Shree Jal Devi Kumari LSS, Taklung
Shree Jal Devi Kumari LSS, Taklung
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
7.1.1 ON INNER WALL sq.m 549.50 600.00 329,700.00 557.11 334,267.16 549.50 329,700.00 7.61 4,567.16 101.39%
7.1.2 ON CEILING (1:4) sq.m 153.38 500.00 76,690.00 288.40 144,201.00 153.38 76,690.00 135.02 67,511.00 188.03%
7.1.3 ON OUTER WALL (1:6)
7.1.3.1 EXTERNAL PLASTER sq.m 197.53 600.00 118,518.00 372.47 223,479.99 345.46 207,278.55 27.00 16,201.44 188.56%
PAINTING WORKS
7.2.1 7DISTEMPER PAINT 174,306.00 1,020.42 204,084.00 177,384.00 133.50 26,700.00 117.08%
sq.m 871.53 200.00 886.92
7.2.2 EXTERIOR WEATHER COAT PAINT sq.m 213.36 350.00 74,676.00 372.47 130,364.50 360.53 126,185.50 11.94 4,179.00 174.57%
7.2.3 CLEAR SILICON WATER-REPELLANT COATNG sq.m 214.68 550.00 118,074.00
7.2.4 ENAMEL PAINT sq.m 224.26 400.00 89,704.00 258.43 103,372.00 224.26 89,704.00 34.17 13,668.00 115.24%
8 MISCELLANEOUS
8.2 CEMENT BOARD WALL sq.m 15.39 6,500.00 100,035.00 14.55 94,575.00 15.39 100,035.00 (0.84) (5,460.00) 94.54%
8.3 RAILING kg 982.18 220.00 216,079.60 992.98 218,455.60 892.89 196,435.80 100.09 22,019.80 101.10%
8.4 PUMP SHED nos. 1.00 80,000.00 80,000.00 1.00 80,000.00 1.00 80,000.00 - - 100.00%
3 ELECTRICAL WORKS
A Common Installation
1 Stand Alone 40 A DP MCB with Enclosure no. 1.00 12,000.00 12,000.00 1.00 12,000.00 1.00 12,000.00 - - 100.00%
2 CABLES & WIRES
1.1 2 Nos 10 Sq mm Multistranded Cu Wire + 1 No 6 Sq rm 60.00 800.00 48,000.00 61.00 48,800.00 60.00 48,000.00 1.00 800.00 101.67%
B mm Multistranded
SCHOOL BLOCKS Cu wire
1 DISTRIBUTION BOARDS
1.1 Ground Floor nos. 1.00 32,000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 - - 100.00%
1.2 First Floor nos. 1.00 25,000.00 25,000.00 1.00 25,000.00 1.00 25,000.00 - - 100.00%
1.3 Second Floor nos. 1.00 25,000.00 25,000.00 1.00 25,000.00 1.00 25,000.00 - - 100.00%
2 CABLES & WIRES
2.1 2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq rm 10.00 600.00 6,000.00 11.00 6,600.00 10.00 6,000.00 1.00 600.00 110.00%
2.2 mm
2 Multistranded
Nos Cu wire Cu Wire + 1 No 2.5 Sq
4 Sq mm Multistranded rm 15.00 500.00 7,500.00 14.00 7,000.00 7,500.00 (1.00) (500.00) 93.33%
15.00
2.2 mm Multistranded
2 Nos Cu wire
2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 rm 30.00 250.00 7,500.00 28.00 7,000.00 7,500.00 (2.00) (500.00) 93.33%
30.00
3 Sq mm Multistranded
General Cu wire
service light point wiring pts.
3.1 one way light point pts. 40.00 700.00 28,000.00 40.00 28,000.00 40.00 28,000.00 - - 100.00%
3.2 Two Way Light Point pts. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 - - 100.00%
3.3 Ceiling Fan Point pts. 4.00 900.00 3,600.00 4.00 3,600.00 4.00 3,600.00 - - 100.00%
4 6A Universal pin Light power point wiring pts. 55.00 700.00 38,500.00 55.00 38,500.00 55.00 38,500.00 - - 100.00%
5 Switch Socket Outlets nos.
5.1 6A Universal power Switch Socket nos. 55.00 900.00 49,500.00 55.00 49,500.00 55.00 49,500.00 - - 100.00%
6 Light Fixtures/Luminaires & Accessories
6.1 24 W LED Recessed Mounted Square type nos. 4.00 4,500.00 18,000.00 4.00 18,000.00 4.00 18,000.00 - - 100.00%
6.2 18 W LED Surface Mounted Square type nos. 16.00 2,700.00 43,200.00 16.00 43,200.00 16.00 43,200.00 - - 100.00%
6.3 18 W LED Recessed Mounted Square type nos. 4.00 2,700.00 10,800.00 4.00 10,800.00 4.00 10,800.00 - - 100.00%
6.4 12 W LED Surface Mounted Cylindrical type nos. 9.00 2,400.00 21,600.00 9.00 21,600.00 9.00 21,600.00 - - 100.00%
6.5 12 W LED Recessed Mounted Crrcular type nos. 5.00 2,400.00 12,000.00 5.00 12,000.00 5.00 12,000.00 - - 100.00%
6.6 LED Wall Light nos. 1.00 1,800.00 1,800.00 1.00 1,800.00 1.00 1,800.00 - - 100.00%
7 Pull Box nos. 3.00 700.00 2,100.00 3.00 2,100.00 3.00 2,100.00 - - 100.00%
8 External post top light pole nos. 3.00 7,500.00 22,500.00 3.00 22,500.00 3.00 22,500.00 - - 100.00%
9 Post Top External Light Fixtures nos. 3.00 9,800.00 29,400.00 3.00 29,400.00 3.00 29,400.00 - - 100.00%
10 Earthing and Lightning protection nos.
10.1 Chemical Earhting nos. 3.00 45,000.00 135,000.00 3.00 135,000.00 3.00 135,000.00 - - 100.00%
10.2 Earthing Bar nos. 3.00 2,200.00 6,600.00 3.00 6,600.00 3.00 6,600.00 - - 100.00%
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
11 GI Strip/Cu wire Earthing
11.1 25*3mm GI Strip mtr. 65.00 300.00 19,500.00 66.00 19,800.00 65.00 19,500.00 1.00 300.00 101.54%
11.2 12 SWG Cu wire mtr. 15.00 200.00 3,000.00 14.00 2,800.00 15.00 3,000.00 (1.00) (200.00) 93.33%
12 Earth Test link nos. 1.00 1,500.00 1,500.00 1.00 1,500.00 1.00 1,500.00 - - 100.00%
C SOLAR PV SYSTEM
1 Solar PV Panel nos. 8.00 26,000.00 208,000.00 8.00 208,000.00 8.00 208,000.00 - - 100.00%
2 Tubular Deep cycle Battery nos. 4.00 30,000.00 120,000.00 4.00 120,000.00 4.00 120,000.00 - - 100.00%
3 Hybrid Inverter nos. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 - - 100.00%
D FIRE EXTINGUISHER
Fire extinguisher ABC stored Pressure 5.0kg size
a ABC stored pressure type Fire extinguisher. nos. 3.00 8,000.00 24,000.00 3.00 24,000.00 24,000.00 - - 100.00%
3.00
b Dry Powder Fire Extinguisher nos. 1.00 8,000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 - - 100.00%
4 SANITARY WORKS
A PIPING WORKS
1 WATER SUPPLY INSTALLATION
- 40 mm rm. 110.00 1,600.00 176,000.00 112.00 179,200.00 110.00 176,000.00 2.00 3,200.00 101.82%
- 15 mm rm. 2.00 500.00 1,000.00 1.80 900.00 2.00 1,000.00 (0.20) (100.00) 90.00%
b Galvanised Iron Pipe
- 40 mm rm. 6.00 1,600.00 9,600.00 6.50 10,400.00 6.00 9,600.00 0.50 800.00 108.33%
- 25 mm rm. 6.00 1,000.00 6,000.00 6.00 6,000.00 6.00 6,000.00 - - 100.00%
c CPVC Ball Valve
- 40 mm nos. 3.00 2,000.00 6,000.00 3.00 6,000.00 3.00 6,000.00 - - 100.00%
- 25 mm nos. 1.00 900.00 900.00 1.00 900.00 1.00 900.00 - - 100.00%
d Electric Centrifugal Water Pump of 0.50 HP set 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 - - 100.00%
e 1000 litres capacity water storage tank nos. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 - - 100.00%
f MS Overhead Tank Stand nos. 1.00 25,000.00 25,000.00 1.00 25,000.00 1.00 25,000.00 - - 100.00%
2 SEWER, RAIN AND WASTE WATER
INSTALLATION
- 75 mm ED 6 kg/sqcm rm. 12.00 1,200.00 14,400.00 12.50 15,000.00 14,400.00 0.50 600.00 104.17%
12.00
- 50 mm ED 6 kg/sqcm rm. 2.00 350.00 700.00 3.00 1,050.00 2.00 700.00 1.00 350.00 150.00%
B SCHOOL BLOCKS
1 SANITARY INSTALLATION
a Stainless Steel Kitchen Sink set 1.00 35,000.00 35,000.00 1.00 35,000.00 1.00 35,000.00 - - 100.00%
b CP self closing bib cock nos. 1.00 4,000.00 4,000.00 1.00 4,000.00 1.00 4,000.00 - - 100.00%
c PVC Multi-floor trap with cover nos. 1.00 600.00 600.00 1.00 600.00 1.00 600.00 - - 100.00%
CP Waste Coupling and PVC bottle trap for water
d trough nos. 1.00 1,500.00 1,500.00 1.00 1,500.00 1,500.00 - - 100.00%
1.00
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
10 FORM WORKS Sq.m 9.12 800.00 7,296.00 11.33 9,064.00 9.12 7,296.00 2.21 1,768.00 124.23%
13 BRICKS MASONRY WORKS Cu.m 0.22 18000.00 3,960.00 0.72 13,032.72 0.57 10,260.00 0.15 2,772.72 329.11%
14 NEAT CEMENT SKIRTING r.m 4.72 100.00 472.00 4.40 440.00 4.72 472.00 (0.32) (32.00) 93.22%
15 METAL WORKS FOR FENCE k.g 1697.69 220.00 373,491.80 1,241.66 273,165.20 1227.30 270,006.00 14.36 3,159.20 73.14%
16 METAL WORKS FOR GATE k.g 130.78 220.00 28,771.60 123.31 27,128.20 118.89 26,155.80 4.42 972.40 94.29%
17 PLASTER ON OUTER WALL Sq.m 7.92 600.00 4,752.00 7.80 4,680.00 7.80 4,680.00 - - 98.48%
18 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 3,104.50 8.28 2,898.00 8.28 2,898.00 - - 93.35%
19 CHAIN LINK FENCE Sq.m 184.58 1000.00 184,580.00 168.00 168,000.00 168.00 168,000.00 - - 91.02%
20 FLAG POLE nos. 2 25000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 - - 100.00%
FURNITURE WORKS lot 1 3,000,000.00 3,000,000.00 1.00 3,000,000.00 1.00 3,000,000.00 - - 100.00%
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-6C(S)-E & Site development works
School Name : Shree Jal Devi Secondary School
Location : Taklung, Gorkha
Abstract of Cost
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount (NRs) Remarks
BOQ Quantity
No. 3-6C(S)-E Site Development Water Tank
GENERAL
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 12.00 25,000.00 12.00 300,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 50.00 2,000.00 48.00 96,000.00
6 DISMANTLING OF COMPLETELY DAMAGED BUILDING sq.m 186.29 3,000.00 180.00 540,000.00
7 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
8 CONSTRUCTION OF NEW TLC sq.m 186.29 3,000.00 - -
9 LAB TEST(WATER TEST) job 1.00 7,500.00 - -
10 TEMPORARY TOILET nos. 2 150,000.00 2.00 300,000.00
11 ROAD REPAIR AND MAINTENANCE Km 11.00 50,000.00 11.00 550,000.00
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 36.51 18,000.00 74.21 74.21 1,335,720.15
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 11.07 1,500.00 11.04 11.04 16,566.60
3.4 HONEY COMB BRICK WORKS (1:3 c/s) cu.m 0.24 9,000.00 0.24 0.24 2,119.50
4 DOORS & WINDOWS WORKS
4.1 METAL FRAME
3 ELECTRICAL WORKS
A Common Installation
1 Stand Alone 40 A DP MCB with Enclosure no. 1.00 12,000.00 1.00 1.00 12,000.00
2 CABLES & WIRES
1.1 2 Nos 10 Sq mm Multistranded Cu Wire + 1 No 6 Sq mm Multistranded Cu wire rm 60.00 800.00 61.00 61.00 48,800.00
B SCHOOL BLOCKS
1 DISTRIBUTION BOARDS
1.1 Ground Floor nos. 1.00 32,000.00 1.00 1.00 32,000.00
1.2 First Floor nos. 1.00 25,000.00 1.00 1.00 25,000.00
1.3 Second Floor nos. 1.00 25,000.00 1.00 1.00 25,000.00
2 CABLES & WIRES
2.1 2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded Cu wire rm 10.00 600.00 11.00 11.00 6,600.00
2.2 2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm Multistranded Cu wire rm 15.00 500.00 14.00 14.00 7,000.00
4 SANITARY WORKS
A PIPING WORKS
1 WATER SUPPLY INSTALLATION
- 40 mm rm. 110.00 1,600.00 112.00 112.00 179,200.00
- 15 mm rm. 2.00 500.00 1.80 1.80 900.00
b Galvanised Iron Pipe
- 40 mm rm. 6.00 1,600.00 6.50 6.50 10,400.00
- 25 mm rm. 6.00 1,000.00 6.00 6.00 6,000.00
c CPVC Ball Valve
- 40 mm nos. 3.00 2,000.00 3.00 3.00 6,000.00
- 25 mm nos. 1.00 900.00 1.00 1.00 900.00
d Electric Centrifugal Water Pump of 0.50 HP set 1.00 12,500.00 1.00 1.00 12,500.00
e 1000 litres capacity water storage tank nos. 1.00 34,000.00 1.00 1.00 34,000.00
f MS Overhead Tank Stand nos. 1.00 25,000.00 1.00 1.00 25,000.00
5 Barricading Works 1 37 37 Rm
Breadth Height
S.No Description No. Length (m) Qty. Unit Remarks
(m) (m)
1 Earthworks
1.1 Site Clearance and Mobilization
3-6C(S) Bldg 1 21.95 13.95 306.20
Soak Pit 1 8.55 Area 8.55
Total 314.75 Sq.m
Building Floors
Classroom
Class Room 2 5.75 5.75 0.20 13.23
Corridor 2 5.75 2.25 0.20 5.18
1 3.25 2.25 0.20 1.46
Below Staircase 1 3.25 5.75 0.20 3.74
Below ramp
For Slope 1 6.82 1.18 0.20 1.61
For Front wall 3-AB 1 6.50 0.45 0.10 0.29
For Side wall -3B 1 1.33 0.45 0.10 0.06
Inside of soak Pit 1 1.13 Area 2.00 2.26
Total 48.25 Cu.m
2 Concrete Works
2.1 PCC
2.1.1 PCC work (1:3:6)
For Footing
Grid 1
Footing (F2) 2 2.20 2.20 0.10 0.97
Footing (F3) 2 2.50 2.50 0.10 1.25
Grid 2
Column
From lower to plinth tie beam 12.00 0.45 0.45 1.20 2.92
Plinth tie beam
Grid 1,2,3 3.00 14.15 0.30 0.53 6.69
Grid A,B,C,D 4.00 7.60 0.30 0.53 4.79
Ground Floor
For column 12 0.45 0.45 3.00 7.29
First Floor
For column 12 0.45 0.45 3.00 7.29
F.F Staircase
Landing beam 1 3.05 0.25 0.38 0.29
Landing 2 1 3.2 1.85 0.15 0.89
First flight
Waist Slab 1 3.35 1.5 0.15 0.75
Riser 9 Area 0.02 1.50 0.30
Second Flight
Waist Slab 1 3.40 1.50 0.15 0.77
Riser 10 Area 0.02 1.50 0.34
Second Floor Beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.53 6.69
Grid A-B-C_D 4 7.60 0.30 0.53 4.79
Secondary Beam
Grid A1-C1 2 7.90 0.25 0.43 1.68
Second Floor
For column 12 0.45 0.45 2.60 6.32
Second Floor Truss Beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.40 5.09
Grid A-B-C-D 4 7.60 0.30 0.40 3.65
Lintel Bands, Second floor level
Along grid A,B,C,D 4 5.55 0.23 0.13 0.64
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 14.15 0.23 0.13 0.41
Sill Bands, Second floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 11.10 0.23 0.08 0.19
Along grid 2 1 11.10 0.23 0.08 0.19
Lab Partition Wall 2.00 3.60 0.23 0.08 0.12
Vetical Band 4.00 2.48 0.23 0.08 0.17
Soak Pit
RCC slab 1 2.27 Area 0.13 0.28
Total 137.54 Cu.m
Soak Pit
RCC slab
Base Area 1 1.13 1.13
Along Sides 1 5.34 0.15 0.80
side formwork for void and Removable Cover 2 2.44 0.15 0.73
Total 953.62 sq.m
3 Brick works
3.2 Brick Masonary Work (1:4 c/s)
Foundation upto plinth
Ground floor
Along grid A,B,C,D/(1-2) 4 5.55 0.23 2.33 11.87
Along grid 1 1 11.10 0.23 2.33 5.94
1 3.05 0.23 2.02 1.42
Along grid 2 1 10.80 0.23 2.33 5.78
Sink Support Wall 2 0.50 0.23 0.65 0.15
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Class Room 2 5.78 5.75 66.41
Corridor 1 15.80 2.50 39.50
1 3.20 1.50 4.80
Below Staircase 1 4.50 3.20 14.40
Staircase Tread 18 0.3 1.50 8.10
Riser 20 0.15 1.50 4.50
Staircase landing 1 1.80 3.20 5.76
7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Classroom 2.00 23.15 2.91 134.73
Staircase 1.00 14.67 2.91 42.69
Kitchen Slab Border 1.00 3.70 0.10 0.37
1.00 2.83 0.10 0.28
Bottom 1.00 2.40 0.65 1.56
Support Walls 2.00 1.50 0.65 1.95
First Floor
Classroom 2.00 23.15 2.91 134.73
Staircase 1.00 14.67 2.91 42.69
Column
Grid 2A,2D 2.00 0.45 2.91 2.62
Grid 2B,2C 2.00 1.08 2.91 6.26
Deductions
W1 -8 1.10 1.13 -4.95
V1 -8 1.10 0.53 -2.31
W2 -1 1.50 1.00 -0.75
D1 -4 1.10 2.48 -5.45
Second Floor
Classroom 2.00 23.15 3.00 138.90
Lab Partition Wall 2.00 7.20 1.20 17.28
2.00 3.60 0.25 1.80
Staircase 1.00 14.67 3.00 44.01
Column
Grid 2A,2D 2.00 0.45 3.00 2.70
Grid 2B,2C 2.00 1.08 3.00 6.45
Deductions
W1 -8 1.10 1.13 -4.95
W2 -1 1.50 1.00 -0.75
V2 -8 1.10 0.65 -2.86
D2 -4 1.10 2.60 -5.72
Total 557.11 sq.m
Secondary Beam
Along Grid A1-C1 2 7.65 0.60 9.18
Along Grid 1a 2 5.70 0.60 6.84
Along Grid 1b 1 3.20 0.60 1.92
Below staircase
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
Second floor
Truss Beam
Classroom 4 4 5.55 0.40 8.88
Classroom 5 4 5.55 0.40 8.88
Corridor; Along grid 2 , ( A-B) and (C-D) 2 5.55 0.40 4.44
Corridor; Along grid 2 , ( B-C) 1 3.05 1.10 3.36
Corridor; Along grid 3 , ( A-B), (B-C) and (C-
D) 1 14.15 0.70 9.91
Corridor; Along grid A, B, C and D; (2-3) 4 2.20 1.10 9.68
Total 288.40 sq.m
Truss Level
Main Beam(300 x 400)
Along grid 1 1.00 14.15 0.40 5.66
Along grid 3 1.00 14.15 0.40 5.66
Along grid A and D 2.00 7.60 0.40 6.08
Column Plaster
Upto Plinth Level
Along grid 1
Grid 1A,1D 2.00 1.10 0.45 0.99
Grid 1B,1C 2.00 0.65 0.45 0.59
Along grid 2
Grid 2A,2D 2.00 0.55 0.45 0.50
Along grid 3
Along grid 3A 1.00 0.08 0.38 0.03
1.00 0.45 0.40 0.18
Grid 3B 1.00 0.08 0.15 0.01
Grid 3C 1.00 0.60 0.15 0.09
Grid 3D 1.00 1.05 0.15 0.16
Upto Sill Level
Along grid 1
Grid 1A,1D 2.00 0.90 0.68 1.22
Grid 1B,1C 2.00 0.45 0.68 0.61
Along grid 2
Grid 2A,2D 2.00 0.55 0.68 0.74
Ground Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2
Grid 2A,2D 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3D 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C 2.00 1.20 2.88 6.90
2.00 0.60 3.00 3.60
First Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2
Grid 2A,2D 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3D 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C 2.00 1.20 2.88 6.90
2.00 0.60 3.00 3.60
Second Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2
Outer Steps
Grid 2A,2D 2.00 1.03 0.45 0.92
Grid 3A 1.00 0.93 0.45 0.42
Steps Edge 3.00 0.60 0.45 0.81
For Ramp
Top-3B 1.00 1.33 0.25 0.33
Top 3AB 1.00 6.47 0.13 0.81
Front 3-AB 1.00 1.60 0.60 0.96
1.00 5.10 0.38 1.91
Inner 1.00 7.52 0.15 1.13
Side-3B 1.00 1.33 0.60 0.80
For Bench
Top 2.00 2.40 0.50 2.40
8 MISCELLANOUS
8.2 Cement Board
Partition
Above Side Walls 1.00 9.70 1.50 14.55
Total 14.55 sq.m
8.3 Railing
Total
Staircase Railing Kg/m Total
No. Length (m) Length
Horizontal ISNB 40 M 1 18.40 18.40 3.61 66.42
Vertical 38 mm Square Pipe 14 0.86 12.04 3.14 37.81
Horizontal 25mm Square Pipe 4 17.35 69.40 0.85 58.99
Balcony Railing
Horizontal ISNB 40 M 2 18.25 36.50 3.61 131.77
Horizontal ISNB 32 M 4 16.40 65.60 3.14 205.98
Vertical ISNB 40 M 34 1.08 36.72 3.61 132.56
Vertical 25mm Square Pipe 236 0.82 193.52 0.85 164.49
Pedestal
ISNB 40M 8 1.70 13.60 3.61 49.10
ISNB 40M 8 2.05 16.40 3.61 59.20
Base plate 69 0.00009375 0.01 7850 50.78
A Foundation
Longitudional Bar
a. F1
1 1400 1 12 150 4 20 1600 128 0.889 113.78
0 0
0 0
b. F2
1 2100 1 12 150 2 30 2300 138 0.889 122.67
0 0
0 0
c. F3
1 2400 1 12 150 4 34 2600 353.6 0.889 314.31
0 0
0 0
1 2700 1
d. F4 12 150 2 38 2900 220.4 0.889 195.91
0 0
0 0
B Foundation Beam 300*250
8850
a 3-12Ø Top Bar Along Grid A, B, C & D 2 2 12 4 3 9710 116.52 0.889 103.57
5 5
0 180 180 0
5 5
0 520
180 520
180 0
15850
e 1-12Ø Top Mid Bar Along Grid 1,2&3 2 2 12 3 1 16710 50.13 0.889 44.56
5 5
0 520
180 520
180 0
g 2-12Ø Bottom Ends Bar Along Grid 1,2&3 7 12 3 2 16710 100.26 0.889 89.12
15850 7
2 2
0 0
h Lapping on Bottom Ends Bar 720 12 3 2 720 4.32 0.889 3.84
i 1-12Ø Bottom Mid Bar Along Grid 1,2&3 7 7 12 3 1 16710 50.13 0.889 44.56
2 15850
2
0 0
j Lapping on Bottom Mid Bar 720 12 3 2 720 4.32 0.889 3.84
200
80
l Entire Beam Length 250 8 100/150 1 673 1060 713.38 0.395 281.83
15850
a 2-16Ø Top Ends Bar Along Grid 1, 2 & 3 7 16 3 2 17290 103.74 1.580 163.94
7
2 2
0 0
b Laping
960 16 3 4 960 11.52 1.580 18.21
15850
c 2-16Ø Top Mid Bar Along Grid 1, 2 & 3 16 3 1 17290 51.87 1.580 81.97
7 7
2 2
0 0
d. Laping 960 16 3 1 960 2.88 1.580 4.55
1 1
e 2-20Ø Bottom Ends Bar Along Grid 1, 2 & 3
0 15850 0 20 3 2 17850 107.10 2.469 264.45
0 0
0 0
f Laping 1200 20 3 2 1200 7.20 2.469 17.78
1 1
g 2-20Ø Bottom Mid Bar Along Grid 1, 2 & 3 0 15850 0 20 3 2 17850 107.10 2.469 264.45
0 0
0 0
1500+70Ø
i 2-20Ø Extra Bar Along Grid 1 & 2 at Grid A 20 2 2 2900 11.60 2.469 28.64
Grid A
6950
j 2-20Ø Extra Bar Along Grid 1 & 2 at Grid B & C 20 2 2 6950 27.80 2.469 68.64
k 2-20Ø Extra Bar Along Grid 1 & 2 at Grid D 25 2 2 3450 13.80 3.858 53.24
Grid D
1700+70Ø
1500+70Ø
l 2-16Ø Extra Bar Along Grid 3 at Grid A 16 1 2 2620 5.24 1.580 8.28
Grid A
3050
m 2-16Ø Extra Bar Along Grid 3 at Grid B 16 1 2 3050 6.10 1.580 9.64
3050
n 2-16Ø Extra Bar Along Grid 3 at Grid C 16 1 2 3050 6.10 1.580 9.64
1500+70Ø
o 2-20Ø Extra Bar Along Grid 3 at Grid D 16 2 2 2620 10.48 1.580 16.56
Grid D
q Laping
960 16 3 2 960 5.76 1.580 9.10
8850
r 3-16Ø Top Bar Along Grid A, B, C & D 16 4 3 10290 123.48 1.580 195.13
7 7
2 2
0 0
1 1
s 4-20Ø Bottom Bar Along Grid A, B, C & D
0 0 20 4 4 10850 173.60 2.469 428.64
8850 0
0
0 0
4200+70Ø
t 2-20Ø Extra Bar Along Grid A, B, C & D at Grid 2 & 3 25 4 2 5950 47.60 3.858 183.64
1700+70Ø
u 2-20Ø Extra Bar Along Grid A, B, C & D at Grid 1 25 4 2 3450 27.60 3.858 106.48
250
12
0
x Grid 1, 2 & 3 475 12 100 3 143 1690 725.01 0.889 644.45
250
12
0
y Grid A, B, C & D 475 12 100 4 77 1690 520.52 0.889 462.69
100 724
100 724
3283
c Longitudional Bar upto ground floor height 6-25Ø for 1( B C ) 25 2 6 4407 52.884 3.858 204.03
100 1024
6283
d Longitudional Bar upto first floor height 6-25Ø for Grid 1( B C ) 25 2 6 7407 88.884 3.858 342.92
100 1024
Longitudional Bar upto ground floor height 2-20Ø for Grid 2( B C 3283
e 20 3 2 4107 24.642 2.469 60.85
D)
100 724
3283
f Longitudional Bar upto ground floor height 4-25Ø for Grid 2(B C D) 25 3 4 4407 52.884 3.858 204.03
100 1024
6283
g Longitudional Bar upto first floor height 6-20Ø for Grid 2(B C D) 20 3 6 7107 127.926 2.469 315.87
m
100 724
h Stirrups for Column upto Floor Height 0.00
370
80
370
i 8 100 12 8 1640 157.44 0.395 62.20
460
140
80
370
j 8 100 12 8 1180 113.28 0.395 44.75
460
370
80
k 8 100 12 8 1180 113.28 0.395 44.75
140
370 460
80
370
n 8 100 12 8 1640 157.44 0.395 62.20
460
140
80
370
o 8 100 12 8 1180 113.28 0.395 44.75
460
370
80
p 8 100 12 8 1180 113.28 0.395 44.75
140
15850
7 7
a Top Main Bar(3-16Ø) 16 3 3 17290 155.61 1.580 245.90
2 2
0 0
b Lapping 960 16 3 6 960 17.28 1.580 27.31
7445 8405
g Torsion Bar (2-16Ø) 16 3 2 16810 100.86 1.580 159.38
960
Extra Bar at Grid 1 & 2
1 1900
h Extra Bar at Grid A (2-20Ø) 0 20 2 2 2900 11.6 2.469 28.64
0
0
6950
i Extra Bar at Grid B & C (2-20Ø) 20 2 2 6950 27.8 2.469 68.64
2100 1
j Extra Bar at Grid D (2-20Ø) 25 2 2 3450 13.8 3.858 53.24
3
5
Extra Bar at Grid 3 0
7 1900
k Extra Bar at Grid A (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28
0
3050
l Extra Bar at Grid B & C (2-16Ø) 16 2 2 3050 12.2 1.580 19.28
1900 7
m Extra Bar at Grid D (2-16Ø) 2 16 2 2 2620 10.48 1.580 16.56
0
2 Along Grid A, B, C & D
8850
a Top Main Bar(3-16Ø)
7 7 16 4 3 10290 123.48 1.580 195.13
2 2
0 0
2100 1
d Extra Bar at Grid 1 (2-25Ø) 25 4 2 3450 27.6 3.858 106.48
3
5
0
1 4600
e Extra Bar at Grid 2 & 3 (2-25Ø) 25 4 2 5950 47.6 3.858 183.64
3
5
0
10
0
4
7
f Stirrups for Main Beam-Long Grid 10 125 1 381 1650 628.65 0.617 388.06
5
250
1
0
0 4
7
g Stirrups for Main Beam-Short Grid 10 125 1 284 1650 468.6 0.617 289.26
5
250
F Secondary Beam (300*425)
1 Along Grid A1 & C1
8870
a Top Main Bar (3-16Ø)
7 7 16 2 3 10290 61.74 1.580 97.57
1 1
0 0
6250
3
c Top Main Bar (3-16Ø)
7 3 16 2 3 7000 42 1.580 66.37
5 7
5
3750
3
e Top Main Bar (3-16Ø)
7 3 16 1 3 4500 13.5 1.580 21.33
5 7
5
3 3
f Bottom Main Bar (4-12Ø) 12 1 4 4500 18 0.889 16.00
7 3750 7
5 5
80
3
7
g Stirrups for Secondary Beam-Short Grid 8 125 1 142 1410 200.22 0.395 79.10
5
250
80
3
h Stirrups for Secondary Beam-Long Grid
7 8 125 1 125 1410 176.25 0.395 69.63
5
250
960
G STAIRCASE
200
50
1150
b 12 1 12 2910 34.92 0.889 31.04
1410
300
c Distribution Bar- Top & Bottom 1460 10 150 1 14 1460 20.44 0.617 12.62
d First Flight- Top & Bottom Bar 1460 10 150 1 55 1460 80.3 0.617 49.57
5
0
g Extra Bar 5 1 12 1 11 2100 23.1 0.889 20.54
0 1000 0
0
0
1840
850
h 220 12 1 12 2960 35.52 0.889 31.58
50
1000
1000 50
i 12 1 11 2100 23.1 0.889 20.54
50
900 3400
j Second Flight-Longitudional Bar 12 125 1 12 7320 87.84 0.889 78.08
450 2270
300
50 1150
k 2000 12 1 12 3420 41.04 0.889 36.48
220
5
l Extra Bar 0 12 1 11 2100 23.1 0.889 20.54
1000
5
1000 0
5
0
410 480
q Nosing Ties 8 4 6 1630 39.12 0.395 15.46
480 260
300 480
410 480
s 8 3 6 1520 27.36 0.395 10.81
480 150
300 480
480
80 1375 500
a Along Short Span-Between Grid A-B & C-D
2000 80 8 300 1 40 9985 399.4 0.395 157.79
575 500
8 8
b 8 300 1 36 9985 359.46 0.395 142.01
0 8750 0
500
2000
c Btween Grid B & C 8 8 8 300 1 11 4535 49.885 0.395 19.71
0 1875 0
500
d
8 8 8 300 1 11 4535 49.885 0.395 19.71
0 3875 0
575
575 1500
e 80 8 300 1 35 7560 264.6 0.395 104.53
2375 2375
8
0
575 575
f 8 8 8 300 1 35 7560 264.6 0.395 104.53
0 6250 0
575 575
8 8
g Grid A-D, 1b-3 0 8 300 1 9 17540 157.86 0.395 62.37
480 4405 0
11345
575 1500
2125 1500
8
0
1625 1625
h 1750 8 300 1 9 17540 157.86 0.395 62.37
575
2230 1500 2125 8
0
j
2050 8 150 1 94 2050 192.7 0.395 76.13
2250
k 8 150 1 18 2250 40.5 0.395 16.00
2130
l 8 150 1 11 2130 23.43 0.395 9.26
370
80
370
a Stirrups for First Floor 8 100 12 25 1640 492 0.395 194.37
460
140
80
370
b 8 100 12 25 1180 354 0.395 139.85
460
80
c 140 8 100 12 25 1180 354 0.395 139.85
370
370
80
460
140
80
370
e 8 100 12 26 1180 368.16 0.395 145.45
460
80
f 140 8 100 12 26 1180 368.16 0.395 145.45
370
K Second Floor Beam (300*525)-Main Beam 0.00
1 Along Grid 1, 2 & 3 0.00
1 1200 120
c Bottom Bars - Ends (2-20Ø) 7275 8575 3 2 19050 114.3 2.469 282.22
0 0
0 0
0 0
7 7
d Bottom Bars- Mid (2-16Ø) 2 3250 960 960 2 16 3 2 19210 115.26 1.580 182.14
0 0
10700 1900
7445 8405
e Torsion Bars (2-16Ø) 16 3 2 16810 100.86 1.580 159.38
960
Extra Bar at Grid 1 & 2 0.00
1 1900
f Extra Bar at Grid A (2-20Ø) 0 20 2 2 2900 11.6 2.469 28.64
0
0
6950
g Extra Bar at Grid B & C (2-20Ø) 20 2 2 6950 27.8 2.469 68.64
1900 1
h Extra Bar at Grid D (2-20Ø) 20 2 2 2900 11.6 2.469 28.64
0
0
Extra Bar at Grid 3 0 0.00
7 1900
i Extra Bar at Grid A (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28
0
3050
j Extra Bar at Grid B & C (2-16Ø) 16 2 2 3050 12.2 1.580 19.28
1900 7
k Extra Bar at Grid D (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28
0
2 Along Grid A, B, C & D 0.00
8850
a Top Main Bar(3-16Ø)
7 7 16 4 3 10290 123.48 1.580 195.13
2 2
0 0
2010 1
e Extra Bar at Grid 1 (2-20Ø) 20 4 2 3010 24.08 2.469 59.46
0
0
0
7 4510
f Extra Bar at Grid 2 & 3 (2-16Ø) 16 4 2 5230 41.84 1.580 66.12
2
0
80
4
7
g Stirrups for Beam-Along Grid 1 & 2 5 10 100 2 81 1610 260.82 0.617 161.00
250
80
4
7
h " 5 10 150 2 41 1610 132.02 0.617 81.49
250
80
4
7
i Stirrups for Beam-Along Grid 3 5 10 100 1 82 1610 132.02 0.617 81.49
250
80
4
7
j Stirrups for Short Grid A, B, C & D 10 100 4 55 1610 354.2 0.617 218.64
5
250
80
4
7
k " 10 150 4 17 1610 109.48 0.617 67.58
5
250
8730
a Top Main Bars (3-16Ø)
8 8 16 2 3 10440 62.64 1.580 98.99
5 5
5 5
6230
8
a Top Main Bar (3-16Ø)
5 8 16 2 3 7940 47.64 1.580 75.28
5 5
5
3730
8
a Top Main Bar (3-16Ø)
5 8 12 1 3 5440 16.32 0.889 14.51
5 5
5
8 8
b Bottom Main Bar (4-12Ø) 12 1 4 5440 21.76 0.889 19.34
5 3730 5
5 5
80
3
7
c Stirrups for Secondary Beam-Along A1 & C1 8 100 2 55 1410 155.1 0.395 61.28
5
250
80
3
7
d " 8 150 2 17 1410 47.94 0.395 18.94
5
250
80
3
7
e Stirrups for Secondary Beam-Along Grid 1a 8 100 1 60 1410 84.6 0.395 33.42
5
250
80
3
7
f " 8 150 1 17 1410 23.97 0.395 9.47
5
250
80
3
7
g Stirrups for Secondary Beam-Along Grid 1b 8 100 1 18 1410 25.38 0.395 10.03
5
250
80
3
7
h " 8 150 1 10 1410 14.1 0.395 5.57
5
250
960
960
M STAIRCASE 0.00
200
50
1150
b 12 1 12 2910 34.92 0.889 31.04
1410
300
c Distribution Bar- Top & Bottom 1460 10 150 1 14 1460 20.44 0.617 12.62
d First Flight- Top & Bottom Bar 1460 10 150 1 55 1460 80.3 0.617 49.57
5
0
g Extra Bar 5 1 12 1 11 2100 23.1 0.889 20.53
0 1000 0
0
0
1840
850
h 220 12 1 12 2960 35.52 0.889 31.57
50
1000
1000 50
i 12 1 11 2100 23.1 0.889 20.53
50
900 3400
j Second Flight-Longitudional Bar 12 125 1 12 7320 87.84 0.889 78.08
450 2270
300
50 1150
k 2000 12 1 12 3420 41.04 0.889 36.48
220
5
l Extra Bar 0 12 1 11 2100 23.1 0.889 20.53
1000
5
1000 0
5
0
410 480
q Nosing Ties 8 4 6 1630 39.12 0.395 15.46
480 260
300 480
410 480
s 8 3 6 1520 27.36 0.395 10.81
480 150
300 480
480
575
1500
80 1500
2375
a Along Short Span-Between Grid A-B & C-D 8 300 1 40 9985 399.4 0.395 157.79
1375 500
2000 80
575 500
b
8 8 8 300 1 36 9985 359.46 0.395 142.01
0 8750 0
500 1875
c Grid 1(b)-3 & B & C 80 8 300 1 11 4535 49.885 0.395 19.71
2000 8
0
500
d
8 8 8 300 1 11 4535 49.885 0.395 19.71
0 3875 0
575
575 1500
e 80 8 300 1 35 7560 264.6 0.395 104.53
2375 2375
8
0
575 575
f 8 8 8 300 1 35 7560 264.6 0.395 104.53
0 6250 0
575 575
8 8
g Grid A-D, 1b-3 0 8 300 1 9 17540 157.86 0.395 62.37
480 4405 0
11345
575
2125 1500 1500
8
0
1625 1625
h 1750 8 300 1 9 17540 157.86 0.395 62.37
575
2230 1500 2125 8
0
i Negative Bar 0.00
2050 50
j Along 1a 50 8 300 1 40 2150 86 0.395 33.98
k Along Grid 2 (A-B) & 2(C-D) 50 1950 50 8 300 2 20 2050 82 0.395 32.40
50 2050 50
l Along Grid 2 (B-C) 8 300 1 12 2150 25.8 0.395 10.19
50 2050
m Along Grid A1 & C1 50 8 300 2 28 2150 120.4 0.395 47.57
50 2250
n Along B & C 50 8 300 2 8 2350 37.6 0.395 14.86
7445 8405
7 716
b Top Bars - Mid (1-16Ø) 2 3 1 18250 54.75 1.580 86.52
960 2
0 0
3 960 316
c Bottom Bars - Ends (2-16Ø) 7275 8575 3 2 17450 104.7 1.580 165.45
2 2
0 0
3 3
d Bottom Bars- Mid (2-12Ø) 2 1925 720 960 2 12 3 2 18170 109.02 0.889 96.91
0 0
12000 1925
2 Along Grid A, B, C & D 0.00
8850
7 7
a Top Main Bar(3-16Ø) 16 4 3 10290 123.48 1.580 195.13
2 2
0 0
80
3
d Stirrups for Main Beam-Along Short Grid (Grid A, B, C & D)
5 8 100 4 55 1650 363 0.395 143.41
0
250
80
3
e "
5 8 150 4 17 1650 112.2 0.395 44.33
0
250
8
0
3
5
f Stirrups for Main Beam-Along Long Grid (1, 2 & 3) 8 100 3 142 1650 702.9 0.395 277.69 14150.000
0
250
3 Lapping at Column Bars 0.00
6000
1200
760
4253
960
760
1253
c SF-Along Grid 1 (A & D) 16 2 6 2973 35.676 1.580 56.38
960
6000
1500
6000
1200
1040
4253
1200
1040
1253
1200
6000
1200
1040
4253
1200
480
1253
720
6000
1500
6000
1200
1040
4253
1200
1040
1253
1200
6000
1200
1040
4253
1200
480
1253
720
6000
1200
760
4253
s FF-Along Grid 3 - B, C & D 16 3 6 5973 107.514 1.580 169.90
960
480
1253
t SF-Along Grid 3 - B, C & D 12 3 6 2453 44.154 0.889 39.25
720
Q Sill Band
1 Ground Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600
2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600
2800 75
375
375
c Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75
4150 75
825
825
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
825
1250
375
Ties
65 65
f Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61
190
65 65
g Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79
190
65 65
h Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07
190
65 65
i Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
50 50
j Store Room Wall 8 150 1 20 170 3.4 0.40 1.35
70
2 First Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600
2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600
2800 75
375
375
c Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75
4150 75
825
825
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties
65 65
e Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61
190
65 65
f Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79
190
65 65
g Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07
190
65 65
h Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
3 Second Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600
2800 75
375
375
b Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75
4150 75
825
825
c Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties
65 65
d Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61
190
65 65
e Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07
190
65 65
f Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
R Lintel Band
1 Ground Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
4150 75
825
825
b Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties
65 65
c Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22
190
65 65
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
2 First Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
4150 75
825
825
b Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties
65 65
c Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22
190
65 65
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
3 Second Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600
4150 75
825
825
c Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties
65 65
d Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22
190
65 65
e Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79
190
65 65
f Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
Site
S. No. Description G.F F.F S.F Quantity Unit Remarks
Development
A. Common Installation
1 Stand Alone 40 A DP MCB with Enclosure 1.00 1.00 nos.
2 CABLES & WIRES
2.1 2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper 21.00 20.00 20.00 61.00 r.m
conductor wires
B School Blocks
1 DISTRIBUTION BOARDS 1.00 1.00 1.00 3.00 nos.
2 CABLES & WIRES
2.1 2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm 11.00 r.m
Multistranded Cu wire
2.2 2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq 14.00 r.m
mm Multistranded Cu wire
2.3 2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq 28.00 r.m
mm Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point 3.00 13.00 12.00 12.00 40.00 pts.
3.2 Two Way Light Point 1.00 1.00 2.00 pts.
3.3 Ceiling Fan Point 4.00 4.00 pts.
4 6A Universal Pin Light Power Socket Wiring 12.00 14.00 29.00 55.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 12.00 14.00 29.00 55.00 no.
8 Light Fixtures/Luminaires & Accessories
8.1 24 W LED Recessed Mounted Square type 4.00 4.00 no.
8.2 18 W LED Surface Mounted Square type 8.00 8.00 16.00 no.
8.3 18 W LED Recessed Mounted Square type 4.00 4.00 no.
8.4 12 W LED Surface Mounted Cylindrical type 4.00 5.00 9.00 no.
8.5 12 W LED Recessed Mounted Circular type 5.00 5.00 no.
8.6 7W LED Wall Light 1.00 1.00 no.
9 Pull Box 3.00 no.
10 External Post Top Light Pole 3.00 3.00 no.
11 Post Top External Light Fixtures 3.00 3.00 no.
12 Earthing & Lighting Protection
12.1 Chemical Earthing 3.00 3.00 no.
12.2 Earthing Bar 3.00 3.00 no.
12.3 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip 66.00 66.00 r.m
12.3.2 12 SWG Cu wire 14.00 14.00 r.m
13 Earth Test link 1.00 1.00 no.
C Solar PV System
1 Solar PV Panel 8.00 8.00 nos.
2 Tubular Deep Cycle Battery 4.00 4.00 nos.
3 Hybrid Inverter 1.00 1.00 nos.
D Fire Extinguisher
1 5.0kg Size ABC Stored Pressure Type Fire 3.00 nos.
Extinguisher 1.00 1.00 1.00
2 Dry Powder Fire Extinguisher 1.00 1.00 nos.
2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.
1.915 1.915
3.02
1.915 1.915
3.29
1.884
0.05
0.49 0.49
1.884
0.05
0.49 0.49
3.02 3.02
0.3 0.3
3.27 3.27
0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 35 3.14 439.6 0.62 272.55 3.045
0.05 0.05
1.915 1.915
3.02
1.915 1.915
3.29
1.884 1.884
0.05
0.49 0.49
1.884 1.884
0.05
0.49 0.49
0.592
0.592 0.6 0.6
3.02 3.02
0.3 0.3
3.27 3.27
0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 35 3.14 439.6 0.62 272.55 3.045
0.05 0.05
4 Boulder Soling
Concrete Pavement
Infront of Building 1 3.80 1.50 0.15 0.86
1 19.50 2.00 0.15 5.85
1 3.00 1.50 0.15 0.68
1 15.50 1.50 0.15 3.49
1 3.00 4.50 0.15 2.03
5 P.C.C. Works
PCC For Gate Column
6 P.C.C.(1:2:4) Works
Concrete Pavement
Infront of Building 1 3.80 1.50 0.15 0.86
1 19.50 2.00 0.15 5.85
1 3.00 1.50 0.15 0.68
1 15.50 1.50 0.15 3.49
1 3.00 4.50 0.15 2.03
8 Steel Reinforcement
For gate
Total
At base of the footing kg per m
length
Main bar(10mm) 12 0.90 10.80 0.62 6.70
Distribution bar(10mm) 12 0.90 10.80 0.62 6.70
For column Ld (12mm) 16 0.48 7.68 0.89 6.84
For column (12mm) 16 2.80 44.80 0.89 39.87
For stirrups (external) 8mm 54 1.10 59.40 0.39 23.17
For stirrups (Internal)) 8mm 54 0.70 37.80 0.39 14.74
Total 98.01 Kg
0.10 Tons
10 Formworks
Entrance Gate-Foundation 2 3.60 0.35 2.52
Gate Column 2 1.20 3.15 7.56
Flag Pole Steps 2 0.25 0.80 0.4
Flag Pole Masonry Top Surface 1 1.70 0.50 0.85
Total 11.33 sq.m
16 External Plaster
Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84
Top Coping 2 2.36 0.05 0.24
4 0.59 0.30 0.71
Total 7.80 sq.m
19 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos