Professional Documents
Culture Documents
CONC .
I17 ~..I1PN/.5 " .
"\ R6 I/il6(AUc;/C(, v t I'.,- IC I' .14-
k'.~~r::.k';; //.
0-7000
A?J.~tu..\ •A<:
.dco1rI, DESCRIPTION
C6\.-.,~ . I ","L,
.. k14~S(;
----""~ 9252D.WPF
«-m -,
1// CD~r-"'.[>";N ..
I ;:;Pc. T q,ID.II.13.
-- .'-'j"
>. ( c:> u U i- I- -f..'!q-
HVAC
JAKARTA
~ as
SLDG
~MARINE
ltill. {DATE
t7..-<}'/"
Q~ £N
CHK'D
APP'D
P
6.,.~-------::>/<
I s.h.
?-;~?/ ~ -E 12.AGE
R;LLCiW20 /'~"u"
DOC.
I\\y+
__/-:-./
qF-•I..)') :'-,
,t' __
No. OF Ar rt-
- '\.-' : CcM~"~NT
. -(;c~~
M ....
PNS' _, -
14 PREP'D
REV.
IS'
-1..EL
1,.H?kt.tJ lIlJt'I Rf':\!I"F~
y- ~J'f/r.J k'
~.--
\< ~1Mti
,'l£/.r
TAI<ASe¥
EXOR-I
I.QI(,O\I-ctJlT.
PERTAMINA ()...4,.) \A.'
PROJECT 11-
!~
"7"/1>'" cA
I
Cl.
<oj
1P ~
•.,/;
'91'QD
' I t SHEET S-OO-13AI-OOIJ
1_ OF
CHK'D I GENE.
'"
« --;',,:
F.PROT'N
BOILER
ROTARY
OPERA
PACKAGE
C·PEN
FURNACE
INST,
,z
-i~
/J,.,..I" ...J ;::
APP'D
PREP~
CMD
EQUIP
<fj)
ISTEEL~
~
YOKOHAMA
J.. .•.
~ BALONGAN;--
JAKARTA
P
U
/
J( (:.)
A~btJ.
~"Z'd/_
2\/~1A'(
T'NbO·il-l/•
I1t1R
///ITD. ~
4-/~....J-i<REV.
2-
If
-/
'q
r- /q ~
A~/R~v~
13.llf
(.'9-7
~
ADDEf)!
/--:> /A.- \~
b-I:2.. ~ ../3
@JGC
_ R8JISEf1 ~~
~\.<&v.:t,
W!JJJOB
CORPORATION
""a,JL,cl
D.AFoster
,L\'S
CODE MARKEB
Wheeler 1Zn..l.
E'1!-,J'815"
k.LAI::AS~\{~
BALONGAN, INDONESIA ~~
PAINTING
DATE CONSTRUCTION
FOR
FOR
I
9252D.WPF
0-7000 S-00-13A1-001J
SHEET 2 OF 15
MATERIALS
CODES
GENERAL
SCOPE
COLOR
Film
Types
Painting
Appearance
Surface
Inspection
Repair
Scope of
of AND
APPLICATION
APPROVAL
INSPECTION
Paint
Extent OFSTANDARDS
CON
CONDITIONING
Thickness
Film Thickness
Schedule
Painting
Work
Paint
Preparation
of
Painting TEN
MATERIALS
Work
Surface
Paint
Inspection/CheckFilm T S
Preparation
5.2
4.2
6.4
3.2
3.3
6.2
6.3
6.5
1- 3.1
7. 6.1
5.1
4.1
8.
2.
3.
5.
6.
4.
9252D.WPF
0-7000 S-00-13A1-00lJ
SHEET 3 OF 15
1. SCOPE
This specification sets forth the basic requirements for painting to be applied
for EXOR-I Project in Indonesia.
The general painting of building and marine facilities is not covered in this
specification.
3. GENERAL
(1) All erected equipment, structures and pipes shall be painted to conform
to the painting schedules above.
(4) Internal surface of equipment, vessels, tanks and pipes shall not be
painted unless specified.
(5) Partial or non-fabricated items including steel plate and structures, and
all completely fabricated items except for above paragraph (3) shall be
prepared and primed and where necessary further coated based on Table 1,
prior to transportation to site.
In such cases it shall be the manufacturer's responsibility to ensure that
the paintwork carried out in the shop has sufficient durability to meet
the construction period on the site before further painting can take
place.
0-7000 S-00-13A1-001J
SHEET 4 OF 15
(1) Paint shall be prepared and applied in strict accordance with the paint
manufacturer's instructions.
(2) Painting shall be done in dry weather on surfaces free from dirt, oil and
moisture.
Painting (outdoor painting) shall not take place under adverse weather
conditions, in particular rain or fog.
(3) All prepared steel surfaces shall be primed before visible re-rusting
occurs.
(5) Tinting
When successive coats of paint of the same colour have been specified,
alternate coats of paint shall be tinted, when practical, sufficiently to
produce enough contrast to indicate complete coverage of the surface.
When the paint is the colour of the steel, or when the tinting of the
final coat is objectionable, the first coat to be applied shall be tinted.
The tinting material shall be compatible with the paint and not
detrimental to its service life.
(7) Dip and flow application shall not be permissible under this
specification.
4. MATERIALS
Coating system and standard dry film thickness (average) shall be per Table
1. and 2.
s. APPLICATION
Prior to treatment, the metal surface shall be cleaned of dirt and grease,
and the heavier layers of rust and weld spatter shall be removed by
grinding.
2) (4)
(1)
(3)
9252D.WPF
0-7000 S-00-13A1-001J
SHEET 5 OF 15
(5) SP6
SP7
SP5 -- Pickling
SP8
SP10-- Commercial
Brush-off
"White" Metal
Near-White Blast
Cleaning
Blast Cleaning
Cleaning
(6))
(8)
(9
(7)
5.1.2 SIS-05-59-00-1967
(3) Sa 1 Light blast cleaning. Loose mill scale, rust and foreign
matter shall be removed.
(4) Sa 2 Thorough blast cleaning. Almost all mill scale, rust and
foreign matter shall be removed. Finally, the surface is
cleaned with a vacuum cleaner, clean dry compressed air or
a clean brush. It shall then be greyish in colour.
(5) Sa 2 1/2 Very thorough blast cleaning. Mill scale, rust and foreign
matter shall be removed to the extent that the only traces
remaining are slight stains in the form of spots or
stripes. Finally, the surface is cleaned with a vacuum
cleaner, clean dry compressed air or a clean brush.
(6) Sa 3 Blast cleaning to pure metal. Mill scale, rust and foreign
matter shall be removed completely. Finally, the surface
is cleaned with a vacuum cleaner, clean dry compressed air
or a clean brush. It shall then have a uniform metallic
colour.
5.2 paintinq
(4) For painting of pipings 50 mm width from edge of pipe should not be
painted for welding and hydrotesting.
(5) Notices, nameplates, lettering, gauges and sight glasses and similar
such items shall not be painted over, and shall be protected during
painting by the application of masking tape etc.
9252D.WPF
0-7000 S-00-13A1-001J
SHEET 6 OF 15
(6) If the primer or finish coat has been damaged by welding or physical
abuse, the area shall be hand cleaned as per SSPC SP-2, spot primed to
the specified thickness and the finish coat restored to the specified
thickness.
(7)Packaged item and valve and piping mise materials above mentioned (1)
and (2) shall be as per "Painting Specification for Manufacturer's
Packaged Equipment" (S-00-13A1-003J).
6. INSPECTION
The prepared surfaces shall be compared with the standard photographs of SIS
or SSPC. Where the prepared surfaces are deemed to be equivalent to those
indicated in the above standard photographs, they shall be deemed
acceptable.
6.3.1 Measurement
When the measured values satisfy the following requirements, they shall be
deemed acceptable.
Minimun
Average
Repair
(1) of all measured
Paintinq :
film thickness
ore of the prescribed film thickness.
(2) Repaired portions shall be visually checked to see if they have been
repaired properly. They shall also undergo sampling inspections to
measure the film thickness using appropriate measuring instruments and
thereby to confirm that the specified film thickness is satisfied.
9252D.WPF
0-7000 S-00-13AI-00IJ
SHEET 7 OF 15
TABLE 3
PAINTING
OWNER JGC SUBCONTRACTOR
All paint materials shall be subject to approval by JGC. This applies to both
shop and field applied paint.
Paint manufacturers trade names include thinner for primers and finish coats
and their shelf-life.
8. COLOR CONDITIONING
Color conditioning shall be as per the "General specification for Lettering and
Color conditioning" (S-00-13AI-002J).
9252D.WPF
0-7000 S-00-13Al-001J
SHEET 8 OF 15
5-1
COATING
1-1
5-1
OPERATING
2-1SYSTEM NO.
4-1
3-1 FIRE
BELOW
TEMP. PROOFED
90°C
INSULATED
10°C
00°C DESCRIPTION
5-1
COATING OPERATING
1-3
2-1SYSTEM
4-1
3-1 NO. INSULATED
TEMP.
BELOW 90°C
400°C
200°C
610 °c DESCRIPTION
3. STRUCTURAL STEEL
STAIRS AND
LADDERS, 1-1
INSTRUMENT ~SUPPORT
AHB
COATING 1-1
OPERATING TEMP.
AHB NO.
SYSTEM UNFIREPRooFED
PROOFED DESCRIPTION
EQUIPMENT STRUCTURAL STEEL
* Field painting at Site of Table 2, coating Sys. No. 1-1 shall not be
painted for Fireproofed Structural steel.
9252D.WPF
0-7000 S-00-13A1-001J
SHEET 9 OF 15
INSTRUMENT
1-2
1-5
AMBSUPPORT
STAIRS
COATING 5-3
1-2
5-3 AMB NO.
AND
OPERATING
SYSTEM UNFIREPRooFED
TEMP. AMB
ROOFED *
RooFED'i*l DESCRIPTION UNFIREPRoo~{~
EQUIPMENT STRUCTURAL STEEL
\: * If already applied
structural primer,
steel which are it
to is
be not necessary and
Fireprooded to remove primer
also not paint to
necessary for\{ ~
~
/ apply T/U paint.
__~ ~~--,~ ---_/----""~-J
5. PIPING
COATING
1-1 1-3
OPERATING
5-1
SYSTEM NO.
5-1
3-1
2-1
4-1 BELOW
TEMP.
COLD
HOT AMB90°C
INSULATED
INSULATED
- 200°C
610°C
400°C DESCRIPTION
COATING
5-4 OPERATING
5-3
1-2 1-4 SYSTEM NO.
5-2
2-2
4-2
3-2 TEMP.
HOT
BELOW
COLD INSULATED
AMB90°C
INSULATED
- 400°C
200°C
610°C DESCRIPTION
0-7000 S-00-13AI-00IJ
SHEET 10 OF 15
6. TANK EXTERNAL
COATING6-2
5-1
6-1 SYSTEM NO.
OPERATING TEMP.
BELOW
BELOW 100
90°C°c
150°C DESCRIPTION
C. MARINE FACILITIES
(NOTE: 1) Checkered Plate Cover, Grating Cover, Elbow seal for Man-hole, Cap for Clean-out Support for
Vent Pipe, Guard Post.
--
T/U = Touch Up P = Primer M = Mid. Coat F = Finish Coat (NOTE: 2) Vent Pipe, Step for Man-hole, Embedded Plate, Drip Funnel, Above Pipe up to Tie-in Point.
~-
<1-"'
9002034-A4[Y"
'. SHEET 12 .r: 15
2 of 5
Silicone 201'C-
91'C-
Rich
Rich 50Acrylic
Surface
15
Surface
Carbon
OFT
Primer
Remarks
SSPC-SP
SSPC-SP10
SSPC-SP2/3
50
Ave/C.
Primer(u)
(u)
Primer
Aluminium
10 Prep. 2
Prep.
Steel
T/U
IU
P 1 Paint
Application
Temp. ShopName ·c at
Painting
80
Inorganic
Operating
Inorganic
200'C ZincManuf.
Zinc Shop
No ofof
No Organic ssrc·sr
SSPC-SP
FieldZinc
Inorganic Rich10 at Site
Painting
Zinc Inorganic Zinc
Inorganic Zinc
F Coating Coat 2
Total
Total OFT
OFT
\.
SHEET 13 !: 15
P
F ire-
proofed
IA
be
Primer
--
Primer
Oxide
line.
Coating
applied
Surface
Note
SSPC-SP
15
None
None
None
50
SSPC-SP213
35
Carbon
Surface
Ave/C.
Galvanized
30
SSPC-SP2/3
25
DFT
otherwise
Polyamide
Aluminium
Primer
specified, shall
Alkyd
None
10
Steel
for RedHot
2Prep.
1Remarks
T/U
P
Prep.
(u) None21
None
Application
Epoxy None
Temp.
Coat
Lead
old
40
1 Paint
1·C-Iron
401·C-
ShopName
nsulated,
90·C
-
Painting
80
35 ·C at Resin
Sillicone
Operating
610·C Manuf. Shop
No ofof
No Silicone Field
Resin SSPC-SP213
SSPC-SP10
SSPC-SP1/2
Painting at Site Silicone
Read LeadResin
Iron Unless
3 of 5
Below
--.
--~
Vf
900203£1 104 0-7000 5-1' -'\13A 1-00 1J
SHEE-I ~ OF 15
4 of 5
SiliconesourAcrylic
water
Surface
SSPC-SP6 PPrep.
Remarks Below
1 Shop
1 Paint below 60·e.
SSCP-SP6
50
25
100 *Painting atSSPC-SP6
Manuf. Shop Painting1a at Site
1
15
Tank50 External
~Surface
DFT
Polyamide
Polyamide
Primer
SSPC-SP7 Internal
Ave/e. Prep.
(u) P
Epoxy
Epoxy
(2) 1
Application
Temp.
CoatOrganiz
Organic11 Zinc
50· Name
Zing BO
150
300
100 ·C Zinc
Rich
Rich
Operating
Organic Rich (1)
(1) Noofof
No Field SSPC-SP M
Coating temp. for shall be 2 Polyamide * Operating
Epoxy (
Total DFT
<fp
5 of 5
Epoxy
Epoxy
Inside
inside
Inside
applied.
applied
inside
Surface
Primer
Tar 200
125
Ave/C.
Tank
400
150
DFT
bottom
of
bottom
Surface tank
Remarks
of for
tank
Prep.
Internal
(u)
Resin
Resin
Epoxy ,
Prep. 2
P tank
Application
of Temp.
Coat
Below
Below
11Paint
Shop
and80·C
Painting
400
1 Name
100 ·C at Manuf.
Operating
50·C
2590·C
from Shop
NoNo ofof
bottom
SSPC-SP
SSPC-SP10
10
Field Painting at Site Organic Zinc Rich
Epoxy Resin
pF
M
M
Epoxy 200
Resin
shallto be
up
from 1m on
bottom
up to 1m on
shall
Minas be
CoatingCrude. F