Professional Documents
Culture Documents
To be
7 Gode - Hargele Lot 2: km 100 -Hargele Somali GOE 116 AC DBB ICB Terminated Project Completed NA
Updated
Construction of remaining works of Tercha- Under design
8 Chida South West GOE 58 AC DBB ICB Terminated Project review
Construction of remaining works of Abomesa -
To be
9 Aseko - Bedeyi - Cheleka Road Project; Oromiya GOE 44.4 AC DBB ICB Terminated Project Completed NA Updated
Contract 2: Dibu River - Cheleleka
11 Construction of remaining works of Gimba - GOE 80.21 AC DBB ICB Terminated Project Under design
Tenta - Tenta Junction Amhara review
Construction of remaining works of Mota- Under design
12 Jaragedo Road Project Amhara GOE 58.22 AC DBB ICB Terminated Project review
Construction of remaining works of Bilbala- Under design
13 Amhara GOE 99.75 AC DBB ICB Terminated Project
Sekota review
19 Construction of remaining works of Kelela- GOE 40.13 AC DBB ICB Terminated Project Under design
Akesta Amhara review
3. Projects which have been awaited by the public for long time and in procurement process in 2014 EFY but cancelled (21 Projects)
20 Robe-Goro-Sofumer Junction Oromiya GOE 112 AC DBB ICB New Completed NA Updated
21 Entoto Observatory-Ethiopia Management Oromiya GOE AC DBB ICB New Completed NA Updated
20
Acadamy
24 Chereti - Hageremekor - Kundi- Guradamole, Lot Somali GOE 82 DBST DBB ICB 2012 Completed NA Updated
3: Kundi - Guradamole (Re-tender)
Goba – Dolomena – Negele Borena/Bitata/ From 10 year road
25 Oromiya GOE 133 AC DB ICB Completed NA Updated
Lot 1: Goba - Dolomena map
Debremarkose-DebreEliyas-Temecha-Kuch-
27 Ayehu-Zegem-Chagni Lot 4: Ambila-Zigem - Amhara GOE 84.82 AC DBB ICB 2010 Completed NA Updated
Chagni
28 Hosaina – Jajura – Gimbichu – Jacho SNNPR GOE 49 AC DBB ICB 2012 Completed NA Updated
To be
31 Tolta-Gelila-Laska and Shirshir-Wubhamer Sper SNNPR GOE 92 AC DB ICB 2012 Completed NA Updated
33 Diri - Masha Lot 2; Km 62- Masaha South West GOE 102 AC DBB ICB 2011 Completed NA Updated
From 10 year road
map (Replacement
34 Degehamedo – Degehabur Somali GOE 72.8 AC DB ICB for Ali Ethiopia Completed NA Updated
Degehamedo)
35 Sekota – Amdework – Tekeze – Ibnat – Addis Amhara GOE 72 AC DB ICB 2012 Completed NA To be
Zemen: Lot 1; Addis Zemen - Km 72 Updated
Debre Markos - Bahir Dar and Injibara Town
36 Widening Project Lot I: Km 0+000 - Km 86 + GOE 86 AC DBB ICB Heavy Maintenance Completed NA To be
Amhara Updated
000
Mile Junction-Biyogurgur, Dubti -Arrisa - To be
37 Addigala - Biyokobob Contract 1: Dubti Town - Afar GOE 72 AC DB ICB 2010 Completed NA Updated
Km 72+000 (Re-tender)
Addis - Sebeta Road Widening & Sebeta - To be
38 Oromiya GOE 40 AC DBB ICB Major Corridor Completed NA Updated
Holeta Road Project
Alemgena - Butajira-Sodo Lot 1: Alemgena -
39 Oromiya SNNPR GOE 132 AC DBB ICB Major Corridor Completed NA Updated
Butajira
To be
40 Bati – Medina – Harewa – Bora – Kemise Amhara GOE 110 AC DB ICB 2012 Completed NA
Updated
41 Metema – Abrihajirar – Maserodenb – Sanja, Amhara GOE 48 AC DBB ICB 2010 Under design (80% Jun-22 NA
Lot 2: Abrihajirar – Maserodenb – Sanja Completed)
4. Remaining Lots and Projects which have been in procurement process in 2014 EFY but Cancelled (17 Projects)
Durbete - Kunzila - Gelago - Metema Lot 2 : Km To be
42 Amhara GOE 115.7 AC DB ICB 2011 Completed NA Updated
85 - Km 170
Seka - Atnago - Alga - Seyo - Shenen - Guder To be
43 Oromiya GOE 90.9 AC DBB ICB 2011 Completed NA
Lot 1; Seka - Atnago - Alga - Seyo Updated
Needs design
44 Gog- Jore - Akobo Lot: 2 Km 35 - Km 69+400 Gambela GOE 35 AC DBB ICB 2011 review
Negele Borena - Doloado - Melkasuftu Lot 2 : To be
45 Km 60 - Filtu Oromiya GOE 62 AC DBB ICB Remaining Lot Completed NA Updated
Mehal Meda - Gisherabiel - Mekoy - Milamile To be
46 Amhara GOE 69.8 AC DBB ICB 2011 Completed NA Updated
Lot 2 : Tormsaya/K.m 64-Milamile
Dilla - Bulle - Haro Wacho-Shakiso Lot 2: To be
47 Oromiya GOE 57 AC DBB ICB 2012 Completed NA Updated
Harowacho-Shakiso
To be
48 Dubiti-Arisa-Adigala-Biyokobob; Contract 3 Afar GOE 118.1 AC DB ICB 2010 Completed NA Updated
Homosha - Hidase Dam - Guba Lot 2 Km 70 - To be
49 Hidase Dam - Guba Benishangul Gumuz GOE 144 AC DBB ICB 2011 Completed NA Updated
Adola/Kibiremengest - Melkadesta - To be
50 Harenfema Oromiya GOE 75 AC DBB ICB Remaining Lot Completed NA Updated
To be
51 Dese Bypass Amhara GOE 17 AC DBB NCB 2012 Completed NA
Updated
To be
52 Bojeber-Areqit - Kutere - Bilalo SNNPR GOE 58 AC DB ICB 2010 Completed NA Updated
53 Kofele- Kore - Bekoji and Arsi Negele - Bilalo Oromiya GOE 65 AC DB ICB From 10 year road Completed NA To be
Junction map Updated
Needs design
54 Aletawondo – Teferikela – Dilla SIDAMA SNNPR GOE 27 AC DBB ICB 2012 review NA
To be
55 Access to Adama indestrial park Oromiya GOE 3 AC DB NCB 2010 Completed NA Updated
To be
56 Itang - Wankey - Mera(Re-tender) Gambela GOE 62.5 AC DB ICB 2011 Completed NA Updated
Under
57 Chebera-Churchura - Gudumu Lot 2; Gudumu - AC DB New procurement of
Waka South West GOE 80
Design Consultant
Benishang Oromiya To be
59 Tongo - Assosa GOE 130 AC DB 2012 2012 Completed NA Updated
ul Gumuz
Under
67 Addis - Chancho-Fiche Oromiya GOE 116 AC DB ICB Major Corridor procurement of
Design Consultant
6. Remaining Projects their designs are available and to be procured based on the market response (9 Projects)
Negele Borena - Doloado - Melkasuftu Lot 3 To be
68 Oromiya Somali GOE 72 AC DBB ICB Remaining Lot Completed NA Updated
Filtu - Doloado
To be
69 Nyignag - Jiko - Dobrar - Rek Lot 1 Gambela GOE 36.12 AC DB ICB 2012 Completed NA Updated
Ginir-Beredimtu-Imi-Lab-Gode Lot 1; Ginir - From 10 year road To be
70 Oromiya GOE 138 AC DBB ICB map Completed NA Updated
Bekol ( Km 138+000)
To be
71 Kobo - Kulmusk - Lalibella Lot 2: Muja-Kobo Amhara GOE 62.36 AC DBB ICB 2011 Completed NA Updated
Negele Borena - Melkasuftu and Doloado - To be
72 Dolobay; Lot 4; Km 93 - Km 180 Somali GOE 87 AC DBB ICB New Completed NA Updated
Ginir-Beredimtu-Imi-Lab-Gode Lot 2; Bekol (Km To be
73 Somali GOE 132 AC DBB ICB New Completed NA Updated
38+000)- Abakero (Km 270+000)
Ginir-Beredimtu-Imi-Lab-Gode Lot 3; Abakero To be
74 (Km 270+000) - Gode Somali GOE 119.5 AC DBB ICB New Completed NA Updated
7. Remaining Projects which are under design and to be procured based on the market response (14 Projects)
Hagayu – Sigmo – Saylem – Leqa – Becho – Under design (95%
75 Oromiya GOE 103 AC DB ICB 2012 May-22
Metu: Lot 1 Completed)
2012 (Horn of Africa Under design (95%
76 Filtu - Moyale: Lot 1 Oromiya GOE 82 AC DB ICB integration) Completed) May-22
Needs design
83 Nignang-Toha(Ongonge) Gambela GOE 69 AC DBB ICB 2011 review
Hamusit - Este/Mekaneyesus/Simada-Sayient
84 Lot 3: Simada-Sayient-Buso [Lot 2 - 44.35 Lot 3 Amhara GOE 63 AC DBB ICB Remaining Lot Under design
- 49]
Needs design
85 Gog - Jor - Akobo; Lot 3; Km 69+400 - Akobo Gambela GOE 85 AC DBB ICB 2010
review
Shashemene - Bishan Guracha (Tikurwiha) - Under design (50%
86 Oromiya SIDAMA GOE 17 AC DB ICB Jun-22
Hawassa Completed)
87 Goba-Dolomena-Negele Borena/Bitata road Oromiya GOE 140 AC DB ICB New Under design (30% Jun-22
project, Lot II Dolomena-Negele Borena/Bitata Completed)
Plan for 2015 EFY
J A S O N D J F M A M J
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
Contract
Signing
Month
S.No Works to be Procured Financer Length Type of Contract Procurement Plan for 2015 EFY
(KM) Surfacing Delivery Type
3. Procurement of Supervision Consultants for projects which are planned in 2015 EFY (45 Projects)
Request for
29 Debremarkose-DebreEliyas-Temecha-Kuch-Ayehu- GOE 84.82 AC DBB Proposal(RFP) Contract
Zegem-Chagni Lot 4: Ambila-Zigem -Chagni and NCB Signing
Month
Request for
30 Morka-Gircha-Chench-Chano Lot 2: Chencha- GOE 22.26 AC DBB Proposal(RFP) Contract
Chano and NCB Signing
Month
Request for
32 Alemgena - Butajira-Sodo Lot 1: Alemgena - GOE 132 AC DBB Proposal(RFP)
Contract
Signing
Butajira and NCB Month
Request for
43 Tolta-Gelila-Laska and Shirshir-Wubhamer Sper GOE 92 AC DB Proposal(RFP) Contract
and NCB Signing
Month
Request for
44 Debremarkose-DebreEliyas-Temecha-Kuch-Ayehu- GOE 85 AC DB Proposal(RFP) Contract
Zegem-Chagni Lot 2: Temcha - Kuch and NCB Signing
Month
Request for
47 Degehamedo – Degehabur GOE 72.8 AC DB Proposal(RFP) Contract
and NCB Signing
Month
Request for
48 Addis - Sebeta Road Widening & Sebeta - Holeta GOE 40 AC DBB Proposal(RFP) Contract
Road Project and NCB Signing
Month
Request for
49 Bati – Medina – Harewa – Bora – Kemise GOE 110 AC DB Proposal(RFP) Contract
and NCB Signing
Month
Request for
51 Durbete - Kunzila - Gelago - Metema Lot 2 : Km 85 GOE 115.7 AC DB Proposal(RFP)
Contract
Signing
- Km 170 and NCB Month
Kofele- Kore - Bekoji and Arsi Negele - Bilalo Request for Contract
62 GOE 65 AC DB Proposal(RFP) Signing
Junction and NCB Month
Request for Contract
63 Aletawondo – Teferikela – Dilla GOE 27 AC DBB Proposal(RFP) Signing
Month
and NCB
Request for
64 Access to Adama indestrial park GOE 3 AC DB Proposal(RFP)
and NCB
Request for
65 Itang - Wankey - Mera(Re-tender) GOE 62.5 AC DB Proposal(RFP)
and NCB
Alemgena - Butajira-Sodo Lot 2: Butajira-Areka- Request for Contract
66 Sodo ( Cont. 1; Butajira - Hossana & Cont. 2; GOE 97 AC DBB Proposal(RFP) Signing
Month
Hossana - Soda [90 Km]) and NCB
Request for
67 Arbaminch
Jinka
- Wezeka - Konso - Jinka Lot 2; Konso - GOE 149 AC DB Proposal(RFP)
and NCB
1. Procurement of Design Consultants for Projects which are Planned in 2014 EFY (10 Packages)
Request for
Chebera - Churchura - Gudumu - Bale Lot 2; Contract
1 Gudumu -Waka
GOE Proposal(RFP) and Signing
Month
NCB
Request for Contract
2 Wacha - Mizan GOE Proposal(RFP) and Signing
Month
NCB
Individual Expert for the consultancy service for Gender Based Contract
4 Violance (GBV) / Sexual Exploitation & Abuse (SEA) Risk management
IDA ICB Signing
Month
12 Technical
ERA.
Assistance Support to Advance the Ease of Doing Business in IDA ICB
Contract
14 Consultancy Services for updating RSDP monitoring Indicators GOE ICB Signing
Month
Contract
5 ERP System Supply and Implementation ICB Signing
Month