2 4 1.01 2.56 10.32
D3 1 0.91 0.96 0.87
Total 31.03 Sq.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
4.5 Window Grill
W1 24 1.01 1.04 25.09
W2 2 1.41 0.91 2.57
W3 1 1.50 0.37 0.56
V1 16 1.01 0.44 7.03
V2 8 1.01 0.56 4.52
Total 39.77 Sq.m

4.6 COLLAPSABLE GATE


1 3.05 2.475 7.55
Total 7.55 sq.m

5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Class Room 2 5.78 5.75 66.41
Corridor 1 15.80 2.50 39.50
1 3.20 1.50 4.80
Below Staircase 1 4.50 3.20 14.40
Staircase Tread 18 0.3 1.50 8.10
Riser 20 0.15 1.50 4.50
Staircase landing 1 1.80 3.20 5.76

First floor plan


Class Room 2 5.78 5.75 66.41
Corridor 1 15.80 2.50 39.50
1 3.20 1.50 4.80
Staircase Tread 18 0.3 1.50 8.10
Riser 20 0.15 1.50 4.50
Staircase landing 1 1.80 3.20 5.76

Second floor plan


Class Room 2 5.78 5.75 66.41
Corridor 1 15.80 2.50 39.50
1 3.20 1.50 4.80

Ramp 1 6.52 1.30 8.48


Exterior Steps (Front) 1 13.50 0.90 12.15
Drain
Back of Building 1 15.95 0.95 15.15
Side of bulding 1 6.45 0.95 6.13
Side Steps 1 10.03 0.875 8.77
Total 433.94 sq.m

5.2 Neat Cement Skirting works


Ground floor plan
Room 2 21.35 42.70
Staircase Lobby 1 15.75 15.75
Waist Slab 2 3.00 6.00
Store Below Landing 1 4.85 4.85
Staircase/Landing 1 12.94 12.94
Column 4 2.25 9.00
Corridor 2 3.85 7.70

First floor plan

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Room 2 21.35 42.70
Staircase Lobby 2 1.77 3.54
Waist Slab 2 3.00 6.00
Staircase/Landing 1 12.94 12.94
Corridor 2 4.53 9.05

Second Floor Plan 0.00


Room 2 21.35 42.70
Staircase Lobby 2 1.77 3.54
Corridor 2 4.53 9.05
Total 228.46 rm

5.3 25mm Terrazo Finishing


For In-built Furniture
Bench 2 2.40 0.50 2.40
Total 2.40 sq.m

6 Roofing/ Terracing Works


6.1 Metal Works
Truss 1 3,545.29
Total of Truss Total 3,545.29 k.g

6.2 CGI Sheet Roofing


Total Area 2 17.90 5.74 205.49
Total 205.50 sq.m

6.3 CGI Ridge


Top 1 17.90 17.90
Total 17.90 r.m

6.4 GI Facia(Eaves) Length (WxT) Density


Grid 1,3/AC 2 17.90 0.00031 7850 87.68
Grid A,D/1-3 4 5.74 0.00031 7850 56.23
Total 143.91 kgs.

6.5 Cement Board For False Ceiling


Backward and front slope of roof 2.00 15.95 1.18 37.64
Side Slope of Roof 4.00 5.65 0.97 21.92
Classroom 2.00 5.70 5.70 64.98
Staircase 1.00 5.70 3.20 18.24
Corridor 2.00 5.70 2.20 25.08
1.00 3.20 2.20 7.04
Total 174.90 Sq.m

7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Classroom 2.00 23.15 2.91 134.73
Staircase 1.00 14.67 2.91 42.69
Kitchen Slab Border 1.00 3.70 0.10 0.37
1.00 2.83 0.10 0.28
Bottom 1.00 2.40 0.65 1.56
Support Walls 2.00 1.50 0.65 1.95

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Deduction 0.00
Sink -1 0.92 0.50 -0.46
Store Below Landing 1.00 2.50 1.25 3.11
2.00 0.31 1.25 0.78
2.00 0.69 1.44 1.98
2.00 1.44 1.63 4.69
Pedestal 4.00 1.25 0.25 1.25
4.00 0.50 0.25 0.50
Column
Grid 2A,2D 2.00 0.35 0.68 0.47
Grid 2B,2C 2.00 0.98 0.68 1.32

Grid 2A,2D 2.00 0.45 2.20 1.98


Grid 2B,2C 2.00 1.08 2.20 4.73
Deductions
W1 -8 1.10 1.13 -4.95
V1 -8 1.10 0.53 -2.31
W3 -1 1.50 0.37 -0.28
D1 -4 1.10 2.48 -5.45
D3 -2 1.00 1.55 -1.55

First Floor
Classroom 2.00 23.15 2.91 134.73
Staircase 1.00 14.67 2.91 42.69
Column
Grid 2A,2D 2.00 0.45 2.91 2.62
Grid 2B,2C 2.00 1.08 2.91 6.26

Deductions
W1 -8 1.10 1.13 -4.95
V1 -8 1.10 0.53 -2.31
W2 -1 1.50 1.00 -0.75
D1 -4 1.10 2.48 -5.45

Second Floor
Classroom 2.00 23.15 3.00 138.90
Lab Partition Wall 2.00 7.20 1.20 17.28
2.00 3.60 0.25 1.80
Staircase 1.00 14.67 3.00 44.01
Column
Grid 2A,2D 2.00 0.45 3.00 2.70
Grid 2B,2C 2.00 1.08 3.00 6.45
Deductions
W1 -8 1.10 1.13 -4.95
W2 -1 1.50 1.00 -0.75
V2 -8 1.10 0.65 -2.86
D2 -4 1.10 2.60 -5.72
Total 557.11 sq.m

7.1.2 Internal Plaster on Ceiling (1:4)


Ground floor
Classroom 1 4 2.73 2.73 29.70
Classroom 2 4 2.73 2.73 29.70
Corridor 4 2.73 2.20 23.98
1 3.20 2.20 7.04

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Staircase Area 1 3.20 0.88 2.80
Secondary Beam
Along Grid A1-C1 2 7.65 0.60 9.18
Along Grid 1a 2 5.77 0.60 6.92
Along Grid 1b 1 3.20 0.60 1.92
Below staircase
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
First floor
Classroom 3 4 2.73 2.73 29.70
Classroom 4 4 2.73 2.73 29.70
Corridor 4 2.73 2.20 23.98
1 3.20 2.20 7.04
Staircase Area 1 3.20 0.88 2.80

Secondary Beam
Along Grid A1-C1 2 7.65 0.60 9.18
Along Grid 1a 2 5.70 0.60 6.84
Along Grid 1b 1 3.20 0.60 1.92

Below staircase
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
Second floor
Truss Beam
Classroom 4 4 5.55 0.40 8.88
Classroom 5 4 5.55 0.40 8.88
Corridor; Along grid 2 , ( A-B) and (C-D) 2 5.55 0.40 4.44
Corridor; Along grid 2 , ( B-C) 1 3.05 1.10 3.36
Corridor; Along grid 3 , ( A-B), (B-C) and (C-
D) 1 14.15 0.70 9.91
Corridor; Along grid A, B, C and D; (2-3) 4 2.20 1.10 9.68
Total 288.40 sq.m

7.1.3 External Plaster


Outer Plaster
Beam Plaster
Plinth Beam
Along grid 1 1 14.15 0.45 6.37
Along grid A & D 1 5.55 0.45 2.50

First Floor Level


Main Beam(300 x 525)
Along grid 1 1.00 11.10 0.53 5.83
Grid 1-BC 1.00 3.05 0.65 1.97
Landing Beam 1.00 3.05 0.56 1.71
Along grid 3 1.00 14.15 0.83 11.67
Along grid A and D 2.00 7.60 0.53 7.98

Second Floor Level


Main Beam(300 x 525)
Along grid 1 1.00 14.15 0.53 7.43
Landing Beam 1.00 3.05 0.38 1.16

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Along grid 3 1.00 14.15 0.83 11.67
Along grid A and D 2.00 7.60 0.53 7.98

Truss Level
Main Beam(300 x 400)
Along grid 1 1.00 14.15 0.40 5.66
Along grid 3 1.00 14.15 0.40 5.66
Along grid A and D 2.00 7.60 0.40 6.08

Column Plaster
Upto Plinth Level
Along grid 1
Grid 1A,1D 2.00 1.10 0.45 0.99
Grid 1B,1C 2.00 0.65 0.45 0.59
Along grid 2
Grid 2A,2D 2.00 0.55 0.45 0.50
Along grid 3
Along grid 3A 1.00 0.08 0.38 0.03
1.00 0.45 0.40 0.18
Grid 3B 1.00 0.08 0.15 0.01
Grid 3C 1.00 0.60 0.15 0.09
Grid 3D 1.00 1.05 0.15 0.16
Upto Sill Level
Along grid 1
Grid 1A,1D 2.00 0.90 0.68 1.22
Grid 1B,1C 2.00 0.45 0.68 0.61
Along grid 2
Grid 2A,2D 2.00 0.55 0.68 0.74
Ground Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2
Grid 2A,2D 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3D 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C 2.00 1.20 2.88 6.90
2.00 0.60 3.00 3.60
First Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2
Grid 2A,2D 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3D 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C 2.00 1.20 2.88 6.90
2.00 0.60 3.00 3.60
Second Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Grid 2A,2D 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3D 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C 2.00 1.20 2.88 6.90
2.00 0.60 3.00 3.60

Plaster in Outer Wall


Ground floor
Along grid A,D/(1-2) 2 5.55 2.33 25.81
Along grid 1 1 11.10 2.33 25.81
1 3.05 2.02 6.16
Along grid 2 1 10.80 2.33 25.11

First floor level


Along grid A,D 2 5.55 2.33 25.81
Along grid 1 1 11.10 2.33 25.81
1 3.05 2.05 6.24
Along grid 2 1 10.80 2.33 25.11

Second floor level


Along grid A,D 2 5.55 2.45 27.20
Along grid 1 1 11.10 2.45 27.20
1 3.05 2.53 7.70
Along grid 2 1 10.80 2.45 26.46
Deduction for doors and windows
Ground floor plan
W1 -8 1.10 1.13 -9.90
V1 -8 1.10 0.53 -4.62
W3 -1 1.50 0.37 -0.56
D1 -4 1.10 2.33 -10.23
First floor plan
W1 -8 1.10 1.13 -9.90
V1 -8 1.10 0.53 -4.62
W2 -1 1.50 1.00 -1.50
D1 -4 1.10 2.33 -10.23
Second floor plan
W1 -8 1.10 1.13 -9.90
V2 -8 1.10 0.65 -5.72
W2 -1 1.50 1.00 -1.50
D2 -4 1.10 2.45 -10.78

Outer Steps
Grid 2A,2D 2.00 1.03 0.45 0.92
Grid 3A 1.00 0.93 0.45 0.42
Steps Edge 3.00 0.60 0.45 0.81
For Ramp
Top-3B 1.00 1.33 0.25 0.33
Top 3AB 1.00 6.47 0.13 0.81
Front 3-AB 1.00 1.60 0.60 0.96
1.00 5.10 0.38 1.91
Inner 1.00 7.52 0.15 1.13
Side-3B 1.00 1.33 0.60 0.80
For Bench
Top 2.00 2.40 0.50 2.40

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Edge 2.00 5.80 0.13 1.45
Total 372.47 sqm

7.2 Painting Works


7.2.1 Distemper Painting Works
As per Internal plaster on wall 1.00 557.11 Area 557.11
As per internal plaster on ceiling 1.00 288.40 Area 288.40
False Ceiling 1.00 174.90 Area 174.90
Total 1,020.42 sq.m

7.2.2 Exterior Weather Coat Paint


Beam,Column and Walls Paint 1.00 372.47 Area 372.47
Total 372.47 sq.m

7.2.4 Enamel Painting


Doors Factor
D1 8 1.10 2.44 2.00 42.86
D2 4 1.10 2.56 2.00 22.53
D3 1 1.00 1.55 2.00 3.10
Collapsible Gate 1 3.05 2.48 2.00 15.10
Window
W1 24 1.10 1.13 2.00 59.40
W2 2 1.50 1.00 2.00 6.00
V1 16 1.10 0.53 2.00 18.48
V2 8 1.10 0.65 2.00 11.44
Window Grill
W1 24 1.01 1.04 2.00 50.18
W2 2 1.41 0.91 2.00 5.13
W3 1 1.50 0.37 2.00 1.11
V1 16 1.01 0.44 2.00 14.06
V2 8 1.01 0.56 2.00 9.05
Total 258.43 sq.m

8 MISCELLANOUS
8.2 Cement Board
Partition
Above Side Walls 1.00 9.70 1.50 14.55
Total 14.55 sq.m

8.3 Railing
Total
Staircase Railing Kg/m Total
No. Length (m) Length
Horizontal ISNB 40 M 1 18.40 18.40 3.61 66.42
Vertical 38 mm Square Pipe 14 0.86 12.04 3.14 37.81
Horizontal 25mm Square Pipe 4 17.35 69.40 0.85 58.99
Balcony Railing
Horizontal ISNB 40 M 2 18.25 36.50 3.61 131.77
Horizontal ISNB 32 M 4 16.40 65.60 3.14 205.98
Vertical ISNB 40 M 34 1.08 36.72 3.61 132.56
Vertical 25mm Square Pipe 236 0.82 193.52 0.85 164.49
Pedestal
ISNB 40M 8 1.70 13.60 3.61 49.10
ISNB 40M 8 2.05 16.40 3.61 59.20
Base plate 69 0.00009375 0.01 7850 50.78

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
12 mm dia. Anchor Bolt, Nut 276 0.13 35.88
Total 992.98 k.g

8.4 Pump Shed


1 1.00 1.00
Total 1.00 Nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(S)-B
School Name : Shree Basuki Lower Secondary School
Location : Aaruarbang, Gorkha
BAR BENDING SCHEDULE

Spacing c/c Rebar Length/pc. Total Length Weight Per Total


SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

A Foundation
Longitudional Bar

a. F1
1 1400 1 12 150 4 20 1600 128 0.889 113.78
0 0
0 0
b. F2
1 2100 1 12 150 2 30 2300 138 0.889 122.67
0 0
0 0
c. F3
1 2400 1 12 150 4 34 2600 353.6 0.889 314.31
0 0
0 0
1 2700 1
d. F4 12 150 2 38 2900 220.4 0.889 195.91
0 0
0 0
B Foundation Beam 300*250

8850
a 3-12Ø Top Bar Along Grid A, B, C & D 2 2 12 4 3 9710 116.52 0.889 103.57
5 5
0 180 180 0

b 3-12Ø Bottom Bar Along Grid A, B, C & D 4 8850 4


12 4 3 9710 116.52 0.889 103.57
3 3
0 0
15850
c. 2-12Ø Top End Bars Along Grid 1,2&3 2 2 12 3 2 16710 100.26 0.889 89.12

5 5
0 520
180 520
180 0

d. Lapping on Top End Bars 720 12 3 4 720 8.64 0.889 7.68

15850
e 1-12Ø Top Mid Bar Along Grid 1,2&3 2 2 12 3 1 16710 50.13 0.889 44.56
5 5
0 520
180 520
180 0

f Lapping on Top Mid Bar 720 12 3 1 720 2.16 0.889 1.92

g 2-12Ø Bottom Ends Bar Along Grid 1,2&3 7 12 3 2 16710 100.26 0.889 89.12
15850 7
2 2
0 0
h Lapping on Bottom Ends Bar 720 12 3 2 720 4.32 0.889 3.84

i 1-12Ø Bottom Mid Bar Along Grid 1,2&3 7 7 12 3 1 16710 50.13 0.889 44.56
2 15850
2
0 0
j Lapping on Bottom Mid Bar 720 12 3 2 720 4.32 0.889 3.84

k Stirrups For Foundation Beam

200
80
l Entire Beam Length 250 8 100/150 1 673 1060 713.38 0.395 281.83

C Plinth Beam 300*525

15850
a 2-16Ø Top Ends Bar Along Grid 1, 2 & 3 7 16 3 2 17290 103.74 1.580 163.94
7
2 2
0 0

b Laping
960 16 3 4 960 11.52 1.580 18.21

15850
c 2-16Ø Top Mid Bar Along Grid 1, 2 & 3 16 3 1 17290 51.87 1.580 81.97
7 7
2 2
0 0
d. Laping 960 16 3 1 960 2.88 1.580 4.55

1 1
e 2-20Ø Bottom Ends Bar Along Grid 1, 2 & 3
0 15850 0 20 3 2 17850 107.10 2.469 264.45

0 0
0 0
f Laping 1200 20 3 2 1200 7.20 2.469 17.78

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

1 1
g 2-20Ø Bottom Mid Bar Along Grid 1, 2 & 3 0 15850 0 20 3 2 17850 107.10 2.469 264.45
0 0
0 0

h Laping 1200 20 3 4 1200 14.40 2.469 35.56

1500+70Ø
i 2-20Ø Extra Bar Along Grid 1 & 2 at Grid A 20 2 2 2900 11.60 2.469 28.64
Grid A

6950
j 2-20Ø Extra Bar Along Grid 1 & 2 at Grid B & C 20 2 2 6950 27.80 2.469 68.64

k 2-20Ø Extra Bar Along Grid 1 & 2 at Grid D 25 2 2 3450 13.80 3.858 53.24
Grid D
1700+70Ø

1500+70Ø
l 2-16Ø Extra Bar Along Grid 3 at Grid A 16 1 2 2620 5.24 1.580 8.28
Grid A

3050
m 2-16Ø Extra Bar Along Grid 3 at Grid B 16 1 2 3050 6.10 1.580 9.64

3050
n 2-16Ø Extra Bar Along Grid 3 at Grid C 16 1 2 3050 6.10 1.580 9.64

1500+70Ø
o 2-20Ø Extra Bar Along Grid 3 at Grid D 16 2 2 2620 10.48 1.580 16.56
Grid D

p Torsion Bars 15850 16 3 2 15850 95.10 1.580 150.28

q Laping
960 16 3 2 960 5.76 1.580 9.10

8850
r 3-16Ø Top Bar Along Grid A, B, C & D 16 4 3 10290 123.48 1.580 195.13
7 7
2 2
0 0

1 1
s 4-20Ø Bottom Bar Along Grid A, B, C & D
0 0 20 4 4 10850 173.60 2.469 428.64
8850 0
0
0 0
4200+70Ø
t 2-20Ø Extra Bar Along Grid A, B, C & D at Grid 2 & 3 25 4 2 5950 47.60 3.858 183.64

1700+70Ø
u 2-20Ø Extra Bar Along Grid A, B, C & D at Grid 1 25 4 2 3450 27.60 3.858 106.48

v Torsion Bars 8850 16 4 2 8850 70.80 1.580 111.88

w Stirrups for Plinth Beam 0.00

250
12
0
x Grid 1, 2 & 3 475 12 100 3 143 1690 725.01 0.889 644.45

250
12
0
y Grid A, B, C & D 475 12 100 4 77 1690 520.52 0.889 462.69

D Column 450*450 upto Floor Height

Longitudional Bar upto ground floor height 6-20Ø for 1( A D ), 2 3283


a 20 7 6 4107 172.494 2.469 425.91
(A) & 3(A B C D)

100 724

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

Longitudional Bar upto first floor height 6-20Ø for Grid 1( A D ), 2


3283
b 20 7 6 7107 298.494 2.469 737.02
(A) & 3( A B C D)

100 724

3283
c Longitudional Bar upto ground floor height 6-25Ø for 1( B C ) 25 2 6 4407 52.884 3.858 204.03

100 1024

6283
d Longitudional Bar upto first floor height 6-25Ø for Grid 1( B C ) 25 2 6 7407 88.884 3.858 342.92

100 1024

Longitudional Bar upto ground floor height 2-20Ø for Grid 2( B C 3283
e 20 3 2 4107 24.642 2.469 60.85
D)

100 724

3283
f Longitudional Bar upto ground floor height 4-25Ø for Grid 2(B C D) 25 3 4 4407 52.884 3.858 204.03

100 1024

6283
g Longitudional Bar upto first floor height 6-20Ø for Grid 2(B C D) 20 3 6 7107 127.926 2.469 315.87
m

100 724
h Stirrups for Column upto Floor Height 0.00

370
80
370
i 8 100 12 8 1640 157.44 0.395 62.20

460
140
80
370
j 8 100 12 8 1180 113.28 0.395 44.75

460
370
80
k 8 100 12 8 1180 113.28 0.395 44.75
140

l C-Bars 8 100 12 5 1180 70.8 0.395 27.97


m Stirrups for Column upto Plinth Height-450 0.00

370 460
80
370
n 8 100 12 8 1640 157.44 0.395 62.20

460
140
80
370
o 8 100 12 8 1180 113.28 0.395 44.75

460
370
80
p 8 100 12 8 1180 113.28 0.395 44.75
140

E First Floor Beam (300*525)-Main Beam


1 Along Grid 1, 2 & 3

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

15850
7 7
a Top Main Bar(3-16Ø) 16 3 3 17290 155.61 1.580 245.90
2 2
0 0
b Lapping 960 16 3 6 960 17.28 1.580 27.31

c Bottom Bar (2-20Ø)


1 1 20 3 2 17850 107.1 2.469 264.45
0 15850 0
0 0
0 0
d Lapping 1200 20 3 2 1200 7.2 2.469 17.78

e Bottom Bar (2-16Ø)


7 7 16 3 2 17290 103.74 1.580 163.94
2 15850 2
0 0
f Lapping 960 16 3 4 960 11.52 1.580 18.21

7445 8405
g Torsion Bar (2-16Ø) 16 3 2 16810 100.86 1.580 159.38

960
Extra Bar at Grid 1 & 2

1 1900
h Extra Bar at Grid A (2-20Ø) 0 20 2 2 2900 11.6 2.469 28.64

0
0
6950
i Extra Bar at Grid B & C (2-20Ø) 20 2 2 6950 27.8 2.469 68.64

2100 1
j Extra Bar at Grid D (2-20Ø) 25 2 2 3450 13.8 3.858 53.24
3
5
Extra Bar at Grid 3 0
7 1900
k Extra Bar at Grid A (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28

0
3050
l Extra Bar at Grid B & C (2-16Ø) 16 2 2 3050 12.2 1.580 19.28

1900 7
m Extra Bar at Grid D (2-16Ø) 2 16 2 2 2620 10.48 1.580 16.56
0
2 Along Grid A, B, C & D

8850
a Top Main Bar(3-16Ø)
7 7 16 4 3 10290 123.48 1.580 195.13
2 2
0 0

b Bottom Bar (4-20Ø)


1 1 20 4 4 10850 173.6 2.469 428.64
0 8850 0
0 0
0 0
c Torsion Bar (2-16Ø) 8850 16 4 2 8850 70.8 1.580 111.88

2100 1
d Extra Bar at Grid 1 (2-25Ø) 25 4 2 3450 27.6 3.858 106.48
3
5
0
1 4600
e Extra Bar at Grid 2 & 3 (2-25Ø) 25 4 2 5950 47.6 3.858 183.64
3
5
0
10
0
4
7
f Stirrups for Main Beam-Long Grid 10 125 1 381 1650 628.65 0.617 388.06
5

250

1
0
0 4
7
g Stirrups for Main Beam-Short Grid 10 125 1 284 1650 468.6 0.617 289.26
5

250
F Secondary Beam (300*425)
1 Along Grid A1 & C1

8870
a Top Main Bar (3-16Ø)
7 7 16 2 3 10290 61.74 1.580 97.57
1 1
0 0

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

b Bottom Main Bar (3-16Ø)


7 7 16 2 3 10290 61.74 1.580 97.57
1 8870 1
0 0
Along Grid 1a

6250
3
c Top Main Bar (3-16Ø)
7 3 16 2 3 7000 42 1.580 66.37

5 7
5

d Bottom Main Bar (3-16Ø)


3 3 16 2 3 7000 42 1.580 66.37
7 6250 7
5 5
Along Grid 1b

3750
3
e Top Main Bar (3-16Ø)
7 3 16 1 3 4500 13.5 1.580 21.33

5 7
5

3 3
f Bottom Main Bar (4-12Ø) 12 1 4 4500 18 0.889 16.00
7 3750 7
5 5

80
3
7
g Stirrups for Secondary Beam-Short Grid 8 125 1 142 1410 200.22 0.395 79.10
5

250

80
3
h Stirrups for Secondary Beam-Long Grid
7 8 125 1 125 1410 176.25 0.395 69.63
5

250

960

i U-Bent at the joint of Beam 16 12 2 3180 76.32 1.580 120.61


530
200 530

G STAIRCASE
200

3354 1560 330


a First Flight-Longitudional Bar 12 1 12 7409 88.908 0.889 79.03
1690
475

50
1150
b 12 1 12 2910 34.92 0.889 31.04
1410
300

c Distribution Bar- Top & Bottom 1460 10 150 1 14 1460 20.44 0.617 12.62

d First Flight- Top & Bottom Bar 1460 10 150 1 55 1460 80.3 0.617 49.57

e Landing 3200 10 150 1 18 3200 57.6 0.617 35.56

f 1800 12 150 1 2 1800 3.6 0.889 3.20

5
0
g Extra Bar 5 1 12 1 11 2100 23.1 0.889 20.54
0 1000 0
0
0
1840
850
h 220 12 1 12 2960 35.52 0.889 31.58

50

1000
1000 50
i 12 1 11 2100 23.1 0.889 20.54

50

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

900 3400
j Second Flight-Longitudional Bar 12 125 1 12 7320 87.84 0.889 78.08
450 2270

300

50 1150
k 2000 12 1 12 3420 41.04 0.889 36.48

220

5
l Extra Bar 0 12 1 11 2100 23.1 0.889 20.54
1000
5
1000 0

270 380 850


m 12 125 1 12 1550 18.6 0.889 16.54
5
5 0
0

350 270 1000


n 12 125 1 11 1670 18.37 0.889 16.33

5
0

o Distribution Bar-Top & Bottom Bar


1460 10 150 1 40 1460 58.4 0.617 36.05

p Nosing Bar 1460 10 1 20 1460 29.2 0.617 18.03

410 480
q Nosing Ties 8 4 6 1630 39.12 0.395 15.46
480 260

300 480

r 8 9 6 1410 76.14 0.395 30.08


480 150

410 480
s 8 3 6 1520 27.36 0.395 10.81
480 150

300 480

t 8 2 6 1520 18.24 0.395 7.21


480 260

480

u 8 2 6 1110 13.32 0.395 5.27


480 150

H First Floor Landing Beam (250*380)

a Top Bar 7 7 16 1 3 5290 15.87 1.580 25.08


1 3870 1
0
9 0 9
6 6
b Bottom Bar 7
0 7 0 16 1 3 5290 15.87 1.580 25.08
1 3870 1
0 0
200
80
c Stirrups for Landing Beam 8 125 1 26.9964 1220 32.94 0.395 13.01
330

I SLAB REINFORCEMENT DETAILS


575 1500
2375 1500

80 1375 500
a Along Short Span-Between Grid A-B & C-D
2000 80 8 300 1 40 9985 399.4 0.395 157.79

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

575 500
8 8
b 8 300 1 36 9985 359.46 0.395 142.01
0 8750 0

500
2000
c Btween Grid B & C 8 8 8 300 1 11 4535 49.885 0.395 19.71
0 1875 0

500
d
8 8 8 300 1 11 4535 49.885 0.395 19.71
0 3875 0

575
575 1500
e 80 8 300 1 35 7560 264.6 0.395 104.53
2375 2375
8
0

575 575
f 8 8 8 300 1 35 7560 264.6 0.395 104.53
0 6250 0

575 575
8 8
g Grid A-D, 1b-3 0 8 300 1 9 17540 157.86 0.395 62.37
480 4405 0
11345

575 1500
2125 1500
8
0
1625 1625
h 1750 8 300 1 9 17540 157.86 0.395 62.37

575
2230 1500 2125 8
0

i Top Main Bar


1950 8 150 1 38 1950 74.1 0.395 29.28

j
2050 8 150 1 94 2050 192.7 0.395 76.13

2250
k 8 150 1 18 2250 40.5 0.395 16.00

2130
l 8 150 1 11 2130 23.43 0.395 9.26

m Distribution Bar 8 150 1 72 2200 158.4 0.395 62.58


n 8 150 1 32 1800 57.6 0.395 22.76
J Column (450*450)

370
80
370
a Stirrups for First Floor 8 100 12 25 1640 492 0.395 194.37

460
140
80
370
b 8 100 12 25 1180 354 0.395 139.85

460

80
c 140 8 100 12 25 1180 354 0.395 139.85

370

370
80

d Stirrups for Second Floor


370 8 100 12 26 1640 511.68 0.395 202.15

460
140
80
370
e 8 100 12 26 1180 368.16 0.395 145.45

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

460
80
f 140 8 100 12 26 1180 368.16 0.395 145.45

370
K Second Floor Beam (300*525)-Main Beam 0.00
1 Along Grid 1, 2 & 3 0.00

3425 9000 3425


7 716
a Top Bars - Ends (2-16Ø) 3 2 19210 115.26 1.580 182.14
2 960 2
0 960
0
7445 8405
7 716
b Top Bars - Mid (1-16Ø) 3 1 18250 54.75 1.580 86.52
2 960 2
0 0

1 1200 120
c Bottom Bars - Ends (2-20Ø) 7275 8575 3 2 19050 114.3 2.469 282.22
0 0
0 0
0 0
7 7
d Bottom Bars- Mid (2-16Ø) 2 3250 960 960 2 16 3 2 19210 115.26 1.580 182.14
0 0
10700 1900

7445 8405
e Torsion Bars (2-16Ø) 16 3 2 16810 100.86 1.580 159.38

960
Extra Bar at Grid 1 & 2 0.00

1 1900
f Extra Bar at Grid A (2-20Ø) 0 20 2 2 2900 11.6 2.469 28.64

0
0
6950
g Extra Bar at Grid B & C (2-20Ø) 20 2 2 6950 27.8 2.469 68.64

1900 1
h Extra Bar at Grid D (2-20Ø) 20 2 2 2900 11.6 2.469 28.64
0
0
Extra Bar at Grid 3 0 0.00

7 1900
i Extra Bar at Grid A (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28

0
3050
j Extra Bar at Grid B & C (2-16Ø) 16 2 2 3050 12.2 1.580 19.28

1900 7
k Extra Bar at Grid D (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28
0
2 Along Grid A, B, C & D 0.00

8850
a Top Main Bar(3-16Ø)
7 7 16 4 3 10290 123.48 1.580 195.13
2 2
0 0

b Bottom Bar (2-16Ø)


7 7 16 4 2 10290 82.32 1.580 130.09
2 8850 2
0 0

c Bottom Bar (2-20Ø)


1 1 20 4 2 10850 86.8 2.469 214.32
0 8850 0
0 0
0 0
d Torsion Bar (2-16Ø) 8850 16 4 2 8850 70.8 1.580 111.88

2010 1
e Extra Bar at Grid 1 (2-20Ø) 20 4 2 3010 24.08 2.469 59.46
0
0
0
7 4510
f Extra Bar at Grid 2 & 3 (2-16Ø) 16 4 2 5230 41.84 1.580 66.12
2
0

80
4
7
g Stirrups for Beam-Along Grid 1 & 2 5 10 100 2 81 1610 260.82 0.617 161.00

250

80
4
7
h " 5 10 150 2 41 1610 132.02 0.617 81.49

250

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

80
4
7
i Stirrups for Beam-Along Grid 3 5 10 100 1 82 1610 132.02 0.617 81.49

250

80
4
7
j Stirrups for Short Grid A, B, C & D 10 100 4 55 1610 354.2 0.617 218.64
5

250

80
4
7
k " 10 150 4 17 1610 109.48 0.617 67.58
5

250

L Secondary Beam (300*425) 0.00


1 Along Grid A1 & C1 0.00

8730
a Top Main Bars (3-16Ø)
8 8 16 2 3 10440 62.64 1.580 98.99
5 5
5 5

b Bottom Main Bars (3-16Ø)


8 8 16 2 3 10440 62.64 1.580 98.99
5 8730 5
5 5
2 Along Grid 1a 0.00

6230
8
a Top Main Bar (3-16Ø)
5 8 16 2 3 7940 47.64 1.580 75.28

5 5
5

b Bottom Main Bar (3-16Ø)


8 8 16 2 3 7940 47.64 1.580 75.28
5 6230 5
5 5
3 Along Grid 1b 0.00

3730
8
a Top Main Bar (3-16Ø)
5 8 12 1 3 5440 16.32 0.889 14.51

5 5
5

8 8
b Bottom Main Bar (4-12Ø) 12 1 4 5440 21.76 0.889 19.34
5 3730 5
5 5

80
3
7
c Stirrups for Secondary Beam-Along A1 & C1 8 100 2 55 1410 155.1 0.395 61.28
5

250

80
3
7
d " 8 150 2 17 1410 47.94 0.395 18.94
5

250

80
3
7
e Stirrups for Secondary Beam-Along Grid 1a 8 100 1 60 1410 84.6 0.395 33.42
5

250

80
3
7
f " 8 150 1 17 1410 23.97 0.395 9.47
5

250

80
3
7
g Stirrups for Secondary Beam-Along Grid 1b 8 100 1 18 1410 25.38 0.395 10.03
5

250

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

80
3
7
h " 8 150 1 10 1410 14.1 0.395 5.57
5

250

960
960

i U-Bent at the joint of Beam 16 12 2 3180 76.32 1.580 120.61


530
200 530

M STAIRCASE 0.00
200

3354 1560 330


a First Flight-Longitudional Bar 12 1 12 7409 88.908 0.889 79.03
1690
475

50
1150
b 12 1 12 2910 34.92 0.889 31.04
1410
300

c Distribution Bar- Top & Bottom 1460 10 150 1 14 1460 20.44 0.617 12.62

d First Flight- Top & Bottom Bar 1460 10 150 1 55 1460 80.3 0.617 49.57

e Landing 3200 10 150 1 18 3200 57.6 0.617 35.56

f 1800 12 150 1 2 1800 3.6 0.889 3.20

5
0
g Extra Bar 5 1 12 1 11 2100 23.1 0.889 20.53
0 1000 0
0
0
1840
850
h 220 12 1 12 2960 35.52 0.889 31.57

50

1000
1000 50
i 12 1 11 2100 23.1 0.889 20.53

50

900 3400
j Second Flight-Longitudional Bar 12 125 1 12 7320 87.84 0.889 78.08
450 2270

300

50 1150
k 2000 12 1 12 3420 41.04 0.889 36.48

220

5
l Extra Bar 0 12 1 11 2100 23.1 0.889 20.53
1000
5
1000 0

270 380 850


m 12 125 1 12 1550 18.6 0.889 16.53
5
5 0
0

350 270 1000


n 12 125 1 11 1670 18.37 0.889 16.33

5
0

o Distribution Bar-Top & Bottom Bar


1460 10 150 1 40 1460 58.4 0.617 36.05

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

p Nosing Bar 1460 10 1 20 1460 29.2 0.617 18.03

410 480
q Nosing Ties 8 4 6 1630 39.12 0.395 15.46
480 260

300 480

r 8 9 6 1410 76.14 0.395 30.08


480 150

410 480
s 8 3 6 1520 27.36 0.395 10.81
480 150

300 480

t 8 2 6 1520 18.24 0.395 7.21


480 260

480

u 8 2 6 1110 13.32 0.395 5.26


480 150

N First Floor Landing Beam (250*380) 0.00

a Top Bar 7 7 16 1 3 5290 15.87 1.580 25.08


1 3870 1
0
9 0 9
6 6
b Bottom Bar 7
0 7 0 16 1 3 5290 15.87 1.580 25.08
1 3870 1
0 0
200
80
c Stirrups for Landing Beam 8 125 1 27 1220 32.94 0.395 13.01
330

O SLAB REINFORCEMENT DETAILS 0.00

575
1500
80 1500
2375
a Along Short Span-Between Grid A-B & C-D 8 300 1 40 9985 399.4 0.395 157.79

1375 500
2000 80

575 500
b
8 8 8 300 1 36 9985 359.46 0.395 142.01
0 8750 0

500 1875
c Grid 1(b)-3 & B & C 80 8 300 1 11 4535 49.885 0.395 19.71
2000 8
0

500
d
8 8 8 300 1 11 4535 49.885 0.395 19.71
0 3875 0

575
575 1500
e 80 8 300 1 35 7560 264.6 0.395 104.53
2375 2375
8
0

575 575
f 8 8 8 300 1 35 7560 264.6 0.395 104.53
0 6250 0

575 575
8 8
g Grid A-D, 1b-3 0 8 300 1 9 17540 157.86 0.395 62.37
480 4405 0
11345

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

575
2125 1500 1500
8
0
1625 1625
h 1750 8 300 1 9 17540 157.86 0.395 62.37

575
2230 1500 2125 8
0
i Negative Bar 0.00

2050 50
j Along 1a 50 8 300 1 40 2150 86 0.395 33.98

k Along Grid 2 (A-B) & 2(C-D) 50 1950 50 8 300 2 20 2050 82 0.395 32.40

50 2050 50
l Along Grid 2 (B-C) 8 300 1 12 2150 25.8 0.395 10.19

50 2050
m Along Grid A1 & C1 50 8 300 2 28 2150 120.4 0.395 47.57

50 2250
n Along B & C 50 8 300 2 8 2350 37.6 0.395 14.86

o Distribution Bar 0.00

p Along 1, 1a 6260 8 150 1 16 6260 100.16 0.395 39.57

q Along 2 & 3 8 150 1 7 16240 113.68 0.395 44.91


12000 4240

r Along Grid A, A1, B, C, C1 & D 8760


6260 8 150 1 18 8760 157.68 0.395 62.29

P Truss Beam (300*400) 0.00


1 Along Grid 1, 2 & 3 0.00

3425 9000 3425


7 716
a Top Bars - Ends (2-16Ø) 2 960 3 2 19210 115.26 1.580 182.14
960 2
0 0

7445 8405
7 716
b Top Bars - Mid (1-16Ø) 2 3 1 18250 54.75 1.580 86.52
960 2
0 0

3 960 316
c Bottom Bars - Ends (2-16Ø) 7275 8575 3 2 17450 104.7 1.580 165.45
2 2
0 0

3 3
d Bottom Bars- Mid (2-12Ø) 2 1925 720 960 2 12 3 2 18170 109.02 0.889 96.91
0 0
12000 1925
2 Along Grid A, B, C & D 0.00

8850
7 7
a Top Main Bar(3-16Ø) 16 4 3 10290 123.48 1.580 195.13
2 2
0 0

b Bottom Bar (2-16Ø)


3 3 16 4 2 9550 76.4 1.580 120.73
5 8850 5
0 0

c Bottom Bar (2-12Ø)


3 3 12 4 2 9550 76.4 0.889 67.91
5 8850 5
0 0

80
3
d Stirrups for Main Beam-Along Short Grid (Grid A, B, C & D)
5 8 100 4 55 1650 363 0.395 143.41
0

250

80
3
e "
5 8 150 4 17 1650 112.2 0.395 44.33
0

250

8
0
3
5
f Stirrups for Main Beam-Along Long Grid (1, 2 & 3) 8 100 3 142 1650 702.9 0.395 277.69 14150.000
0

250
3 Lapping at Column Bars 0.00

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

6000

a GF-Along Grid 1 (A & D) 20 2 6 7200 86.4 2.469 213.33

1200

760
4253

b FF-Along Grid 1 (A & D) 16 2 6 5973 71.676 1.580 113.27

960

760
1253
c SF-Along Grid 1 (A & D) 16 2 6 2973 35.676 1.580 56.38

960

6000

d GF-Along Grid 1 (B & C) 25 2 4 7500 60 3.858 231.48

1500

6000

e GF-Along Grid 1 (B & C) 20 2 2 7200 28.8 2.469 71.11

1200

1040
4253

f FF-Along Grid 1 (B & C) 20 2 6 6493 77.916 2.469 192.39

1200

1040
1253

g SF-Along Grid 1 (B & C) 20 2 6 3493 41.916 2.469 103.50

1200

6000

h GF-Along Grid 2 - A 20 1 6 7200 43.2 2.469 106.67

1200

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

1040
4253

i FF-Along Grid 2 - A 20 1 6 6493 38.958 2.469 96.19

1200

480
1253

j SF-Along Grid 2 - A 12 1 6 2453 14.718 0.889 13.08

720

6000

k GF-Along Grid 2 - B, C & D 25 3 4 7500 90 3.858 347.22

1500

6000

l GF-Along Grid 2 - B, C & D 20 3 2 7200 43.2 2.469 106.67

1200

1040
4253

m FF-Along Grid 2 - B, C & D 20 3 6 6493 116.874 2.469 288.58

1200

1040
1253

n SF-Along Grid 2 - B, C & D 20 3 6 3493 62.874 2.469 155.25

1200

6000

o GF-Along Grid 3 - A 20 1 6 7200 43.2 2.469 106.67

1200

1040
4253

p FF-Along Grid 3 - A 20 1 6 6493 38.958 2.469 96.19

1200

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

480
1253

q SF-Along Grid 3 - A 12 1 6 2453 14.718 0.889 13.08

720

6000

r GF-Along Grid 3 - B, C & D 20 3 6 7200 129.6 2.469 320.00

1200

760
4253
s FF-Along Grid 3 - B, C & D 16 3 6 5973 107.514 1.580 169.90

960

480
1253
t SF-Along Grid 3 - B, C & D 12 3 6 2453 44.154 0.889 39.25

720

Q Sill Band
1 Ground Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600

2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600

2800 75
375
375
c Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75

4150 75
825
825
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

825

e Store Room Wall 600 700 10 1 2 3750 7.5 0.62 4.63

1250
375

Ties

65 65
f Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61

190

65 65
g Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79

190

65 65
h Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07

190

65 65
i Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22

190

50 50
j Store Room Wall 8 150 1 20 170 3.4 0.40 1.35

70
2 First Floor
Longitudinal Bars

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600

2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600

2800 75
375
375
c Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75

4150 75
825
825
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties

65 65
e Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61

190

65 65
f Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79

190

65 65
g Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07

190

65 65
h Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22

190
3 Second Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600

2800 75
375
375
b Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75

4150 75
825
825
c Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

Ties

65 65
d Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61

190

65 65
e Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07

190

65 65
f Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22

190
R Lintel Band
1 Ground Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

4150 75
825
825
b Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

Ties

65 65
c Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22

190

65 65
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22

190
2 First Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Rebar Length/pc. Total Length Weight Per Total
SN Description Shape Size (mm) Structure Nos Remarks
(mm) Nos (mm) (m) Meter (Kg) Weight (Kg)

4150 75
825
825
b Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

Ties

65 65
c Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22

190

65 65
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22

190
3 Second Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600

4150 75
825
825
c Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

Ties

65 65
d Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22
190

65 65
e Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79
190

65 65
f Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190

S Slab of Bench at Corridor


2450
a At Long Direction 8 150 1 5 2450 12.25 0.40 4.84

b At Short Direction 8 150 1 17 550 9.35 0.40 3.7


550
550 Total of Reinforcement Work 22961.67 Kg
22.97 Mt.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-6C(S)-E
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha

Weight Length Total


S.N. Particulars Size Thickness Qty Total wt. Remarks
Per Metre (m) Length
1 TOP CHORD PIPE 50MM MID 5.03 5.641 12 67.69 340.49
2 BOTTOM CHORD PIPE 40MM MID 3.56 4.378 12 52.54 187.03
3 VERTICAL BRACING.1 40MM MID 3.56 1.351 12 16.21 57.71
4 VERTICAL BRACING.2 40MM MID 3.56 1.088 12 13.05 46.47
5 VERTICAL BRACING.3 40MM MID 3.56 0.825 12 9.90 35.24
6 VERTICAL BRACING.4 40MM MID 3.56 0.419 12 5.03 17.90
7 DIGONAL BRACING.1 32 MM MID 3.1 1.328 12 15.94 49.40
8 DIGONAL BRACING.2 32MM MID 3.1 1.123 12 13.48 41.78
9 DIGONAL BRACING.3 32MM MID 3.1 1.272 12 15.26 47.32
10 PURLIN 1 65MM MID 6.42 3.000 48 144.00 924.48
11 PURLIN 2 65MM MID 6.42 3.500 12 42.00 269.64
12 RUNNER 1 40MM MID 3.56 3.000 24 72.00 256.32
13 RUNNER2 40MM MID 3.56 3.500 8 28.00 99.68
15 END PURLIN 65MM MID 6.42 1.125 24 27.00 173.34
16 CROSS BRACING 40MM MID 3.56 1.380 32 44.16 157.21
17 BASE PLATE 250X250 10MM 4.9 18 88.20
18 BASE PLATE STIFFNER(L) 127X250 10MM 2.49 24 59.76
19 BASE PLATE STIFFNER(S) 50X75 10MM 0.29 24 6.96
20 PURLIN CLITE 200X90 10MM 1.41 144 203.04
21 TRUSS CLITE 200X90 10MM 1.41 72 101.52
22 RUNNER CLITE 175X70 10MM 0.96 40 38.40
23 R.CONNECTION BOX PLATE 175X160 10MM 2.19 12 26.28
24 TRUSS JOINT CLITE(C) 175X175 10MM 2.4 16 38.40
25 TRUSS JOINT CLITE(O) 175X175 10MM 2.4 8 19.20
26 STIPNER1. 100X63 10MM 0.49 16 7.84
27 STIPNER2. 63X63 10MM 0.31 64 19.84
28 WIND TIE PLATE 380X80 6MM 1.43 16 22.88
29 BRACING TIE STEPER 100X100 6MM 0.47 16 7.52
30 CROSS BRACING PIPE CLITE 165X80 6MM 0.62 64 39.68
31 TEMP PLATE 250X250 10MM 4.9 18 88.20
32 ANCHOR BOLT 16MM 1.58 0.45 72 32.40 51.19
33 NUT BOLT(16X60) 16MM 1.58 0.06 148 14.03
34 NUT BOLT(16X50) 16MM 1.58 0.05 48 3.79
35 NUT BOLT(16X40) 16MM 1.58 0.04 72 4.55
Total 3545.29 Kgs.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-6C(S)-E
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha

Site
S. No. Description G.F F.F S.F Quantity Unit Remarks
Development
A. Common Installation
1 Stand Alone 40 A DP MCB with Enclosure 1.00 1.00 nos.
2 CABLES & WIRES
2.1 2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper 21.00 20.00 20.00 61.00 r.m
conductor wires
B School Blocks
1 DISTRIBUTION BOARDS 1.00 1.00 1.00 3.00 nos.
2 CABLES & WIRES
2.1 2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm 11.00 r.m
Multistranded Cu wire
2.2 2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq 14.00 r.m
mm Multistranded Cu wire
2.3 2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq 28.00 r.m
mm Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point 3.00 13.00 12.00 12.00 40.00 pts.
3.2 Two Way Light Point 1.00 1.00 2.00 pts.
3.3 Ceiling Fan Point 4.00 4.00 pts.
4 6A Universal Pin Light Power Socket Wiring 12.00 14.00 29.00 55.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 12.00 14.00 29.00 55.00 no.
8 Light Fixtures/Luminaires & Accessories
8.1 24 W LED Recessed Mounted Square type 4.00 4.00 no.
8.2 18 W LED Surface Mounted Square type 8.00 8.00 16.00 no.
8.3 18 W LED Recessed Mounted Square type 4.00 4.00 no.
8.4 12 W LED Surface Mounted Cylindrical type 4.00 5.00 9.00 no.
8.5 12 W LED Recessed Mounted Circular type 5.00 5.00 no.
8.6 7W LED Wall Light 1.00 1.00 no.
9 Pull Box 3.00 no.
10 External Post Top Light Pole 3.00 3.00 no.
11 Post Top External Light Fixtures 3.00 3.00 no.
12 Earthing & Lighting Protection
12.1 Chemical Earthing 3.00 3.00 no.
12.2 Earthing Bar 3.00 3.00 no.
12.3 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip 66.00 66.00 r.m
12.3.2 12 SWG Cu wire 14.00 14.00 r.m
13 Earth Test link 1.00 1.00 no.
C Solar PV System
1 Solar PV Panel 8.00 8.00 nos.
2 Tubular Deep Cycle Battery 4.00 4.00 nos.
3 Hybrid Inverter 1.00 1.00 nos.
D Fire Extinguisher
1 5.0kg Size ABC Stored Pressure Type Fire 3.00 nos.
Extinguisher 1.00 1.00 1.00
2 Dry Powder Fire Extinguisher 1.00 1.00 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-6C(S)-E
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha

S. No. Description Quantity Unit Remarks


A PIPING WORKS
1 WATER SUPPLY INSTALLATION
a CPVC Pipe
40 mm 112.00 r.m
15mm 1.80 r.m
b Galvanised Iron
40mm 6.50 r.m
25mm 6.00 r.m
c CPVC Ball Valve
40mm 3.00 nos.
25mm 1.00 nos.
d Electric Centrifugal water pump of 0.5 HP 1.00 nos.
e 1000 Litres Capacity Water Storage Tank 1.00 nos.
f MS Overhead Tank Stand 1.00 nos.
2 SEWER, RAIN AND WASTE WATER INSTALLATION
1 PVC SWR
1.1 75 mm 12.50 r.m
1.2 50 mm 3.00 r.m
B SCHOOL BLOCKS
1 SANITARY INSTALLATION
a Stainless Steel Kitchen Sink 1.00 set
b CP Self Closing Bib Cock 1.00 no.
c PVC Multi Floor Trap with Cover 1.00 nos.
d CP Waste Coupling and PVC Bottle Trap for Water Trough 1.00 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-6C(S)-E
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha

S.N Furniture Description Symbol Qty Unit Remarks


1 Student Desk 6-12 (2 Seater) D-01C 30 nos.
2 Student Bench 6-12 (2 Seater) B-01C 30 nos.
3 Student Bench G6-12 (3 Seater) B-02C 8 nos.
4 Teacher's Table T-01 4 nos.
5 Teacher's Chair C-01 4 nos.
6 White Board F-03 2 nos.
7 Library Table T-02 4 nos.
8 Library Shelf F-04 3 nos.
9 Computer Chair C-02 24 nos.
10 Computer Table T-04 12 nos.
11 White Board with Stand F-05 1 nos.
12 Cabinet F-06 3 nos.
13 Office Table T-07 12 nos.
14 Office Chair C-03 12 nos.
15 Office Chair (Visitor) C-05 12 nos.
16 Dining Table T-09 2 nos.
17 Equipment Cabinet F-09 2 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha

Length Breadth Height


S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
1 Earthworks
1.1 Site Clearance & Mobilization
For Water Tank 1 4.85 4.6 22.31
Total 22.31 sq.m

1.2 Earthwork in excavation


For Water Tank 1 3.65 3.40 1.98 24.57
Total 24.57 Cu.m.

1.3 Earthback Filling


Total Earthwork Excavated 24.57
Water Tank Volume -1 3.35 3.1 1.98 -20.56
Total 4.01 Cu.m.

1.4 Boulder soling


Below Water Tank 1 3.35 3.1 0.2 2.077
Total 2.08 Cu.m.

2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.

2.2 PCC for RCC Work 1:1.5:3


For Base Slab 1 3.35 3.10 0.18 1.82
For Water Tank Wall
Long Wall 2 3.35 0.18 1.68 1.96
Short Wall 2 2.75 0.18 1.68 1.61
Trianagle Portion
Long Wall 2 3.00 0.05 Area 0.27
Short Wall 2 2.75 0.05 Area 0.25
Slab 1 3.35 3.1 0.15 1.56
Manhole openings -1 0.6 0.6 0.15 -0.05
Total 7.41 Cu.m.

2.3 Silica Admixture


10 Kg per cu.m. of R.C.C. M20 10 7.41 74.15
Total 74.15 kg

2.5 Form works


For Base Slab 1 12.9 0.18 2.26
For Water Tank Wall
Outer Side
Long Wall 2 3.35 1.83 12.23
Short Wall 2 3.10 1.83 11.32
Inside wall
Long Wall 2 3.00 1.53 9.15
Short Wall 2 2.75 1.53 8.39
Trianagle Portion
Long Wall 2 3.00 0.42 2.54

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Short Wall 2 2.75 0.42 2.33
Slab 1 3 2.75 8.25
Side for Manhole openings 1 2.4 0.15 0.36
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 56.46 Sq.m.

3 PLASTERING WALL FINISHING WORKS


3.1.1 CEMENT PLASTER WORKS WITH
PUNNING
Base Slab 1 2.40 2.15 5.16
For Water Tank Wall
Long Wall 2 3.00 1.53 9.15
Short Wall 2 2.75 1.53 8.39
Triangle Portion
Long Wall 2 3.00 0.42 2.54
Short Wall 2 2.75 0.42 2.33
Top Slab 1 3.00 2.75 8.25
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 35.46 Sq.m.

4 Water Proof Coating


Inside Water tank 1 35.46
Total 35.46 sq.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha
Bar Bending Schedule
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)
A Outer Vertical Bars 1
1 Shorter Span 10 35 7.01 245.35 0.62 152.12 0.083 0.083

1.915 1.915

3.02

2 Longer span 10 32 7.286 233.152 0.62 144.55


0.083 0.083

1.915 1.915

3.29

B Inner Vertical Bars 2


1 Shorter Span 10 35 2.503 175.21 0.62 108.63 0.079

1.884

0.05
0.49 0.49

2 Longer Span 10 32 2.503 170.204 0.62 105.527 0.079

1.884

0.05
0.49 0.49

C. Extra Bars 2 10 67 1.79 239.86 0.62 148.71 0.6

0.592 0.6 0.6

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)
D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 21 3.62 304.08 0.62 188.53

3.02 3.02

0.3 0.3

2 Longer Span 10 21 3.87 325.08 0.62 201.55 0.3 0.3

3.27 3.27

0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 35 3.14 439.6 0.62 272.55 3.045
0.05 0.05

2 Longer Span 10 31 3.42 424.08 0.62 262.93 3.32


0.05 0.05
F Man Hole Rebar
1 horizontal Rebar -2 10 6 1.2 -14.4 0.62 -8.93 0.9 0.3
Total 1576.17 Kg
1.58 Mt.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha
Bar Bending Schedule
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)
A Outer Vertical Bars 1
1 Shorter Span 10 35 7.01 245.35 0.62 152.12 0.083 0.083

1.915 1.915

3.02

2 Longer span 10 32 7.286 233.152 0.62 144.55


0.083 0.083

1.915 1.915

3.29

B Inner Vertical Bars 2


1 Shorter Span 10 35 2.503 175.21 0.62 108.63 0.079 0.079

1.884 1.884

0.05
0.49 0.49

2 Longer Span 10 32 2.503 170.204 0.62 105.527 0.079 0.079

1.884 1.884

0.05
0.49 0.49

C. Extra Bars 2 10 67 1.79 239.86 0.62 148.71 0.6 0.6

0.592
0.592 0.6 0.6

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)
D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 21 3.62 304.08 0.62 188.53

3.02 3.02

0.3 0.3

2 Longer Span 10 21 3.87 325.08 0.62 201.55 0.3 0.3

3.27 3.27

0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 35 3.14 439.6 0.62 272.55 3.045
0.05 0.05

2 Longer Span 10 31 3.42 424.08 0.62 262.93 3.32


0.05 0.05
F Man Hole Rebar
1 horizontal Rebar -2 10 6 1.2 -14.4 0.62 -8.93 0.9 0.3
Total 1576.17 Kg
1.58 Mt.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job: Site Development Works
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha
Site Development Work
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
1 Site Clearance
Concrete Pavement
Infront of Building 1 3.80 1.50 5.70
1 19.50 2.00 39.00
1 3.00 1.50 4.50
1 15.50 1.50 23.25
1 3.00 4.50 13.50

Way to Toilet Block 1 26.00 1.50 39.00


Total 124.95 sq.m

2 Earth Work Excavation


Excavation For Gate Column
Column 2 1.20 1.20 1.50 4.32
Concrete Pavement
Infront of Building 1 3.80 1.50 0.15 0.86
1 19.50 2.00 0.15 5.85
1 3.00 1.50 0.15 0.68
1 15.50 1.50 0.15 3.49
1 3.00 4.50 0.15 2.03

Way to Toilet Block 1 26.00 1.50 0.15 5.85


Excavation For Boundary Wall
Chain Link Fence 89 0.15 0.15 0.60 1.20

Excavation For Flag Pole 0.00


Flag Pole 2 0.60 0.60 1.00 0.72
2 1.10 0.50 0.15 0.17
2 1.60 0.25 0.15 0.12
1 0.60 0.40 0.15 0.04
Total 25.31 cu.m

3 Earth Back Filling


Total Excavation Work 1 25.31 25.31
Deduction
Soling -1 18.75 Volume -18.75
P.C.C.(1:3:6) -1 0.00 Volume 0.00
RCC -2 0.90 0.90 0.25 -0.41
-2 0.30 0.30 2.95 -0.53
5.63 cu.m

4 Boulder Soling
Concrete Pavement
Infront of Building 1 3.80 1.50 0.15 0.86
1 19.50 2.00 0.15 5.85
1 3.00 1.50 0.15 0.68
1 15.50 1.50 0.15 3.49
1 3.00 4.50 0.15 2.03

Way to Toilet Block 1 26.00 1.50 0.15 5.85


Total 18.75 cu.m

5 P.C.C. Works
PCC For Gate Column

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Column 2 0.90 0.90 0.08 0.12

PCC For Flag Pole


Flag Pole 2 0.30 0.30 1.20 0.22
1 2.40 0.80 0.10 0.19
2 0.30 0.30 0.08 0.01
Deduct Pole -2 0.004 Area 1.35 -0.01
0.53 cu.m

6 P.C.C.(1:2:4) Works
Concrete Pavement
Infront of Building 1 3.80 1.50 0.15 0.86
1 19.50 2.00 0.15 5.85
1 3.00 1.50 0.15 0.68
1 15.50 1.50 0.15 3.49
1 3.00 4.50 0.15 2.03

Way to Toilet Block 1 26.00 1.50 0.15 5.85


Total 18.74 cu.m

7 P.C.C For R.C.C. Works


R.C.C. Works M20
Foundation
Gate Column Footing
Footing 2 0.90 0.90 0.25 0.41
Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.18 0.05 0.02
Total 0.99 cu.m

8 Steel Reinforcement
For gate
Total
At base of the footing kg per m
length
Main bar(10mm) 12 0.90 10.80 0.62 6.70
Distribution bar(10mm) 12 0.90 10.80 0.62 6.70
For column Ld (12mm) 16 0.48 7.68 0.89 6.84
For column (12mm) 16 2.80 44.80 0.89 39.87
For stirrups (external) 8mm 54 1.10 59.40 0.39 23.17
For stirrups (Internal)) 8mm 54 0.70 37.80 0.39 14.74
Total 98.01 Kg
0.10 Tons

9 Silica Cement Admixture


10.00 0.99 9.88
Total 9.89 Kg

10 Formworks
Entrance Gate-Foundation 2 3.60 0.35 2.52
Gate Column 2 1.20 3.15 7.56
Flag Pole Steps 2 0.25 0.80 0.4
Flag Pole Masonry Top Surface 1 1.70 0.50 0.85
Total 11.33 sq.m

12 Full Brick (230 mm) Works (1:4c/s)


Gate Column 2 0.54 0.23 1.85 0.46
2 0.3 0.23 0.45 0.06
Flag Pole Base 2 0.8 0.23 0.55 0.20
Total 0.72 cu.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)

13 Neat Cement Skirting works


Gate Column 2 2.2 4.40
Total 4.40 r.m

14 Metal Works (Fence)


Total
Description Nos length Kg/m Total
Length
Chain Link Fence
ISA 40x40x4mm 2 140 280.00 2.40 672.00
ISA 50x50x5mm 59 1.89 111.51 3.80 423.74
Bracing ISA 50x50x5mm 30 1.28 38.40 3.80 145.92
Total 1,241.66 k.g

15 Metal work (Entrance Gate)


Metal Gate
50mm Dia MS Pipe 2 7.13 14.26 3.61 51.48
25mm Dia MS Pipe 56 0.7 39.2 1.58 61.94
Middle sheet 1 0.74 0.0012 7850 6.97
Hole Fast 4 0.45 1.8 3.61 2.92
Total 123.31 k.g

16 External Plaster
Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84
Top Coping 2 2.36 0.05 0.24
4 0.59 0.30 0.71
Total 7.80 sq.m

17 Exterior Weather Coat Paint


As per Outside Plaster 1 7.8 7.80
Gate Column Skirting 2 2.36 0.10 0.47
Total 8.28 sq.m

18 Chain Link Fence(50x50 Mesh)


Fencing 1.00 140 1.20 168.00
Total 168.00 sq.m

19 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer