NIST Campus
Net Zero Energy Residential Test Facility Gaithersburg, MD

DRAWING LIST

ARCHITECTURAL FIRE PROTECTION


A-001 DESIGN CRITERIA, ABBREVIATIONS, & GEN. STRUCTURAL NOTES F-001 FIRE PROTECTION GENERAL NOTES, LEGEND, AND ABBREVIATIONS
A-101 ARCHITECTURAL SITE PLAN
A-101A ARCHITECTURAL SITE PLAN DETAILS F-101 BASEMENT FLOOR PLAN
A-102 FOUNDATION PLAN F-102 FIRST FLOOR PLAN
A-103 BASEMENT PLAN F-103 SECOND FLOOR PLAN
A-104 FIRST FLOOR FRAMING PLAN F-104 ATTIC FLOOR PLAN
A-105 FIRST FLOOR PLAN
A A-106 FIRST FLOOR KEY PLAN & WALL FRAMING ELEVATIONS F-601 FIRE PROTECTION DETAILS AND MATRIX
S A-107 SCREEN PORCH & GARAGE KEY PLANS & WALL FRAMING ELEVS.
A-108 SECOND FLOOR & LOWER ATTIC FRAMING PLAN PLUMBING
A-109 SECOND FLOOR PLAN
A-110 SECOND FLOOR KEY PLAN & WALL FRAMING ELEVATIONS P-101 BASEMENT FLOOR PLAN - PLUMBING
A-111 ATTIC FRAMING PLAN P-102 FIRST FLOOR PLAN - PLUMBING
o A-112 ROOF FRAMING PLAN P-103 SECOND FLOOR PLAN - PLUMBING
A-113 ROOF PLAN P-104 ATTIC FLOOR PLAN - PLUMBING
A-114 LOWER ROOF OVERHANG FRAMING PLAN
A-115 UPPER ROOF OVERHANG FRAMING PLAN P-501 PLUMBING DETAILS
PROJECT DESCRIPTION A-121 FIRST AND SECOND FLOOR REFLECTED CEILING PLANS
P-601 PLUMBING RISERS AND SCHEDULES
A-201 EXTERIOR ELEVATIONS
These plans describe an energy efficient net zero single family home to be built in Gaithersburg, MD. The home has four bedrooms, three full baths and a full A-202 EXTERIOR ELEVATIONS
basement.The drawing set and specifications were developed by Building Science Corporation with support from the Department of Energy's Building America A-203 EXTERIOR ELEVATIONS
Program. The home will be registered under USGBC's LEED for Homes program and will target Platinum Certification. During project planning and construction, A-204 INTERIOR ELEVATIONS MECHANICAL
A-205 INTERIOR ELEVATIONS
all efforts should be made to meet the goals of this project. A-206 INTERIOR ELEVATIONS M-001 MECHANICAL LEGEND, SCHEDULES & DETAILS
A-207 INTERIOR ELEVATIONS M-002 MECHANICAL SITE PLAN

BUILDING CODE M-101 BASEMENT FLOOR PLAN - HVAC


A-301 BUILDING SECTION
A-302 BUILDING SECTION M-102 FIRST FLOOR PLAN - HVAC
These plans are submitted under the 2009 Edition of the International Residential Code For One-and Two-Family Dwellings. A-303 BUILDING SECTION M-103 FIRST FLOOR PLAN GARAGE - HVAC
A-304 BUILDING SECTION M-104 SECOND FLOOR PLAN - HVAC
A-305 GARAGE, BREEZEWAY & SCREEN PORCH SECTIONS M-105 ATTIC FLOOR PLAN - HVAC
SQUARE FOOTAGES - Area calculations according to ANSI Z765-2003 M-106 BASEMENT FLOOR PLAN - RADIANT FLOOR HEAT
A-401 WALL SECTIONS & DETAILS
Basement 1,518 sq. ft. A-402 WALL SECTIONS M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
First Floor 1,518 sq. ft.
A-501A REQUIRED CONSTRUCTION SEQUENCE - PART A
Second Floor 1,191 sq. ft. A-501B REQUIRED CONSTRUCTION SEQUENCE - PART B M-601 MECHANICAL SCHEDULES
A-501C REQUIRED CONSTRUCTION SEQUENCE - PART C
A-502 ADVANCED FRAMING DETAILS
A-503 WINDOW DETAILS & INSTALLATION SEQUENCE ELECTRICAL
PROJECT TEAM A-504 DOOR DETAILS & INSTALLATION SEQUENCE
A-505 ENCLOSURE PENETRATION DETAILS & SEQUENCES E-001 ELECTRICAL LEGEND, ABBREVIATIONS, SYMBOLS & LIGHTING FIXTURE
CLIENT MEP ENGINEER SPECIFICATIONS CONSULTANT A-506 FOUNDATION DETAILS SCHEDULE
A-507 HORIZONTAL DETAILS
National Institute of Standards and Technology EBL Engineers, LLC Kalin Associates
A-508 VERTICAL DETAILS E-101 BASEMENT FLOOR PLAN - ELECTRICAL
100 Bureau Drive 8005 Harford Road 1121 Washington Street
A-509 ROOF DETAILS E-102 FIRST FLOOR PLAN - LIGHTING
Gaithersburg, MD 20899 Baltimore, MD 21234 Newton, MA 02465
E-103 FIRST FLOOR PLAN - POWER
Contact: Hunter Fanney Contact: Ed Hubner Contact: Mark Kalin A-601 WINDOW & DOOR SCHEDULES & TYPES E-104 SECOND FLOOR PLAN - LIGHTING & POWER
(301)975-5900 (410) 668-8000 (617) 964-5477 A-602 INTERIOR FINISH SCHEDULE E-105 ATTIC FLOOR PLAN - ELECTRICAL
hunter.fanney@nist.gov ehubner@eblengineers.com mkalin@kalinassociates.com A-603 PENETRATION SCHEDULE
E-501 ELECTRICAL RISER DIAGRAM
A-701 FIRST FLOOR OPEN WEB FLOOR TRUSS TYPE ELEVATIONS E-502 ELECTRICAL DETAILS
A-702 SECOND FLOOR OPEN WEB FLOOR TRUSS TYPE ELEVATIONS
ARCHITECT LEED for HOMES PROVIDER CONSTRUCTION MANAGER
E-601 ELECTRICAL PANEL SCHEDULES
Building Science Corporation Everyday Green Jacobs Engineering Group, Inc.
30 Forest Street 1877 Ingleside Terrace NW Contact:
Somerville, MA 02143 Washington, DC 20010
Contact: Betsy Pettit Contact: Andrea Foss
(978)589-5100 (202)213-6984
betsy@buildingscience.com andrea@everydaygreen.com

Building Science Corporation


30 Forest Street
Somerville, MA 02143
CONSTRUCTION DOCUMENTS AHIBIldlSa^Sa
U.S. Department of Energy
Research Toward Zero Energy Homes
978.589.5100
Contact: Betsy Pettit
betsy@buildingscience.com 31 MARCH 2010 ISSUED FOR CONSTRUCTION U.S. DEPARTMENT OF

ENERGY
Energy Efficiency &
Renewable Energy
COPYRIGHT (C) 2009 BUILDING SCIENCE CORPORATION
GENERAL STRUCTURAL NOTES DESIGN CRITERIA

1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THESE PLANS, THE STRUCTURAL DESIGN CRITERIA BUILDING SCIENCE
INTERNATIONAL RESIDENTIAL CODE (IRC 2009), TRUSS MANUFACTURER
SHOP DRAWINGS, AND THE MATERIAL MANUFACTURERS' INSTALLATION DESIGN ITEM CRITERIA CODE REFERENCE CORPORATION
INSTRUCTIONS.
GROUND SNOW LOAD 30 PSF — SEE NOTE 1 IRC 2009 FIG R301.2(5),
ASCE 7 FIG 7-1
2. WHERE CONFLICTING INFORMATION EXISTS BETWEEN THESE PLANS AND
OTHER REFERENCED REQUIREMENTS, THE MORE STRINGENT BASIC WIND SPEED 90 MPH (GUST) IRC 2003, FIG R301.2(4)
ASCE 7, FIG 6-1C
REQUIREMENT SHALL APPLY UNLESS OTHERWISE APPROVED BY THE
DESIGN PROFESSIONAL RESPONSIBLE FOR THESE PLANS. WIND EXPOSURE C IRC 2003, SEC R301.2.1.4
ASCE 7, Sect 6.5.6
3. THE CONTRACTOR IS RESPONSIBLE TO IDENTIFY AND RESOLVE ALL
WIND BORNE DEBRIS REGION NO IRC 2009 Sect. R301.2.1.2
CONFLICTS AND DISCREPANCIES PRIOR TO AND DURING CONSTRUCTION
ASCE 7, Sect. 6.5.9
AND FACILITATE PROPER CONSTRUCTION AS INTENDED BY THESE PLANS.
MAPPED SEISMIC HAZARD Ss = 0.16g
4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE S1 = 0.05g ASCE 7, CH 11 &CH 22
STRUCTURAL SUPPORT OF CONSTRUCTION LOADS DURING ALL PHASES OF
SEISMIC SITE CLASS D (firm soil assumed) 30 FOREST STREET SOMERVILLE, MA
CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, FOUNDATION (Fa = 1.6; Fv = 2.4) ASCE 7, Sect. 11.4.2
BACKFILL, BRACING OF WALL FRAMING TO RESIST CONSTRUCTION FLOOR
T: (978) 589-5100 F: (978) 589-5103
LOADS AND LATERAL BUILDING LOADING, BRACING OF TRUSSES DURING SEISMIC DESIGN SPECTRAL www.buildingscience.com
INSTALLATION AND SUBSEQUENT CONSTRUCTION LOADING, AND OTHER ACCELERATION PARAMETERS SDS = 2/3(1.6)(0.16g) = 0.17g
SD1 = 2/3(2.4)(0.05g) = 0.08g ASCE 7, Sect. 11.4
CONDITIONS AS DICTATED BY THE CONTRACTOR’S CONSTRUCTION
PRACTICE. SEISMIC DESIGN CATEGORY B CONSULTANT:
(IRC DWELLINGS EXEMPT) ASCE 7, Sect. 11.6
5. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT CONSTRUCTION
IRC 2009, FIG R301.2(2)
SAFETY REGULATIONS OF OSHA.
LIVE LOADS IRC 2009, TABLE R301.4
ASCE TABLE 4-1
6. ALL CONSTRUCTION SHALL BE PERFORMED IN A GOOD, WORKMANLIKE FLOORS & DECKS 40 PSF
MANNER FOLLOWING ACCEPTED CONSTRUCTION PRACTICES AND FLOORS (BEDROOM AREAS) 30 PSF
ATTIC WITH STORAGE 20 PSF
TOLERANCES. DEFECTIVE OR DAMAGED MATERIALS SHALL NOT BE USED
ATTIC W/O STORAGE 10 PSF
AND SHALL BE REPLACED. ROOF 20 PSF - SEE NOTE 2

DEAD LOADS Main house roof/ceiling dead load is 20 psf to account


for solar panels and non-standard framing.

FLOOR 10 PSF
ROOF 15 PSF (20 PSF main house)
ENCLOSURE THERMAL ENVELOPE CRITERIA WALL 8 PSF
r n

FROST DEPTH 30 INCHES Based on local practice

AIR-FREEZING INDEX 350 deg. F-DAYS ASCE 32-01, IRC FIG. R403.3(2)
COMPONENT R-VALUE U-VALUE
SOIL BEARING VALUE (ASD) 3,000 PSF-SEE NOTE 3 Based on preliminary information
for soils report provided by NIST
FRAMED WALLS R-45 consultant (otherwise use
presumptive value per IRC Table
ROOF R-72 401.4.1) L J

WINDOWS U-0.19 LATERAL SOIL LOAD 45 PCF Backfill Soil Class I or II required per
PROJECT:
IRC 2009 Table R404.1.2(4) and
BASEMENT WALLS R-23 Table 405.1
BASEMENT FLOOR R-10 CONVENTIONAL LIGHT-FRAME
National Institute of
CONSTRUCTION REQUIREMENTS SEE CODE REFERENCE IRC 2009, CH 3, 4, 5, 6, 8
IBC 2009, CH 18 AND SEC 2308
Standards and Technology
NOTES:
1. UNIFORM ROOF SNOW LOAD (23 PSF) SHALL BE USED ONLY WITH LOAD COMBINATIONS Net Zero Energy
INVOLVING MORE LOAD EFFECTS THAN DEAD PLUS SNOW. GROUND SNOW LOAD SHALL
BE USED FOR DESIGN OF ROOF FRAMING AND WHEN CHECKING D+S LOAD COMBINATION.
DRIFT SNOW LOAD OF 54 PSF SHALL BE USED FOR LOWER ROOFS.
Residential Test
2. ROOF LIVE LOADS SHALL BE USED FOR THE DESIGN OF ROOF ELEMENTS ONLY. THESE
LOADS ARE INTENDED TO ADDRESS MAINTENANCE, ACCESS, AND TEMPORARY Facility
CONSTRUCTION LOADS AND ARE NOT INTENDED FOR USE IN COMBINATION WITH OTHER
LOAD EFFECTS.
3. MINIMUM 2,700 PSF SOIL BEARING VALUE REQUIRED FOR 36”X36” BASEMENT COLUMN NIST Campus
FOOTINGS; MINIMUM 1,500 PSF SOIL BEARING VALUE REQUIRED FOR CONTINUOUS Gaithersburg, MD
FOUNDATION WALLS.

U.S. Department of Energy


Research Toward Zero Energy Homes

ABBREVIATIONS U.S. DEPARTMENT OF


Energy Efficiency &
ENERGY Renewable Energy
A.F.F. ABOVE FINISHED FLOOR

B.O. BOTTOM OF

BTW BETWEEN

C/L CENTER LINE

CLR. CLEAR

EL. ELEVATION

ELEV. ELEVATION
MARK DATE DESCRIPTION
EQ. EQUAL
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
GWB GYPSUM WALLBOARD

HRV HEAT RECOVERY VENTILATOR PROJECT NO: NIST NZERTF


CAD DWG FILE: A-PLOT-SPEC-NZERTF
HVAC HEATING VENTILATING AND AIR CONDITIONING
DRAWN BY: CG
INSUL INSULATION
CHECKED BY: BP
LSL LAMINATED STRAND LUMBER COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
MIN. MINIMUM
SHEET TITLE:
O.C. ON CENTER

PCF POUNDS PER CUBIC FOOT


DESIGN CRITERIA,
PV PHOTOVOLTAIC

T&G TONGUE & GROOVE


ABBREVIATIONS &
T.O. TOP OF GEN.STRUCTURAL
TYP. TYPICAL

W/ WITH
NOTES I

o
SCALE AS NOTED z

WD. WOOD

W/O WITHOUT

A-001
GENERAL SHEET NOTES
1. FOR PROPERTY LINE, LIMIT OF DISTURBANCE,
GRADING CHANGES, LANDSCAPING, AND
BUILDING SCIENCE
LOCATION OF BUILDING ON SITE, SEE
SITE/CIVIL DRAWINGS. CORPORATION

STEPS DOWN DRIP EDGE DRAINAGE PATIO WITH CONCRETE PAVER 3'-0" WIDE
TO GRADE (2 SYSTEM UNDER UNIT AND VENEER STONE EDGE , PEASTONE BED WITH
RISERS) PATIO, SEE 5/A-101A SEE 4/A-101A DRIP EDGE DRAINAGE
OUTDOOR SYSTEM, TYP. SEE
AIR-HANDLER 2/A-101A 30 FOREST STREET SOMERVILLE, MA
UNIT
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
i
TRANSFORMERS i
:L: I FUTURE
OUTDOOR CONSULTANT:
T AIR-HANDLER
UNIT

OUTDOOR
AIR-HANDLER
UNIT

r n
FUTURE
OUTDOOR
AIR-HANDLER
UNIT

MAX.y4" GRADE
INCREASE FROM
CONCRETE 3'-0" WIDE L J
SIDEWALK TO
PAVERS PEASTONE BED,
\ BREEZEWAY
TYP. SEE 1/A-101A PROJECT:
SLAB

National Institute of
MAX.y4" GRADE
INCREASE FROM Standards and Technology
SIDEWALK TO PORCH
prn' '
SLAB
Net Zero Energy
\
WALKWAY WITH
SLOPE <1:20
Residential Test
Facility
3'-0" WIDE CONCRETE
WALKWAY WITH 6" CONCRETE
\ NIST Campus
PAVER EDGE EACH SIDE, TYP.
SEE 3/A-101 A, SIM. Gaithersburg, MD

U.S. Department of Energy


Research Toward Zero Energy Homes

\
\
U.S. DEPARTMENT OF
Energy Efficiency &
ENERGY Renewable Energy
CONCRETE DRIVEWAY

WALKWAY WITH
EXISTING TREE TO BE
SLOPE <1:20
REMOVED, TYP.

05/07/10 UPDATED

MARK DATE DESCRIPTION

ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: A-PLOT-PLAN-NZERTF

DRAWN BY: HW

CHECKED BY: BP

COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

ARCHITECTURAL
3'-0" WIDE CONCRETE
WALKWAY WITH 6" CONCRETE
PAVER EDGE EACH SIDE, TYP.
SITE PLAN
SEE 3/A-101A

SCALE AS NOTED
/

ARCHITECTURAL SITE PLAN


SCALE: 1:10
A-101
GENERAL SHEET NOTES
BUILDING SCIENCE
CORPORATION

>> PATIO CONCRETE PAVERS (SET IN


5’—0 SAND WITH CRUSHED STONE
SUBBASE)
PE "7Ta TT
A <7

/:
I
<7.
<7
A

-4
4
]
STONE BED, DEPTH BASED
JH l A
ON GRADE AND DEPTH NEEDED
JH J I TO CONNECT TO DRAIN
L,
b.

o k-
30 FOREST STREET SOMERVILLE, MA
A
- b
^43' p( p( j T: (978) 589-5100 F: (978) 589-5103
FILTER FABRIC www.buildingscience.com
> [£>

EPDM MEMBRANE ATTACHED TO


BUILDING WALL, WRAPPED AROUND
4 * PIPE AND EXTENDED UP TO EDGE OF
CONSULTANT:
FILTER FABRIC

6" PERFORATED PIPE CONNECTED TO


NON-PERFORATED PIPE DRAINING TO
DAYLIGHT (SEE SITE/CIVIL DRAWINGS)
FREE DRAINING BACKFILL:
UNIFIED SOIL CLASSIFICATION
SYSTEM TYPE GW, GP, SW, OR SP

DRIP EDGE DRAINAGE UNDER PATIO


5 SCALE: 3/4" = 1-0"

r n

t-f J h 3" DEEP, 3-0" WIDE PEASTONE BED


WITH BLACK STEEL EDGING OR OTHER
PERMEABLE MATERIAL
CONCRETE PAVER UNIT
WITH MIN. SOLAR REFLECTANCE SLOPE GRADE AWAY FROM
INDEX (SRI) OF 29; SET IN SAND Pk FOUNDATION (5% MIN SLOPE)
L J
STONE VENEER CAP ~ PLANTING SOIL
y
(COLORING AND PROJECT:
TEXTURE TO MATCH
GARAGE FACADE STONE)
</.
<7
3“i n •-^~l t-

o< >o
FILTER FABRIC
National Institute of
a a

Standards and Technology


c> C: C: C: C:

o
4
4 8"-14" STONE VENEER 3'-0" WIDE STONE BED, DEPTH BASED
o<a )0( )0(::)0( )0( >o
(COLORING, SHAPE AND b
C: C: C: 3
ON GRADE AND DEPTH NEEDED TO
<j TEXTURE TO MATCH =■ CONNECT TO DRAIN
>3 3 3 3 3 3 3 >^< $<
i=n i=n i=n i=n i=n i=rn=rrtern= j J
A
GARAGE FACADE STONE)
4 t EPDM MEMBRANE ATTACHED TO Net Zero Energy
1 4'-6" OF CRUSHED STONE (CR)

4 '>
BUILDING WALL, WRAPPED AROUND
PIPE AND EXTENDED UP TO EDGE OF
FILTER FABRIC
Residential Test
tE 8" CONCRETE WALL WITH
WEEPHOLES AND SEAT
6" PERFORATED PIPE, CONNECTED TO
NON-PERFORATED PIPE DRAINING TO
Facility
A FOR STONE VENEER DAYLIGHT (SEE SITE/CIVIL DRAWINGS)

J
FREE DRAINING BACKFILL: NIST Campus
<i
UNIFIED SOIL CLASSIFICATION Gaithersburg, MD
SYSTEM TYPE GW, GP, SW, OR SP
SOIL SUBGRADE (COMPACTED)

l=l l l=l l l=l 11 l l l l l l l l l l

PEASTONE BED WITH DRIP EDGE DRAINAGE


SCALE: 3/4" = 1-0" U.S. Department of Energy
Research Toward Zero Energy Homes

U.S. DEPARTMENT OF
Energy Efficiency &
PATIO EDGE ENERGY Renewable Energy
SCALE: 1" = 1'-0"

CONCRETE CURB (AT DRIVEWAY) 05/07/10 UPDATED


3" DEEP, 3-0" WIDE PEASTONE BED MARK DATE DESCRIPTION
6" CONCRETE PAVER WITH BLACK STEEL EDGING OR OTHER
EDGE PATTERN (BOTH SIDES) ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PERMEABLE MATERIAL
SLOPE GRADE AWAY FROM
FOUNDATION (5% MIN SLOPE) PROJECT NO: NIST NZERTF
WALKWAY: CONCRETE
WITH MIN. SOLAR PLANTING SOIL CAD DWG FILE: A-PLOT-PLAN-NZERTF
T
♦ ♦ REFLECTANCE INDEX DRAWN BY: HW
o< o>< o>< o>< o>< o>< o>< o
♦ ♦ (SRI) OF 29 \9L ■:> ■:> ■:>v; ■:> ■:> ■:> t>

a
H

CHECKED BY: BP
o< o o< o< o< o< o
in FILTER FABRIC
DROUGHT-TOLERANT b
ooooooo COPYRIGHT © 2009
TURF o 6 BUILDING SCIENCE CORPORATION
3’-0" WIDE STONE BED, DEPTH BASED
- — b
b ON GRADE AND ADJACENT STONE BEDS
SHEET TITLE:
DRIVEWAY: CONCRETE
WITH MIN. SOLAR it. FILTER FABRIC
REFLECTANCE INDEX
(SRI) OF 29
ARCHITECTURAL
NOTE: SEE SITE/CIVIL DRAWINGS
4 *

SITE PLAN

AND SPECIFICATIONS FOR
CONSTRUCTION DETAILS
FREE DRAINING BACKFILL:
DETAILS
UNIFIED SOIL CLASSIFICATION
SYSTEM TYPE GW, GP, SW, OR SP I

o
SCALE AS NOTED z

PAVING PLAN
SCALE: 1" = r-0'
PEASTONE BED W/O DRIP EDGE DRAINAGE
SCALE: 3/4" = 1'-0"
A-101A
GENERAL SHEET NOTES
1. BASEMENT FOUNDATION WALL TO HAVE (1)
#4 HORIZONTAL REINFORCEMENT W/
BUILDING SCIENCE
MATCHING CORNER BAR AT TOP AND (1) AT
EACH MIDDLE THIRD, AND (1) #4 VERTICAL CORPORATION
REINFORCEMENT AT 48" O.C. LOCATED WITH
1-1/4" CONCRETE COVER MEASURED FROM
THE INSIDE FACE OF THE FOUNDATION WALL.

2. LOCATE 4" CONNECTION PIPE THROUGH


BASE OF FOOTING WITHIN 5’ OF EVERY
1 2 3 4 4.1 5 6 6.1 7 CORNER AND EVERY 15’ MAX ALONG LENGTH
OF WALL SEGMENT WITH MIN OF 1 PER WALL
86-0"
■7 ~ ■7 ~ SEGMENT.

3. LOCATE CONDENSATE DRAINS BASED ON


26-0' 16’-0" 36-0' 8-0'
-7 ~ y- y- y- y- LAYOUT OF MECHANICAL EQUIPMENT
2-0" CONCRETE FOOTING, TYP 4"
7^
4. SEE A-506 FOR FOUNDATION DETAILS.
6" CONCRETE PORCH foundAtion wall
, TYP
5. SEE A-603 FOR PENETRATION SCHEDULE.
-v

F.1 6. EL. +0-0" IN THE ARCHITECTURAL DRAWINGS


CORRESPONDS TO 461.30' IN THE SITE/CIVIL
30 FOREST STREET SOMERVILLE, MA
DRAWINGS T: (978) 589-5100 F: (978) 589-5103
-v

13’-5"
n 7. IF THE HIGH VELOCITY HVAC OPTION IS NOT
www.buildingscience.com
r- T.O. PORCH FDN WALL
EL. HY-2 3/8 4 AWARDED, THE PENETRATION FOR THE
CONDUITS WILL NOT BE PROVIDED.

10" CONCRETE FOUNDATION WALL, TYP. o


CONSULTANT:
I

2-0" CONCRETE FOOTING, TYP. o 4" DIAM. PERFORATED PERIMETER


DRAIN PIPE TYP; SEE 1/A-506
BOTTOM OF FOUNDATION WALL
DETAIL, TYP; SEE 1/A-506

DRAIN A1 BASE OF WINDOW WELL


6" CONCRETE GARAGE FOUNDATION W^LL, TYP (CONNECTED TO BASEMENT
v SUMP) |
F .u
2-0" CONCRETE FOOTING, TYP
ft
n
4ft
J I T * n
■ r -V F

11
to
©f it m
O SHEET KEYNOTES
7-0 1

CO
S6 n
CD
1
THROUGH-WALL CONDUITS CONDENSATE
LO
-V £JL FOR HEADER PIPES FOR DRAIN o LU -V
"si- Q
THROUGH-WALL VERTICAL GROUND LOOP § r n
INSTRUMENTATION
F1 S1
SYSTEM
THROUGH-WALL
5 I §
CONDUIT TO GARAGE
7E 5
l\ V-7
CONDUITS FOR o s O o

E o 10"B HEADER PIPES FOR CO D


CO
SLAB (3-0" ABOVE CO LU CD
1
CO I
4" PERFORATED VENT BEDDED IN STONE HORIZONTAL c: §
o BASEMENT SLAB) CM
o
WITH "L" CONNECTION TO 4" RISER SOIL GROUND LOOP LJ \
CM -V
GAS VENT THROUGH ROOF; SEE 4/A-506 SYSTEM
T.O. GARAGE FOUNDATION S5 T.O. WINDOWSILL___ zk
EL. -0-5' 9 =F CM
st- F5
SOIL GAS
VENT
4" CONCRETE SLAB
EMBEDDED HYDRONIC TUBING F3
IJJ 'EL. -7-1" V
Q. W1.4 x W1.4 WELDED WIRE MESH AT MID-DEPTH O
i CD SANITARY DRAIN > 6 MIL POLYETHYLENE o
Is- 4" PVC PIPE THROUGH
CD THROUGH SLAB 2" XPS RIGID INSULATION
CM
L
BOTTOM OF FOOTING, TYP; j

O 4" STONE PAD (NO FINES) / SEE 1/A-506


1
T.O. GARAGE FOUNDATION AT FRONT OPENINGS FILTER FABRIC I
CONDENSATE PROJECT:
Ob
EL. -2-8" UNDISTURBED NATIVE SOIL
* C/L C/L O
S6
DRAIN
II PENETRATION KEY
E.1 C/L © © CT>

CM MINIMUM 4" DIAM. O O THROUGH-STEM WALL be CM


CO

CO
National Institute of
STANDARD STEEL PIPE on
CONDUITS FOR FUTURE CO
S1. SOIL GAS VENT
COLUMN (RATED FOR
O HIGH VELOCITY HVAC AIR Standards and Technology
MIN. 22,230 LB. LOAD) o 3-0" X 3-0" X 1'-4" TO AIR OUTDOOR UNIT (SEE F10 S2. FLOOR DRAIN
TYP. GENERAL SHEET NOTE #7) \=T

OF BEAM
CONCRETE FOOTING
O
1
00 i 4'-6' W/ (4) #5 EACH WAY, S3. STEEL PIPE COLUMN
Net Zero Energy

POCKET
oo FLOOR DRAIN 6K" W x 16y2" D BEAM POCKET,
CM TYP. o
SLAB ON GRADE S2 1 SEE 2/A-506 S4. SUMP PUMP
CO
Residential Test

=C/L
ABOVE S6
00 -CJ------- ----- CJ------- ------ CJ------
CO ------ ©©5 D S5. SEWER CONNECTION

CM
CO
O'
S3 LSL BEAM ABOVE S3 COLUMN ISOLATION
------|—r^—a-
Facility
6%" W x 16/4" D BEAM
CONTROL JOINT, TYP. it- S6. CONDENSATE DRAIN
o

C.1 POCKET; SEE 2/A-506


12-4 3/4" 9-6 1/2" _____ 12-4 3/4" ____ -- CONDENSATE DRAIN F1. VERTICAL GROUND LOOP SYSTEM
1
7^

-------- CONDENSATE NIST Campus


Ob DRAIN I THROUGH-STEM F2. SLINKY LOOP SYSTEM Gaithersburg, MD
T.O. GARAGE FOUNDATION AT SOUTH DOOR T.O. FOUNDATION COLUMN AND FOOTING S6
EL. -2-1 3/4 *
10" SONO TUBE FOOTINGS FOR
BREEZEWAY COLUMNS, PROVIDE
3 #4 REINFORCING, TYP. -
EL. +0,-0"
T.O. FOUNDATION S±^F
4> DETAIL, TYP; SEE 3/A-506
WALL CONDUITS FOR
C ENTRAL AIR TO AIR
OUTDOOR UNIT
F3. HORIZONTAL. GROUND. LOOP SYSTEM
© 9-4"
EL. -r-2 II
CD F4. SUMP PUMP OUTLET
S2 THROUGH-STEM F9 CD

8" CONCRETE SLAB THIS WALL CONDUITS FOR F5. INSTRUMENTATION CONDUIT
FLOOR DRAIN
CO SECTION (UNDER BASE FUTURE AIR TO AIR CD
i U.S. Department of Energy
o O S6 OUTDOOR UNIT F6. GAS CONNECTION
CD OF BASEMENT STAIR) Research Toward Zero Energy Homes
CN
c CO O O CONDENSATE DRAIN o
F10 F7. WATER CONNECTION
T.O. SLAB SUMP PUMP: SUMP PUMP CROCK CONNECTION TO
4’-6" S4 U.S. DEPARTMENT OF
Energy Efficiency &
THROUGH-WALL INSTRUMENTATION
CONDUIT TO GARAGE SLAB
EL. -9-11 1/ 9 TO HAVE AIR-TIGHT LID OR
CLOSURE 7L
~Z-9"
7^
STORM DRAIN WITH
CHECK 7ALVE
F8. ELECTRICITY CONNECTION
ENERGY Renewable Energy
4-2 1/4' 9-4
M
(3'-0" ABOVE BASEMENT SLAB) -
THROUGH-WALL PENETRATION FOR
F7
THROUGH-WALL CONDUIT FOR
o
CM
-v o
THROUGH-WALL CONDUITS
FOR HEADER PIPES FOR SUMP
BfUl F9. AIR-TO-AIR OUTDOOR UNIT CONNECTION

O INVERTER DISCONNECT UTILITY F12 DOMESTIC AND SPRINKLER - SLINKY LOOP SYSTEM F10. FUTURE AIR-TO-AIR OUTDOOR UNIT
1
CD GAS CONNECTION
Ob THROUGH-WALL PENETRATION FOR F11 WATER
CN CONNECTION
COMMUNICATION AND FIRE SAFETY CM S6 K ?’
F4
THROUGH-WALL PENETRATION FOR
F13
F8
- CONDENSATE ftft
1—1
---
9s oo
CM\
F11. COMMUNICATION/FIRE SAFTEY CONNECTION

FIRE DEPARTMENT CONNECTION - DRAIN


Hff B
=Hi/d
Jr

JO"
CO F12. INVERTER UTILITY DISCONNECT
F8 F2
THROUGH-WALL CONDUIT FOR
UNMETERED ELECTRICAL WIRING /
ftftl
-i.i i—i
:—r-fp ft r O

CM
CONNECTION

nt A 07/27/10 UPDATED
k
ft) Ett ftttr C/L
-,± 2’-6" y- THROUGH-STEM
F13. FIRE DEPARTMENT CONNECTION
06/29/10 UPDATED
TH|ROUGH-WALL CONDUIT FOR ELECTRICAL WALL CONDUIT MARK DATE DESCRIPTION
WIRING FROM HOUSE METER CO
FOR SUMP
DISCHARGE ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
10" SONO TUBE FOOTINGS FOR LO

FRONT PORCH COLUMNS,


PROVIDE 3 #4 REINFORCING, TYP.
PROJECT NO: NIST NZERTF

©C/L ©C/L ©C/L A.1 CAD DWG FILE: A-PLOT-PLAN-NZERTF


C/L
DRAWN BY: CG
, , 5 1/2l' 11'-7' 7L
11’-11" 7L
ir-7' "7 ^ 7 ~
5 1/2"
CHECKED BY: BP

COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

FOUNDATION PLAN

FOUNDATION PLAN SCALE AS NOTED o


z

SCALE: 1/4" = 1'-0"

A-102
GENERAL SHEET NOTES
1. BASEMENT AREA TO OUTSIDE FACE OF
FOUNDATION WALL:
BUILDING SCIENCE
2.
1,518 SQ. FT.

SEE A-602 FOR FINISH SCHEDULE.


CORPORATION

1 2 3 4 4.1 5 6 6.1 7

F.1 30 FOREST STREET SOMERVILLE, MA


T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

PATIO ABOVE
CONSULTANT:
SLAB ON GRADE
ABOVE

F F
4.
4
O SHEET KEYNOTES
J 1. PROVIDE BLOCKING IN WALL TO SUPPORT

EGRESS WINDOW
SOIL GAS VENT FUTURE STAIR LIFT. BLOCKING SHOULD
r n
EXTEND UP TO A HEIGHT OF 3’-0" ABOVE
STAIR TREADS.
E
2. STAIR FROM BASEMENT TO FIRST FLOOR TO
HAVE 16 RISERS AT 6-2/3", 15 TREADS AT 10"
WITH y4" NOSING.

SANITARY DRAIN
PREFABRICATED WINDOW
WELL WITH EGRESS
L J
LADDER;
SEE 6/A-506
UTILITY SHAFT i
PROJECT:
OPENING
E.1 © © ABOVE
National Institute of
r
L
Standards and Technology
SLAB ON GRADE
WALKWAY ABOVE
ABOVE FLOOR DRAIN;
CONNECT TO SOIL 6-0" HIGH PLYWOOD PANEL
WITH 2x4 STUD BACKING
CONDENSATE DRAIN;
CONNECT TO SUMP
Net Zero Energy
PIPE
Residential Test
'0[ ZQ D
3-9' Facility
C.1 ©
NIST Campus
I Gaithersburg, MD
O- CONDENSATE DRAIN;
CONNECT TO SUMP

FLOOR DRAIN;
CONNECT TO SOIL U.S. Department of Energy
PIPE Research Toward Zero Energy Homes
c <D CONDENSATE DRAIN;
o CONNECT TO SUMP U.S. DEPARTMENT OF

ENERGY
Energy Efficiency &
Renewable Energy
□ -v SUMP
CONDENSATE DRAIN;
UP cc
< CONNECT TO SUMP
LU
12'-2‘ 5 1/2" 3-9
M

O
CM

CO
I B

A n A

MARK DATE DESCRIPTION


ABOVE ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF

© © © © A.1 CAD DWG FILE: A-PLOT-PLAN-NZERTF

DRAWN BY: CG

CHECKED BY: BP

COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

BASEMENT PLAN

BASEMENT PLAN SCALE AS NOTED o

SCALE: 1/4" = 1'-0"

A-103
GENERAL SHEET NOTES
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
BUILDING SCIENCE
2.
SUPPLIER.

EWP CONNECTIONS TO FOLLOW EWP SUPPLIER


CORPORATION
INSTRUCTIONS.

3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR


ON THE FRAMING ORDER TO 10% OR LESS.

4. PROVIDE ENGINEERED WOOD BLOCKING


1 2 3 4 4.1 5 6 6.1 7 BETWEEN JOISTS UNDER PARTITIONS
PARALLEL TO, BUT BETWEEN, JOISTS;
COORDINATE LOCATION OF BLOCKING WITH
MECHANICAL DUCTWORK.

5. SEE A-701 AND A-702 FOR OPEN WEB FLOOR


JOIST TYPES; OPEN WEB FLOOR JOISTS TO BE
CONSTRUCTED USING FSC-CERTIFIED WOOD;
OPEN WEB FLOOR JOISTS TO BE ENGINEERED
44'-0"
BY TRUSS SUPPLIER TO MEET LOCAL CODE.
F.1 30 FOREST STREET SOMERVILLE, MA
6. GENERAL STRUCTURAL FRAMING
36-0' 8-0’
7L
CONNECTIONS: T: (978) 589-5100 F: (978) 589-5103
o www.buildingscience.com
LSL CEILING JOISTS TO FLOOR HEADERS: USP
THD179 ENGINEERED WOOD JOIST HANGER;

DOUBLE LSL FLOOR HEADER TO TRIMMER: USP


14" DEEP OPEN WEB FLOOR HD 410 DOUBLE HANGER. CONSULTANT:
TRUSS TYPE "A1" AT 24" O.C.
7. STRUCTURAL FRAMING CONNECTIONS FOR
WITH g" T & G FLOOR
CENTER BEARING WALL (TO RESIST ROOF
SHEATHING; SEE A-701,A-702
UPLIFT):
FOR TRUSS TYPES
RAFTER TO RIDGE BOARD: USP AC7 ANGLE
2x4 TREATED SILL PLATE 2'-0" 2'-0" 2'-0" BRACKET WITH 4 10d NAILS EACH LEG
v- —> — —> —
2x6 TREATED PLATE ON
RAFTER TO STUD IN ATTIC BEARING WALL: USP
FOUNDATION SHELF
F -v F LTW12 WITH R 10d NAILS EACH END
n
1-1/4" x 14" LSL RIM JOIST 1-1/4" x 14" LSL RIM JOIST STUD IN ATTIC BEARING WALL TO CEILING
ATTACHED TO FOUNDATION o
/ ATTACHED TO FOUNDATION JOIST: USP LTW12 WITH 4 10d NAILS EACH END
THROUGH 2" XPS INSULATION THROUGH 2" XPS INSULATION
CEILING JOIST TO STUD IN SECOND FLOOR
2" XPS INSULATION ON \ BEARING WALL: USP RT10 WITH 4 8d NAILS
FOUNDATION SHELF, TYPICAL EACH END (USE USP LTW12 AT CONNECTIONS
r n
14" DEEP OPEN WEB FLOOR TO WALL HEADERS)
E 1-3/4" x 14" ENGINEERED WOOD TRUSS TYPE "A" AT 24" O.C. WITH
: LL


BLOCKING BETWEEN RIM JOIST T & G FLOOR SHEATHING; SEE STUD TO SOLE PLATE IN SECOND FLOOR
AND WEB JOIST, 4'-0" O.C., TYPICAL CO A-701 ,A-702 FOR TRUSS TYPES BEARING WALL: (2) USP S01 CLIP ANCHORS

SOLE PLATE TO FLOOR DECK: (2) #8x3" WOOD


SCREWS AT 12" O.C.
3t-
o
CD
o
ATTIC FLUSH-FRAMED BEAM TO WALL STUDS
CD CM AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS L J
EACH END OF STRAP; PROVIDE CONTINUOUS
14" DEEP OPEN WEB FLOOR LOAD PATH DOWN TO BASEMENT BEAM USING
TRUSS TYPE "A" AT 24" O.C. WITH SIMILAR SIZED STRAPS AT ALL FRAMING PROJECT:
T & G FLOOR SHEATHING; SEE JOINTS.
E.1 A-701 ,A-702 FOR TRUSS TYPES National Institute of
D= □ ! BEAM BELOW - Standards and Technology
BLOCKING BETWEEN JOISTS u 11 LSL 5-1/4" x 16" 1.55E O SHEET KEYNOTES
UNDER PARTITIONS PARALLEL TO
<£>
BUT BETWEEN JOISTS, TYPICAL

<£> <i> <i> <D <£> 2'-0" 2'-0" 2'-0" 1. END OF FLOOR JOIST TO BE FULL BEARING
Net Zero Energy

C/LOF
BEAM
7^

Residential Test
7^ 7^

CD ON BEAM BELOW.
O
m
1-3/4" x 14"
■V
CO
CO
D 2. 2-2x6 BLOCKS IN FLOOR BELOW JACK STUDS
TO TRANSFER LOAD TO BEAM BELOW WHERE
JACKS STUDS ARE NOT ALIGNED WITH FLOOR
Facility
C.1 LSL HEADER JOIST.
AT STAIR NIST Campus
OPENING Gaithersburg, MD
DASHED LINES INDICATE STUD 1-1/4" x 14" LSL RIM JOIST
WALLS ABOVE ATTACHED TO FOUNDATION
12-5 1/2' 3-10' THROUGH 2" XPS INSULATION
CD
CN

CD
U.S. Department of Energy
CD
Research Toward Zero Energy Homes
C
14" DEEP OPEN WEB FLOOR 14" DEEP OPEN WEB FLOOR
TRUSS TYPE "B" AT 24" O.C. WITH 1-%" x 14" TRUSS TYPE "C" AT 24" O.C.
U.S. DEPARTMENT OF
Energy Efficiency &
T & G FLOOR SHEATHING; SEE
A-701,A-702 FOR TRUSS TYPES
LSL HEADER
AT STAIR
WITH l" T & G FLOOR
SHEATHING; SEE A-701,
ENERGY Renewable Energy
OPENING A-702 FOR TRUSS TYPES

B
/■
7 1-1/4" x 14" LSL RIM
o
i

CN
JOIST ATTACHED TO
A FOUNDATION
■»c A
14" DEEP OPEN WEB -r BLOCKING BETWEEN JOISTS THROUGH 2" XPS
2’-0" 2’-0" 2’-0"
FLOOR TRUSS TYPE "D" AT UNDER PARTITIONS PARALLEL TO 7^ 7^ 7^ 7^
INSULATION MARK DATE DESCRIPTION
24" O.C. WITH §" T & G BUT BETWEEN JOISTS, TYPICAL
FLOOR SHEATHING; SEE ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
A-701,A-702 FOR TRUSS
TYPES
PROJECT NO: NIST NZERTF
A.1 CAD DWG FILE: A-PLOT-PLAN-NZERTF

DRAWN BY: CG

CHECKED BY: BP

COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

FIRST FLOOR
FRAMING PLAN

FIRST FLOOR FRAMING PLAN SCALE AS NOTED o

SCALE: 1/4" = 1'-0"

A-104
GENERAL SHEET NOTES
1. FIRST FLOOR AREA TO OUTSIDE FACE OF
STUD WALL: 1,518 SQ. FT.
BUILDING SCIENCE
2. DIMENSIONS ARE TO FACE OF STUD UNLESS CORPORATION
OTHERWISE NOTED.

3. INTERIOR PARTITIONS FRAMED WITH 2x4


WOOD STUDS UNLESS OTHERWISE NOTED.

4. INTERIOR BEARING WALLS FRAMED WITH 2x6


1 2 3 4 4.1 5 6 6.1 7
WOOD STUDS UNLESS OTHERWISE NOTED.

86’-0" 5. INTERIOR DOORS TO BE CENTERED


7—

BETWEEN THE NEAREST WALL


26-0' 16’-0" 2-0' 32-0' 2’-0" 8-0'
7—
PERPENDICULAR ON EACH SIDE OF THE
5'-9 1/4’ 14-5 1/2' 5-9 1/4' 2’-9 1/4' 8-7 3/4' 8-7 3/4' 9-6 3/4' 6’-4 1/2' 3-9 1/4' 4’-2 3/4' DOOR UNLESS OTHERWISE NOTED.
7— 7— 7— 7L 7 ~ 7L 7L 7 ~ 7L 7 ~

4"
7^" 6. SEE A-602 FOR FINISH SCHEDULE
13-5'
8" 7— 7—

F.1 7. REFER TO POCKET DOOR FRAME KIT


-V
INSTALLATION INSTRUCTIONS TO DETERMINE
30 FOREST STREET SOMERVILLE, MA
-
CONCRETE PAVERS WITH 8" ROUGH OPENING OF POCKET DOOR. T: (978) 589-5100 F: (978) 589-5103
CONCRETE SLAB
CONCRETE WALL EDGE; STONE W/ BROOM FINISH:
www.buildingscience.com
VENEER ON TOP AND SID E OF SLOPE TO FLOOR
CONCRETE WALL; SEE 4/A101A DRAIN
DOWN FLOOR DRAIN; CONNECT TO
PATIO -n ROOF DRIP EDGE DRAINAGE CONSULTANT:
> SYSTEM o
o
o
CONDUIT THROUGH WALL FOR
IM>
o
cn SCREEN
o O SHEET KEYNOTES
FUTURE GAS WATER HEATER PORCH
CONCRETE PAD
SUPPLY/EXHAUST
FOR OUTDOOR 19 1. PROVIDE BLOCKING IN WALL TO SUPPORT
5/A-205 SEE 3/A-507
UNIT FOR GARAGE FUTURE STAIR LIFT. BLOCKING SHOULD
HEAT PUMP EXTEND UP TO A HEIGHT OF 3’-0" ABOVE
CL CL CL
CL STAIR TREADS.
2' l
-v 2. STAIR FROM FIRST TO SECOND FLOOR TO
F -V F
8"
■V
CM l J HAVE 16 RISERS AT 7%", 10" TREADS WITH %
NOSING.
L\_
8' 3-0' 8" 5'-10"
O
+ -H I
18
J 3. CASED OPENING, 7-6" FINISHED HEIGHT
<2
CO CM
CD
1
-2/A-294- i
i i
LO LO
LD i LO WINDOW 4. CASED OPENING, 6-8" FINISHED HEIGHT
3ji 375" 5 1/2" 28'-1 1/2 ii

"7
d-
WELL
CL CO 5. DROPPED CEILING, 7-9" FINISHED HEIGHT r n
CL 00 ^ 8/A-204 I

SEAT CO
>IS 6/A-204 18" x 18" ACCESS PANEL ABOVE DOOR FOR
E ^4I Oio o -v 6.
Kl -
CONDUIT THROUGH WALL ACCESS TO FCU-2 UNIT.

f UNDERGROUND CONDUIT BETWEEN SOI. GAS


----- VENT
CO
1

CO 'd-
o
r
□ TO FUTURE MULTI-SPLIT
OUTDOOR UNIT 7. CONCRETE GARAGE STAIR TO HAVE 4 RISERS
AT 6y2", 11" TREADS.
-sJ- l 1 GARAGE AND BASEMENT
CD
CM

<
I
CM
8. GARAGE ATTIC ACCESS PANEL TO FIT WITHIN
I —3/|lTH #1 OO
o
f^-
i
X CM
DINING ROOF TRUSSES; SEE A-112 ROOF FRAMING
LO
CO 4/A-|204 i
i

< ROOM / O PLAN FOR LOCATION AND SIZE. PANEL TO BE


SEE 4&5/A-507, TYP. SLOPE GARAGE SLAB 4" :12" 00 1

4" SLAB ON GRADE; SEE 1/A-305 Ol


■I Ol
LO O a CD
1
o FASTENED FROM BELOW AND REMOVABLE
> mi - CM

<s>
■f]
L J
o 12 N) a> WITHOUT REMOVING PANEL TRIM. ACCESS
o co
CM -i^ > PANEL TO BE INSULATED. CELLULOSE ATTIC
-V
CONCRETE STAIR AND LANDING i
O CO
ro INSULATION SHALL BE HELD BACK FROM PROJECT:
V = o
O LU 4^ ACCESS ACCESS OPENING.
ATTIC ACCESS -o
E.1 ABOVE -
1 Bo 11"
B r
2 CM
I
CO
4 O
O
W/D
LO
I
CO
PANEL ABOVE
9. SIZE OF CONCRETE PAD TO BE SPECIFIED BY National Institute of
= < CD MANUFACTURER OF AIR-TO-AIR OUTDOOR
o
UP cr o
lAT U UNIT, Standards and Technology
J
o
sr i 4-4^ --2-7 1/4' 3’-1" 1 ©, 4’-3 1/4
M
©54. 11-10" 10. LOCATION OF FUTURE OUTDOOR AIR-TO-AIR
<2
CO ii -7 ■7 -7
11 11 11"
ii

CM 7^ x
p{(2 (2
/CCESS UNIT.
O
I

CM
CD

O
CO
C\J
GARAGE o
A l\ j ©
O.
-V
CD
BREEZEWAY O
15
■ii
1■-11 ■
co
PANEL ABOVE
11--1 1/4' 3/A-207
<25 3-1" 3-11 3/4' 8-1 ,'-10 1/2;
CM
LO
1
11. DO NOT SLOPE SLAB IN THIS AREA; THICKEN Net Zero Energy
SLAB UNDER CHAIR LIFT IF SPECIFIED BY
1 Residential Test
iL
0
CD 5-0" CLEAR MUDROOM 5 1/2 11
5 1/2" BEARING WALL I 5 1/2’ MANUFACTURER OF LIFT.
CONCRETE WITH BROOM CL
©
I
00 O
CO

<2 ■V FINISH
5
CM

co
I
CLOSE
UTILITY
DOWN CO

o
-CO 4-
S> CM ■V

T CO
D
Facility
B B 1/2 II CM CLOSET
11
O
C.1 1 5 1/2 HI 1

CH, CT> 11/A-204 I m


CO
1/A-205
CM
LIFT 11" ® i
1
CO
CD
1
"nJ- <
o
CD
1 O DOOR KEY NIST Campus
<<p (11) -|
-7
4i T 12"
~ 7 ~
4'-9"/y5 1/2
11
2-3 1/2" 3’-10
h'
4’-11 1/2" 1 II

-7
2-1 1/2
11
9-10 1/2
M

t-
O
CO Gaithersburg, MD
CM CO

!©,
25-1
UNDERGROUND CONDUIT BETWEE^
f^-

CD
1
ENTRY
HALL
- <2
CD
1. 1 ’-8" x 6’-8" LH
1
1^ GARAGE AND BASEMENT ol O 2. (2) 1-10" x 6-8"
SEE 3&7/A-507, TYP. CO
co CO
CO
> >I
t ro
o
cn Q ro
o
LIVING ROOM
LO
o
CM
LU
Z
3. 2-4" x 6-8" LH
U.S. Department of Energy
f
M
ACCESS 5 1/2" 4-2 -h 1 1
) ;S; co < CD m 4. 2-4" x 6-8" RH
c CO
I
PANEL ABOVE
<2 CO <
o
5. 2-4" x 6'-8" POCKET
Research Toward Zero Energy Homes

U.S. DEPARTMENT OF
Energy Efficiency &
©

u
(= = = = =!=

LO

ENERGY
I PASSIVE DOOR

<2 <2 6. 2-6" x 6'-8" RH


ACTIVE DOOR

■7-^r

O
- CD Renewable Energy
OFFICE / OPTIONAL ■f^r CD

S)
\

o CO 7. 2'-6" x 6'-8" LH
BEDROOM 4
\

LU CONDUIT THROUGH
7/A-205
\

M—\JP- CD
9'-0"


\

O WALL FOR FUTURE 8. 2'-8" x 6'-8" LH


\

Tf DO
o o a: <
< CT>
o GAS FURNACE
I o
11'-6 1/2" LU
9'-
11
ID 12'-1 8-0" 1
SUPPLY/EXHAUST 9. 2'-8" x 6'-8" RH
10
JJ 1
"7
f <L
4 (- CO

LO
1
<2 o
LO
13
l
T -V B 10. 3'-0" X 6'-8" LH

f )
o
I
CM
11. 3'-0" x 6'-8" RH

A
l 4 3B CL
A 12. 3'-0" x 6-8" POCKET
07/27/10
06/29/10
UPDATED
UPDATED
M SEE 2/A-507, TY
6" 13. 3'-0" x 7'-0" RH W/12" SIDELITES
SEE 1/A-507, TYP. ,'-7- CL CL CL CL CL MARK DATE DESCRIPTION
CONCRETE SLAB W/ BROOM
FRONT FINISH: SLOPE SLAB 1/4":12 11
CO
CO PORCH I 14. 3'-0" x 7'-0" LH ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
I AWAY FROM HOUSE LO
CO
15. 3'-0" x 7'-0" RH
PROJECT NO: NIST NZERTF

e A.1
16.

17.
9'-0" x 8-0" OVERHEAD

(2) 4'-6" x 8'-0'


CAD DWG FILE:
DRAWN BY:
A-PLOT-PLAN-NZERTF
CG
CL CL CL CL
L T1’-7'
-71-
1T- TT" 7L
1Y-T
xw 18. 6'-0" x 6'-8" (1) LH PANEL, (1) FIXED PANEL CHECKED BY: BP

8-10 1/4" 11'-4 1/2' 5-91/4


n
3-4
M
5-10" 8-10" 8-10" 30-8 1/8
n
5-10
n
3-4
n
4 -2 3/4 11
19. 3'-0" x 6-8" RH COPYRIGHT © 2009
7^- 7^- 7^- 7— 7— 7— 7
BUILDING SCIENCE CORPORATION

SHEET TITLE:

FIRST FLOOR PLAN

FIRST FLOOR PLAN SCALE AS NOTED o


z

SCALE: 1/4" = 1'-0"

A-105
M
O'-O O'-O"
BLOCKING TO SUPPORT HANGER GENERAL SHEET NOTES
M
FOR SCREEN PORCH END BEAM
O'-O

36'-0" 35'-8 ii
25'-3 1/2" 10'-8" -7^
36'-0'
36'-0"
34'-6 3/4 M

31-10 3/4'
27'-1"
22-1"
17'-3 1/4"
14'-7 1/4 ii
'-8 1/4 ii

3-0 3/4'
-7^
8'-5 1/2
8-5 1/2"
ii
5'-11 1/4"
2'-6 1/4"
7
4
1. REAR WALL FRAMING ELEVATIONS DRAWN AS
SEEN FROM INTERIOR; INTERIOR BEARING
BUILDING SCIENCE
-7^ 7 “

36-0" 30-10"
9'-1 1/4"
25'-3 1/2"
8'-4 3/4" 4'-6 3/4" 3'-4 M

4
14'-1 3/4"
13'-4"
2'-1" 2'-0'
7^

z^\~ zz zziz ft 7^| ft ~7\


"7 ~
2'-0"
Y-
77©
2'-0'
Z7
WALL FRAMING ELEVATION DRAWN AS SEEN
FROM THE FRONT; ALL OTHER ELEVATIONS CORPORATION
7

,Z
DRAWN AS SEEN FROM EXTERIOR
TT ^r 2. TYPICAL WALL HEIGHT = 9'-1".
^4 X
3! 3. TYPICAL FIRST FLOOR WINDOW FRAMING HEAD
(2) 1.75" x 11.25" LSL (2) 1.75" x 11.25" LSL \ 3.5" x 5.5" LSL 3.5" x 5.5" LSL 3.5" x 5.5" 1.3 =
3.5" x 7.25" LSL /
1.55E HEADER ^7 1.55E HEADER 1.3E HEADER 1.3E HEADER LSL HEADEF HEIGHT = 7'-6 3/4".
1.3E HEADER 3.5" x 9.25” LSL
(2)1.75” x
11.25” LSL
\ CM
CT>
l
1.3E HEADER
3'-2" 4. WINDOW AND EXTERIOR DOOR FRAMING
E I
/ C C&co / E > CMI - © —? !

1.55E HEADER "mI-


A
6'-4 1/2 ii

V-
OPENING DIMENSIONS TO BE ADJUSTED PER
-A
4-7 M

-AS. 1/2' -A
3-10" 3-1 8'-1" ' 2-5' 2'-5'
©-
I MANUFACTURER SELECTION AS FOLLOWS:
©- 7< - © -© -A © \ A LO
±5 i

CN CN
CNJ \ CD A. FRAMING WIDTH FOR DOORS AND WINDOWS:
/
©
CN

CD

CD
© CD

CD
© <D

CD N-
/ / / 18
/
/
\ INCREASE THE MANUFACTURER'S
SPECIFIED ROUGH OPENING WIDTH BY
/ / ADDING V2" TO EACH SIDE.
/ / B. FRAMING HEIGHT FOR WINDOWS:
■v -V
INCREASE THE MANUFACTURER'S
& 30 FOREST STREET SOMERVILLE, MA
KT TK S S S KTT TT TT TT TT TTK SS S KTT TTK S E KT TK S S KT C C TK S KT C TK S S KT TK S E E S KT c TK S E SPECIFIED ROUGH OPENING HEIGHT BY
ADDING V2" TO THE TOP AND 1" TO THE T: (978) 589-5100 F: (978) 589-5103
IB1 BOTTOM.
www.buildingscience.com
C: FRAMING HEIGHT FOR DOORS:
H7 H6 INCREASE THE MANUFACTURER'S
SPECIFIED ROUGH OPENING HEIGHT BY
ADDING 1/2" TO THE TOP.
5. FRAMING STUDS TO BE FSC-CERTIFIED CONSULTANT:
LUMBER.
O

O
©-------

CN
CN

CD
■A
\
1 LU

6. LIMIT THE OVERALL ESTIMATED WASTE FACTOR


ON THE FRAMING ORDER TO 10% OR LESS.'
cn
H7 i

CN
CO
/ 7. STRUCTURAL SHEATHING CONNECTIONS (TO
RESIST ROOF UPLIFT):
CO T £ 5-7"
m ny DO
-©—V O
W CD
CN
o
LAP SHEATHING ON RAFTER RIM BOARD:
O i
MINIMUM 8d NAILS AT 3" O.C.
X OO <
o
HORIZONTAL SHEATHING EDGES AT BLOCKING
/
(a OR FRAMING: MINIMUM 8d NAILS AT 3" O.C.
\ \
cn
/ / HORIZONTAL SHEATHING EDGES BELOW
CN SECOND FLOOR: MINIMUM 8d NAILS AT 6" O.C.
\ r i
CD cn LO
\

i

CN <> X
if)
< CN
/ O SHEET KEYNOTES
Ol
i
\
4^ if)
/ CO
LO /
00
if) J-
i
LO
oo
X 7 o
\
< CN
/ i

CO <
o
L J
/
CN CN \
PROJECT:
\ CD CD
if)
i
/ CD CD /
in

7\
\ /
M. U ./
\
LU
National Institute of
00
00
/
Standards and Technology
hJ \ H6 CN

x 7i
7'-3" t
\>
*
X n
o
o
a> \ 2 * Net Zero Energy
00 00
n nni ^ pm PE y \ 2'-7"
Residential Test
CN © 7!-

CN
/ O

if) IB1 CO
CD

/
Facility
CO
"si-
\ l o
t U
in
\
\ NIST Campus
/ if)

if)
CN Gaithersburg, MD
00
NO
CD
CN /
\
i
o
CO
\ ^1"
oo
if) X
(n
t
NO Ol \ /
i
NO
\
/ NO X if)

if)
U.S. Department of Energy
\ V, 2'-7" Research Toward Zero Energy Homes
o
t /
if)
Is- CD

Energy Efficiency &


i

LO \ co U.S. DEPARTMENT OF

S> ENERGY
i
7s LO o
O
N-
i
Renewable Energy
> oo
LU
NO \ -V
T
o 5'-7" /
t; T

if) 00 00
::=nLU
if) y O
OO
i
-N
i
-N
OsJ ^
CO
CD
\ X
\
©
4^
m A CO LU
7 \ 'I x H2
T— T

H1
MARK DATE DESCRIPTION
BLOCKING TO SUPPORT HANGER BLOCKING TO SUPPORT HANGER O'-O" O'-O'
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
FOR FRONT PORCH END BEAM FOR FRONT PORCH END BEAM

36’-0' 34-4 1/2" 28-6 1/2 M


21'-2 3/4" 10'-10 1/2" 5'-0 1/2 M

7L
8'-5 1/2 M
5'-11 1/4"
PROJECT NO: NIST NZERTF
36'-0" 30'-11 1/2' 25-1 1/2 M
14’-9 1/4" 7^
7-5 1/2 M
r-7 1/5 7 =
M
8-5 1/2" 2-6 1/4"
2-0
M
2-0
M
2-0" CAD DWG FILE: A-PLOT-PLAN-NZERTF
1?*- 7^
^7 rz Tz DRAWN BY: HW
4 -4©
\/ -4©
CHECKED BY: BP
'-Z,
COPYRIGHT © 2009
3.5" x 5.5" 1.3 = 3.5” x 5.5” 1.3 = 3.5" x 5.5" 1.3 = 3.5" x 5.5" 1.3 = 3.5” x 5.5" 1.3 =
\ LSL HEADEF LSL HEADEF 3.5" x 7.25" LSL LSL HEADEF LSL HEADEF
/ LSL HEADEF BUILDING SCIENCE CORPORATION
/ 1.3E HEADER
/ 6-2 1/2" \ 2x4 STUD FOR STRUCTURAL
\ 3-2" 3-2
ii
/ 3-2" 3-2
M
3-2
ii
SHEET TITLE:
-© ©

© z' © © z! / SHEATHING ATTACHMENT,
\ 3-3 1/2" ! TYPICAL
N-
1
N- \ - © i— i— 00
A / A A A A \
LO LO

CN
i
\
/
LO \/ LO LO

/
LO
00

h-
FIRST FLOOR KEY
\ 13© \

ns
/ \ / / \
±<Z

\ \
/
/ \
/
PLAN & WALL
/ \

E KTC c TK S KT C
m C TK s S KT SS SS TK S s KT C
mC TK S KT c C TK E
£
E S KT C TK S E
FRAMING
3 3/8"
1/2" 4'x8' PLYWOOD ELEVATIONS i

STRUCTURAL SHEATHING, cz
o
H1 H2 SCALE AS NOTED z
TYPICAL

FIRST FLOOR KEY PLAN & WALL FRAMING ELEVATIONS


SCALE: 1/4" = 1'-0
H A-106
GENERAL SHEET NOTES
1. REAR WALL FRAMING ELEVATIONS DRAWN AS
SEEN FROM INTERIOR; ALL OTHER ELEVATIONS
BUILDING SCIENCE
2.
DRAWN AS SEEN FROM EXTERIOR

TYPICAL GARAGE WALL HEIGHT = 9-4".


CORPORATION
O'-O"
3. TYPICAL GARAGE WINDOW FRAMING HEAD
HEIGHT= 6’-10y2" ABOVE TOP OF GARAGE
26'-0" 21'-11 1/4" 7'-5 15/16" FOUNDATION WALL.
26'-0' 18'-6 1/4" 4'-0 3/4"
7L 4. WINDOW AND EXTERIOR DOOR FRAMING
2'-0" 2'-0' OPENING DIMENSIONS TO BE ADJUSTED PER
~? ~ ~? ~ ~? ~

\ 7^7 xA FTF' ~FF F7 MANUFACTURER SELECTION AS FOLLOWS:


22. 2^. ^2. ^2. ^2. A. FRAMING WIDTH FOR DOORS AND WINDOWS:
X ft FT 7F INCREASE THE MANUFACTURER'S
A

x 3.5" X 5.5" LSL


\
3.5" X 5.5" LSL
/
SPECIFIED ROUGH OPENING BY ADDING y2"
TO EACH SIDE.
B. FRAMING HEIGHT FOR WINDOWS:
\ 1.3E HEADER 1.3E headef: INCREASE THE MANUFACTURER'S
3'-2' SPECIFIED ROUGH OPENING HEIGHT BY
3'-2" -?:
-=f 30 FOREST STREET SOMERVILLE, MA
■ A
7^7 O) ADDING y2" TO THE TOP AND 1" TO THE
’A f^- BOTTOM. T: (978) 589-5100 F: (978) 589-5103
LO I

A A LO
/ C. FRAMING HEIGHT FOR DOORS: www.buildingscience.com
INCREASE THE MANUFACTURER'S ROUGH
OPENING HEIGHT BY ADDING Vi' TO THE
CM : = TOP.

4 5 KT c TK S S S S S
I
S KT C
CO
I
\
TK S E
5. FRAMING STUDS TO BE FSC-CERTIFIED
LUMBER.
CONSULTANT:

6. LIMIT THE OVERALL ESTIMATED WASTE FACTOR


l_ J ON THE FRAMING ORDER TO 10% OR LESS.

7. STRUCTURAL SHEATHING CONNECTIONS ON


G3 GARAGE (FOR BRACING):

FASTEN PLYWOOD SHEATHING ON WEST WALL


WITH MINIMUM 8d NAILS AT 3" O.C.

o CO
O SHEET KEYNOTES

■PI
r-p 1/21
i

I
l-£Z

O'-O'

4
E

E
/

/
^2
r

r-6 1/2"
n
X
ii
IX

S
J

2^.
IK

L2

s
9'-10 3/4”

2L*.
^2
SINGLE 2x6

13'-2 1/4”
HEADER

s
L-.6

21'-5 3/4"
16

2^.
77
L j

2Li

\/
\/
PROJECT:
CD

CM
-r

v|KS
W-

CO
CM
2^.

00
National Institute of
B , II . II
Ik

fxxr

3'-3 1/2

G2
G2

FF©-

5SZ
G4

G4
s kI

\l
\l

0
Standards and Technology
JL
ii

^2

S K
12'-4 3/4"

\/
Net Zero Energy

\/

w
Residential Test

S
SINGLE 2x6

O'-O"

2L*.
HEADER
I--,6

/
^2
16

13'-5' 12-9 3/4' 8-9 3/4" 3-10 3/4'


Facility
10-8 1/4"

s
7L

13-5' 9-6 1/4" 4-7 1/4' 7 1/4"

2^.

/
i1-

3.5” x 9.25" LSL


NIST Campus

s
1.3E BEAM
FF-

Gaithersburg, MD
CM
O)

^2
23'-1"
23'-1"
-V
*

SC
L
w-

s
Ik

r-6 1/2”
XT

T
,o-,o
1'-6 1/2
1’-7 1/4"
\w

2^.
K

(2) 2X6 (2) 2X6

rr
r

~I
E
F
ii

POST POST
I

I
CT

00
CD

LO
CO
U.S. Department of Energy
ACTIVE DOOR

CO
3-3 1/2’ 4-2 1/2’ 3-3 1/2’
Research Toward Zero Energy Homes
^PASSIVE DOOR

7 - -7' ' CO
\
\

U.S. DEPARTMENT OF
Energy Efficiency &
\
\

ENERGY
CO
X
\

CM
Renewable Energy
—V
o
o

ES K C C K K C C K K C

SP2
26-0" 21 '-11 1/4 ii
7'-5 3/4"

26'-0' 12'-4 1/4" 4'-0 3/4’
SP2
2'-0 ii
2'-0 ii

\ 7^ TFFF fTF' 7F
H
X
22* 4
5-8 1/4
ii
I
CD
o
O 4 ft
A .2^, .2^,
■f:
.2^, L o
I
CO
CM
J
7 5-8 1/4" Jo
/I \
Z
V
\ 3.5" x 5.5" L5fL
\ 7 2X4 STUD FOR
STRUCTURAL
o
w
-t*
J
ho
o

NO
o
I
o
o
I

t
I
v-
o

MARK DATE DESCRIPTION


3.5" x 9.25" LSL 1.3E HEADER o>
SHEATHING
1.3E HEADER

9-4"
v-
3'-2' ATTACHMENT, TYPICAL col *
Tl
o

' \
f <>
c/)
"D
co
CL
Cf.)
A 3?
o

* Q_
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

r^ 00 TCl C/)
A LO
I
6-9 1/2 M

T Ul
CO 1 O PROJECT NO: NIST NZERTF
©
f^
00 CM
,s]-
oo 00 CO
/
CD
CD \
Ol
LO
I

I CAD DWG FILE: A-PLOT-PLAN-NZERTF


CD
i

s
7 00 o
I
/ o DRAWN BY: HW
LO
* A 4^
X
4 5 K ’
CO
TK S S S KT C TK S
FOUNDATION WALL,
TYPICAL m
00
4^
A-----A
o
o
HI T
o
o
3T
CO
> o> A
-2,-

\ JJ
CHECKED BY: BP

COPYRIGHT © 2009
oo r-3 1/21 /
l_ BUILDING SCIENCE CORPORATION
l_ l
SHEET TITLE:
G1

SCREEN PORCH &


GARAGE KEY
PLANS & WALL
FRAMING ELEVS.
GARAGE KEY PLAN & WALL FRAMING ELEVATIONS SCREEN PORCH KEY PLAN & WALL FRAMING ELEVATIONS SCALE AS NOTED o

SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1’-0’

A-107
GENERAL SHEET NOTES
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
SUPPLIER.
BUILDING SCIENCE
2. EWP CONNECTIONS TO FOLLOW EWP SUPPLIER
INSTRUCTIONS.
CORPORATION
3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS.
4. PROVIDE ENGINEERED WOOD BLOCKING
BETWEEN JOISTS UNDER PARTITIONS
1 2 3 4 4.1 5 6 6.1 7 PARALLEL TO, BUT BETWEEN, JOISTS;
COORDINATE LOCATION OF BLOCKING WITH
MECHANICAL DUCTWORK.

5 SEE A-701 AND A-702 FOR OPEN WEB FLOOR


JOIST TYPES; OPEN WEB FLOOR JOISTS TO BE
M
CONSTRUCTED USING FSC-CERTIFIED WOOD;
36-0 8'-0' OPEN WEB FLOOR JOISTS TO BE ENGINEERED
7L 7^

BY TRUSS SUPPLIER TO MEET LOCAL CODE.

F.1 6. GENERAL STRUCTURAL FRAMING


CONNECTIONS:
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
LSL CEILING JOISTS TO FLOOR HEADERS: USP www.buildingscience.com
THD179 ENGINEERED WOOD JOIST HANGER;

DOUBLE LSL FLOOR HEADER TO TRIMMER: USP


HD 410 DOUBLE HANGER.
CONSULTANT:
[] 7. STRUCTURAL FRAMING CONNECTIONS FOR
CENTER BEARING WALL (TO RESIST ROOF
UPLIFT):

RAFTER TO RIDGE BOARD: USP AC7 ANGLE


WX14" LSL RIM JOIST BRACKET WITH 4 10d NAILS EACH LEG
2'-0' 2'-0' 2'-0' 2'-0" 2'-0" 2'-0"
■7 ~ -7<- 7^ 7 ~

RAFTER TO STUD IN ATTIC BEARING WALL: USP


[] LTW12 WITH R 10d NAILS EACH END
F
2x4 VERTICAL WOOD STUD
t—r F
STUD IN ATTIC BEARING WALL TO CEILING
JOIST: USP LTW12 WITH 4 10d NAILS EACH END
o
BLOCKING ALONG RAKE END RIM
1 JOIST BETWEEN SILL PLATE AND CEILING JOIST TO STUD IN SECOND FLOOR
F
T
FLOOR SHEATHING BEARING WALL: USP RT10 WITH 4 8d NAILS
EACH END (USE USP LTW12 AT CONNECTIONS
14" DEEP OPEN WEB FLOOR
TO WALL HEADERS)
r n
m
=i O TRUSS TYPE "E" AT 24" O.C. WITH
i

E 00 T & G FLOOR SHEATHING; SEE STUD TO SOLE PLATE IN SECOND FLOOR


=i
JC m
A-701 ,A-702 FOR TRUSS TYPES BEARING WALL: (2) USP S01 CLIP ANCHORS
14" DEEP OPEN WEB FLOOR

14'-:
BLOCKING BETWEEN JOISTS
J UNDER PARITIONS ALIGNED WITH TRUSS TYPE "E" AT 24" O.C. WITH SOLE PLATE TO FLOOR DECK: (2) #8x3" WOOD
BUT BETWEEN JOISTS, TYPICAL T & G FLOOR SHEATHING; SEE SCREWS AT 12" O.C.
m
A-701 ,A-702 FOR TRUSS TYPES

FROM BELOW
I ATTIC FLUSH-FRAMED BEAM TO WALL STUDS

O
0
O

ACCESS
AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS

3-10 1/2"
o

o
m CN EACH END OF STRAP; PROVIDE CONTINUOUS L J

1
LOAD PATH DOWN TO BASEMENT BEAM USING
SIMILAR SIZED STRAPS AT ALL FRAMING
/ PROJECT:
JOINTS.
14" DEEP OPEN WEB FLOOR
E.1 TRUSS TYPE "E1" AT 24" O.C. WITH
National Institute of

^ rIWCT
T & G FLOOR SHEATHING; SEE

CN

00
tI>F
Standards and Technology

-
A-701, A-702 FOR TRUSS TYPES
o WX14" LSL RIM (jOIST
=3 WfF O SHEET KEYNOTES

BELOW
ACCtSS
Net Zero Energy

FROM

0
iy4"X1iy4" LSL RIM JOIST
<D

0
1. END OF FLOOR JOIST TO BE FULL BEARING ON
CD
BEARING WALL BELOW. Residential Test

IT
CO

IT
I

i
CO

Tr o

:
D
Facility

n
L0
2. FOR SIZE AND LOCATION OF HEADERS IN THE
BEARING WALL BELOW, SEE A-108, WALL IB1.

C/3

m
-'j

LU
<
X
.0
C.1 CO
CO

n
2x4 VERTICAL WOOD STUD
BLOCKING ALONG RAKE
NIST Campus
END RIM JOIST BETWEEN Gaithersburg, MD
O SILL PLATE AND GABLE
DASHED LINES INDICATE CN CL
WALL BOTTOM PLATE
STUD WALLS ABOVE O C/3
co 5
LU g
CO
o 1%" x 11 y4" LSL ENGINEERED
O LU
<-ea ATTIC JOISTS AT 24" O.C.
tr
1 o CO
U.S. Department of Energy

18'-1 1/4"
c/3 CO
iy4"X14" LSL RIM JOIST LU Research Toward Zero Energy Homes
c O

2x4 VERTICAL WOOD STUD — 14" DEEP OPEN WEB FLOOR


U.S. DEPARTMENT OF
Energy Efficiency &
I
BLOCKING ALONG RAKE END RIM
JOIST BETWEEN SILL PLATE AND
TRUSS TYPE "G" AT 24" O.C.
WITH g" T & G FLOOR
ENERGY Renewable Energy
FLOOR SHEATHING SHEATHING; SEE A-701,
A-702 FOR TRUSS TYPES
14" DEEP OPEN WEB FLOOR
TRUSS TYPE "F" AT 24" O.C. WITH 1 '-5 1/2 ii
9-1 iy4"X 11-1/4" LSL
T & G FLOOR SHEATHING; SEE
7 -
RIM JOIST
A-701,A-702 FOR TRUSS TYPES
B
2'-0" 2'-0" o
CN

A A
2'-0' 2'-0' 2'-0' 2'-0" 7^
2'-0" 2'-0" 1)4" X 14" LSL RIM JOIST
-7 ~ 7 ~
2x4 VERTICAL WOOD STUD MARK DATE DESCRIPTION
iy4-X 14" LSL RIM JOIST BLOCKING
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


A.1 CAD DWG FILE: A-PLOT-PLAN-NZERTF

DRAWN BY: CG

CHECKED BY: BP

COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

SECOND FLOOR &

LOWER ATTIC
FRAMING PLAN

SECOND FLOOR & LOWER ATTIC FRAMING PLAN SCALE AS NOTED o

SCALE: 1/4" = 1'-0"

A-108
GENERAL SHEET NOTES
1. SECOND FLOOR AREA TO OUTSIDE FACE OF
STUD WALL: 1,191 SQ. FT.
BUILDING SCIENCE
2. DIMENSIONS ARE TO FACE OF STUD UNLESS CORPORATION
OTHERWISE NOTED.

3. INTERIOR PARTITIONS FRAMED WITH 2x4


WOOD STUDS UNLESS OTHERWISE NOTED.

4. INTERIOR BEARING WALLS FRAMED WITH 2x6


1 2 3 4 4.1 5 6 6.1 7 WOOD STUDS UNLESS OTHERWISE NOTED.

36'-0' INTERIOR DOORS TO BE CENTERED BETWEEN


7^ 5.
THE NEAREST WALL PERPENDICULAR ON
2-0’ 8'-2‘ 12-9 1/2" <- 6-7 1/2' 4'-5' 2’-0" EACH SIDE OF THE DOOR UNLESS OTHERWISE
1L -7^- 7^ 7^ 7^ 7^
NOTED.

6. FLOOR ACCESS PANELS FIT WITHIN FRAMING


MEMBERS; SEE FRAMING PLAN. PANELS TO
F.1 BE COVERED WITH FINISH FLOORING. SEE
f" 8/A-508.
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
7. SEE A-602 FOR FINISH SCHEDULE. www.buildingscience.com
8. REFER TO POCKET DOOR FRAME KIT
INSTALLATION INSTRUCTIONS TO DETERMINE
ROUGH OPENING FOR POCKET DOOR.
CONSULTANT:

OL tL dL
F V F
CLOSET
CM
O SHEET KEYNOTES
MASTER
r;W
BATH
CO
1. INSTRUMENTATION CONDUIT FROM GARAGE

4 3“T 2' 01^5'-:


-V
14'-6 1/2"
A ATTIC (THROUGH BREEZEWAY) TO ENTER
r n
WALL THROUGH RIM JOIST (IN 2ND FLOOR
->H‘-
o> FRAMING). PENETRATION "E10", SEE A-603 FOR

..8-6 I,
r i
©

10'-8”
05 h-
E >i MASTER BEDROOM PENETRATION SCHEDULE.
ro CO CO
o 5iA-206 CM
CO
I
CM
3-5" 03
z 7^
6-8 1/2" to
o
&
2. AIR RETURN FOR FCU-1 LOCATED IN WALL
:^/2 3]a-2(|)6 co ABOVE DOOR
<
FLOOR

2/A-206

1/A-206
o ACCESS
LO

o
3 1/2'
o 1 CLOSET F CO
o
o] tol i- i i I

CD
aSOIL GAS -v
o
CM
L J
5 1/2" o CM CN

co
CM
VENT ^

4
0/A-206S-
© <

CN
PROJECT:

O
-V
o
Gk

4'-6 1/2"
CO N-
§/A-206

6 SHELVES
LO

-6©P
3-6 6-3’ LO
E.1 ft u

4-
\-

4
CO
CM National Institute of
© BATH #2 ©

To
LA] oo
Standards and Technology

L?

F
o
GARAGE ATTIC
II

H
rv rvj
ACCES HATCH r^i
I
<D

z-.e § 7
LU
/(\TTIC ACCESS W)/
Net Zero Energy
05 CN
I 2/A-205
PULLDOWN $T^IR

2-7'

LU =
o
--l-L- CLOSET
©

H
HALL

LJ CO
00

5'-9' 5 1^2" 3-9' l'-3 1 9-1" 4'-0 1/2" 2' 3 1/2'


T INSTRUMENTATION CONDUIT
I
^-7-
r
7^ 7^
00

Residential Test

■v
BETWEEN GARAGE ATTIC AND ©


2ND FLOOR FRAMING -BOWN- D
5 1/2"
®*
O 5 1/2'
o DOOR KEY Facility

©
. . 5 1/2'
C.1 0, CD
CL. ; f~~? ; ■ ~
©
o <TJ
± / FLOOR
ACCESS
a -V
NIST Campus

6-10 1/2'

6-10 1/2'
BEARING WALL 5 1/2" 1. 1 ’-8" x 6’-8" LH
BEARING WALL Gaithersburg, MD
FLOOR ACCESS
2. (2) T-10" x 6’-8"
7-11 1/2' 3 1/2'

CM

CM
, 2-9" 10-8 1/2"

O
©
©
4
-*7
OPEN 3. 2-4" x 6-8" LH
TO
l\J
BELOW 4. 2-4" x 6-8" RH
>
l\J
O
^1
5. 2-4" x 6-8" POCKET U.S. Department of Energy
CO
I
Research Toward Zero Energy Homes
6. 2-6" x 6-8" RH
C CM
LO
00

i CO 7. 2-6" x 6-8" LH U.S. DEPARTMENT OF


Energy Efficiency &
CO

ir-2" BEDROOM 2 BEDROOM 3


8. 2-8" x 6-8" LH
ENERGY Renewable Energy
S)
C\J

9. 2'-8" x 6-8" RH

A 10. 3'-0" X 6'-8" LH

11. 3'-0" x 6'-8" RH


B 12. 3'-0" x 6'-8" POCKET
10-8 1/2' 9-1 10-8 1/2"
4

13. 3-0" x 7'-0" RH W/12" SIDELITES


A u ____I
-v A
CL 0L dL 14. 3'-0" x 7'-0" LH
MARK DATE DESCRIPTION
15. 3'-0" x 7'-0" RH
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
16. 9'-0" x 8-0" OVERHEAD

17. (2) 4'-6" x 8-0' PROJECT NO: NIST NZERTF


A A.1 18. 6'-0" x 6'-8" (1) LH PANEL, (1) FIXED PANEL CAD DWG FILE: A-PLOT-PLAN-NZERTF

DRAWN BY: CG
19. 3-0" x 6-8" RH
CHECKED BY: BP
M M
2-0 7-2" 8-10" 8-10 7’-2' 2-0
7L 7" 7L 7 ~ COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

SECOND FLOOR
PLAN

SECOND FLOOR PLAN SCALE AS NOTED o


z

SCALE: 1/4" = 1-0"

A-109
O'-O"
GENERAL SHEET NOTES
O'-O’ 1. REAR WALL FRAMING ELEVATIONS DRAWN AS

36'-0' 34-0 1/4’ 28'-11 3/4" 25'-5" 22'-6 1/2' 12-9 3/4’ 4-10 1/4'
32'-0" 26'-6" 12'-11 6-3 1/2" 7 “
SEEN FROM INTERIOR; INTERIOR BEARING
WALL FRAMING ELEVATION DRAWN AS SEEN
BUILDING SCIENCE
7 32'-0" 2T-2" 9-2" 2'-6 1/2' FROM THE FRONT; ALL OTHER ELEVATIONS
36'-0' 31-3 3/4" 25-11 1/4" 22’-9 1/2' 13-5 1/2" 9-9 1/4' 2'-1 3/4'
2'-0"
7 “

7^
DRAWN AS SEEN FROM EXTERIOR CORPORATION
IK 2 IK 2. TYPICAL WALL HEIGHT = 9'-1".

o
o
\-----------“r=
3.5" x 11.25" LSL 1.3E BEAM
(FLUSH FRAMED)
\ /
' 3.5" x li 5" LSL
\ / \ s
3.5" x 5.5" LSL
\
\
m
3.5" x 5.5" LSL
/
3. TYPICAL SECOND FLOOR WINDOW FRAMING
HEAD HEIGHT = 7'-7 1/2".

2
00
17)

/ 5.5" x 3.5' 5.5" x 3.5" 5.5"): 3.5" 5.5" x 3.5' 5.5" x 3.5"
\ /
1.3E F ADER =

5' I"
CM

2"
V /
1.3E HEADER

G
CD
I
CN
1.3E HEADER

G
CD
I
OJ
4. WINDOW AND EXTERIOR DOOR FRAMING
OPENING DIMENSIONS TO BE ADJUSTED PER
MANUFACTURER SELECTION AS FOLLOWS:
CO LSL 1.3E LSL. 1.3E LSL 1.3E LSL 1.3E LSL 1.3E <- 7"
HEADER HEADER HEADER HEADER HEADER / / Z—X—V
(FLATWISE) (FLATWISE) (FLAT/VISE) (FLA'"WISE) (FLATWISE) I E E
is 71 CO
o A. FRAMING WIDTH FOR DOORS AND WINDOWS:
CT> 3'-@*' \ 3'-6 o
2'-5 1/2' 2'-9 1/2" 2'-4 1/2" 9'-1" 2'-C| 1/2" 2'-5 1/2' 7 !
INCREASE THE MANUFACTURER'S
"2 7 y © V © v 7 " -A 7 " / \ / \ / / \
SPECIFIED ROUGH OPENING WIDTH BY
co x V CM © CM © fc© CM © Ss® /
T
\ L
7
1 L 7 \ \
r CM
2
ADDING V2" TO EACH SIDE.
00 CT> 05 O) CT> CT> X X X X X X X 7“ X X B. FRAMING HEIGHT FOR WINDOWS:
-t*
CD CD CD CD CD \ INCREASE THE MANUFACTURER'S
V. m
SPECIFIED ROUGH OPENING HEIGHT BY
2 2 2 2 2 2 2
©
2
X.
2
©
2
©
2 2
©
2
© 2 M X. Xr
UK 2 2 ADDING©’ TO THE TOP AND 1" TO THE 30 FOREST STREET SOMERVILLE, MA
c tR :

+
E KT TK S TK TK KT TKS SS KT TK S S TK TK E S KT C S SKT C Tk KT C TK S
2 2 BOTTOM. T: (978) 589-5100 F: (978) 589-5103
C/D CO
7
CO :22r C: FRAMING HEIGHT FOR DOORS:
2 www.buildingscience.com
X4
.© 2 IB2 H12 CO
INCREASE THE MANUFACTURER'S
T
£ o
i
SPECIFIED ROUGH OPENING HEIGHT BY
£ 2 , 2'-5" oc
2 LO ADDING 1/2" TO THE TOP.
7 ! '
LU 5. FRAMING STUDS TO BE FSC-CERTIFIED
O LUMBER. CONSULTANT:
o

,7 V
o D Q
LU ^4 CO

CO 6. LIMIT THE OVERALL ESTIMATED WASTE FACTOR


77
2 7 V CM
7T
vr2 CP ON THE FRAMING ORDER TO 10% OR LESS.'
X

fO H12
i

I
CM

CM
7
5'-4"
7 2
7. STRUCTURAL SHEATHING CONNECTIONS (TO
RESIST ROOF UPLIFT):
O
I *7 CD
i
CD 1
o LAP SHEATHING ON RAFTER RIM BOARD:
ro CO
CO "x
00 ro MINIMUM 8d NAILS AT 3" O.C.
X 2 2
00 V 2
©
fO
<© X
©

C
12

1" ■>
HORIZONTAL SHEATHING EDGES AT BLOCKING
OR FRAMING: MINIMUM 8d NAILS AT 3" O.C.
CD
2
vn 5-7"
W
\ 7
CO
00

o CO
I
HORIZONTAL SHEATHING EDGES BELOW
O
k CM
CM
SECOND FLOOR: MINIMUM 8d NAILS AT 6" O.C.
GO
S
r
ro >
2 Z
/x I r n

2 -7T 2
©
2-5" 1
©. 2 O SHEET KEYNOTES
9'-1" 2”’ Q o
I
0) V
CM

7
V
CO
rv
x
I
m
ro

m
D
O
v
X X'
£ m
L J
m m
73 w
CO
co
CO
CO © CO PROJECT:
CJ) (J)

CO
National Institute of
CO 77
CD

00
CO
1
CD

00
CO
1
Standards and Technology
CO
77T

X X Net Zero Energy


CO
\
CD
00 JOT non L CO

Residential Test
o ©—©—"a -m O
\
o ■V
ro
<n IB2 X X
ur
Facility
O

co o
V © <0-
CD
1
—V
NIST Campus
7^ Gaithersburg, MD
CD
CO
00

T CO

CO
5 CO
CN

CM
I
TT’'
o

CO
U.S. Department of Energy
40
CO Research Toward Zero Energy Homes

9'-1" co
U.S. DEPARTMENT OF
Energy Efficiency &
ENERGY
V
2
CCL
Renewable Energy
'

f 7 —
9'-1 7—

z:
7

7
X
I__
m Mil------ ran m—n ____I
GO GO

■xj

H9
r^- o
X MARK DATE DESCRIPTION
ro
O'-O'
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

32’-0" 28’-5 1/2" 17'-9 3/4" 10'-9 1/2' PROJECT NO: NIST NZERTF
7—

T7- 32-0" 21’-2 1/2' 14'-2 1/4" 3'-6 1/2' CAD DWG FILE: A-PLOT-PLAN-NZERTF
7— 1/2" 4'x8' PLYWOOD
2'-0" STRUCTURAL SHEATHING, DRAWN BY: HW
/ TYPICAL
TO
2 ZL CHECKED BY: BP

4.
CO
^X ^X
\ / \ COPYRIGHT © 2009
\ / ^£1. 2X. ^£l. X
\ / CO- BUILDING SCIENCE CORPORATION
©
M
3.5" x 7.25" LSL 3.5" X 5.5" LS L 3.5" x 7.25" LSL
1.3E HEADER 1.3E HEADER / 1.3E HEADER
\ / o CO SHEET TITLE:
CO ©
7' 1"
~! ©
3'-4 1/2' -©
7' r ©
00

/ 1 1 \
O

00
/ \
B B
LO

\
B
IO

/
B B
LO

/ \
CO
SECOND FLOOR
ro
CO
\ 2x4 STUD FOR STRUCTURAl
/
vr k X ^v
© SHEATHING ATTACHMENT,
TYPICAL
CO
00
KEY PLAN & WALL
o

FRAMING
CO

2
© x 2 2
© 2 2
© 2 x- 2
2 2 X
J© 2 X
2 2 2 2 X
CO

c tT c

-----V
co

-m
2
S KT C C SKT
4^ TKS KT C c: C TJ S
©L
co
ELEVATIONS 1
2 CL
O
H9 SCALE AS NOTED z

2------V

SECOND FLOOR KEY PLAN & WALL FRAMING ELEVATIONS


SCALE: 1/4" = 1'-0"
A-110
GENERAL SHEET NOTES
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP BUILDING SCIENCE
SUPPLIER.

2. EWP CONNECTIONS TO FOLLOW EWP SUPPLIER CORPORATION


INSTRUCTIONS.

3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR


ON THE FRAMING ORDER TO 10% OR LESS.

4. GENERAL STRUCTURAL FRAMING


1 2 3 4 4.1 5 6 6.1 7 CONNECTIONS:

LSL CEILING JOISTS TO FLOOR HEADERS: USP


2'-0' 32-0' 2-0"
-7^- ■7 ~ 7^ 7^
THD179 ENGINEERED WOOD JOIST HANGER;

DOUBLE LSL FLOOR HEADER TO TRIMMER: USP


HD 410 DOUBLE HANGER.

5. STRUCTURAL FRAMING CONNECTIONS FOR


CENTER BEARING WALL (TO RESIST ROOF
UPLIFT):
F.1 30 FOREST STREET SOMERVILLE, MA
RAFTER TO RIDGE BOARD: USP AC7 ANGLE
BRACKET WITH 4 10d NAILS EACH LEG
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
RAFTER TO STUD IN ATTIC BEARING WALL: USP
LTW12 WITH R 10d NAILS EACH END

STUD IN ATTIC BEARING WALL TO CEILING CONSULTANT:


JOIST: USP LTW12 WITH 4 10d NAILS EACH END

CEILING JOIST TO STUD IN SECOND FLOOR


1-1/4’ x 11-1/4" RIM LSL ATTIC JOIST ADJACENT TO
BEARING WALL: USP RT10 WITH 4 8d NAILS
BOARD ROOF RAFTER, TYPICAL
EACH END (USE USP LTW12 AT CONNECTIONS
TO WALL HEADERS)
/ 1

7 ~
-10 1/2’ 2'-0 7L
2'-0'
7L
2'-0' 2'-0' 2'-0'
7" 7"
2-0" ,2’-1 1/2" 7^
STUD TO SOLE PLATE IN SECOND FLOOR
BEARING WALL: (2) USP S01 CLIP ANCHORS
F -v F
SOLE PLATE TO FLOOR DECK: (2) #8x3” WOOD
SCREWS AT 12” O.C.

ATTIC FLUSH-FRAMED BEAM TO WALL STUDS


AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS
2x4 VERTICAL WD STUD 2x4 VERTICAL WD STUD EACH END OF STRAP; PROVIDE CONTINUOUS

1 34/ " X11 y4 " LSL ENGINEERED CEILING


BLOCKING ALONG RAKE END RIM BLOCKING ALONG RAKE END RIM r n
LOAD PATH DOWN TO BASEMENT BEAM USING
JOIST BETWEEN TOP PLATE OF JOIST BETWEEN TOP PLATE OF SIMILAR SIZED STRAPS AT ALL FRAMING
E WALL BELOW AND BOTTOM PLATE WALL BELOW AND BOTTOM PLATE JOINTS.
OF GABLE WALL OF GABLE WALL

JOISTS AT 24” O.C.


CO

iy4"X1iy4" LSL RIM JOIST 1)4" x 11)4" LSL RIM JOIST

BLOCKING AT 2’-0” O.C. Q SHEET KEYNOTES


o
o
CN 1. FOR LOCATION OF FLUSH FRAMED
L J
HEADER AND SUPPORT, SEE A-110,
J DOUBLE JOIST WALL IB2
DOUBLE JOIST PROJECT:
2. FOR SIZE AND LOCATION OF
BLOCKING AT 2'-0" O.C.
E.1 © HEADERS IN THE BEARING WALL
rl -v
UTIL
DOUBLE JOIST if BELOW SEE A-110, WALL IB2. National Institute of
n SHAFT / 2x6 VERTICAL WD STUD GABLE
WALL (BALLOON FRAME) ON TOP
Standards and Technology
.-v
PLATE AT 2ND FLOOR FRAMING
CN

2
1
© © 2 Net Zero Energy
2x6 VERTICAL WD STUD GABLE

■It t Residential Test


WALL (BALLOON FRAME) ON TOP
PLATE AT 2ND FLOOR FRAMING
r-: 1/4’
© D
Facility
7'-1 1/4’ 4'-6"
C.1 7 ~

ar CONTINUOUS 3-1/2" x 11-1/4" LSL 1.3E


FLUSH FRAMED HEADER NIST Campus
J Gaithersburg, MD
w

1%" X 11K" LSL ENGINEERED CEILING JOISTS


2 x 6 WD STUD 24 O.C. BEARING WALL
CONTINUES TO ROOF RAFTERS ABOVE
hr i

U.S. Department of Energy


CD Research Toward Zero Energy Homes

AT 24” O.C.
C CO

U.S. DEPARTMENT OF
Energy Efficiency &
2x4 VERTICAL WD STUD 2x4 VERTICAL WD STUD ENERGY Renewable Energy
BLOCKING ALONG RAKE END RIM BLOCKING ALONG RAKE END RIM
JOIST BETWEEN TOP PLATE OF JOIST BETWEEN TOP PLATE OF
WALL BELOW AND BOTTOM PLATE WALL BELOW AND BOTTOM PLATE
OF GABLE WALL OF GABLE WALL
i

A = A

1-1/4" x 11-1/4” LSL RIM MARK DATE DESCRIPTION


BOARD
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


A.1 CAD DWG FILE: A-PLOT-PLAN-NZERTF

DRAWN BY: CG

CHECKED BY: BP

COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

ATTIC FRAMING
PLAN

ATTIC FRAMING PLAN SCALE AS NOTED o

SCALE: 1/4” = 1’-0"

A-111
GENERAL SHEET NOTES
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
BUILDING SCIENCE
SUPPLIER.

2. EWP CONNECTIONS TO FOLLOW EWP SUPPLIER


CORPORATION
INSTRUCTIONS.

3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR


ON THE FRAMING ORDER TO 10% OR LESS.
4. SAWN LUMBER RAFTERS AND BLOCKING TO BE
1 2 3 4 4.1 5 6 6.1 7 FSC CERTIFIED.

5. GENERAL STRUCTURAL FRAMING


26-0' 2-0" , 32'-0' 2'-°" 8'-0' CONNECTIONS:
7L

LSL CEILING JOISTS TO FLOOR HEADERS: USP


THD179 ENGINEERED WOOD JOIST HANGER;

DOUBLE LSL FLOOR HEADER TO TRIMMER: USP


HD 410 DOUBLE HANGER.
F.1 6. SEE A-305 FOR GARAGE ROOF TRUSS TYPES; 30 FOREST STREET SOMERVILLE, MA
TRUSSES TO BE CONSTRUCTED USING T: (978) 589-5100 F: (978) 589-5103
FSC-CERTIFIED WOOD; ROOF TRUSSES TO BE www.buildingscience.com
ENGINEERED BY TRUSS SUPPLIER TO MEET
LOCAL CODE.

7. STRUCTURAL FRAMING CONNECTIONS FOR


CENTER BEARING WALL (TO RESIST ROOF CONSULTANT:
UPLIFT):

RAFTER TO RIDGE BOARD: USP AC7 ANGLE


BRACKET WITH 4 10d NAILS EACH LEG
2x6 RAFTER PLATE ON 1-1/4" x 1iy4" LSL RIM 2x6 RAFTER PLATE ON
Vs" FLOOR SHEATHING BOARD Vs FLOOR SHEATHING RAFTER TO STUD IN ATTIC BEARING WALL: USP
LTW12 WITH R 10d NAILS EACH END
2'-0' 2-0' 2'-0' 2-0 2-0 2-0
—? ~ * 7L
STUD IN ATTIC BEARING WALL TO CEILING
JOIST: USP LTW12 WITH 4 10d NAILS EACH END
F F
CEILING JOIST TO STUD IN SECOND FLOOR
4:12 SLOPED BEARING WALL: USP RT10 WITH 4 8d NAILS
2'-0' 2'-0' ROOF RAFTER EACH END (USE USP LTW12 AT CONNECTIONS
-7—
TO WALL HEADERS)
9.67:12 SLOPED
LEDGER BOARD STUD TO SOLE PLATE IN SECOND FLOOR r n

1%" X 1 V/s LSL ENGINEERED ROOF RAFTERS AT 24"


BEARING WALL: (2) USP S01 CLIP ANCHORS

O.C. WITH 4" PLYWOOD SHEATHING WITH H-CLIPS


E Jr
?s:
SOLE PLATE TO FLOOR DECK: (2) #8x3" WOOD
SCREWS AT 12" O.C.
9.67:12 SLOPED
LEDGER BOARD ATTIC FLUSH-FRAMED BEAM TO WALL STUDS
AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS
4:12 SLOPED ROOF RAFTER EACH END OF STRAP; PROVIDE CONTINUOUS
o LOAD PATH DOWN TO BASEMENT BEAM USING
o o
2x4 ROOF TRUSSES AT 24" O.C. W/ USP RT10

SIMILAR SIZED STRAPS AT ALL FRAMING


W/ 3 8-d NAILS EACH END ON EACH TRUSS;

CM
5/8" PLYWOOD SHEATHING WITH H-CLIPS

o L J
JOINTS.

ATTIC ACCESS PROJECT:


T

E.1
1
I

National Institute of
FRAMING MEMBERS FOR Standards and Technology
ONE-STORY ROOM BELOW
o

7)
cn
cr
Net Zero Energy

4^

m
O
<
Q
O
o

X
CO 2x6 RAFTER P .ATE
CM 2'-0" 2 x 12 RIM BOARD
2'-0"
Residential Test
it:

D
/
O SHEET KEYNOTES Facility
C.1

2X12 COMMON RAFTERS AT 24" O.C.; 1/2"


NIST Campus

PLYWOOD SHEATHING WITH H-CLIPS


1%" x 1 V/s" LSL ENGINEERED ROOF RAFTERS AT 24'
Gaithersburg, MD
BEARING WALL (2 x 6 @ 24 " O.C.) 2x14 RIDGE BOARD

| O.C. WITH 4" PLYWOOD SHEATHING WITH H-CLIPS


EXTENDED TO SUPPORT ROOF
RAFTERS

9.67:12 SLOPED
LEDGER BOARD CD
U.S. Department of Energy
4:12 SLOPED CD

4:12 SLOPED ROOF RAFTER ROOF RAFTER Research Toward Zero Energy Homes
c
9.67:12 SLOPED 2x6 RAFTER P.ATE
LEDGER BOARD ON CEILING JOISTS
U.S. DEPARTMENT OF
Energy Efficiency &
WOOD BLOCKING
ENERGY Renewable Energy
BETWEEN TRUSSES

WOOD BLOCKING
BETWEEN UPPER
RAFTERS

1
B
O
CM

A A
2x12 RIM BOARD

MARK DATE DESCRIPTION


FRAMING MEMBERS FOR
ONE-STORY ROOM BELOW ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
2x6 RAFTER PLATE ON 1-1/4" x 11%" IISL RIM 2x6 RAFTER PLATE ON
Vs FLOOR SHEATHING BOARD Vs" FLOOR S HEATHING
PROJECT NO: NIST NZERTF
A.1 CAD DWG FILE: A-PLOT-PLAN-NZERTF

DRAWN BY: CG

CHECKED BY: BP

COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

ROOF FRAMING
PLAN

ROOF FRAMING PLAN SCALE AS NOTED o

SCALE: 1/4" = 1'-0"

A-112
GENERAL SHEET NOTES
1. ROOF PENETRATIONS TO BE LOCATED SO AS
TO AVOID POSSIBILITY OF SHADING
BUILDING SCIENCE
2.
PHOTOVOLTAIC ARRAY.

AT HOUSE, CONTINUOUS FULLY-ADHERED


CORPORATION
PEEL AND STICK ROOFING MEMBRANE TO BE
APPLIED SHINGLE STYLE OVER ENTIRE ROOF
INCLUDING OVERHANGS AT EAVES AND
RAKES AND OVER PORCHES AND
BREEZEWAY.
1 2 3 4 4.1 5 6 6.1 7
3. AT HOUSE, CONTINUOUS FULLY-ADHERED
PEEL AND STICK ROOFING MEMBRANE TO BE
2-0' 32'-0' 2'-0" 8-0’ EXTENDED MIN. 12" UP PLYWOOD WALL
7^ 7^ 7 ~ 7 ~ 7 ~

SHEATHING AT ALL ROOF-WALL


INTERSECTIONS EXCEPT WHERE PORCH OR
BREEZEWAY ROOF MEETS WALL.
4. AT HOUSE, ADDITIONAL STRIP OF
FULLY-ADHERED PEEL AND STICK ROOFING
MEMBRANE TO BE APPLIED AT ALL
F.1 ROOF-WALL INTERSECTIONS EXTENDING MIN. 30 FOREST STREET SOMERVILLE, MA
12" OVER ROOF MEMBRANE AND 12" UP FACE T: (978) 589-5100 F: (978) 589-5103
OF WALL INSULATING SHEATHING. www.buildingscience.com
5. AT GARAGE, CONTINUOUS FULLY-ADHERED
PEEL AND STICK ROOFING MEMBRANCE TO
BE APPLIED TO 4:12 SECTION OF ROOF AND
C\l AT EAVE OF 9.67:12 SLOPE EXTENDING A MIN.
o CONSULTANT:
OF 36" FROM THE EXTERIOR WALL TOWARDS
o THE RIDGE.
6. SEE A-603 FOR PENETRATION SCHEDULE.

LINE OF CLADDING BELOW


F Jr
F
LINE OF STUD WALLS BELOW O SHEET KEYNOTES

r n
LINE OF CLADDING BELOW I
E <D
LINE OF STUD WALLS BELOW 1 CD
O)
CM
CM T” "

CD | R1 R2 CM o
CJ> o 0 o
CM
L J

CM
PROJECT:
SOIL GAS VENT
E.1
PENETRATION KEY
^r PLUMBING STACK VENT National Institute of
R1. PLUMBING STACK VENT
CM Standards and Technology
R2. SOIL GAS VENT
CONDUIT FOR VERTICAL RACK PV PANEL CONDUIT FOR
PV ARRAY MOUNTING SYSTEM, TYP PV ARRAY
o
CM
CM CONDUIT FOR
PV ARRAY
R3. PV CONDUIT
Net Zero Energy
CM - Residential Test
CD
CT> O R3 R3 O R3 r D
Facility
T
C.1 7 ROW x 6 COLUMN PV ARRAY
CD NIST Campus
o> Gaithersburg, MD
CM

CM CM

^r CM
CD
U.S. Department of Energy

3
CD
L J CD OJ Research Toward Zero Energy Homes
C ct>
I*- CD
U.S. DEPARTMENT OF
Energy Efficiency &
I (D C7) ENERGY Renewable Energy
<75

CM
1
Jr
B
o
LINE OF STUD WALLS iBELOW CM

A -V A
LINE OF CLADDING BELOW 06/29/10 UPDATED

MARK DATE DESCRIPTION


CM r n CM co
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
ID

PROJECT NO: NIST NZERTF


i "V A.1 CAD DWG FILE: A-PLOT-PLAN-NZERTF
SOLAR HOT WATER PANELS
DRAWN BY: CG
1 1
CHECKED BY: BP

COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

ROOF PLAN

ROOF PLAN SCALE AS NOTED o

1 SCALE: 1/4" = 1’-0"

A-113
GENERAL SHEET NOTES
1. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS BUILDING SCIENCE
2. STRUCTURAL FRAMING CONNECTIONS FOR 2x4
ROOF OVERHANG OUTRIGGERS (TO RESIST CORPORATION
WIND UPLIFT):

(1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO


RAFTER RIM BOARD;

(1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO


1 2 3 4 4.1 5 6 6.1 7 RAFTER, 4" FROM END OF 2x4.

3. STRUCTURAL FRAMING CONNECTIONS FOR


FRONT PORCH ROOF TO RESIST WIND UPLIFT:
15'-5" 7^

RAFTER LEDGER TO WALL STUDS: (2) %" LAG


1'-0" ---- ;L
13'-5" 7!------------ 7 ~
r-o’ SCREWS AT 24" O.C. (MINIMUM PENETRATION
INTO STUD OF 2");
r-o1 ■V

2X4 FASCIA NAIL ER CEILING JOIST LEDGER TO WALL STUDS: (1) %'
F.1 LAG SCREW AT 24" O.C. (MINIMUM 30 FOREST STREET SOMERVILLE, MA
3.5" x 9.25" LSL 1.3E PENETRATION INTO STUD OF 2"); T: (978) 589-5100 F: (978) 589-5103
BEAM
1-3/4" x 9.25" LSL 1.3E BELOW RAFTER TO LEDGER: USP AC7 ANGLE BRACKET;
www.buildingscience.com

o 1-3/4" x 9.255" LSL. 1.3E BELOW CEILING JOIST TO LEDGER: 4 16d TOE-NAILS OR
USE USP A3 ANGLE BRACKET.
CONSULTANT:
24'-1 2X12 RAFTERS AT 24" O.C.; 4. STRUCTURAL FRAMING CONNECTIONS FOR
iL

ROOF SHEATHING BREEZEWAY:


WITH H-CLIPS; 2x6 CEILING USE TIE STRAP AT EACH RAFTER TO TIE
1'-4" 22-9' 2X12 LEDGER INSTALLED ON TOP
7' JOISTS BELOW AT 24" O.C. RAFTERS TO CEILING JOISTS.
OF WALL RIGID INSULATION

o <j>
5. STRUCTURAL FRAMING CONNECTIONS FOR
FRONT PORCH AND BREEZEWAY COLUMNS (TO
RESIST WIND UPLIFT):
CM
L
Zl z
F -v N
F BEAM TO STRUCTURAL COLUMN AND COLUMN
i
w ___ I
i
J U t BASE TO SONOTUBE CONNECTION TO FOLLOW
COLUMN SUPPLIER'S INSTRUCTIONS; UPLIFT
2X4 FASCIA NAILER
LOAD IS 800 LBS NOMINAL.
2X4 OUTLOOK AT 24" O.C. INSTALLED / 6. STRUCTURAL FRAMING CONNECTIONS FOR
ON TOP OF ROOF SHEATHING WITHIN SCREEN PORCH ROOF (TO RESIST WIND UPLIFT
i
ROOF RIGID INSULATION, TYP. AND FOR BRACING): r i
2X6 FASTENED BACK
E :i --------- — -----------T0-2X8 LEDGER, TYP. 2X LEDGER ON TCP OF FASTEN 2x LEDGER AT SLOPE-CUT ENDS OF
m L ROOF RIGID INSULATION RAFTERS TO WALL STUDS AT 24" O.C. USING (2)
2X8 LEDGER INSTALLED ON TOP %" LAG SCREWS, TOP AND BOTTOM,
OF WALL RIGID INSULATION 2X4 FASCIA NAIL ER PENETRATING MINIMUM 2-1/2" INTO STUDS
ALONG LENGTH OF LEDGER;
15'-0" 2X4 OUTLOOK A-/ 24" O.C. INSTALLED
"7 ~
ON TOP OF ROOF SHEATHING WITHIN FASTEN PORCH ROOF SHEATHING TO LEDGER
ROOF RIGID INSULATION, TYP. USING 8d COMMON NAILS AT 3" O.C.
4'-0' 7'-0' 4-0'
7 ~ -7<- -7<- 7 ~
7. 2x FRAMING MEMBERS TO BE FSC-CERTIFIED. L J
2X4 LEDGER INSTALLED ON TOP
-v OF ROOF SHEATHING
oo (2)1.75" x 9.25 LSL 1.55E BEAM PROJECT:

m m.
i

E.1 -V
H ;l
J

i
m 2X4 FASCIA NAIL ER
National Institute of
CNJ 1
l±l
I
J uJ O SHEET KEYNOTES Standards and Technology
o —u 2X4 OUTLOOK AT 24" O.C. INSTALLED
ON TOP OF ROOF SHEATHING WITHIN
2X12 RAFTERS AT 24" O.C. ; §" ROOF ROOF RIGID INSULATION, TYP.
1. CONCEALED HANGER SCREWED THROUGH
LO
-V
\
SHEATHING WITH H-CLIPS;
2x6 CEILING JOISTS BELOW AT 24" O.C. INSULATION TO BLOCKING IN HOUSE WALL Net Zero Energy
CNJ

O
2x12 RIDGE
BOARD
"1 J

fry ll
■ n T3 A
CM

D
Residential Test

Facility
j-
r
(2)1.75" x 9.25 LSL 1.55E BEAM L i

C.1
00
"V
m m 3 m m NIST Campus

STRUCTURAL COLUMN, TYP.


■ Gaithersburg, MD

2X4 FASCIA NAILER m


m
m CO ■'vf
U.S. Department of Energy
CD
CNJ Research Toward Zero Energy Homes
r
c J' L
I

T
U.S. DEPARTMENT OF
Energy Efficiency &
2X4 FASCIA NAILER ENERGY Renewable Energy
2X4 OUTLOOK AT 24" O.C. INSTALLED
ON TOP OF ROOF SHEATHING WITHIN
S)
ROOF RIGID INSULATION, TYP.

2X4 LEDGER INSTALLED ON TOP


OF ROOF SHEATHING
1 r ■V B
HATCH INDICATES EXTENT OF
MAIN HOUSE FRAMING
r
II n r i r
It CD

<N
A A
2X LEDGER ON TOP OF ROOF -V
/
RIGID INSULATION
2X10 LEDGER INSTALLED ON TOP
1
2X12 RAFTERS AT 24" O.C. ; §" ROOF SHEATHING WITH H-CLIPS;
<D 2X4 FASCIA
MARK DATE DESCRIPTION
OF WALL RIGID INSULATION
1 -3/4" x 9.25 LSL 1,3E BELOW
2x6 CEILING JOISTS BELOW AT 24" O.C. K NAILER
2XLEDGER ON
CNJ

LD O
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

STRUCTURAL COLUMN, TYP. TOP OF ROOF CD


(2)1.75" x 9.25 LSL 1.55E BEAM (2)1.75" x 9.25 LSL 1.55E BEAM (2)1.75" x 9.25 LSL 1.55E BEAM RIGID INSULATIO \l PROJECT NO: NIST NZERTF

2X4 FASCIA NAILER


z. ii! -v A.1 CAD DWG FILE: A-PLOT-PLAN-NZERTF
(2) 1-3/4" x 9.25" L 3L 00

1.3E BELOW DRAWN BY: CG


-v -N-

, 2'-0' 2'-0" , CHECKED BY: BP


7 ~ V- v-
1'-(» 1/2" 11 ’-7' ir-11" 11'-7' 1'-6 1/2' COPYRIGHT © 2009
7 — v- 7 7 — 7 ~

1-9 1/2' BUILDING SCIENCE CORPORATION


1 -9 1/2'
SHEET TITLE:
7 ~
6-8' / 1'-4"y-

7 —
38-8'
7
8-0'
LOWER ROOF
OVERHANG
FRAMING PLAN
I

LOWER ROOF OVERHANG FRAMING PLAN SCALE AS NOTED o


z

1 SCALE: 1/4" = 1'-0"

A-114
GENERAL SHEET NOTES
1. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS BUILDING SCIENCE
2. STRUCTURAL FRAMING CONNECTIONS FOR 2x4
ROOF OVERHANG OUTRIGGERS (TO RESIST
WIND UPLIFT):
CORPORATION
(1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO
RAFTER RIM BOARD;

(1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO


1 2 3 4 4.1 5 6 6.1 7 RAFTER, 4" FROM END OF 2x4.

3. 2x FRAMING MEMBERS TO BE FSC-CERTIFIED.

f" F.1 30 FOREST STREET SOMERVILLE, MA


T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

CONSULTANT:

34-8'

7^
1-4" , 2-0 28’-0’ ■ 2-0"
7^
r-4"7 “

“V

LO
CM
\
F -V
ii—
Irtt CM
F
o
CM
i
o
CM
O SHEET KEYNOTES
-V

i
r n

E r i
f

*
L J
L
PROJECT:

E.1 in n

r-: v;
X i
National Institute of
.J, Standards and Technology
pi
CO CM
CO

Net Zero Energy


CO -T]-

CM
CO
CO

CO
Residential Test
D
jj-
I Facility
C.1
NIST Campus
Gaithersburg, MD
4f

-j|

•*r\ U.S. Department of Energy


2X4 FASCIA NAILER, TYP. & Research Toward Zero Energy Homes
c I_ 2X4 OUTLOOK AT 24" O.C. INSTALLED
U.S. DEPARTMENT OF
ON TOP OF ROOF SHEATHING WITHIN Energy Efficiency &
ROOF RIGID INSULATION, TYP. ■M-
ENERGY Renewable Energy
2X4 INSTALLED ON TOP r,J ±
OF ROOF SHEATHING, TYP. -zs

HATCH INDICATES EXTENT OF i


MAIN HOUSE FRAMING

t B
O

CM I I
I O

CM

A -V
I -V A
U I
CM CM
MARK DATE DESCRIPTION
■v ■V ■V ■V
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
1’-4" 2-0 28’-0' 2’-0" 1’-4"
7 -7^-

34-8' PROJECT NO: NIST NZERTF


A.1 CAD DWG FILE: A-PLOT-PLAN-NZERTF

DRAWN BY: CG

CHECKED BY: BP

COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

UPPER ROOF
OVERHANG
FRAMING PLAN
i

UPPER ROOF OVERHANG FRAMING PLAN SCALE AS NOTED o


z

1 SCALE: 1/4" = 1'-0"

A-115
GENERAL SHEET NOTES
1. CEILING ELEMENTS SHOWN FOR LOCATION
ONLY; SEE E-001 FOR LIGHT FIXTURE
BUILDING SCIENCE
SCHEDULE; SEE M-001 FOR DUCTWORK
LEGEND. REFER TO MECHANICAL AND CORPORATION
ELECTRICAL DRAWINGS FOR FIXTURE AND
GRILLE SPECIFICATIONS.

2. ALL CEILING HEIGHTS AT 9’-0" A.F.F., UNLESS


OTHERWISE NOTED.

3. SEE SPRINKLER PLAN FOR SPRINKLER HEAD


LOCATIONS.

4. DIMENSIONS ARE TO FACE OF STUD AND


CENTER OF CEILING ELEMENT.

5. SITE-BUILT ACCESS PANELS FIT WITHIN


FRAMING MEMBERS ABOVE. SEE FRAMING
PLANS FOR SIZE AND LOCATION. APPLY

r 1-1/2" x %" FLAT TRIM AROUND EDGE OF 30 FOREST STREET SOMERVILLE, MA

¥-
PANEL. PANEL TO BE FASTENED AND
REMOVABLE FROM BELOW WITHOUT T: (978) 589-5100 F: (978) 589-5103

m
o

O
4-
REMOVING THE TRIM. PANEL FINISH TO www.buildingscience.com

T
*
MATCH CEILING FINISH. SEE 7/A-508.

EQ.
6. CROWN MOULDING EXTENDS 5" FROM GWB,
SEE INTERIOR ELEVATIONS FOR EXTENT OF
CONSULTANT:
CROWN MOULDING.

EQ.
CO
4

CO

CM
LO
-i

1
i

¥■
HT
i O EQ.
+ EQ.
-7

■ 'Jr \
o
CO

CM

CN
EQ.

TO
LU

CO
■7 ■

3'-2'
-V

CM
TO
-V CM
CM

4-4'

CO

CM

•v
0 ,S4

TO
LU

CO

CM
CH
CM
11
2'-8 r n

EQ.
0 0
LU
LU

CO

CM
IEI

4
-v

4'-3"
-4
EQ. EQ.

I'D
4-

CO
4,
a


LU

TO

m
m

o
IM)
00

o
2'-0' 2'-0'

EQ.
CM
TO
7L 7^ 7L
:S4 -v

co

CM
■^7

ro
TO
EQ. EQ. CO
-p -

EQ.

ACCESS
CM

PANEL

~o
CM
L

Ob
j

-v
SLOPED

ro
4'-4 1/2"

TO

CM
CO
CEILING I
O SLOPED
aLU

CO

CM

A
R4; LU CEILING PROJECT:
r-6 1/2"

m
EQ. , EQ.

o
7 ^

LO
4^
4
National Institute of

+ CO
o

CM
CM
4.

„6-,8
aLU

4
r
Standards and Technology

^7
m

m
I I I

II 6'-8" A.F.F. II
7,

EQ.

EQ.
EQ. EQ.

ACCESS
O

PANEL
-7

ACCESS - 0
EQ.
LU
Net Zero Energy

TO

TO
LU
EQ.
+

-4-
4^
~A ATTIC PULL MR4

EQ.

EQ.
DOWN STAIR a o

CO

CM
2-0 M2'K LU U
!r
Residential Test

an
iV
I I ’c

J
1'-1 3/4’ 1'-1 3/4’
II UJ -\- &-8" A.F.F. 7’-6" A.F.F.
3'-6 1/4' 10 1/2
11
Facility

CO

LL
LL
<
-4
CM

GO

3-0 1/2"
CM

CO

4^
CM CO

4.
o I

CO
CM NIST Campus

m
;R3

-Y-
o
,.t7/e l-z
1
4-4"

2'-7 3/4"
-Y

0
CM LO Gaithersburg, MD

TO
*
O

EQ.
1/2
M

aLU f
CO

ACCESS
CO 0

PANEL
CO LU

EQ. EQ. Kl EQ. EQ.


5-11 1/4’

MSS

EQ.
7L "7 7L

CO
U

7'-6" A.F.F.

e
-v U.S. Department of Energy

CM

CO
00
-4

-Y
4,
-v -v Research Toward Zero Energy Homes

CD
EQ. EQ. 11-1
M

o
“7 7L -^
5-11 1/4’ U.S. DEPARTMENT OF
Energy Efficiency &
10 1/2"
ENERGY

CO

o
Renewable Energy

4^

EQ.
m

m
0

O
5>

D
CM

“F

TO
a (J) o

EQ.
LU LU

3-0 1/2"
CD CM
CM

7'-9" A.F.F.
I
O
I CO
I
CO
CM
■r
L
----------- 1

I
I__

MARK DATE DESCRIPTION

ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: A-PLOT-PLAN-NZERTF

DRAWN BY: CG

CHECKED BY: BP

COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

FIRST & SECOND


FLOOR REFLECTED
CEILING PLANS

SECOND FLOOR REFLECTED CEILING PLAN FIRST FLOOR REFLECTED CEILING PLAN SCALE AS NOTED o

SCALE: 1/4" = 1'-0" SCALE: 1/4"= 1'-0 ii

A-121
A.1 A B D F
GENERAL SHEET NOTES
1. FIRST FLOOR SOFFITS AND SECOND FLOOR
SOFFITS TO ALIGN AROUND PERIMETER OF
BUILDING SCIENCE
2.
HOUSE.

SEE A-601 FOR WINDOW SCHEDULE.


CORPORATION
3. SEE A-603 FOR PENETRATION SCHEDULE.
1 4. SIDING TO BE PAINTED P-12.
A-304
5. ALL TRIM AND SOFFITS TO BE PAINTED P-13.
12 SOIL GAS 6. ALL DOORS TO BE PAINTED P-14.
12 VENT
4
\ 4
© 7. CEILINGS OF PORCHES AND BREEZEWAY TO
BE PAINTED P-15.
R2
© 8. FRONT PORCH AND BREEZEWAY COLUMNS
TO BE PAINTED P-13.
12 12 © 9. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS
CORRESPONDS TO 461.30' IN THE SITE/CIVIL
9.67 9.67 DRAWINGS.
30 FOREST STREET SOMERVILLE, MA
10. IF THE HIGH VELOCITY HVAC OPTION IS NOT
T: (978) 589-5100 F: (978) 589-5103
4 B.O. CEILING JOISTS
EL. +19-7 1/4 ii

2k
ALIGN

2k 2k
AWARDED, THE PENETRATION FOR THE
CONNECTION WILL NOT BE PROVIDED. www.buildingscience.com

2 <£>
O SHEET KEYNOTES
©
D
© CONSULTANT:

1. ASPHALT ROOF SHINGLES


(*>
12 B 2. 1" x 8f" FRIEZE BOARD TRIM MOULDING
12
22 12
12 9.67 3. f x 8 TRIM WITH 3" CROWN MOULDING
9.67 4
4 4. 1" X 85" TRIM
12
4 5. FIBER CEMENT SIDING, 4" EXPOSURE
T.O. SECOND FLOOR SUBFLOOR
$ EL. +10-6 1/4 11
6. 2x2 TRIM
ALIGN
7. f x 10 TRIM

$
B.O. FLOOR JOISTS
EL. +9'-3 3/8
11
±k 2k 2k. 2k
© 8. 1" x 4 5" WINDOW TRIM
24
© F F
23
9.
10.
BUILT-UP WINDOW CROWN

1" x 6" DOOR TRIM


r n

28
11. BUILT-UP DOOR CROWN
CONDUIT FOR FUTURE GAS I
FURNACE SUPPLY/EXHAUST A A 12. 5/4 x 8 TRIM

13. f x 6 RAKE EDGE TRIM WITH 3" CROWN


© E3
U E3 E4 □ E3 □ E3
MOULDING

14. 1" x 81" BEAM TRIM


T.O. FIRST FLOOR SUBFLOOR
II
EL. +0-2 3/8
F4 F'0 F9
Or
F10 E11 E11
©© 15. EGRESS WINDOW WELL AND LADDER L J
$
T.O. FOUNDATION WALL CONNECTION FOR
r 16. STONE VENEER AT GARAGE FOUNDATION WALL
EL. +0-0
CONDUIT SUMP
PUMP OUTLET CONNECTION /
FUTURE MULTISPLIT
OUTDOOR UNIT
r 1'5 29
17. CONCRETE DECK PROJECT:
FOR FUTURE CONNECTION
AIR-TO-AIR FOR CENTRAL
CONNECTION FOR FUTURE
HIGH VELOCITY HVAC J HI © 18. CONCRETE WALL WITH STONE VENEER EDGES
National Institute of
OUTDOOR UNIT AIR-TO-AIR
OUTDOOR UNIT
AIR-TO-AIR OUTDOOR UNIT
(SEE GENERAL SHEET
NOTE #10)
B Jt 19. LOAD-BEARING COLUMN

20. EXTERIOR LANTERN Standards and Technology


21. PV ARRAY
J'L
l_ J 22. SOLAR COLLECTOR (HOT WATER SYSTEM) Net Zero Energy
RIGHT SIDE (EAST) ELEVATION
2 SCALE: 1/4" = 1'-0"
23. SCREEN PANEL

24. PREFABRICATED PILASTER


Residential Test
1 2 3 4 5 6 7
25. FIBER CEMENT PANEL Facility
26. FIBER CEMENT TRIM

27. 2" SILL NIST Campus


28. KICK-OUT FLASHING Gaithersburg, MD
29. ALUMINUM COIL STOCK COVERING
1 2 1 1 1
A-305 A-305 A-303 A-302 A-301

O WINDOW KEY U.S. Department of Energy


Research Toward Zero Energy Homes

A. 3-0" x 5'-5" DH
U.S. DEPARTMENT OF
Energy Efficiency &
©
B. 3'-2^" x 5-2" DH ENERGY Renewable Energy
c. 2'-1" x 3'-7" DH
© D. 2'-8" x 2'-3" AWN

E. 2'-3" x 4'-0" DH

© B.O. CEILING JOISTS


EL. +19-7 1/4 II
F. 3'-4" x 2'-3" AWN
08/03/10 UPDATED
8 G. 3'-4" x 2'-7" AWN
2 07/27/10 UPDATED

06/29/10 UPDATED
© PENETRATION KEY
© ©
MARK

ISSUE:
DATE DESCRIPTION

03/31/10 ISSUED FOR CONSTRUCTION


© B B B B B E1. COLLECTOR PANEL CONDUIT

E2. EXTERIOR LANTERN


© © E3. WEATHER PROTECTED OUTLET
PROJECT NO:
CAD DWG FILE:
NIST NZERTF
A-PLOT-ELEV-NZERTF

E1 E1 T.O. SECOND FLOOR SUBFLOOR E4. CONDUIT FOR FUTURE GAS FURNACE DRAWN BY: CG
© EL. +10-6 1/4 11

CHECKED BY: BP
E5. DRYER VENT
* B.O. FLOOR JOISTS COPYRIGHT © 2009
E6. RANGE HOOD VENT BUILDING SCIENCE CORPORATION
EL. +9'-3 3/8
11

© E7. HRV EXHAUST SHEET TITLE:

A A E8. HRV INLET


□□□□ □□□□ E2 E2 <•>

<Z> EXTERIOR
E2
□□□□ E2 19 A A A A A
E9. INSTRUMENTATION CONDUIT
29
E10. CONDUIT FOR FUTURE GAS WATER HEATER ELEVATIONS
A
© /
T.O. FIRST FLOOR SUBFLOOR ^ E11. FUTURE MULTI-SPLIT OUTDOOR UNIT
16 CONNECTION
EL. +0-2 3/8
=«^=
I E12. HOSE BIBB
CONDUIT FOR COLLECTOR PANEL THROUGH OUNDAT ON WALL I

L. +0'-0 F4. SUMP PUMP OUTLET


■!
r WALL AT RIM JOIST UNDER FRONT PORCH
ROOF
SCALE AS NOTED o
z

F9. AIR-TO-AIR OUTDOOR UNIT CONNECTION


T.O. GARAGE SLAB (LOWEST PT) A,
F10. FUTURE AIR-TO-AIR OUTDOOR UNIT

1
FRONT (SOUTH) ELEVATION
SCALE: 1/4" = 1'-0"
EL. -2'-4" (458.3T)

R1.
CONNECTION

PLUMBING STACK VENT A-201


R2. SOIL GAS VENT
F E D C B A A.1
GENERAL SHEET NOTES
1. FIRST FLOOR SOFFITS AND SECOND FLOOR
SOFFITS TO ALIGN AROUND PERIMETER OF
BUILDING SCIENCE
I 2.
HOUSE.
SEE A-601 FOR WINDOW SCHEDULE.
CORPORATION
3. SEE A-603 FOR PENETRATION SCHEDULE.
1 4. SIDING TO BE PAINTED P-12.
A-304
5. ALL TRIM AND SOFFITS TO BE PAINTED P-13.
PLUMBING 6. ALL DOORS TO BE PAINTED P-14.
I 12
STACK VENT
4 12 7. CEILINGS OF PORCHES AND BREEZEWAY TO
4 BE PAINTED P-15.
R1

12
© 8. FRONT PORCH AND BREEZEWAY COLUMNS
TO BE PAINTED P-13.
12 9. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS
13
9.67 CORRESPONDS TO 461.30' IN THE SITE/CIVIL
9.67
12 DRAWINGS.
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
4 B.O. CEILING JOISTS
EL. +19-7 1/4 n
ALIGN
<E> O SHEET KEYNOTES www.buildingscience.com

© ±
D
2
1. ASPHALT ROOF SHINGLES

© © 2. 1" x 8f" FRIEZE BOARD TRIM MOULDING


CONSULTANT:

© A
© 3.

4.
f x 8 TRIM WITH 3" CROWN MOULDING

1" X 85" TRIM


© 4
12
I
12
22
5. FIBER CEMENT SIDING, 4" EXPOSURE
23 4 6. 2x2 TRIM
HRV
T.O. SECOND FLOOR SUBFLOOR
4
7. f x 10 TRIM
INLET
E9
EL. +10-6 1/4" □ O
ALIGN
8. 1"x4 WINDOW TRIM

B.O. FLOOR JOISTS


E8
± 9. BUILT-UP WINDOW CROWN

4 EL. +9-3 3/8" :


^lz
10. 1" x 6" DOOR TRIM

© 11. BUILT-UP DOOR CROWN


r n
27 E2 © 12. 5/4 x 8 TRIM

25
A
© 13. f x 6 RAKE EDGE TRIM WITH 3" CROWN
MOULDING
28
©© E3 E3 19
14. 1" x 81" BEAM TRIM

o □ 15. EGRESS WINDOW WELL AND LADDER

© 16. STONE VENEER AT GARAGE FOUNDATION WALL

4 T.O. FIRST FLOOR SUBFLOOR


EL. +0-2 3/8" tr 17. CONCRETE DECK L J

T.O. FOUNDATION WALL 18. CONCRETE WALL WITH STONE VENEER EDGES
EL. +0-0
11
© PROJECT:

T.O. GARAGE SLAB (LOWEST PT)


CONDUIT FOR INSTRUMENTATION □ 19. LOAD-BEARING COLUMN
20. EXTERIOR LANTERN
National Institute of
4 EL. -2'-4"
THROUGH WALL AT RIM JOIST
UNDER BREEZEWAY ROOF 21. PV ARRAY

22. SOLAR COLLECTOR (HOT WATER SYSTEM) Standards and Technology


23. SCREEN PANEL

LEFT SIDE (WEST) ELEVATION 24. PREFABRICATED PILASTER Net Zero Energy
2 SCALE: 1/4" = 1'-0"
25. FIBER CEMENT PANEL
Residential Test
26. FIBER CEMENT TRIM
7 6 5 4 3 2 1 27. 2" SILL Facility
28. KICK-OUT FLASHING

29. ALUMINUM COIL STOCK COVERING NIST Campus


Gaithersburg, MD
I I I
1 1 1 3 1
A-301 A-302 A-303 A-305 A-305

o WINDOW KEY
U.S. Department of Energy
R2 R1 I I I A. 3-0" x 5'-5" DH Research Toward Zero Energy Homes
SOIL GAS
VENT B. 3'-25" x 5'-2" DH
U.S. DEPARTMENT OF
Energy Efficiency &
© PLUMBING
c. 2'-1" x 3'-7" DH ENERGY Renewable Energy
© STACK VENT
I I I I D. 2'-8" x 2'-3" AWN

© E. 2'-3" x 4'-0" DH

B.O. CEILING JOISTS F. 3-4" x 2'-3" AWN

4 EL. +19-7 1/4


11

G. 3-4" x 2'-7" AWN

I © I I
cm rm 08/03/10 UPDATED

<D G G
□m □m <*>
PENETRATION KEY
07/27/10
06/29/10
UPDATED
UPDATED
E E
MARK DATE DESCRIPTION
© I I I
E1. COLLECTOR PANEL CONDUIT
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
E2. EXTERIOR LANTERN

E3. WEATHER PROTECTED OUTLET PROJECT NO: NIST NZERTF

4 T.O. SECOND FLOOR SUBFLOOR DRYER VENT RANGE HOOD HRV EXHAUST CAD DWG FILE: A-PLOT-ELEV-NZERTF
IN SOFFIT — VENT IN SOFFIT " IN SOFFIT E4. CONDUIT FOR FUTURE GAS FURNACE
EL. +10-6 1/4"
a t± DRAWN BY: CG
3 XL
hi
n xu f m E5. DRYER VENT
CHECKED BY: BP

4 EL. +9-3 3/8"


B.O. FLOOR JOISTS E5 E6 E7

©
E6. RANGE HOOD VENT

an □m
nnn E7. HRV EXHAUST
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

rn © SHEET TITLE:
© E
E2 C C E2
E 19
E8. HRV INLET

© A
27
E9. INSTRUMENTATION CONDUIT
EXTERIOR
© ZL E3 A A
E10. CONDUIT FOR FUTURE GAS WATER HEATER

ELEVATIONS
E3 O E10 ?| E12 E11. FUTURE MULTI-SPLIT OUTDOOR UNIT

4 T.O. FIRST FLOOR SUBFLOOR


EL. +0-2 3/8" ©© E3 O CONNECTION

T I I E12. HOSE BIBB

4 T.O. FOUNDATION WALL L.


EL. +0-0 M
o( )o F4. SUMP PUMP OUTLET
I

29 cr
HOSE F9. AIR-TO-AIR OUTDOOR UNIT CONNECTION SCALE AS NOTED O
z
CONDUIT FOR FUTURE GAS WATER BIBB
T.O. GARAGE SLAB (LOWEST PT)
4 EL. -2'-4
11
HEATER SUPPLY/EXHAUST
F10. FUTURE AIR-TO-AIR OUTDOOR UNIT
CONNECTION

REAR (NORTH) ELEVATION


SCALE: 1/4" = 1'-0"
R1. PLUMBING STACK VENT

R2. SOIL GAS VENT


A-202
GENERAL SHEET NOTES
1. FIRST FLOOR SOFFITS AND SECOND FLOOR
SOFFITS TO ALIGN AROUND PERIMETER OF
BUILDING SCIENCE
2.
HOUSE.

SEE A-601 FOR WINDOW SCHEDULE.


CORPORATION
3. SEE A-603 FOR PENETRATION SCHEDULE.

4. SIDING TO BE PAINTED P-12.

5. ALL TRIM AND SOFFITS TO BE PAINTED P-13.


E C
6. ALL DOORS TO BE PAINTED P-14.

7. CEILINGS OF PORCHES AND BREEZEWAY TO


BE PAINTED P-15.
I 8. FRONT PORCH AND BREEZEWAY COLUMNS
TO BE PAINTED P-13.

9. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS


CORRESPONDS TO 461.30' IN THE SITE/CIVIL
T.O. GARAGE ROOF RIDGE
DRAWINGS.
EL. +18-10 12 30 FOREST STREET SOMERVILLE, MA
I 9.67
T: (978) 589-5100 F: (978) 589-5103
O SHEET KEYNOTES www.buildingscience.com
12
1. ASPHALT ROOF SHINGLES
9.67
CONSULTANT:
2. 1" x 8f" FRIEZE BOARD TRIM MOULDING
I
12 3. f x 8 TRIM WITH 3" CROWN MOULDING
13
4 4. 1" X 85" TRIM

<2> 5. FIBER CEMENT SIDING, 4" EXPOSURE

B.O. CEILING JOISTS 4 6. 2x2 TRIM


EL. +8-11 4 <£> 7. f x 10 TRIM

4) <4 8.

9.
1"x4 WINDOW TRIM

BUILT-UP WINDOW CROWN


A <±>
□□□□ □□□□ □□□□ 10. 1" x 6" DOOR TRIM

E2
□□□□ □□□ E2 4) 11. BUILT-UP DOOR CROWN
r n

<Z> 12.

13.
5/4 x 8 TRIM

f x 6 RAKE EDGE TRIM WITH 3" CROWN


T.O. HOUSE FOUNDATION WALL MOULDING
EL. +0-0
14. 1" x 81" BEAM TRIM
f 15. EGRESS WINDOW WELL AND LADDER
T.O. GARAGE FOUNDATION WALlX ;■

EL. -0'-5’ 16. STONE VENEER AT GARAGE FOUNDATION WALL


i-
17. CONCRETE DECK L J

4 GRADE AND T.O. GARAGE SLAB


EL. -2'-4
T.O. GARAGE FOOTING
LOWEST POINT 18.
19.
CONCRETE WALL WITH STONE VENEER EDGES

LOAD-BEARING COLUMN PROJECT:

* EL. -4-0 20. EXTERIOR LANTERN


21. PV ARRAY
National Institute of
22. SOLAR COLLECTOR (HOT WATER SYSTEM) Standards and Technology
23. SCREEN PANEL

LEFT SIDE (WEST) GARAGE ELEVATION 24. PREFABRICATED PILASTER Net Zero Energy
2 SCALE: 1/4"= 1'-0"
25. FIBER CEMENT PANEL
Residential Test
26. FIBER CEMENT TRIM

27. 2" SILL Facility


28. KICK-OUT FLASHING

29. ALUMINUM COIL STOCK COVERING NIST Campus


Gaithersburg, MD

C E
o WINDOW KEY
U.S. Department of Energy
A. 3-0" x 5-5" DH Research Toward Zero Energy Homes
I
B. 3-24" x 5'-2" DH
U.S. DEPARTMENT OF
Energy Efficiency &
T.O. GARAGE ROOF RIDGE
c. 2'-1" x 3'-7" DH ENERGY Renewable Energy
$ EL. +18-10 12 D. 2'-8" x 2'-3" AWN

I 9.67 E. 2'-3" x 4'-0" DH

F. 3-4" x 2'-3" AWN


12
G. 3-4" x 2'-7" AWN
9.67
08/03/10 UPDATED
I
<£> 07/27/10 UPDATED
12 13 06/29/10 UPDATED
4 PENETRATION KEY MARK DATE DESCRIPTION
E9 12
E1. COLLECTOR PANEL CONDUIT ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
B.O. CEILING JOISTS
EL. +8-11 <4 E2. EXTERIOR LANTERN

<s> <£> E3. WEATHER PROTECTED OUTLET


PROJECT NO:

CAD DWG FILE:


NIST NZERTF
A-PLOT-ELEV-NZERTF
20
E4. CONDUIT FOR FUTURE GAS FURNACE DRAWN BY: CG
E2
4) E5. DRYER VENT CHECKED BY: BP
1 4) COPYRIGHT © 2009
<=>
<z> E6. RANGE HOOD VENT

E7. HRV EXHAUST


BUILDING SCIENCE CORPORATION

SHEET TITLE:
T.O. HOUSE FOUNDATION WALL
E8. HRV INLET
EL. +0-0

T.O. GARAGE FOUNDATION WALL



E9. INSTRUMENTATION CONDUIT EXTERIOR
* EL. -0'-5
CONDUIT FOR INSTRUMENTATION
E10. CONDUIT FOR FUTURE GAS WATER HEATER

E11. FUTURE MULTI-SPLIT OUTDOOR UNIT


ELEVATIONS
4 GRADE AND T.O. GARAGE SLAB
EL. -2'-4
LOWEST POINT THROUGH WALL AT RIM JOIST
UNDER BREEZEWAY ROOF
CONNECTION

E12. HOSE BIBB


T.O. GARAGE FOOTING
EL. -4'-0 F4. SUMP PUMP OUTLET
O
SCALE AS NOTED
F9. AIR-TO-AIR OUTDOOR UNIT CONNECTION

F10. FUTURE AIR-TO-AIR OUTDOOR UNIT

RIGHT SIDE (EAST) GARAGE ELEVATION


SCALE: 1/4"= 1'-0"
CONNECTION

R1. PLUMBING STACK VENT

R2. SOIL GAS VENT


A-203
GENERAL SHEET NOTES
1'-0" 8-0 11
9-5 3-6 5-0
1. ALL TROPICAL WOOD, IF USED, MUST BE
FSC-CERTIFIED.
BUILDING SCIENCE
^—v "v
x 2. SEE A-602 FOR FINISH SCHEDULE. CORPORATION
®—^ 7® CD
1
V 3. ALIGN SWITCH AND RECEPTACLE PLATES WITH
V —r TOP OF TILE IN KITCHENS AND BATHROOMS.
G7 G7 CD
00
^------V -V

m
5 1/2
EQ. EQ.
-7 — 7- 7 —
5'-0"
7— 7—
EH*
r-6" 3-5" 1
o o 7— 7^ 7^
1

CD
(G13) 1

CD
G3 G3

□M 5-11 11
©
© 0 O SHEET KEYNOTES
CD
1

i"-
I 5-10" 111
6" 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
7^

1 1
7
1 1 "v ’t 7
-v GENERAL:
G1. CROWN MOULDING
www.buildingscience.com
o o o o

EQ. EQ. G2. BASE MOULDING


/
o I o @© o G3. PAINTED WALL
831 1
©© 1 CONSULTANT:
co K2 CO CO
K3 G4. WINDOW HEAD TRIM
G5. 1x4 WINDOW JAMB TRIM

f
3E
©
3 j" FILLER 3" FILLER 3" FILLER G6. WINDOWSILL TRIM
z—v -z—v ■V

4 3/8" B30 (15" DEEP) B30 (15" DEEP) f" END PANEL END PANEL G7. CASED OPENING HEAD TRIM
<k <L G8. 1x6 CASED OPENING JAMB TRIM
G9. CASED OPENING BASE TRIM
G10. DOOR HEAD TRIM
OPENING ELEVATION HALF WALL ELEVATION ISLAND ELEVATION ISLAND ELEVATION G11. 1x4 DOOR JAMB TRIM
SCALE: 1/2"= 1'-0 11
SCALE: 1/2" = 1'-0’ SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" G12. INTERIOR DOOR
G13. BUILT-UP COLUMN
G14. COLUMN BASE TRIM r n
G15. WOOD PANEL
G16. WOOD CAP
3-6 10'-7 1/4" 13-5'
7L G17. MANTLE
3" FILLER 3’ FILLER G18. MANTLE TRIM
f" END PANEL W3615 f" END PANEL W3615 (2) (31" DEEP) W2415 W2115 W2115 W2415 31 FILLER
X 7 3 7 7 7 ir
x X
^—v G19. BASE CABINET
G20. WOOD SHELF
CD
AIR G21. 1 "x4" DOOR HEAD TRIM L J
RETURN
7 00
71 7 O O
7 7 o 7 o 0
7 0
7
BATH: PROJECT:
B1. TILE
K5 o
o o
JL O)
B2. HAND HELD SHOWER National Institute of
K3
-V
B3. SHOWER SEAT
Standards and Technology
B4. GRAB BAR
RANGE HOOD o
O o O O
WITH VENT
o o B5. TOWEL BAR
Net Zero Energy

„0-,6
o o
I

CD
B6. TOWEL RING
CT>
W363a W2433 W2133 W2133 -W2433-
7L
5-11" 00 □ ©
© D©© ©©
©©
©
© B7. TOILET PAPER HOLDER
Residential Test

ALIGN PLATE WITH T.O. TILE


LU CO

r-6'
1 7^
5-10' 7 B8. MIRROR
©
Facility

^ ALIGN PLATE WITH T.O. TILE;


K7 ©
O B9. FRAMELESS MIRROR
"zur Pf
2

ALIGN PLATE WITH T


zx B10. ACCESSIBLE LAVATORY

I
BUILT-IN
B11. ACCESSIBLE TOILET NIST Campus
O MICROWAVE [I TT o o

O
o o
B12. TOILET Gaithersburg, MD

m]
3-0"

3-0"

13 O
1

CO
K2
B13. BATHTUB
EQ. EQ. oI
o o
7 CM
B14. VANITY BASE CABINET
B15. SOLID SURFACE BACKSPLASH
^----- V

-Nco
3n 3n

m
3" FILLER REF

Q
2 5" FILLER B18 END

Q.
<
END PANEL B18 B3012 (24" DEEP) B18 3 j FILLER SB36 24" DISHWASHER B18 3" FILLER 4 4 END B24 B21 30" BUILT-IN OVEN B21 3" FILLER B16. SOLID SURFACE COUNTERTOP
PANEL (2" FILLER PANEL WITH COOKTOP U.S. Department of Energy
ABOVE) B17. FRAMELESS GLASS SHOWER DOOR, TEMPERED
Research Toward Zero Energy Homes
B18. SOLID SURFACE BATHTUB DECK
B19. 6" DEEP NICHE U.S. DEPARTMENT OF
Energy Efficiency &
ISLAND ELEVATION KITCHEN ELEVATION KITCHEN ELEVATION ENERGY Renewable Energy
KITCHEN:
SCALE: 1/2" = 1'-0’ SCALE: 1/2"= 1'-0 ii
SCALE: 1/2" = 1'-0"
K1. WALL CABINET
K2. BASE CABINET
K3. END PANEL
K4. SUPPORT BRACKET

KJ
K5. RANGE HOOD EXHAUST DUCT
K6. TILE BACKSPLASH
K7. SOLID SURFACE BACKSPLASH
14

14

M
7

H
w

w
CD
O

O
K8. SOLID SURFACE COUNTERTOP
o

MARK DATE DESCRIPTION


STAIR:

cd
CD

ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

co
-1^
a
CO

S1. WOOD HANDRAIL

IM
00

ut

ot
’la

S2. WOOD BALUSTER

7
7

PROJECT NO: NIST NZERTF

7
S3. WOOD TREAD
CAD DWG FILE: A-PLOT-ELEV-NZERTF
CD 1 I DO

S4. WOOD TRIM


co

CO
DRAWN BY: KG, HW
S5. WOOD STRINGER
CHECKED BY: BP
LO
tr

CO II CD
OO 1 f CM
S6. WOOD POST
CO

A-

M.
M.
COPYRIGHT © 2009

9'-O'
,0-6
9-0'

9-0'

SCREEN PORCH: BUILDING SCIENCE CORPORATION

@0
1=1 r

CM
00
LO
P1. EXTERIOR WATER TABLE SHEET TITLE:

7
CD

ALIGN PLATE WITH T.O. TILE


CM

CM

CM

CD
<8Hk
,o-z

,o-z
o

o
CD

6'-9"
(U>
DO
7

,o-z
4

P2. PORCH DOOR


4^
m

A
R
\<\

p*
\w\

m
LO

7
P3. EXTERIOR FIBER CEMENT LAP SIDING
INTERIOR
p

cy
DO

P4. % x 6 DOOR TRIM

7
ELEVATIONS
00
CD

CD
3'-6"

P5. % TRIM BOARD


CO

CO

3'-4'
Y7

2'-10"
3'-0"

3'-0'
t= i=

3-0'
I z]

7
P6. 3" CROWN

2'-3'
m
CO

P7. 5 1/2" BASE

r-6"

r-6"
P8. FIBER CEMENT PANEL BOARD
CD

CD

a
CD

CD
CN

CM

CM

CM

P9. %" WALL CAP


7

7
7

7
7

7
7

7
I

oc
o
P10. SCREEN PANEL SCALE AS NOTED z

P11. SCREEN DOOR


P12. 3 1/2" TRIM

BATH #1 ELEVATION
SCALE: 1/2" = 1'-0’
BATH #1 ELEVATION
SCALE: 1/2"= 1'-0'
BATH #1 ELEVATION
SCALE: 1/2"= 1'-0"
BATH #1 ELEVATION
SCALE: 1/2"= 1'-0"
P13. 10" TRIM BOARD W/ INSET PANEL

P14. 21/2" BEADBOARD


P15. TRIM BOARD
A-204
GENERAL SHEET NOTES

20'-0" 15'-6"
1. ALL TROPICAL WOOD, IF USED, MUST BE
FSC-CERTIFIED.
BUILDING SCIENCE
CORPORATION
7^- 7^- 7^-

2. SEE A-602 FOR FINISH SCHEDULE.


8-0" 12'-0' 4'-10" 5'-10' 4'-10"
7^- 7^ 7^ 7^ 7^ 7^ 7L
3. ALIGN SWITCH AND RECEPTACLE PLATES WITH
TOP OF TILE IN KITCHENS AND BATHROOMS.

z Z------ V

m
o
G5 G5 55" FLAT -=f
SCREEN TV
Tl T
WALL WALL O SHEET KEYNOTES
CD G6
SCONCE 0 SCONCE
-V
30 FOREST STREET SOMERVILLE, MA
G3
h- T: (978) 589-5100 F: (978) 589-5103
GENERAL:
o
G3 o
www.buildingscience.com
CT> CD
[ ] ■v G1. CROWN MOULDING

CN G2. BASE MOULDING


G1 G3. PAINTED WALL
v= CONSULTANT:
-2 CD
G4. WINDOW HEAD TRIM
G16 CD

G5. 1x4 WINDOW JAMB TRIM


O O o o o o o o o o o
G6. WINDOWSILL TRIM
© o
©) \ ^7

CO G7. CASED OPENING HEAD TRIM


(G19)
(G1 CD G8. 1x6 CASED OPENING JAMB TRIM
G9. CASED OPENING BASE TRIM
©0 -v
^--------"s------V
mi mi ■v
m\\------------------- V G10. DOOR HEAD TRIM
2 1/8"
2 1/8"
G11. 1x4 DOOR JAMB TRIM

LIVING ROOM ELEVATION LIVING ROOM ELEVATION G12. INTERIOR DOOR

SCALE: 1/2" = 1’-0' SCALE: 1/2" = 1'-0’ G13. BUILT-UP COLUMN


G14. COLUMN BASE TRIM r n
G15. WOOD PANEL
G16. WOOD CAP
G17. MANTLE
G18. MANTLE TRIM
12'-5"
7^ ~? ~
9-10' 7 ~
G19. BASE CABINET
G20. WOOD SHELF
Z------ V Z------ V
P6 P6 G21. 1 "x4" DOOR HEAD TRIM L J
CM CM

P5
BATH:
t T
) }
B1. TILE
PROJECT:
P8 CEILING
FAN/LIGHT B2. HAND HELD SHOWER National Institute of
B3. SHOWER SEAT
Standards and Technology
B4. GRAB BAR
P13 B5. TOWEL BAR
CO

LO
B6. TOWEL RING Net Zero Energy
o
P1
o
B7.
B8.
TOILET PAPER HOLDER
MIRROR
Residential Test
G1 7 7
P2
CO
o
CD
05
PH
CT>
B9. FRAMELESS MIRROR Facility
P10 B10. ACCESSIBLE LAVATORY
B11. ACCESSIBLE TOILET NIST Campus
7
^7
B12. TOILET Gaithersburg, MD
TT
mi
-v B13. BATHTUB
WALL
SCONCE u "sE
CO
P15
T7 ^E
CO
'sE
CO
CO
B14. VANITY BASE CABINET
B15. SOLID SURFACE BACKSPLASH
CN
CN CN

© Z--------- "7------- V
P7
Z-------- ' 7------ V
B16. SOLID SURFACE COUNTERTOP
B17. FRAMELESS GLASS SHOWER DOOR, TEMPERED U.S. Department of Energy
6"
f B18. SOLID SURFACE BATHTUB DECK
Research Toward Zero Energy Homes

OD
SCREEN PORCH ELEVATION SCREEN PORCH ELEVATION B19. 6" DEEP NICHE U.S. DEPARTMENT OF
Energy Efficiency &
<^==i

□ ■V
CO

CD
5 SCALE: 1/2"= 1'-0" 4 SCALE: 1/2" = 1'-0’ KITCHEN:
ENERGY Renewable Energy
K1. WALL CABINET
K2. BASE CABINET

o K3. END PANEL


CO
K4. SUPPORT BRACKET
17'-6" K5. RANGE HOOD EXHAUST DUCT
9-0' 3-0' K6. TILE BACKSPLASH
7 ~ 7‘ 7L

■^7---------------^ 7

4-6' 6
7 -------------- 7 ”
12-6" 7-
K7. SOLID SURFACE BACKSPLASH
—v K8. SOLID SURFACE COUNTERTOP
7
■^t—v

■^7------ V
7 MARK DATE DESCRIPTION
STAIR:
WALL
■^7
V n- S1. WOOD HANDRAIL
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

SCONCE CM
n- S2. WOOD BALUSTER
->7
CM PROJECT NO: NIST NZERTF
~ ^ 7------------=-----------
S3. WOOD TREAD
7 CD
-^7------------ V ->7

S4. WOOD TRIM


CAD DWG FILE: A-PLOT-ELEV-NZERTF
^7
co DRAWN BY: KG, HW
ID S5. WOOD STRINGER
3 1/2" CHECKED BY: BP
S6. WOOD POST
CO

CD
G11 COPYRIGHT © 2009
o SCREEN PORCH: BUILDING SCIENCE CORPORATION
o
CD
CT> P1. EXTERIOR WATER TABLE SHEET TITLE:
(G1 o
i^i (Ji P2. PORCH DOOR
S1 CD 00

S2
■7
r--
CO S1
7 ^ 7

"7
CD
P3.

P4.
EXTERIOR FIBER CEMENT LAP SIDING

% x 6 DOOR TRIM
INTERIOR
CD

P5. % TRIM BOARD ELEVATIONS


S2 P6. 3" CROWN
o
CO P7. 5 1/2" BASE
P8. FIBER CEMENT PANEL BOARD
P9. %" WALL CAP I

^------ V **------V o
P10. SCREEN PANEL SCALE AS NOTED
E
z
G2
^7--------*7--------V
P11. SCREEN DOOR
P12. 3 1/2" TRIM

3
STAIR ELEVATION
SCALE: 1/2"= 1'-0" 2
BALCONY ELEVATION
SCALE: 1/2"= 1'-0' 1
OPENING ELEVATION
SCALE: 1/2"= 1'-0'
P13. 10" TRIM BOARD W/ INSET PANEL

P14. 21/2" BEADBOARD


P15. TRIM BOARD
A-205
6-0" 5-10' 6-0" 9'-8'
-?*- -?*- -?*-
GENERAL SHEET NOTES
"7 ~
3-2'
7^
2-8"
7 ~ 7^
5-0"
7^
1’-0" 7^
1. ALL TROPICAL WOOD, IF USED, MUST BE
FSC-CERTIFIED.
BUILDING SCIENCE
■v -v 2. SEE A-602 FOR FINISH SCHEDULE. CORPORATION
3. ALIGN SWITCH AND RECEPTACLE PLATES WITH
TOP OF TILE IN KITCHENS AND BATHROOMS.

(G10)

■v G3

o o o 6 o
B15
ct> CD CD

@0 1
CD
O SHEET KEYNOTES
o o 2-7' o
30 FOREST STREET SOMERVILLE, MA
4’
CO Is- LO h- B6 ■^r-v
CD

CO
Is- T: (978) 589-5100 F: (978) 589-5103
co GENERAL:
O
1
CO
www.buildingscience.com
B7 /n G1. CROWN MOULDING
s -V
% i G2. BASE MOULDING
■v I
o B19 o G3. PAINTED WALL
1 ITT!
ITT)
CONSULTANT:
CO CO
o
G4. WINDOW HEAD TRIM
CM CM
13 B1
G5. 1x4 WINDOW JAMB TRIM
LO

fi ■y—y le y------- y—y—y—y AX y—y—y y-------- y------ y—y


G6.
G7.
WINDOWSILL TRIM
CASED OPENING HEAD TRIM
G8. 1x6 CASED OPENING JAMB TRIM
G9. CASED OPENING BASE TRIM
G10. DOOR HEAD TRIM
BATH #2 ELEVATION BATH #2 ELEVATION BATH #2 ELEVATION BATH #2 ELEVATION G11. 1x4 DOOR JAMB TRIM

SCALE: 1/2"= 1'-0" SCALE: 1/2" = 1'-0’ SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" G12. INTERIOR DOOR
G13. BUILT-UP COLUMN
G14. COLUMN BASE TRIM r n
7 ~
5'-0"
7 ~ 7 ~
9-9"
7 ~ 71
10'-9 1/2" 7 ~ 71
9'-9"
7 ~
G15. WOOD PANEL
G16. WOOD CAP
6-9" 3'-0' 4-0" 61/2,; 6’-3'
7 ~ 7 ~ 7 ~ 71 7 ~
G17. MANTLE
G18. MANTLE TRIM
y

m y

m z ■V y

m y G19. BASE CABINET


G20. WOOD SHELF
G21. 1 "x4" DOOR HEAD TRIM L J

Q 0^0 □ -V -V -V
BATH:
B1. TILE
PROJECT:
■v -v
-v
o
B2. HAND HELD SHOWER National Institute of
7 ~
3-10" 7^
2’-0"
7 ~
CD
PH
B3. SHOWER SEAT
Standards and Technology
B4. GRAB BAR
€>- y
B5. TOWEL BAR
o o o
B5
2'. 6"
7 ~ 6"^
o
B6. TOWEL RING
Net Zero Energy
CD
CN

CM
CD CD

© X €) s y
CD

B7. TOILET PAPER HOLDER


Residential Test
o o o EQ. EQ. 9’ o
15 CT> 7^
1/ M 1/ M
O) B8. MIRROR
Is- t-v Is-
\
-v
co B1
€)- -v CD
G6
O
B6
£“7
CO
B9. FRAMELESS MIRROR Facility
/
17 B10. ACCESSIBLE LAVATORY
CD
S B1 o B11. ACCESSIBLE TOILET NIST Campus
o o IF
14 Gaithersburg, MD
o B1 o B18 -v 18) o B12. TOILET
CO CO
T T CO
\ / I B13. BATHTUB
l / CD 13
/ I B14. VANITY BASE CABINET

M&5K
G2

VC60
y-------- y------- y------- y
G2
y--------y------- y------- y
13 \ /
i y------ y------V y------ y------y------y------V
B15. SOLID SURFACE BACKSPLASH
B16. SOLID SURFACE COUNTERTOP
£ B17. FRAMELESS GLASS SHOWER DOOR, TEMPERED U.S. Department of Energy
Research Toward Zero Energy Homes
B18. SOLID SURFACE BATHTUB DECK
B19. 6" DEEP NICHE U.S. DEPARTMENT OF
Energy Efficiency &
BATH #2 ELEVATION MASTER BATH ELEVATION MASTER BATH ELEVATION MASTER BATH ELEVATION ENERGY Renewable Energy
KITCHEN:
SCALE: 1/2"= 1'-0" SCALE: 1/2" = 1'-0’ SCALE: 1/2"= 1'-0' SCALE: 1/2" = 1’-0'
K1. WALL CABINET
K2. BASE CABINET

7 ~
10’-9 1/2' 7 ~ 7 ~
15-1 1/2" 7 ~ 7 ~
15-1 1/2' 7 ~ K3. END PANEL
K4. SUPPORT BRACKET

7 ~
6-7 1/2' 7 ~
101 7 ~
3'-4'
7 ~ 7 ~
2'-6"
7 ~
2'-6" 3'-6" 3'-6" 3-1 1/2" 7 ~ 7 ~
10-8' 7^
4-5 1/2' 7 ~
K5. RANGE HOOD EXHAUST DUCT
K6. TILE BACKSPLASH
K7. SOLID SURFACE BACKSPLASH

<§>—[3 3
y

<§>—El Z z y—y

©---El z SI
y------ V
K8. SOLID SURFACE COUNTERTOP
MARK DATE DESCRIPTION
STAIR:
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
y

8~ Q^Q ~9 7 7 y
S1. WOOD HANDRAIL
: : S2. WOOD BALUSTER
PROJECT NO: NIST NZERTF
S3. WOOD TREAD
o
CAD DWG FILE: A-PLOT-ELEV-NZERTF
S4. WOOD TRIM
CD
DRAWN BY: KG, HW
EQ. EQ. S5. WOOD STRINGER
7 ~ 7 CD
CHECKED BY: BP
B9 II N- S6. WOOD POST
o o o COPYRIGHT © 2009
O)
(G20) O) (J) SCREEN PORCH: BUILDING SCIENCE CORPORATION
CD
P1. EXTERIOR WATER TABLE SHEET TITLE:
o
15
v O)

CD
n-
(G1
P2. PORCH DOOR

2 P3. EXTERIOR FIBER CEMENT LAP SIDING


INTERIOR
O O o o P4. % x 6 DOOR TRIM
o o o o
o
1 o "
EQ. EQ. P5. % TRIM BOARD ELEVATIONS
00 CO P6. 3" CROWN
EQ.
I EQ.
(G1
7 “
EQ.
I EQ.
7 “ T CD P7. 5 1/2" BASE
P8. FIBER CEMENT PANEL BOARD
0 0 -y
—v —v ----- V
P9. %" WALL CAP
3/4' VC78 3/4" 2 1/8"
I

o
FILLER FILLER P10. SCREEN PANEL SCALE AS NOTED z
<L <L
P11. SCREEN DOOR
P12. 3 1/2" TRIM

3
MASTER BATH ELEVATION
SCALE: 1/2" = 1’-O' 2
MASTER BEDROOM ELEVATION
SCALE: 1/2" = 1’-O' 1
MASTER BEDROOM ELEVATION
SCALE: 1/2" = 1’-O'
P13. 10" TRIM BOARD W/ INSET PANEL

P14. 21/2" BEADBOARD


P15. TRIM BOARD
A-206
GENERAL SHEET NOTES
1. ALL TROPICAL WOOD, IF USED, MUST BE
FSC-CERTIFIED.
BUILDING SCIENCE
2. SEE A-602 FOR FINISH SCHEDULE. CORPORATION
3. ALIGN SWITCH AND RECEPTACLE PLATES WITH
TOP OF TILE IN KITCHENS AND BATHROOMS.

O SHEET KEYNOTES
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
GENERAL:
www.buildingscience.com
G1. CROWN MOULDING
G2. BASE MOULDING
G3. PAINTED WALL
CONSULTANT:
G4. WINDOW HEAD TRIM
G5. 1x4 WINDOW JAMB TRIM
G6. WINDOWSILL TRIM
G7. CASED OPENING HEAD TRIM
G8. 1X6 CASED OPENING JAMB TRIM
G9. CASED OPENING BASE TRIM
G10. DOOR HEAD TRIM
G11. 1X4 DOOR JAMB TRIM
G12. INTERIOR DOOR
G13. BUILT-UP COLUMN
G14. COLUMN BASE TRIM r n
G15. WOOD PANEL
G16. WOOD CAP
G17. MANTLE
G18. MANTLE TRIM
G19. BASE CABINET
G20. WOOD SHELF
G21. 1"x 4" DOOR HEAD TRIM L J

BATH: PROJECT:
B1. TILE
B2. HAND HELD SHOWER National Institute of
B3. SHOWER SEAT
Standards and Technology
B4. GRAB BAR
B5. TOWEL BAR
B6. TOWEL RING
Net Zero Energy
B7. TOILET PAPER HOLDER
Residential Test
B8. MIRROR
B9. FRAMELESS MIRROR Facility
B10. ACCESSIBLE LAVATORY
B11. ACCESSIBLE TOILET NIST Campus
B12. TOILET Gaithersburg, MD
B13. BATHTUB
B14. VANITY BASE CABINET
B15. SOLID SURFACE BACKSPLASH
B16. SOLID SURFACE COUNTERTOP
B17. FRAMELESS GLASS SHOWER DOOR, TEMPERED U.S. Department of Energy
Research Toward Zero Energy Homes
B18. SOLID SURFACE BATHTUB DECK
B19. 6" DEEP NICHE U.S. DEPARTMENT OF
Energy Efficiency &
KITCHEN:
ENERGY Renewable Energy
K1. WALL CABINET
K2. BASE CABINET
17-11 1/2" v-
5'-1 O' v- K3. END PANEL
K4. SUPPORT BRACKET

-7^-
5'-0" ir-2' 6-9 1/2’ V-
2'-8" 3'-2'
V-
K5. RANGE HOOD EXHAUST DUCT
K6. TILE BACKSPLASH

m
K7. SOLID SURFACE BACKSPLASH

V
-v
z -v
K8. SOLID SURFACE COUNTERTOP
MARK DATE DESCRIPTION
18"x 18"
STAIR:
ACCESS ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PANEL S1. WOOD HANDRAIL
S2. WOOD BALUSTER
JK PROJECT NO: NIST NZERTF
S3. WOOD TREAD
CAD DWG FILE: A-PLOT-ELEV-NZERTF
S4. WOOD TRIM
2-0' DRAWN BY: KG, HW
S5. WOOD STRINGER
r €> CHECKED BY: BP
S6. WOOD POST
o G3 o o COPYRIGHT © 2009
G3 1
£ o> G)
C\J
(Ji SCREEN PORCH: BUILDING SCIENCE CORPORATION
CN
P1. EXTERIOR WATER TABLE SHEET TITLE:
o
/
\ LO P2. PORCH DOOR
18 CD

T
] P3.

P4.
EXTERIOR FIBER CEMENT LAP SIDING

% x 6 DOOR TRIM
INTERIOR
1 1 ©©
©© 10 -V
o
P5. % TRIM BOARD ELEVATIONS
X co P6. 3" CROWN
CN
13 P7. 5 1/2" BASE
ID
P8. FIBER CEMENT PANEL BOARD
G2 G2 G2
Sr- —nr ^^^\------------------- V P9. %" WALL CAP i

o
£ P10. SCREEN PANEL SCALE AS NOTED z

P11. SCREEN DOOR


P12. 3 1/2" TRIM

3
1ST FLOOR HALL ELEVATION
SCALE: 1/2"= 1'-0" 2
BEDROOM 2 ELEVATION (BEDROOM 3 SIMILAR)
SCALE: 1/2" = 1'-0’ 1
BATH #2 ELEVATION
SCALE: 1/2"= 1'-0'
P13. 10" TRIM BOARD W/ INSET PANEL

P14. 21/2" BEADBOARD


P15. TRIM BOARD
A-207
GENERAL SHEET NOTES
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
BUILDING SCIENCE
2.
SUPPLIER.

EWP CONNECTIONS TO FOLLOW EWP


CORPORATION
SUPPLIER INSTRUCTIONS.

3. FIRST AND SECOND FLOOR SOFFITS TO ALIGN


AROUND PERIMETER OF HOUSE, PORCHES
AND BREEZEWAY.

4. EL. +0-0" IN THE ARCHITECTURAL DRAWINGS


CORRESPONDS TO 461.30' IN THE SITE/CIVIL
DRAWINGS.

5. EL. +0'-23/8" (T.O. FIRST FLOOR SUBFLOOR) IN


THE ARCHITECTURAL DRAWINGS
CORRESPONDS TO 461.5' IN THE SITE/CIVIL
DRAWINGS.

6. EL. -9'-1iy2" (T.O. BASEMENT SLAB) IN THE


ARCHITECTURAL DRAWINGS CORRESPONDS
30 FOREST STREET SOMERVILLE, MA
TO 451.34 IN THE SITE/CIVIL DRAWINGS.
T: (978) 589-5100 F: (978) 589-5103
A.1 A B D F F.1 www.buildingscience.com

5'-8" 2'-0" 16'-6' 20'-0" 10-10"


7L -><- -><-
CONSULTANT:

O SHEET KEYNOTES

r n
I

UNVENTED ROOF ASSEMBLY: L J


3'-1 7/8’ 6'-8 1/8" RAFTER 'AN
7 *-
6'-8" RAFTER SPAN
7 ~ ASPHALT SHINGLES,
2x14 RIDGE CONTINUOUS FULLY-ADHERED PEEL AND STICK ROOF MEMBRANE,
PROJECT:
BOARD f" PLYWOOD SHEATHING WITH H-CLIPS,
T.O. ROOF STRUCTURAL RIDGE
t 12 12
5" OF FOIL-FACED POLYISOCYANURATE IN 3 LAYERS (1-1/2", 2", 1-1/2"),
$ EL. +16-9 1/8’ CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE National Institute of
9.67 9.67 1/2" PLYWOOD SHEATHING WITH H-CLIPS,
2x12 ROOF RAFTERS, Standards and Technology
NETTED CELLULOSE INSULATION,

\
1VI1 1/2
t I
Net Zero Energy
4
12
OPEN CELL SPRAY FOAM
"K .
-v 2
A-402
Residential Test
1/
$
B.O. ATTIC JOISTS
EL. +9-3 3/8 m
INSULATION (0.5 PCF)
5- Facility
2'-6" 2'-4'
/ *
— CEILING ASSEMBLY: ---- (— EXTERIOR WALL ASSEMBLY:
if" x 11^" LSL ENGINEERED JOISTS V FIBER CEMENT SIDING, I NIST Campus
AT 24" O.C., WOOD FURRING STRIPS, Gaithersburg, MD
(2) 2" FOIL-FACED POLYISOCYANURATE
GWB
CM
WITH STAGGERED AND TAPED JOINTS,
CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE
O
£' PLYWOOD SHEATHING,
2x6 24" O.C. WOOD STUD WALL FILLED
1 WITH CELLULOSE INSULATION TO R-19 I
GWB
T.O. FIRST FLOOR SUBFLOOR A-402 U.S. Department of Energy
\
EL. +0-2 3/8" Research Toward Zero Energy Homes
T.O. FOUNDATION WALL I
$ EL. +0-0" EXTERIOR WALL AT FIRST FLOOR FRAMING: U.S. DEPARTMENT OF
Energy Efficiency &
GRADE
EL. -0-3 5/8
../
2" MINERAL WOOL BLANKET INSULATION COVERED WITH COIL STOCK
DRAINAGE MAT (EXTENDS UP TO INSULATING SHEATHING AND DOWN TO FOOTING) ENERGY Renewable Energy
— 1ST FLOOR ASSEMBLY: 4" CONCRETE STEM WALL

4 T.O. FOUNDATION WALL SHELF


EL. -T-2" I—I
§" T & G FLOOR SHEATHING,
14" DEEP OPEN WEB WOOD JOIST
I 2" XPS INSULATION
OPEN CELL SPRAY FOAM INSULATION (0.5 PCF)

l=l
m ROOF DRIP EDGE DRAINAGE IN STONE BED,
TYPICAL; SEE2/A-101A I
00
m
- EXTERIOR WALL AT FOUNDATION
:j~| DRAINAGE MAT
E DAMPPROOFING
T.O. BASEMENT SLAB :| :JJ 10" CONCRETE WALL
$ EL. -9-11 1/2 ;TT 2" XPS SLOTTED INSULATION
TT = 2" FOIL-FACED POLYISOCYANURATE INSULATION MARK DATE DESCRIPTION
I
1 :| -11 £' GWB
4 T.O. FOOTING
EL. -10-5 1/2 :JJ]=I :i :m==l
:l 11=111=111=111=1
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

US 1
— BASEMENT FLOOR ASSEMBLY: PROJECT NO: NIST NZERTF
4" CONCRETE SLAB W/ W1.4 x W1.4 FREE DRAINING BACKFILL, UNIFIED
CAD DWG FILE: A-PLOT-SECT-NZERTF
SOIL CLASSIFICATION SYSTEM TYPE
WELDED WIRE MESH AT MID-DEPTH &
EMBEDDED HYDRONIC TUBING, GW, GP, SW, OR SP DRAWN BY: CG
6 MIL POLYETHYLENE VAPOR BARRIER, CHECKED BY: BP
2" XPS RIGID INSULATION,
4" STONE PAD (NO FINES), COPYRIGHT © 2009
FILTER FABRIC BUILDING SCIENCE CORPORATION
UNDISTURBED / NATIVE SOIL
SHEET TITLE:

BUILDING SECTION

BUILDING SECTION SCALE AS NOTED o

1 SCALE: 1/4" = 1'-0'

A-301
GENERAL SHEET NOTES
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
BUILDING SCIENCE
2.
SUPPLIER.

EWP CONNECTIONS TO FOLLOW EWP


CORPORATION
SUPPLIER INSTRUCTIONS.

3. FIRST AND SECOND FLOOR SOFFITS TO ALIGN


AROUND PERIMETER OF HOUSE, PORCHES,
AND BREEZEWAY.

4. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS


CORRESPONDS TO 461.30' IN THE SITE/CIVIL
DRAWINGS.

5. EL. +0-2%" (T.O. FIRST FLOOR SUBFLOOR) IN


THE ARCHITECTURAL DRAWINGS
CORRESPONDS TO 461.5' IN THE SITE/CIVIL
DRAWINGS.

6. EL. -9'-1iy2" (T.O. BASEMENT SLAB) IN THE


ARCHITECTURAL DRAWINGS CORRESPONDS
30 FOREST STREET SOMERVILLE, MA
TO 451.34' IN THE SITE/CIVIL DRAWINGS.
T: (978) 589-5100 F: (978) 589-5103
A.1 A B D E G www.buildingscience.com

7"
5'-8'
7
2'-0"
V-
16'-6" 18'-0" 2'-0'
CONSULTANT:

O SHEET KEYNOTES
19'-3" RAFTER SPAN 19'-3" RAFTER SPAN
7- 7l ”7 “

UNVENTED ROOF ASSEMBLY:


ASPHALT SHINGLES,
CONTINUOUS FULLY-ADHERED PEEL AND STICK ROOF MEMBRANE,
T.O. ROOF RIDGE f" PLYWOOD SHEATHING WITH H-CLIPS,
$ EL. +27-5 3/8 II
1-1/4" x 14" LSL 5" OF FOIL-FACED POLYISOCYANURATE IN 3 LAYERS (1-1/2", 2", 1-1/2"),
RIDGE BOARD CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE
4 T.O. 4/12 ROOF STRUCTURAL RIDG
EL. +26-11 1/2"
12 12
1/2" PLYWOOD SHEATHING WITH H-CLIPS,
1-3/4" X 11-7/8" LSL ENGINEERED ROOF RAFTERS, r n
4- CELLULOSE INSULATION,
4 4
J £' GWB

co
V A-401J
:C

t~±
igg? 3 1/4'
B.O. CEILING JOISTS
* EL. +19'-7 1/4 ii

SEE A-509 FOR FLASHING AT


+ L J
2'-4'
J. — ATTIC FLOOR ASSEMBLY
I 2'-4"
ROOF-TO-WALL INTERSECTIONS
LEDGER BOARDS (FOR RAFTERS AND CEILING 1/2" PLYWOOD SUBFLOOR (PARTIAL) I 7 ~

PROJECT:
JOISTS) ON TOP OF INSULATING SHEATHING 13/4" X11 LSL ENGINEERED CEILING JOIST
M___ y
FRONT PORCH ROOF ASSEMBLY:
ASPHALT SHINGLES,
CM
£' GWB
EXTERIOR WALL ASSEMBLY:
National Institute of
FULLY-ADHERED PEEL-AND-STICK ROOF MEMBRANE O
O)
FIBER CEMENT SIDING,
WOOD FURRING STRIPS,
Standards and Technology
§" PLYWOOD SHEATHING WITH H-CLIPS,
(2) 2" FOIL-FACED POLYISOCYANURATE
2x12 ROOF RAFTERS,
WITH STAGGERED JOINTS,
6 12 12
CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE Net Zero Energy
4 PLYWOOD SHEATHING,
T.O. SECOND FLOOR SUBFLOOR
A-508
\ 9.67 2x6 24" O.C. WOOD STUD WALL FILLED
WITH CELLULOSE INSULATION TO R-19
Residential Test
EL. +10-6 1/4 ii
$ 4"
m
4’ £' GWB
Facility
$
B.O. FLOOR JOISTS
EL. +9-3 3/8 ii
±- r

2ND FLOOR ASSEMBLY:


£
v T-8' y NIST Campus
7Y- y- T & G FLOOR SHEATHING,
FRONT PORCH CEILING ASSEMBLY: 14" DEEP OPEN WEB WOOD JOIST, Gaithersburg, MD
2x6 JOISTS AT 24" O.C., £' GWB
BEADBOARD eg
CM
FRONT PORCH FLOOR ASSEMBLY:
6" CONCRETE SLAB WITH WELDED WIRE MESH O) o OPEN CELL SPRAY FOAM
oo o> INSULATION (0.5 PCF) AT RIM
SLOPED AWAY FROM HOUSE WITH BROOM FINISH
COMPACTED STONE BASE, JOIST OF 1ST AND 2ND FLOOR
FRAMING V A-401 J
T.O. FIRST FLOOR SUBFLOOR y \ U.S. Department of Energy
$ EL. +0-2 3/8 ii
Research Toward Zero Energy Homes
T.O. FOUNDATION WALL m
$ EL. +0-0"
GRADE
•i
1
i-
EXTERIOR WALL A T FIRST FLOOR RIM JOIST (A T PA TIO):
2" MINERAL WOOL BLANKET INSULATION COVERED W/ COIL STOCK
U.S. DEPARTMENT OF

ENERGY
Energy Efficiency &
Renewable Energy
EL. -0-3 5/8
ii

m — 1ST FLOOR ASSEMBLY:


DRAINAGE MAT (EXTENDS UP TO INSULATING
SHEATHING AND DOWN TO FOOTING)
4 T.O. FOUNDATION WALL SHELF
EL. -1'-2"
3 y T & G FLOOR SHEATHING,
14" DEEP OPEN WEB WOOD JOIST
II 4" CONCRETE STEM WALL
2" XPS INSULATION
A-508
II OPEN CELL SPRAY FOAM INSULATION (0.5 PCF)
ROOF DRIP EDGE DRAINAGE
SONOTUBE BEYOND, oo UNDERNEATH STONE BED OF PATIO;
UNDER PORCH COLUMN II=III=IT1 SEE 5/A-101A
EXTERIOR WALL AT FOUNDATION
! = DRAINAGE MAT
T.O. BASEMENT SLAB N=m=Nj
EL. -9-11 1/2 II
IF
1 V DAMPPROOFING
:|J10" CONCRETE WALL 05/07/10 UPDATED
V T JE 2" XPS SLOTTED INSULATION
MARK DATE DESCRIPTION
1=11 2" FOIL-FACED POLYISOCYANURATE INSULATION

4 T.O. FOOTING
EL. -10-5 1/2 ii
I l=l 11:

; ;
I:

11:
l|:
H
l=l I l:
mm* GWB

I l=l I l=l 11;


ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

— BASEMENT FLOOR ASSEMBLY: PROJECT NO: NIST NZERTF


FREE DRAINING BACKFILL, UNIFIED
4" CONCRETE SLAB W/ W1.4 x W1.4 WELDED WIRE CAD DWG FILE: A-PLOT-SECT-NZERTF
SOIL CLASSIFICATION SYSTEM TYPE
MESH AT MID-DEPTH & EMBEDDED HYDRONIC TUBING,
GW, GP, SW, OR SP DRAWN BY: CG
6 MIL POLYETHYLENE VAPOR BARRIER,
2" XPS RIGID INSULATION, CHECKED BY: BP
4" STONE PAD (NO FINES),
FILTER FABRIC COPYRIGHT © 2009
UNDISTURBED / NATIVE SOIL BUILDING SCIENCE CORPORATION

SHEET TITLE:

BUILDING SECTION

BUILDING SECTION SCALE AS NOTED o


z

1 SCALE: 1/4" = 1'-0"

A-302
GENERAL SHEET NOTES
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
BUILDING SCIENCE
2.
SUPPLIER.

EWP CONNECTIONS TO FOLLOW EWP


CORPORATION
SUPPLIER INSTRUCTIONS.

3. FIRST AND SECOND FLOOR SOFFITS TO ALIGN


AROUND PERIMETER OF HOUSE, PORCHES
AND BREEZEWAY.

4. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS


CORRESPONDS TO 461.30' IN THE SITE/CIVIL
DRAWINGS.

5. EL. +0'-23/8" (T.O. FIRST FLOOR SUBFLOOR) IN


THE ARCHITECTURAL DRAWINGS
CORRESPONDS TO 461.5' IN THE SITE/CIVIL
DRAWINGS.

6. EL -9'-1 iy2" (T.O. BASEMENT SLAB) IN THE


ARCHITECTURAL DRAWINGS CORRESPONDS
30 FOREST STREET SOMERVILLE, MA
TO 451.34' IN THE SITE/CIVIL DRAWINGS.
T: (978) 589-5100 F: (978) 589-5103
A.1 A B D G www.buildingscience.com

5'-8' v 2'-°" 16'-6" 20'-0'


CONSULTANT:

O SHEET KEYNOTES

19'-3" RAFTER SPAN 19'-3" RAFTER SPAN


T.O. ROOF RIDGE
EL. +27-5 3/8 1-1/4" x 14" LSL
T.O. 9.67/12 ROOF STRUCTURAL RIDGE RIDGE BOARD
EL. +26-10 1/8 r n

UNVENTED ROOF ASSEMBLY:


12 12 ASPHALT SHINGLES,
CONTINUOUS FULLY-ADHERED PEEL AND STICK ROOF MEMBRANE,
9.67 9.67 PLYWOOD SHEATHING WITH H-CLIPS,
B.O. CEILING JOISTS 5" OF FOIL-FACED POLYISOCYANURATE IN 3 LAYERS (1-1/2", 2", 1-1/2"),
EL. +19'-7 1/4 nn
— ATTIC FLOOR ASSEMBLY
CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE
1/2" PLYWOOD SHEATHING WITH H-CLIPS,
L J

1-3/4" X 11-7/8" LSL ENGINEERED ROOF RAFTERS,


1%"x11 LSL ENGINEERED CEILING JOIST PROJECT:
CELLULOSE INSULATION,
Jr" GWB
£' GWB
CM
National Institute of
O
CD
Standards and Technology

12
1--11 1/2" 1--11 1/2"
Net Zero Energy
4
T.O. SECOND FLOOR SUBFLOOR -E 1
Residential Test
2
L-j

EL. +10-6 1/4’ 4'


Facility
H
-V
4"
B.O. FLOOR JOISTS
— 2ND FLOOR ASSEMBLY: 2'-4"
* EL. +9-3 3/8 NIST Campus
T-8' §" T & G FLOOR SHEATHING, EXTERIOR WALL ASSEMBLY:
14" DEEP OPEN WEB WOOD JOIST, FIBER CEMENT SIDING, Gaithersburg, MD
GWB WOOD FURRING STRIPS,
CM
(2) 2" FOIL-FACED POLYISOCYANURATE
o OPEN CELL SPRAY FOAM WITH STAGGERED JOINTS,
CT> INSULATION (0.5 PCF) AT RIM CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE
JOIST OF 1ST AND 2ND FLOOR 2 PLYWOOD SHEATHING,
FRAMING 2x6 24" O.C. WOOD STUD WALL FILLED WITH CELLULOSE INSULATION TO R-19
T.O. FIRST FLOOR SUBFLOOR U.S. Department of Energy
4 EL. +0-2 3/8"
T.O. FOUNDATION WALL
f GWB
Research Toward Zero Energy Homes

EL. +0-0 | EXTERIOR WALL A T FIRST FLOOR FRAMING (A T PA TIO):


U.S. DEPARTMENT OF
Energy Efficiency &
GRADE
I I- “ 2" MINERAL WOOL BLANKET INSULATION COVERED W/ COIL STOCK ENERGY Renewable Energy
* EL. -0-3 5/8 m — 1ST FLOOR ASSEMBLY: DRAINAGE MAT (EXTENDS UP TO INSULATING

4 T.O. FOUNDATION WALL SHELF


EL. -1'-2"
_
I g" T & G FLOOR SHEATHING,
14" DEEP OPEN WEB WOOD JOIST
I SHEATHING AND DOWN TO FOOTING)
4" CONCRETE STEM WALL
2" XPS INSULATION
2 OPEN CELL INSULATION (0.5 PCF)

m co
ROOF DRIP EDGE DRAINAGE
UNDERNEATH STONE BED OF PATIO;
11: :| 11—111—111—111—111:
SEE 5/A-101A

- EXTERIOR WALL AT FOUNDATION


_jrr DRAINAGE MAT
T.O. BASEMENT SLAB j=| | |E DAMPPROOFING
$ EL.-9-11 1/2 05/07/10 UPDATED
10" CONCRETE WALL
m 2S - ^ ^ 1 V. „ . .j—;. & • 1 — b...- . k— -------------- ■ .„ 4.—r——r~——r II t 2" XPS SLOTTED INSULATION MARK DATE DESCRIPTION
2" FOIL-FACED POLYISOCYANURATE INSULATION

4 T.O. FOOTING
EL. -10-5 1/2 i = i i=i 11
zoilfe
:lll:
2 GWB
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


— BASEMENT FLOOR ASSEMBLY:
FREE DRAINING BACKFILL, UNIFIED
4" CONCRETE SLAB W/ W1.4 x W1.4 WELDED WIRE MESH CAD DWG FILE: A-PLOT-SECT-NZERTF
SOIL CLASSIFICATION SYSTEM TYPE
AT MID-DEPTH & EMBEDDED HYDRONIC TUBING,
GW, GP, SW, OR SP DRAWN BY: CG
6 MIL POLYETHYLENE VAPOR BARRIER,
2" XPS RIGID INSULATION, CHECKED BY: BP
4" STONE PAD (NO FINES),
FILTER FABRIC COPYRIGHT © 2009
UNDISTURBED / NATIVE SOIL BUILDING SCIENCE CORPORATION

SHEET TITLE:

BUILDING SECTION

BUILDING SECTION SCALE AS NOTED o

1 SCALE: 1/4" = 1'-0"

A-303
GENERAL SHEET NOTES
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
BUILDING SCIENCE
2.
SUPPLIER.

EWP CONNECTIONS TO FOLLOW EWP


CORPORATION
SUPPLIER INSTRUCTIONS.

3. FIRST AND SECOND FLOOR SOFFITS TO


ALIGN AROUND PERIMETER OF HOUSE,
PORCHES AND BREEZEWAY.

4. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS


CORRESPONDS TO 461.30' IN THE SITE/CIVIL
DRAWINGS.

5. EL +0'-23/s" (T.O. FIRST FLOOR SUBFLOOR) IN


THE ARCHITECTURAL DRAWINGS
CORRESPONDS TO 461.5' IN THE SITE CIVIL
DRAWINGS.

6. EL. -9'-11 V2" (T.O. BASEMENT SLAB) IN THE


ARCHITECTURAL DRAWINGS CORRESPONDS 30 FOREST STREET SOMERVILLE, MA
TO 451.34 IN THE SITE/CIVIL DRAWINGS.
T: (978) 589-5100 F: (978) 589-5103
3 4 5 6 7 www.buildingscience.com

2'-0" 32'-0' 2'-0" 8'-0"


-><- -><-
CONSULTANT:
UNVENTED UPPER ROOF ASSEMBLY:
ASPHALT SHINGLES,
CONTINUOUS FULLY-ADHERED PEEL AND STICK ROOF MEMBRANE,
PLYWOOD SHEATHING WITH H-CLIPS,
5" OF FOIL-FACED POLYISOCYANURATE IN 3 LAYERS (1-1/2", 2", 1-1/2"), O SHEET KEYNOTES
CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE
1/2" PLYWOOD SHEATHING WITH H-CLIPS,
5 1-3/4" X 11-7/8" LSL ENGINEERED ROOF RAFTERS AT 24" 0,C,
CELLULOSE INSULATION,
A-508
4" GWB

4 T.O. ROOF RIDGE


EL. +27'-5 3/8" \
T.O. 4/12 ROOF STRUCTURAL RIDGB
IN SECTION

$ EL. +26-11 1/2 =l


y \ 2 r n

4 T.O. 9.67/12 ROOF STRUCTURAL F^DGE


EL. +26-10 1/8 \ y
I/
I
A-508

1'--’ 1 -4"
T
L VF y
- UNVENTED LOWER ROOF ASSEMBLY:
ASPHALT SHINGLES,
CONTINUOUS FULLY-ADHERED PEEL AND STICK ROOF MEMBRANE,
PLYWOOD SHEATHING WITH H-CLIPS,

4 B.O. CEILING JOISTS


EL. +19'-7 1/4 FF
LI 5" OF FOIL-FACED POLYISOCYANURATE IN 3 LAYERS (1-1/2", 2", 1-1/2"),
— CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE
1/2" PLYWOOD SHEATHING WITH H-CLIPS, L J
T-4' 1'-4"
— ATTIC ASSEMBLY: 2x12 WOOD RAFTERS AT 24" 0,C,
1%" x 114 " LSL ENGINEERED NETTED CELLULOSE INSULATION, PROJECT:
JOISTS AT 24" O.C.,
I' GWB
CN
y \ National Institute of
o M Standards and Technology
CD

4
/
3 r-4"

Net Zero Energy


A-508
------- CEILING ASSEMBLY:
Residential Test
4 T.O. SECOND FLOOR SUBFLOOR
EL. +10'-6 1/4"
£3

l
. =L

I
_ _ 1|" x 11|" LSL ENGINEERED JOISTS AT 24" O.C.,
I' GWB
Facility
■ 2r = ±(-|s
f
4 B.O. FLOOR JOISTS
EL. +9'-3 3/8" — 2ND FLOOR ASSEMBLY:
T & G FLOOR SHEATHING, NIST Campus
14" DEEP OPEN WEB WOOD JOIST AT 24" O.C., Gaithersburg, MD
I' GWB
eg EXTERIOR WALL ASSEMBLY:
FIBER CEMENT SIDING,
OPEN CELL SPRAY o WOOD FURRING STRIPS,
FOAM INSULATION CT>
(2) 2" FOIL-FACED POLYISOCYANURATE
(0.5 PCF) AT RIM WITH STAGGERED JOINTS,
JOIST OF 1ST AND CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE

4 T.O. FIRST FLOOR SUBFLOOR 2ND FLOOR FRAMING U.S. Department of Energy
I' PLYWOOD SHEATHING,
EL. +0'-2 3/8" y \ 2x6 24" O.C. WOOD STUD WALL FILLED WITH CELLULOSE INSULATION TO R-19 Research Toward Zero Energy Homes
1
4 T.O. FOUNDATION WALL
EL. +0'-0
o
4" GWB___ _ --------------------

EXTERIOR WALL AT FIRST FLOOR FRAMING (AT GRADE):


U.S. DEPARTMENT OF
Energy Efficiency &
4 GRADE
EL. -0'-3 5/8’ ■1 r- 2" MINERAL WOOL BLANKET INSULATION COVERED W/ COIL STOCK
DRAINAGE MAT (EXTENDS UP TO INSULATING
ENERGY Renewable Energy

4 T.O. FOUNDATION WALL SHELR


EL. -1'-2
— 1ST FLOOR ASSEMBLY:
l" T & G FLOOR SHEATHING,
5
A-402
y; SHEATHING AND DOWN TO FOOTING)
4" CONCRETE STEM WALL
2" XPS INSULATION
T 14" DEEP OPEN WEB WOOD JOIST l|"x14" LSL RIM JOIST
OPEN CELL SPRAY FOAM INSULATION (0.5 PCF)
00

EXTERIOR WALL AT FOUNDATION


ajL—MU—LM—Li

4 T.O. BASEMENT SLAB


EL.-9-11 1/2" - ___
I TT7
t
DRAINAGE MAT
DAMPPROOFING
10" CONCRETE WALL
MARK DATE DESCRIPTION
2" XPS SLOTTED INSULATION
1SS:
w

4 T.O. FOOTING
EL. -10-5 1/2
=l i i=i i i=i 11= TTT TTT

:|
” TTT :|jj=|| 2" FOIL-FACED POLYISOCYANURATE INSULATION
ii'GWB
3
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

— BASEMENT FLOOR ASSEMBLY: PROJECT NO: NIST NZERTF


4" CONCRETE SLAB W/ W1.4 x W1.4 WELDED WIRE MESH FREE DRAINING BACKFILL, UNIFIED
SOIL CLASSIFICATION SYSTEM TYPE CAD DWG FILE: A-PLOT-SECT-NZERTF
AT MID-DEPTH & EMBEDDED HYDRONIC TUBING,
6 MIL POLYETHYLENE VAPOR BARRIER, GW, GP, SW, OR SP DRAWN BY: CG
2" XPS RIGID INSULATION,
CHECKED BY: BP
4" STONE PAD (NO FINES),
FILTER FABRIC COPYRIGHT © 2009
UNDISTURBED / NATIVE SOIL BUILDING SCIENCE CORPORATION

SHEET TITLE:

BUILDING SECTION

BUILDING SECTION SCALE AS NOTED o

1 SCALE: 1/4" = 1'-0"

A-304
F F.1 GENERAL SHEET NOTES
C C.1 E.1 E

"7 ~
10'-10' 1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
BUILDING SCIENCE
2.
SUPPLIER.

EWP CONNECTIONS TO FOLLOW EWP


CORPORATION
I SUPPLIER INSTRUCTIONS.
7-11 1/2' 8-1 7-11 1/2' 3. FIRST FLOOR SOFFITS TO ALIGN AROUND
7^ I1-

PERIMETER OF HOUSE, PORCHES AND


V- BREEZEWAY
LEpGER BOARDS (FOR RAFTERS AND CEILING 4. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS
JOISTS) ON TOP OF INSULATING SHEATHING CORRESPONDS TO 461.30' IN THE SITE/CIVIL
I DRAWINGS.
SCREEN PORCH ROOF ASSEMBLY:
BREEZEWAY ROOF ASSEMBLY: ASPHALT SHINGLES,
ASPHALT SHINGLES, FULLY-ADHERED PEEL-AND-STICK ROOF MEMBRANE
FULLY-ADHERED PEEL-AND-STICK ROOF MEMBRANE -2 114" SPAN 4-2 114" SPAN |" PLYWOOD SHEATHING WITH H-CLIPS,
7d " 7 ~
§" PLYWOOD SHEATHING WITH H-CLIPS, 12 2x12 ROOF RAFTERS AT 24" O.C.,
2x12 ROOF RAFTERS AT 24" O.C., 4
12 12 I
4 4 30 FOREST STREET SOMERVILLE, MA
4
I T: (978) 589-5100 F: (978) 589-5103
TIE STRAP CONNECTING RAFTER \ A-402
AND CEILING JOIST 4" www.buildingscience.com
V 4 B.O. PORCH CEILING JOISTS
EL. +9-3 3/8 it r
I r-o"
I 1'-8’ ’-8" SCREEN PORCH CEILING ASSEMBLY: CONSULTANT:
7L
I 2x6 JOISTS AT 24" O.C.,
BREEZEWAY PORCH CEILING ASSEMBLY: BEADBOARD
2x6 JOISTS AT 24" O.C.,

8'-9 1/2"
SCREEN PORCH FLOOR ASSEMBLY:
BEADBOARD
4" CONCRETE SLAB W/ WELDED WIRE

8'-0"
BREEZEWAY FLOOR ASSEMBLY:
6" CONCRETE SLAB W/ WELDED WIRE MESH
05
3'1/2' 7 7^
5 1/2' MESH WITH BROOM FINISH O SHEET KEYNOTES
SLOPED TO FLOOR DRAIN,
SLOPED TO SIDES WITH BROOM FINISH
6 MIL POLYETHYLENE VAPOR BARRIER
COMPACTED STONE BASE,
2" XPS RIGID INSULATION UNDERNEATH

t
y T.O. PORCH FOUNDATION WALL

y
4
CD
T.O. BREEZEWAY FLOOR SURFACE EL. +0-2 3/8 ii
CM
AND ON OUTER PERIMETER EDGES,
EL. +0-2 3/8 ii
COMPACTED STONE BASE,
T.O. HOUSE FOUNDATION WALL -V -V COMPACTED FREE DRAINING BACKFILL
ii
$ EL. +0-0
4 T.O. HOUSE FOUNDATION WALL
EL. +0-0 ii

ROOF DRIP EDGE 4 GRADE


EL. -0-3 5/8 ii
H
i
t| CD

DRAINAGE IN STONE BED;


SEE 2/A-101A 3
I CM
r n
II...... ' ====
A-508
:l I l=l I :l I l=l 11: i=m—m—m=m
_ :l I l=l I l=l 11:
:| 11=| 11=| 11=| 11=| 11=|
;| ROOF DRIP EDGE DRAINAGE IN STONE BED;
SOfMOTUBE BEYOND,
UNDER PORCH COLUMN I :| I :| I
SEE 2/A-101A

ill
STURBED SOIL OR
COMPACTED FILL

4 EL. -9-11 1/2


T.O. BASEMENT SLAB
ii ill
L j

BREEZEWAY SECTION T.O. FOOTING


rnrifn
f PROJECT:
3 SCALE: 1/4" = 1'-0"
EL. -10-5 1/2 ii

National Institute of
SCREEN PORCH SECTION Standards and Technology
SCALE: 1/4" = 1’-0'
c E
Net Zero Energy
Residential Test
12
24’-0'
Facility
9.67 9.67 7" 7"

NIST Campus
Gaithersburg, MD
CD
X
~7^
5-2"
C-
9’-0' C-
9’-1 O’ ~7^
C\l

12 T.O. GARAGE ROOF RIDGE


-v
4
ii
EL. +18-10 CONTINUOUS FULLY-ADHERED PEEL AND STICK UNVENTED ROOF/ATTIC ASSEMBLY: U.S. Department of Energy
ROOF MEMBRANE ON THIS SECTION OF ROOF; 12 12
ASPHALT SHINGLES, Research Toward Zero Energy Homes
10 M4'K -v EXTEND 1’ BEYOND CHANGE IN ROOF SLOPE CONTINUOUS FULLY-ADHERED PEEL AND STICK ROOF MEMBRANE
9.67 9.67
2'-0
ii
2'-0' 2'-0" 2'-0" 2'-0" 2'-0" 2'-2" r-10 M
2'-0" 2'-0" 2'-0" 2'-0" 1'-10 7/8" EXTENDING 3'-0" FROM EXTERIOR WALL TOWARDS RIDGE AND
U.S. DEPARTMENT OF
7L 7L 7L 7L 7 ~
CONTINUOUS ON 4:12 SLOPED SECTION, Energy Efficiency &
|" PLYWOOD SHEATHING WITH H-CLIPS,
2x4 RAISED HEEL ROOF TRUSS,
ENERGY Renewable Energy
6" CLOSED CELL SPRAY FOAM INSULATION (2.0 PCF) APPLIED TO
UNDERSIDE OF PLYWOOD SHEATHING; EXTEND DOWN TO TOP
PLATE,

TYPICAL GARAGE ROOF END WALL TRUSS 3 12


y2" GWB

1B SCALE: 1/4" = 1'-0"


A-402
7 7/8'
B.O. ROOF TRUSS n Jc

08/03/10 UPDATED
$ EL. +8-11 7 7/8"^ T AHU
r-11" r-11" 07/27/10 UPDATED

06/29/10 UPDATED
GARAGE WALL ASSEMBLY:
FIBER CEMENT SIDING, MARK DATE DESCRIPTION
WOOD FURRING STRIP,
1'-11 5-2' 9'-0' 9-10" r-11" ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
(2) 2" FOIL-FACED POLYISOCYANURATE WITH STAGGERED
CM
JOINTS,
CM
CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE
(EXTEND ONTO FOUNDATION WALL) PROJECT NO: NIST NZERTF
12
PLYWOOD SHEATHING, CAD DWG FILE: A-PLOT-SECT-NZERTF
T.O. HOUSE FOUNDATION WALL 2x6 24" O.C. WOOD STUD WALL FILLED WITH CELLULOSE
9.67 9.67 ii r-9’
EL. +0-0 INSULATION TO R-19 DRAWN BY: CG
T.O. GARAGE FOUNDATION WALL \-
$ EL. -0-5 ii l- 1" GWB CHECKED BY: BP
yf
LOWEST POINT GARAGE FOUNDATION WALL ASSEMBLY: COPYRIGHT © 2009
OFGARAGE SLAB CULTURED STONE IN MORTAR, BUILDING SCIENCE CORPORATION
3 T=T 6" FOUNDATION WALL,

12
4 GRADE AND T.O. GARAGE SLAB ATloWEST POINT
EL. -2'-4 ii
i=i i i=i \- Jjj 1 (2) 2" XPS RIGID INSULATION (ON INTERIOR) DOWN TO T.O.
FOOTING,
4=nj 1-5/8" METAL STUD WALL WITH 1/2" FOAM SILL AT BASE,
SHEET TITLE:

T.O. GARAGE FOOTING


4 ■v
ipm:
EL. -4 -0 II

V y
£' GWB WALL BOARD GARAGE j
10 1/4V
1 '-10 7/8" GAR A GE FLOOR ASSEMBL Y: —
ROOF DRIP EDGE DRAINAGE IN STONE BED,
TYPICAL; SEE2/A-101A BREEZEWAY &
4" CONCRETE SLAB SLOPE PER 12" TOWARDS FRONT DOOR,
6 MIL POLYETHYLENE VAPOR BARRIER,
2" XPS RIGID INSULATION,
SCREEN PORCH
4" STONE PAD (NO FINES),

TYPICAL GARAGE ROOF TRUSS FILTER FABRIC,


UNDISTURBED / NATIVE SOIL
SECTIONS
o
SCALE AS NOTED
SCALE: 1/4" = 1'-0"

GARAGE SECTION
SCALE: 1/4" = 1'-0" A-305
i GENERAL SHEET NOTES
ASPHALT ROOF SHINGLES

FULLY-ADHERED PEEL AND STICK ROOF MEMBRANE


1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
BUILDING SCIENCE
ASPHALT ROOF SHINGLES
§" PLYWOOD ROOF SHEATHING WITH H-CLIPS; ATTACH TO ROOF
2.
SUPPLIER.

EWP CONNECTIONS TO FOLLOW EWP


CORPORATION
FRAMING USING GALVANIZED WOOD SCREWS (MIN. LENGTH 7-1/2")
SUPPLIER INSTRUCTIONS.
FULLY-ADHERED ROOF MEMBRANE OVER ALL ROOF 5" OF FOIL-FACE POLYISOCYANURATE INSULATING SHEATHING IN 3
3. FIRST AND SECOND FLOOR SOFFITS TO ALIGN
SHEATHING INCLUDING OVERHANG LAYERS (1.5", 2", 1.5"); EXTEND TO OUTER EDGE OF ROOF OVERHANG; AROUND PERIMETER OF HOUSE, PORCHES,
f" PLYWOOD ROOF SHEATHING WITH H-CLIPS; ATTACH TO ROOF JOINTS STAGGERED AND BREEZEWAY.
FRAMING USING GALVANIZED WOOD SCREWS (MIN. LENGTH 7-1/2")
CONTINUOUS FULLY -ADHERED AIR BARRIER MEMBRANE
1 FOIL-FACED POLYISOCYANURATE SHEATHING CONTINUOUS WITH MEMBRANE OVER WALL SHEATHING
2x4 (PLANED TO EXACTLY 3 £') TO FORM OUTRIGGER FRAMING AT 2'-0"
O.C.;
2" FOIL-FACED POLYISOCYANURATE SHEATHING; AT EAVE, FIT PLYWOOD SHEATHING WITH H-CLIPS
TIGHTLY BETWEEN OUTRIGGER FRAMING

1 FOIL-FACED POLYISOCYANURATE SHEATHING; AT EAVE, FIT


TIGHTLY BETWEEN OUTRIGGER FRAMING
30 FOREST STREET SOMERVILLE, MA
i" PLYWOOD SHEATHING WITH H-CLIPS 1£' x 35" LOOKOUT FRAMING AT 24" O.C.
/ WITH 2 LAYERS OF INSULATING T: (978) 589-5100 F: (978) 589-5103
,/ / SHEATHING www.buildingscience.com

1
/ CONTINUOUS FULLY-ADHERED AIR BARRIER
/ /
/ MEMBRANE OVER SHEATHING; OVERLAP AND FULLY
/ > / ,/
/
/
/
/
ADHERE WITH MEMBRANE ON WALL SHEATHING >Z/ 7' r1
L Ll', ' ',7 7V
/. /
^1 / / /
/
A
/
/
/
/;
/
/
h J

L---_
ru

/'
/ /
STAINLESS
EDGE
STEEL DRIP
CONSULTANT:

/ /
/ /^ / L---_
'7
©
/ / L-_-_
/ / L
/
?':o»
/
/ / /■>

/
/■>

/
/^?
/
/
/
/
/
/
/
11f LSL ROOF RAFTER
t w
A
I ■v

“T72" 6 1/2"
3" CROWN MOULDING O SHEET KEYNOTES

l
'Y- / /Y 3 1/4
ii

/ i 11 l" NETTED CELLULOSE L---_


INSULATION L
L 2'-4"
f GWB, PAINTED WITH LATEX - 5/4x8 TRIM BOARD
STAINLESS STEEL DRIP EDGE UNDER ROOF V
MEMBRANE PAINT
V A-401 J
BOTTOM OF CEILING JOIST L
L-_
CONTINUOUS RIM BOARD
L i" PLYWOOD
L
L y2" BEADBOARD SOFFIT
f PLYWOOD WALL SHEATHING L
y2" BEADBOARD SOFFIT L r n
L 1" x 8f" FRIEZE BOARD
CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE OVER L-_
1/2" PLYWOOD PLYWOOD SHEATHING L
L
L
CONTINUOUS FULLY-ADHERED AIR BARRIER EXTEND INSULATING SHEATHING ON WALL UP TO PLYWOOD ON L
MEMBRANE UNDERSIDE OF ROOF INSULATING SHEATHING; JOINTS STAGGERED
AND TAPED ON OUTER LAYER
1/2" PLYWOOD WALL SHEATHING
TYPICAL WALL SECTION AT EAVE OF SECOND FLOOR
(2) LAYERS OF FOIL-FACED POLYISOCYANURATE;
EXTEND UP TO PLYWOOD UNDERNEATH ROOF
2 SCALE: 3/4" = 1'-0’

INSULATION SHEATHING; STAGGER JOINTS AND


FIBER CEMENT SIDING L J
TAPE ON OUTER LAYER
1 x4WD FURRING STRIP
PROJECT:
(2) LAYERS 2" FOIL-FACED POLYISOCYANURATE
RIGID INSULATION, JOINTS STAGGERED
TYPICAL DETAIL AT SECOND FLOOR ROOF/WALL CONNECTION HORIZONTALLY AND VERTICALLY, OUTER LAYER National Institute of
4 SCALE: 1-1/2" = 1'-0"
2x6 24" O.C. WOOD STUD WALL WITH
CELLULOSE CAVITY INSULATION SEALED WITH TAPE
CONTINUOUS FULLY-ADHERED AIR BARRIER Standards and Technology
f GWB, PAINTED WITH LATEX PAINT MEMBRANE COVERING PLYWOOD SHEATHING
SEALED ONTO FOUNDATION WALL

PLYWOOD SHEATHING
Net Zero Energy
3
WATER TABLE CAP (SLOPE TOP)
CLADDING VENT
Residential Test
CAPILLARY BREAK BELOW 2x4 WOOD
A-401
INSECT SCREEN Facility
I
SILL PLATE, 6 MIL POLY OR EQUAL
ALUMINUM COIL STOCK
14" DEEP OPEN WEB FLOOR JOIST
WITH l" FLOOR SHEATHING 1 2" MINERAL WOOL INSULATION BLANKET
£ EXTENDING BEYOND PLYWOOD SHEATHING NIST Campus
FIBER CEMENT LAP SIDING
I <
1
7 <7
< < Gaithersburg, MD
1x4 FURRING STRIP ATTACHED TO WALL FRAMING
OPEN CELL SPRAY FOAM INSULATION (0.5 PCF) 5" K-
/-,! \-j

2 LAYERS OF 2" FOIL-FACED POLYISOCYANURATE MIN. DEPTH


X4u_JLl cy ) CONCRETE PAVERS SET IN SAND (OR
INSULATING SHEATHING (JOINTS STAGGERED AND CONCRETE SLAB AT FRONT PORCH)
TAPED ON OUTER LAYER) .'.a cr )■
2" XPS INSULATION i- k_..A ' - CRUSHED STONE SUBBASE (COMPACTED)
\ PLYWOOD SHEATHING
c 5cm
LIQUID APPLIED CAPILLARY U.S. Department of Energy
OJ
\ " GWB WITH LATEX BREAK BELOW 2x6 WOOD PLATE
CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE OVER Research Toward Zero Energy Homes
PAINT 7

PLYWOOD SHEATHING AND SEALED ONTO THE FOUNDATION %" x 22" A307 STEEL ANCHOR BOLT WITH NUTS AND PLATE
2x6 WALL FILLED WITH ROOF EDGE DRAINAGE SYSTEM,
WALL WASHERS EMBEDDED 7" INTO CONCRETE. BOLTS SPACED
CELLULOSE
6'-0" O.C. MAX., MIN. (2) BOLTS PER PLATE SECTION WITH
<7
UNDER PATIO; SEE 5/A-101A FOR DETAIL
U.S. DEPARTMENT OF
Energy Efficiency &
2x6 WALL BOTTOM PLATE CLADDING VENT
INSECT SCREEN AROUND BOTTOM OF INSULATION
BOLTS LOCATED NOT MORE THAN 12" OR LESS THAN 7 BOLT
DIAMETERS FROM EACH END OF THE PLATE SECTION. <7
j /'
FILTER FABRIC ENERGY Renewable Energy
2x4 TREATED SILL PLATE
CAPILLARY BREAK GEOCOMPOSITE
ALUMINUM COIL STOCK; ATTACH BEHIND
WOOD FILLER %" x 12" A307 STEEL ANCHOR BOLT AS ABOVE BELOW-GRADE DRAINAGE
INSULATING SHEATHING, BEND OUT UNDERNEATH
£ SUBFLOOR r INSULATING SHEATHING AND EXTEND DOWN
j
SYSTEM FROM BOTTOM OF
10" CONCRETE FOUNDATION WALL W/ (1) #4 HORIZONTAL INSULATING SHEATHING
OVER MINERAL WOOL INSULATION
< ■ .

REINFORCEMENT W/ MATCHING CORNER BAR AT TOP AND (COVERING PLYWOOD


~\F7, SHEATHING AT RIM JOIST)
<] MIDDLE THIRDS AND #4 VERTICAL REINFORCEMENT AT 48" O.C.
— J <1
4'
9 DOWN TO FOOTING
7T WITH 1 y4” CONCRETE COVER FROM INTERIOR SIDE OF WALL
OPEN CELL SPRAY FOAM INSULATION J
(0.5 PCF) - MIN. DEPTH 5" ' 1/2 2" MINERAL WOOL INSULATION BLANKET 2" XPS SLOTTED RIGID INSULATION AGAINST CONCRETE
- FREE DRAINING BACKFILL:
FROM BOTTOM OF INSULATING SHEATHING; FOUNDATION. ATTACH TO CONCRETE WALL WITH 1x3
UNIFIED SOIL
EXTEND DOWN APPROXIMATELY 2'-0" FURRING STRIPS IN SLOTS j 05/07/10 UPDATED
<7
CLASSIFICATION SYSTEM
2" XPS INSULATION tSi 2" FOIL-FACED POYISOCYANURATE INSULATION TYPE GW, GP, SW, OR SP MARK DATE DESCRIPTION
H ATTACHED TO FURRING STRIPS IN SLOTS; TAPE SEAMS I
SEALANT <7
DAMPPROOFING ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
CONTINUOUS FILLET BEAD OF URETHANE SEALANT M _
BTW 2" XPS BOND BREAK AND FOUNDATION WALL
CT
PROJECT NO: NIST NZERTF
WOOD FILLER CONTINUOUS FILLET BEAD OF URETHANE
4 SEALANT BTW 2" XPS BOND BREAK AND CAD DWG FILE: A-PLOT-WSEC-NZERTF
2X6 TREATED PLATE
6’ 4'
E - GEOCOMPOSITE BELOW-GRADE DRAINAGE
SYSTEM EXTENDING FROM BOTTOM OF
CONCRETE SLAB
j <
KEYWAY DRAWN BY: CG
LIQUID APPLIED CAPILLARY INSULATING SHEATHING TO FOOTING
O CHECKED BY: BP
BREAK J 2" XPS BOND BREAK ----- LIQUID-APPLIED CAPILLARY BREAK (MUST DRY
[ - TACK FREE) APPLIED ON TOP OF FOOTING PRIOR
a
7: EMBEDDED HYDRONIC TUBING COPYRIGHT © 2009
J “ TO PLACING / CASTING CONCRETE FOUNDATION
BUILDING SCIENCE CORPORATION
T j
“ WALL
DAMPPROOFING ON ■
zi <7
<7 4" CONCRETE SLAB W/ W1.4 x W1.4 WELDED — FILTER FABRIC PLACED UNDER PERIMETER SHEET TITLE:
FOUNDATION WALL
WIRE MESH PLACED AT MID-DEPTH ------ DRAIN AND WRAPPED AROUND GRAVEL
4 <7
6 MIL POLYETHYLENE VAPOR
BARRIER
-9/ -9/

-9/
‘A
COARSE GRAVEL (NO FINES)
WALL SECTIONS &
n
2" XPS RIGID FOAM SLAB
INSULATION
4" PERFORATED
DRAIN
PERIMETER
DETAILS
TYPICAL DETAIL AT FIRST FLOOR FOUNDATION/WALL CONNECTION 4" GRAVEL PAD (NO FINES) CONTINUOUS CONCRETE FOOTING 2'-0" WIDE
3 SCALE: 1-1/2" = 1'-0" FILTER FABRIC
x 10" DEEP
4" PVC PIPE THROUGH BOTTOM FOOTING
CONNECTING INTERIOR AND EXTERIOR
I
UNDISTURBED NATIVE SOIL OR ENGINEERED FILL GRAVEL BEDS o
AS DETERMINED BY SOIL CONDITIONS SCALE AS NOTED z

TYPICAL WALL SECTION AT PATIO/FRONT PORCH


SCALE: 3/4" = 1’-0'
A-401
END OF 1£' x 3^" LOOKOUT FRAMING AT
24" O.C.; 2 LAYERS OF INSULATING
GENERAL SHEET NOTES
SHEATHING TIGHTLY FIT BETWEEN
ASPHALT ROOF SHINGLES
FULLY-ADHERED PEEL AND STICK ROOF MEMBRANE
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
BUILDING SCIENCE
PLYWOOD ROOF SHEATHING WITH H-CLIPS;
ATTACH SHEATHING TO FRAMING USING
2.
SUPPLIER.

EWP CONNECTIONS TO FOLLOW EWP


CORPORATION
GALVANIZED WOOD SCREWS (MIN. LENGTH 7-1/2")
SUPPLIER INSTRUCTIONS.
5" OF FOIL-FACE POLYISOCYANURATE INSULATING
SHEATHING IN 3 LAYERS (1.5" , 2", 1.5"); EXTEND TO 3. FIRST AND SECOND FLOOR SOFFITS TO ALIGN
OUTER EDGE OF ROOF OVERHANG; JOINTS AROUND PERIMETER OF HOUSE, PORCHES
STAGGERED AND BREEZEWAY.

CAPILLARY BREAK BELOW 2x4 CONTINUOUS FULLY -ADHERED AIR BARRIER


FOR WALL ASSEMBLY DETAILS, SEE WALL SECTION 1/A-401 MEMBRANE CONTINUOUS WITH MEMBRANE OVER
WOOD SILL PLATE, 6 MIL POLY OR
\ WALL SHEATHING
EQUAL 'V
V
k" SUBFLOOR f PLYWOOD SHEATHING WITH H-CLIPS
V
FOR FOUNDATION WALL AND FOOTING \
14" DEEP OPEN WEB FLOOR JOIST
(PARALLEL TO FOUNDATION WALL)
£
1

m<
I DETAILS, SEE WALL SECTION 1/A-401 2x12 ROOF RAFTER
11-1/4" NETTED
CELLULOSE INSULATION
<N
\
X
\
v
STAINLESS STEEL DRIP 30 FOREST STREET SOMERVILLE, MA
1’ I EDGE
OPEN CELL SPRAY FOAM INSULATION (0.5 PCF) 5"
a-"
BLACK STEEL EDGING
BOTTOM OF CEILING I T: (978) 589-5100 F: (978) 589-5103
MIN. DEPTH CONTINUOUS FROM DECK TO RIM 229 a: SLOPE GRADE AWAY FROM JOIST
l- 4' -v 3" CROWN MOULDING www.buildingscience.com
JOIST :
dOoOoO^
M
K FOUNDATION (5% MIN SLOPE)
TAZ
CN

- JOT iW
1-1/4" x 14" LSL RIM JOIST ATTACHED TO
FOUNDATION WALL
If ’(j; x x
3" DEEP, 3-0" WIDE PEASTONE BED
OVER STONE BED; SEE 1/LA-102
4" OPEN CELL SPRAY FOAM INSTULATION
(0.5 PCF) AT RIM JOIST
CD

oA /
fSCJS( 5/4x8 TRIM BOARD CONSULTANT:
PLYWOOD WALL SHEATHING f PLYWOOD
2" XPS CONTINUOUS RIGID INSULATION
X X X j:_a CONTINUOUS FULLY-ADHERED AIR BARRIER y2" BEADBOARD SOFFIT
LIQUID APPLIED CAPILLARY jor/of/of/w Y
FREE DRAINING BACKFILL: MEMBRANE OVER PLYWOOD SHEATHING
BREAK BELOW 2x6 WOOD PLATE <7
1"x8f" FRIEZE BOARD
UNIFIED SOIL CLASSIFICATION EXTEND INSULATING SHEATHING ON WALL
A
SYSTEM TYPE GW, GP, SW, OR SP UP TO PLYWOOD ON UNDERSIDE OF ROOF O SHEET KEYNOTES
<7 INSULATING SHEATHING; JOINTS
STAGGERED AND TAPED ON OUTER LAYER

TYPICAL FIRST FLOOR FOUNDATION/WALL CONNECTION (PARALLEL) EAVE DETAIL AT LIVING ROOM (NORTH WALL)
SCALE: 3/4" = 1-0" SCALE: 3/4" = 1-0"

r n

ASPHALT ROOF SHINGLES

FOR WALL ASSEMBLY DETAILS, SEE WALL SECTION 1/A-401


FULLY-ADHERED PEEL AND
STICK ROOF MEMBRANE
PLYWOOD SHEATHING CONTINUOUS FULLY-ADHERED AIR BARRIER
WITH H-CLIPS MEMBRANE COVERING PLYWOOD SHEATHING
EXTENDING ONTO FOUNDATION WALL; SEAL TO
%" PLYWOOD ROOF FOUNDATION WALL; USE VAPOR PERMEABLE
SHEATHING WITH H-CLIPS MEMBRANE OVER THE RIM JOIST L J
STAINLESS STEEL DRIP WATER TABLE
EDGE CONTINUOUS FULLY-ADHERED ROOF
6" OF CLOSED CELL SPRAY FOAM CLADDING VENT PROJECT:
MEMBRANE
INSULATION (2.0 PCF) APPLIED TO
UNDERSIDE OF ROOF PLYWOOD INSECT SCREEN WRAPPING BOTTOM OF INSULATING SHEATHING

3" CROWN MOULDING


ASPHALT ROOF SHINGLES SHEATHING; COMPLETELY FILL ALUMINUM COIL STOCK ATTACHED BEHIND INSULATING SHEATHING, National Institute of
ALL GAPS BETWEEN BLOCKING, BENDING OUT UNDER INSULATING SHEATHING, AND EXTENDING
CONTINUOUS FULLY-ADHERED AIR
BARRIER MEMBRANCE OVER /2"
TRUSSES, AND TOP PLATE. BELOW GRADE OVER MINERAL WOOL INSULATION Standards and Technology
1/ " BEADBOARD PLYWOOD WALL SHEATHING RAISED HEEL ROOF TRUSS 2" MINERAL WOOL INSULATION BLANKET EXTENDING DOWN
2

STAINLESS STEEL DRIP EDGE - 1"


APPROXIMATELY 2'-0"
GEOCOMPOSITE BELOW-GRADE DRAINAGE SYSTEM FROM
Net Zero Energy
£
3" CROWN MOULDING EE
BOTTOM OF INSULATING SHEATHING (COVERING PLYWOOD
SHEATHING AT RIM JOIST) DOWN TO FOOTING Residential Test
1
5/4x8 TRIM BOARD ;
BLOCKING
BLACK STEEL EDGING
SLOPE GRADE AWAY FROM
Facility
WOOD FRAMED SCREEN c? o Oi O'
V&. FOUNDATION (5% MIN SLOPE)
TOP PLATE 0( )0( >0( >0( >0( >0( )0( >o
NIST Campus
a a
3" DEEP, 3'-0" WIDE PEASTONE BED
1/2" PLYWOOD SHEATHING ; o o pOoOcj Gaithersburg, MD
PLANTING SOIL
y2" BEADBOARD SOFFIT CONTINUOUS BEAD OF ACRYLIC o 6

BUILDING PAPER LATEX SEALANT oOoOoOoOoOoi


' FILTER FABRIC
CUT INSULATION TO FIT TIGHTLY - k

1 x 4 WOOD FURRING STRIP


o BETWEEN ROOF TRUSS TAILS
BEADBOARD, PAINTED

MStiSSl
FIBER CEMENT PANEL ; ROOF DRIP EDGE DRAINAGE;
LO
BOARD 1" x 8|" FRIEZE BOARD » 1a
SEE 2/A-101A
2x4 TREATED WOOD rz: WATER TABLE, SLOPE CAP
SILL PLATE FREE DRAINING BACKFILL: U.S. Department of Energy
A &
UNIFIED SOIL CLASSIFICATION
4" CONCRETE SLAB W/ 9" Research Toward Zero Energy Homes
FIBER CEMENT SIDING SYSTEM TYPE GW, GP, SW, OR SP
WIRE MESH CM
-p ->■■■

i, L
1 x4WD FURRING STRIP
2" XPS RIGID FOAM FOR FOUNDATION WALL AND FOOTING
(2) LAYERS 2" FOIL-FACED
U.S. DEPARTMENT OF
Energy Efficiency &
SLAB INSULATION
FROM TOP OF POLYISOCYANURATE INSULATION,
JOINTS STAGGERED HORIZONTALLY
2x6 24" O.C. WOOD STUD WALL
DETAILS, SEE WALL SECTION 1/A-401
ENERGY Renewable Energy
FOUNDATION WALL TO
AND VERTICALLY AND TAPED ON
WITH CELLULOSE CAVITY -ts n^°
TOP OF FOOTING ALUMINUM COIL STOCK INSULATION
-V OUTER LAYER
ATTACHED TO PLYWOOD
-111 - HI - - fPKI
o
SHEATHING AND EXTENDING CONTINUOUS SELF-ADHERED AIR
y2" GWB WITH LATEX PAINT
TYPICAL WALL SECTION AT LIVING ROOM
6 MIL POLYETHYLENE
VAPOR BARRIER M DOWN TO BELOW GRADE BARRIER MEMBRANE COVERING
PLYWOOD SHEATHING SEALED
PAINTED WOOD CAP
4" XPS RIGID FOAM
1 SCALE: 3/4" = 1'-0"
2" XPS RIGID FOAM £3 K ONTO FOUNDATION WALL
<7
SLAB INSULATION 3" DEEP, 3'-0" WIDE PEASTONE y PLYWOOD SHEATHING
V:
V-7
e>
CAPILLARY BREAK BELOW 2x6 08/03/10 UPDATED
6" GRAVEL BASE, BED WATER TABLE CAP (SLOPE TOP) TREATED WOOD SILL PLATE, 6 MIL
COMPACTED o<c> )C? e> FILTER FABRIC POLY OR EQUAL 07/27/10 UPDATED
<3
o CLADDING VENT
FREE DRAINING FILL, V.’ STONE BED CONTINUOUS BEAD OF ACRYLIC 06/29/10 UPDATED
INSECT SCREEN WRAPPED SEALANT TO CREATE AIR SEAL BTW
COMPACTED <7

j %" x 12" ANCHOR BOLT AT 6-0" AROUND BOTTOM OF INSULATION XPS BOARDS BTW XPS AND MARK DATE DESCRIPTION
6" CONCRETE FOUNDATION <7
O.C. AND WITHIN 1'(BUT AT METAL DRIP EDGE FOUNDATION WALL
WALL WITH HORIZONTAL #4 ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
<7
<7 LEAST 7 BOLT DIAMETERS) OF i” x 12" ANCHOR BOLTS 6'-0" O.C. AND A 1-5/8" METAL STUD WALL,
REBAR AT TOP AND BOTTOM A
T\
THE END OF EACH SILL PLATE WITHIN 1'-0" (BUT AT LEAST 7 BOLT O
< 2' UNINSULATED WITH y2" GWB AND
SECTION AMETERS) OF THE END OF EACH SILL FOAM SILL FOR THERMAL BREAK AT
CONTINUOUS CONCRETE PLATE SECTION PROJECT NO: NIST NZERTF
LIQUID-APPLIED CAPILLARY BASE
FOOTING 2'-0" WIDE x 10" 6" CONCRETE FOUNDATION WALL WITH 4" XPS RIGID FOAM SLAB INSULATION CAD DWG FILE: A-PLOT-WSEC-NZERTF
BREAK (MUST DRY TACK <7

DEEP; BOTTOM OF FOOTING #4 HORIZONTAL REBAR AT TOP AND FROM TOP OF FOUNDATION WALL TO
FREE) APPLIED ON TOP OF DRAWN BY: CG
AT LEAST 30" BELOW GRADE BOTTOM OF WALL TOP OF FOOTING
FOOTING PRIOR TO PLACING
/ CASTING CONCRETE CULTURED STONE SET IN MORTAR OVER CHECKED BY: BP
FOUNDATION WALL FOUNDATION WALL TO BELOW GRADE CONTINUOUS FILLET BEAD OF

J
<7 <7
<7
URETHANE SEALANT BTW XPS COPYRIGHT © 2009
KEYWAY <7
AND CONCRETE SLAB
CONCRETE PAVERS SET IN SAND BUILDING SCIENCE CORPORATION
<7 4" CONCRETE SLAB SLOPED 12"
TOWARDS GARAGE DOOR ENTRANCE SHEET TITLE:
WALL SECTION AT SCREEN PORCH SUBBASE FOR PAVERS

4 SCALE: 3/4" = 1'-0"


o
6 MIL POLYETHYLENE VAPOR
BARRIER
WALL SECTIONS
FREE DRAINING FILL 2" XPS RIGID FOAM SLAB
4 <7 INSULATION
4 4
<7
4" GRAVEL PAD (NO FINES)
CONTINUOUS CONCRETE UNDISTURBED NATIVE SOIL OR ENGINEERED
FOOTING 2'-0" WIDE x 10" FILL AS DETERMINED BY SOIL CONDITIONS
DEEP; BOTTOM OF FOOTING LIQUID-APPLIED CAPILLARY BREAK
AT LEAST 30" BELOW GRADE (MUST DRY TACK FREE) APPLIED ON TOP
OF FOOTING PRIOR TO PLACING / I

CASTING CONCRETE FOUNDATION WALL SCALE AS NOTED o


z

KEYWAY

WALL SECTION AT GARAGE


SCALE: 3/4" = 1'-0" A-402
FIRE PROTECTION LEGEND FIRE PROTECTION (FIRE SPRINKLER) FIRE PROTECTION (FIRE ALARM)
SYMBOL DESCRIPTION GENERAL NOTES: GENERAL NOTES: BUILDING SCIENCE
o RISE IN PIPE
1. PROVIDE A COMPLETE AND OPERATIONAL FIRE SPRINKLER SYSTEM. THE
SYSTEM SHALL BE DESIGNED, FABRICATED, INSTALLED, COORDINATED,
1. THE GENERAL SCOPE OF THE FIRE ALARM PORTION OF THIS PROJECT SHALL CONSIST
OF THE INSTALLATION OF A NEW SUPERVISED FIRE ALARM AND DETECTION SYSTEM
CORPORATION
♦ DROP IN PIPE TESTED AND PLACED INTO SERVICE IN ACCORDANCE WITH NFPA 13, NFPA
FOR THE BUILDING AS INDICATED ON THE DRAWINGS. ALL WORK SHALL BE IN FULL
13D, NFPA 24, NFPA 25, NFPA 70, NFPA 72, NFPA 241, LOCAL
ACCORDANCE WITH THE REQUIREMENTS AND APPENDIX OF NFPA 70, 72, 241, IBC,
SPRINKLER MAIN AUTHORITY REQUIREMENTS, AND THE CONTRACT DOCUMENTS.
LOCAL AUTHORITY REQUIREMENTS, AND THE CONTRACT DOCUMENTS.
UNDERGROUND PIPE 2. THE GENERAL SCOPE OF THE AUTOMATIC FIRE SPRINKLER SYSTEM SHALL 2. THE FIRE ALARM INSTALLER(S) SHALL SUBMIT COMPLETE LAYOUT SHOP
CONSIST OF THE FOLLOWING FOR ALL AREAS OF THE BUILDING AS SHOWN: DRAWINGS, CALCULATIONS, AND ANNOTATED MANUFACTURER’S DATA
A OS&Y GATE VALVE W/ VALVE TAMPER
SUPERVISORY SWITCH
A. PROVIDE NFPA 13D WET PIPE SPRINKLER SYSTEM TO PROTECT
ALL OCCUPIED AREAS OF THE NET ZERO ENERGY HOUSE AS
INFORMATION TO THE OWNER AND ENGINEER OF RECORD FOR REVIEW AND
APPROVAL. APPROVALS SHALL BE OBTAINED BEFORE THE PURCHASE OR
INDICATED ON DRAWINGS. INSTALLATION OF EQUIPMENT.
N CHECK VALVE B. PROVIDE NFPA 13 WET PIPE SPRINKLER SYSTEM TO PROTECT THE
GARAGE. 3. THE FIRE ALARM INSTALLER(S) SHALL BE RESPONSIBLE FOR ALL APPLICABLE
QUICK RESPONSE-CONCEALED TYPE W/ WHITE FINISH PLATE TRADE PERMITS, REQUESTS FOR INSPECTION, AND TESTING AS REQUIRED BY THE
3. RESIDENTIAL SPRINKLER HEADS PROTECTING THE NET ZERO ENERGY HOUSE APPROVING AHJ.
o QUICK RESPONSE UPRIGHT W/ BRASS FINISH SHALL BE LISTED FOR 20’ X 20’ COVERAGE.
4. SPACING OF SMOKE SENSORS SHALL BE IN ACCORDANCE WITH NFPA 72 AND
3—] ONE-WAY FIRE DEPARTMENT CONNECTION FREE STANDING 4. THE FIRE PROTECTION INSTALLER(S) SHALL SUBMIT COMPLETE LAYOUT AS INDICATED ON THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL 30 FOREST STREET SOMERVILLE, MA
SHOP DRAWINGS, CALCULATIONS, AND ANNOTATED MANUFACTURER’S DATA CONFIRM AND IF NECESSARY, REDUCE SPACING AS APPLICABLE, BASED ON
INFORMATION TO THE OWNER AND ENGINEER OF RECORD FOR REVIEW AND CEILING HEIGHT, CONSTRUCTION, AND/OR AIR CHANGE RATES, AT NO T: (978) 589-5100 F: (978) 589-5103
TWO-WAY FIRE DEPARTMENT CONNECTION WALL-MOUNT
APPROVAL. APPROVALS SHALL BE OBTAINED BEFORE THE PURCHASE OR ADDITIONAL COST TO THE OWNER. www.buildingscience.com
INSTALLATION OF EQUIPMENT.
SPECIAL CABINET - TYPE AS NOTED 5. FIRE ALARM MANUAL PULL STATIONS AT DOOR OPENINGS SHALL BE WITHIN

□ ADDRESSABLE FIRE ALARM MANUAL STATION - MOUNTING HEIGHT 4’-0!


5. THE FIRE PROTECTION INSTALLER(S) SHALL BE RESPONSIBLE FOR ALL
APPLICABLE TRADE PERMITS, REQUESTS FOR INSPECTION, AND TESTING AS
REQUIRED BY THE APPROVING AHJ. 6.
5’—0” HORIZONTALLY OF THE DOOR OPENING.

DUCT SMOKE DETECTORS SHALL BE PROVIDED IN THE SUPPLY AND RETURN CONSULTANT:
WP OF ALL HVAC UNITS WITH A CAPACITY GREATER THAN 2,000 CFM.
EKI GENERAL BUILDING FIRE ALARM COMBINATION AUDIO/VISUAL (HORN/STROBE)
6. THE FINAL DESIGN OF THE FIRE PROTECTION SYSTEM SHALL BE
15,30, DEVICE - MOUNTING HEIGHT 6’-8” UNLESS NOTED OTHERWISE 7. DUCT SMOKE DETECTORS SHALL BE PROVIDED BY THE MECHANICAL
COORDINATED WITH FIELD CONDITIONS AND THE AVAILABLE WATER SUPPLY.
75,110,185 CONTRACTOR. EXTEND ALL ASSOCIATED FIRE ALARM WIRING AND CONDUIT
- SUBSCRIPT ’15,30,75,110,185’ DENOTES CANDELA RATING
FROM MONITOR MODULE AND CONNECT TO DUCT SMOKE DETECTOR.
- SUPERSCRIPT ’WP’ DENOTES WEATHERPROOF 7. THE FIRE PROTECTION INSTALLER(S) SHALL COORDINATE ALL SYSTEM
PIPING, DEVICES, CONDUIT, EQUIPMENT, AND RELATED APPURTENANCES 8. CONDUCTORS FOR THE FIRE ALARM SYSTEM SHALL BE INSTALLED IN
WITH THE BUILDING STRUCTURAL, MECHANICAL AND ELECTRICAL ELEMENTS,
EH VALVE TAMPER SUPERVISORY SWITCH WITH MONITOR MODULE INCLUDING BUT NOT LIMITED TO, STRUCTURAL MEMBERS AND SYSTEMS, AIR
ACCORDANCE WITH NFPA 70. THE CONDUCTORS SHALL NOT BE INSTALLED
WITH CONDUCTORS OF LIGHTING OR POWER SYSTEMS. THE SUM OF THE
EBL ENGINEERS, LLC
DUCTS AND OUTLETS, LIGHT FIXTURES, AND SIMILAR EQUIPMENT AND CROSS-AREA OF INDIVIDUAL CONDUCTORS SHALL NOT EXCEED 40 PERCENT MECHANICAL • ELECTRICAL • FIRE PROTECTION
WATERFLOW SWITCH WITH MONITOR MODULE MATERIAL THAT MAY INTERFERE WITH THE PROPER INSTALLATION AND OF THE INTERIOR CROSS-SECTION OF THE CONDUIT. ALL FIRE ALARM SYSTEM The Professional Engineering Center
OPERATION OF THE SYSTEM. SUBMITTED LAYOUT SHOP DRAWINGS SHALL
© SMOKE SENSOR PHOTOELECTRIC TYPE WITH INTEGRATED SOUNDER BASE
BE COORDINATED WITH ALL TRADES.
CONDUIT SHALL NOT BE LESS THAN 3/4 INCH. 8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001

© CARBON MONOXIDE (CO) DETECTOR WITH INTEGRATED SOUNDER BASE


8. THE FIRE PROTECTION SYSTEM PIPING, DEVICES, HANGERS, CABINETS,
9. ALL DEVICES SHALL BE MOUNTED AND SECURED TO THE BUILDING
STRUCTURE.
e-mail ebl@eblengineers.com

WP EQUIPMENT AND RELATED APPURTENANCES SHALL BE INSTALLED NEAT


© ELECTRIC SPRINKLER ALARM BELL
- SUBSCRIPT ’WP’ DENOTES WEATHERPROOF DEVICE
AND IN A WORKMANLIKE MANNER. CONFORM TO THE LATEST TRADE 10. ALL FLOOR AND WALL PENETRATIONS SHALL BE CORE DRILLED AND SHALL BE
PRACTICES. PIPING SHALL BE ROUTED PARALLEL OR PERPENDICULAR TO COORDINATED WITH STRUCTURAL SYSTEMS.
JUNCTION BOX WITH ADDRESSABLE MONITOR MODULE BUILDING LINES AND PROPERLY MOUNTED/SECURED TO THE BUILDING
STRUCTURE. 11. THE TERM ’’PROVIDE” MEANS TO FURNISH AND INSTALL, COMPLETE AND
READY FOR INTENDED USE.
JUNCTION BOX WITH ADDRESSABLE CONTROL MODULE
9. THE FIRE PROTECTION SYSTEM WORK SHALL BE COORDINATED WITH
©
IAM
JUNCTION BOX - SIZE AS REQUIRED

INDIVIDUAL ADDRESSABLE MODULE


SPECIAL TRADES (ELEVATOR, ENERGY MANAGEMENT, COMPUTER DATA, ETC)
AS APPLICABLE TO THE PROJECT. FIRE PROTECTION DESIGN CRITERIA:
10. THE TERM ’PROVIDE’ MEANS TO FURNISH AND INSTALL COMPLETE AND 1. THE REQUIRED FIRE SPRINKLER SYSTEM SHALL ADHERE TO SPECIFIC
ZONE ADAPTER MODULE READY FOR THE INTENDED USE. HYDRAULIC DESIGN REQUIREMENTS. WHEN THE REQUIREMENTS OF NFPA 13, PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
NFPA 13D, LOCAL OR STATE AUTHORITIES ARE MORE STRINGENT, THOSE ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LPI JUNCTION BOX WITH LINE POWERED ISOLATOR 11. THE FIRE PROTECTION INSTALLER SHALL PROVIDE ALL NECESSARY PARTS REQUIREMENTS SHALL GOVERN. IF NOT, THE SYSTEM SHALL COMPLY WITH LICENSE NO: 18546 EXPIRATION DATE: 1-02-2012

AND ACCESSORIES EVEN THOUGH THE PARTS AND ACCESSORIES ARE NOT THE FOLLOWING: PROJECT:
|TVSS| TRANSCIENT VOLTAGE SURGE SUPPRESSOR SPECIFICALLY MENTIONED OR SHOWN WITHIN THE CONTRACT DOCUMENTS. A. NET ZERO ENERGY HOUSE fNFPA 13D1 - AREAS SHALL BE
HYDRAULICALLY DESIGNED BASED ON A MINIMUM DISCHARGE OF
HOMERUN TO PANEL - NUMBER OF ARROWS INDICATE
NUMBER OF CIRCUITS AND NUMBER OF CROSSLINES
12. ALL FIRE SPRINKLER SYSTEM PIPING AND EQUIPMENT SHOWN ARE FOR 13 GPM TO ALL THE DESIGN SPRINKLERS SIMULTANEOUSLY AND A National Institute of
SUGGESTIVE PURPOSES ONLY AND SHALL NOT BE SCALED. MINIMUM OF 18 GPM TO ANY SPRINKLER IN THEY SYSTEM. THE
INDICATES NUMBER OF #12 CONDUCTORS - WHERE SYSTEM SHALL PROVIDE A MINIMUM DENSITY OF 0.05 GPM/SF TO Standards and Technology
NO CROSSLINES APPEAR 2#12 PLUS 1 #12 GRD 13. ALL FIRE SPRINKLER VALVES SHALL BE SUPERVISED IN ACCORDANCE WITH THE DESIGN SPRINKLERS. THE NUMBER OF DESIGN SPRINKLERS
CONDUCTORS ARE IMPLIED NFPA 13 AND NFPA 72. ALL WIRING CONNECTIONS SHALL BE COORDINATED SHALL BE ALL THE SPRINKLERS WITHIN A COMPARTMENT, UP TO
FIRE ALARM/SPRINKLER ZONE BOUNDARY
BY THE SPRINKLER INSTALLER AND MADE BY THE FIRE ALARM INSTALLER. A MAXIMUM OF TWO. THE MAXIMUM SPRINKLER HEAD SPACING
SHALL BE PER THE MANUFACTURER’S LISTING.
NET ZERO ENERGY
14. THE FIRE SPRINKLER PIPING SHALL BE SUBJECTED TO A HYDROSTATIC
DRAWING NOTE NUMBER PRESSURE TEST IN ACCORDANCE WITH NFPA 13.
B. LIGHT HAZARD - AREAS SHALL BE HYDRAULICALLY DESIGNED
BASED ON A DENSITY OF .10 GPM/SF OVER THE MOST REMOTE RESIDENTIAL TEST
1500 SF. THE MAXIMUM SPRINKLER HEAD SPACING SHALL BE
15. FIRE SPRINKLER PIPE HANGERS AND PIPE SUPPORTS SHALL BE PROVIDED
IN ACCORDANCE WITH NFPA 13. ALL HANGER MATERIALS SHALL BE UL
225 SF. THE HOSE STREAM ALLOWANCE SHALL BE 100 GPM. FACILITY
CONVENTIONS LISTED. PIPE STANDS SHALL BE SECURELY MOUNTED TO BOTH THE FLOOR
AND THE PIPE WHICH IT SUPPORTS.
C. ORDINARY HAZARD. GROUP 1 - AREAS SHALL BE HYDRAULICALLY
DESIGNED BASED ON A DENSITY OF .15 GPM/SF OVER THE MOST
REMOTE 1500 SF. THE MAXIMUM SPRINKLER HEAD SPACING NIST Campus
SECTION CUT 16. ALL FLOOR AND WALL PENETRATIONS SHALL BE CORE DRILLED AND SHALL BE 130 SF. THE HOSE STREAM ALLOWANCE SHALL BE Gaithersburg, MD
COORDINATED WITH THE BUILDING STRUCTURAL SYSTEM. SLEEVES SHALL 250 GPM.
SECTION LAYER BE PROVIDED AT ALL FLOOR AND/OR WALL PENETRATIONS IN D. ORDINARY HAZARD. GROUP 2 - AREAS SHALL BE HYDRAULICALLY
A ACCORDANCE WITH NFPA 13, UNO. DESIGNED BASED ON A DENSITY OF .20 GPM/SF OVER THE MOST
REMOTE 1500 SF. THE MAXIMUM SPRINKLER HEAD SPACING
11 SHEET NO. WHERE SECTION IS SHOWN
17. PROVIDE FIRE SPRINKLER SYSTEM ACCESS PANELS FOR VALVES AND/OR SHALL BE 130 SF. THE HOSE STREAM ALLOWANCE SHALL BE
EQUIPMENT CONCEALED ABOVE HARD CEILINGS OR BEHIND WALLS IN 250 GPM.
SHEET NO. WHERE SECTION IS CUT ACCORDANCE WITH NFPA 13 AND AS INDICATED.
2. ALL FIRE SPRINKLER SYSTEM PIPING SHALL ADHERE TO THE FOLLOWING U.S. Department of Energy ^
18. 2-INCH MAIN DRAINS AND INSPECTOR’S TEST/DRAINS THAT DO NOT REQUIREMENTS: Research Toward Zero Energy Homes
DETAIL DISCHARGE TO THE EXTERIOR OF THE BUILDING SHALL BE PIPED TO A. 2-INCH AND SMALLER - THREADED BLACK STEEL SCHEDULE 40.
APPROVED ENCLOSED FLOOR DRAINS AND/OR OTHERWISE ARRANGED TO B. 2 34-INCH AND LARGER - ROLL GROOVED BLACK STEEL U.S. DEPARTMENT OF
DETAIL NO. SCHEDULE 10, UNO. Energy Efficiency &
1
11
PREVENT SPLASHING/BACKFLOW. THE LOCATION OF DRAINS INSIDE THE
BUILDING SHALL BE APPROVED BY NIST. C. BRANCHLINE OUTLETS AT MAIN PIPING SHALL BE SHOP-WELDED.
D. ALL PIPING SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 13.
ENERGY Renewable Energy
SHEET NO. WHERE DETAIL IS SHOWN E. CONCEAL ABOVE SUSPENDED, PLASTER OR DRYWALL CEILINGS.
G:\projects\2009\09247.000\cadd\R submission\09-247 F-001.dwg, 8/6/2010 11:22:02 AM, PHOLTHAU

F. CPVC PIPING IS PERMITTED FOR THE NET ZERO ENERGY HOUSE


J7--QO ABBREVIATIONS NFPA 13D SYSTEM ACCORDING TO THE MANUFACTURER’S LISTING.
A AMPERE 3. FIRE SPRINKLER HEADS SHALL BE PROVIDED IN ACCORDANCE WITH NFPA
ACFM ACTUAL CUBIC FEET PER MINUTE 13 AND THE CONTRACT DOCUMENTS. SPRINKLER HEADS SHALL BE
0000i$ ACT ACOUSTICAL CEILING TILE PROVIDED AS FOLLOWS;
0 AHJ AUTHORITY HAVING JURISDICTION A. IN FINISHED CEILINGS - RESIDENTIAL QUICK RESPONSE, WHITE
0 ,0 FINISH, PENDENT, FLUSH TYPE WITH MATCHING FINISH
pi AHU AIR HANDLING UNIT
ESCUTCHEON.
0 -..r'
IfS' ASSD AIR SAMPLING SMOKE DETECTION
B. IN UNFINISHED CEILINGS - QUICK RESPONSE, BRASS FINISH,
0 ATR ALL THREAD ROD 08/03/10 UPDATE
00 PENDENT OR UPRIGHT TYPE.
(0 BPA BACKFLOW PREVENTION ASSEMBLY MARK DATE DESCRIPTION
0 C CONDUIT
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
f%
/
i
/Ml
EE STANDING Kl
00
0)
CRAH
DACT
COMPUTER ROOM AIR HANDLER
DIGITAL ALARM COMMUNICATOR TRANSMITTER CODES AND STANDARDS REFERENCES:
i! 7 eSx DN DOWN ALL REFERENCES TO NFPA 13 SHALL MEAN THE 2002 EDITION. PROJECT NO: NIST NZERTF
ALL REFERENCES TO NFPA 13D SHALL MEAN THE 2002 EDITION
FA FIRE ALARM CAD DWG FILE: 09-247 F-001
VI xX
jL-
FACP FIRE ALARM CONTROL PANEL
ALL REFERENCES TO NFPA 24 SHALL MEAN THE 2002 EDITION
ALL REFERENCES TO NFPA 25 SHALL MEAN THE 2002 EDITION. DRAWN BY:
FAPB FIRE ALARM POWER BOOSTER PANEL ALL REFERENCES TO NFPA 70 SHALL MEAN THE 2005 EDITION.
CHECKED BY:
I NEW. 3” INCOMING FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL
ALL REFERENCES TO NFPA 72 SHALL MEAN THE 2002 EDITION.
ALL REFERENCES TO NFPA 90A SHALL MEAN THE 2002 EDITION.
I SERVICE
X L-A_
FDC FIRE DEPARTMENT CONNECTION ALL REFERENCES TO NFPA 241 SHALL MEAN THE 2004 EDITION. COPYRIGHT C 2009 o
V-- GPM GALLONS PER MINUTE ALL REFERENCES TO IBC SHALL MEAN THE 2006 EDITION. BUILDING SCIENCE CORPORATION
■J^>v

I GRD GROUND SHEET TITLE:

k
\
HP
MAX
HORSEPOWER
MAXIMUM WATERFLOW TEST INFO:
0 \
NEW POST INDICATING
VALVE MIN MINIMUM STATIC: 75 PSI
FIRE PROTECTION
EXISTING 12” WATER NFACP NETWORK FIRE ALARM CONTROL PANEL
\ SF SQUARE FEET
RESIDUAL:
FLOW:
42 PSI
3528 GPM
GENERAL NOTES,
TVSS TRANSIENT VOLTAGE DATE:
BY:
9/09
NIST FIRE PROTECTION GROUP
LEGEND AND
~l SURGE SUPPRESSOR LOCATION: BUILDING 226 (FH 52) ABBREVIATIONS
I TYP TYPICAL ELEV.: GRADE
I UG UNDERGROUND
UL UNDERWRITERS LABORATORIES
NOTE: THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
©

NORTH
UP-TO-DATE AND ACCURATE WATERFLOW INFORMATION
UNO UNLESS NOTED OTHERWISE SCALE AS NOTED
PRIOR TO PREPARATION OF INSTALLATION SHOP DRAWINGS.
I
I PLAN V
w
VOLTS
WIRE

F-001
NOTE:
NO SCALE TEST HYDRANT (FH 52) w/ WITH
AT BLDG 226
1. ALL PIPING AND HYDRANT LOCATIONS DEPICTED ON THIS PLAN ARE SHOWN FOR
THE PURPOSES OF HYDRAULIC CALCULATIONS AND FIRE DEPARTMENT CONNECTION
POSITION. THIS SITE PLAN IS NOT INTENDED FOR INSTALLATION OF PIPING AND/OR
HYDRANT LOCATIONS.
GENERAL NOTES: (APPLY TO THIS SHEET ONLY) BUILDING SCIENCE
1. REFER TO F-001 FOR LEGEND, SYMBOLS, ABBREVIATIONS, AND DESIGN
CRITERIA. CORPORATION
2. BASEMENT TO BE DESIGNED BASED PER NFPA 13D.

DRAWING NOTES: (APPLY TO THIS SHEET ONLY)

(T) 3” INCOMING UNDERGROUND COMBINATION DOMESTC/SPRINKLER. SEE CIVIL


w DRAWINGS FOR ALL WORK BEYOND 5FT OUTSIDE OF BUILDING.

© FOR RISER DETAIL REFER TO F-601.


© 2 1/2” UP TO FIRST FLOOR.
@ 2 1/2” UP TO FDC.
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
3 4 4.1 5 6 6.1 © TYPICAL SMOKE SENSOR AND CARBON MONOXIDE DETECTOR LOCATIONS.
PROVIDE INTEGRATED SOUNDER BASE(S). COMBINATION SMOKE/CO
www.buildingscience.com
DETECTORS ARE ACCEPTABLE.
© 2 1/2” SWING CHECK W/ BALL DRIP.
CONSULTANT:
I____ I
F.1

EBL ENGINEERS, LLC


MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com

r n rr n rr n rr F
U LL u LL U LL
2

PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME. AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
1T 1 1 OF THE STATE OF MARYLAND,

Q1—60 10—50
O 12-0
O LICENSE NO: 18546 EXPIRATION DATE: 1-02-2012

PROJECT:

National Institute of
r~n
© i©t Standards and Technology
ID
NET ZERO ENERGY
_L
RESIDENTIAL TEST
© ©
1 1 1
FACILITY
Q1-60 O O 7
10-50 12-0
NIST Campus
O
CM
I
ro
Gaithersburg, MD

O, ®
C CM CM o: o D D

© ©
CM

CD
(t cp
CM

CD
J. 1
20
4-60
i

o 1
4-0
urnft
U.S. Department of Energy ^
CM

2-70
o 3
&
i Research Toward Zero Energy Homes
-1 1
1-6 10-0
o U.S. DEPARTMENT OF
Energy Efficiency &
<D>
csj lO
oo
ENERGY Renewable Energy

©
G:\projects\2009\09247.000\cadd\R submission\09-247 F-101.dwg, 8/6/2010 11:24:35 AM, PHOLTHAU

20 © O
I © 9-20°
1
3—90 O
r 5-9
© CM
o

5’-0” I lfyT] IwfI


I SI I
I SI IfvTl CD
i

A- I LO

l-o ,l—1 CM CO

I____ I
1 2 08/03/10 UPDATE
1 1
1-6 10-0
o 3-9
J~© CD
CM I
o CM
CM
I
MARK
ISSUE:
DATE
03/31/10
DESCRIPTION
ISSUED FOR CONSTRUCTION
2D 2
N 4-3 11-10 B
PROJECT NO: NIST NZERTF
CAD DWG FILE: 09-247 F-101
A
DRAWN BY:
CHECKED BY:

COPYRIGHT O C 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:

© © O ©J A.1
BASEMENT FLOOR
PLAN

BASEMENT FLOOR PLAN


SCALE: K" = 1-0'
CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.

GRAPHIC SCALE
0 2’ 4’ 8’ 12’
1 /4”=1’—0 F-101
GENERAL NOTES: (APPLY TO THIS SHEET ONLY)

1. REFER TO F-001 FOR LEGEND, SYMBOLS, ABBREVIATIONS, AND DESIGN


CRITERIA.
BUILDING SCIENCE
2. PIPING IN GARAGE TO BE RUN EXP. CORPORATION
3. GARAGE TO BE DESIGNED BASED ON ORDINARY HAZARD GROUP II PER
NFPA 13.
4. NET ZERO ENERGY HOUSE TO BE DESIGNED PER NFPA 13D.

DRAWING NOTES:(APPLY TO THIS SHEET ONLY)


(?) 2 1/2” UP FROM BASEMENT FLOOR.

@2 1/2 FREE STANDING FDC. LOCATE 18” TO 36” ABOVE FINISH GRADE.
PROVIDE MATCHING CAP AND CHAIN. LOCATE IN LANDSCAPED AREA NEXT
TO PATH.

© REFER TO F-601 FOR RISER DETAIL. 30 FOREST STREET SOMERVILLE, MA


© TYPICAL SMOKE SENSOR AND CARBON MONOXIDE DETECTOR LOCATIONS.
PROVIDE INTEGRATED SOUNDER BASE(S). COMBINATION SMOKE/CO
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
DETECTORS ARE ACCEPTABLE.

© ON
FIRE ALARM CONTROL PANEL LOCATION. SEE FIRE ALARM RISER DIAGRAM
SHEET F-601 FOR ALARM MONITOR CONNECTIONS.
CONSULTANT:
© CAMPUS FIRE ALARM DEVICE CABINET. SEE SHEET F-601 FOR DETAIL.
3 4 4.1 5 6 6.1 (7) 3” INCOMING UNDERGROUND COMBINATION DOMESTC/SPRINKLER. SEE CIVIL
DRAWINGS FOR ALL WORK BEYOND 5FT OUTSIDE OF BUILDING.

© 4X2^X2^ FDC MOUNTED ON THE WALL. LOCATE 18” TO 36” ABOVE GRADE.

EBL ENGINEERS, LLC


MECHANICAL • ELECTRICAL • FIRE PROTECTION
□ □ F.1
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com


h.

JlF
PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
F ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
T LICENSE NO: 18546 EXPIRATION DATE: 1-02-2012

1 2 L ---- b---- 1 PROJECT:

c
National Institute of
Standards and Technology
Oio

1
^ol r i
□ NET ZERO ENERGY
o- 3±3E) oCN| o
F 3l
i 1
7-80
o Ix (8>
RESIDENTIAL TEST
I/\ 5-20
<P I
OO
CNJ CNI
2” UP TO ATTIC f-----?l (i-10 □□ FACILITY
C75
CO NIST Campus
Gaithersburg, MD
cp S

CM I
CO
I
oo
II 7
© 1
H 1
4

1 1
o 3-30 7-80
o CO 1-2 Cp
1-0 L© ©j U.S. Department of Energy ^
<P
OO
I
2 MY 2 2 Research Toward Zero Energy Homes

H
CM
7-80 2- 8-(
2” UP TO ATTIC \L 0— LJ
cp D
U.S. DEPARTMENT OF
Energy Efficiency &
CM I
r*o
ENERGY Renewable Energy
RFP

©
G:\projects\2009\09247.000\cadd\R submission\09-247 F-102.dwg, 8/6/2010 11:26:15 AM, PHOLTHAU

o
Cp
CM
I
oo
O
W CM
OO

O ©© Q
2” UP TO ATTIC ©© H
i
O
gKjvn [yii
cp
8 to
<p CP
7-80 15
CM I
20 Q ~20 6 5
5-2 3-30 □
1 1 1 08/03/10 UPDATE
<S) <S>
7-40 1-0 6-11 Itk4 MARK DATE DESCRIPTION

WP
© ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
K
5’-0” PROJECT NO: NIST NZERTF
7 CAD DWG FILE: 09-247 F-102
2
1 DRAWN BY:
CHECKED BY:

w3. B COPYRIGHT O C 2009


© n e RFP
BUILDING SCIENCE CORPORATION

S A SHEET TITLE:

FIRST FLOOR PLAN

A.1

CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.

FIRST FLOOR PLAN GRAPHIC SCALE


scale: y4" = T-0’

0 2’ 4’ 8’ 12’
1/4”=1’—0
F-102
GENERAL NOTES: (APPLY TO THIS SHEET ONLY) BUILDING SCIENCE
1. REFER TO F-001 FOR LEGEND, SYMBOLS, ABBREVIATIONS, AND DESIGN
CRITERIA. CORPORATION
2. NET ZERO ENERGY HOUSE TO BE DESIGNED PER NFPA 13D.
3. NET ZERO ENERGY GARAGE ATTIC TO BE DESIGNED BASED ON LIGHT
HAZARD PER NFPA 13.

DRAWING NOTES:(APPLY TO THIS SHEET ONLY)


(?) 2 1/2 UP FROM FIRST FLOOR.

© RELOCATE SPRINKLER HEADS AT SLOPE CHANGE.

© TYPICAL SMOKE SENSOR AND CARBON MONOXIDE DETECTOR LOCATIONS.


PROVIDE INTEGRATED SOUNDER BASE(S). COMBINATION SMOKE/CO 30 FOREST STREET SOMERVILLE, MA
DETECTORS ARE ACCEPTABLE.
T: (978) 589-5100 F: (978) 589-5103
(7) LOCATE UPRIGHT SPRINKLER HEAD MIN. 2-0” FROM SIDE OF WOOD TRUSS www.buildingscience.com
PER NFPA 13, SECTION 8.6.4.1.3.3. MAX. DISTANCE FROM PEAK TO BE
3’—0” PER NFPA 13, SECTION 8.6.4.1.3.1.

CONSULTANT:
3 4 4.1 5 6 6.1

fr F.1 EBL ENGINEERS, LLC


MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com

d F PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
1 2 OF THE STATE OF MARYLAND,

:s
LICENSE NO: 18546 EXPIRATION DATE: 1-02-2012

5
PROJECT:

National Institute of
r i i
G 9-
G 8-0 Standards and Technology

© NET ZERO ENERGY


2
©' m

RESIDENTIAL TEST
1 1
SLOPE
CHANGE
UTL
I G
1!) ir
e 40
G I II 01 FACILITY
5-5 2-11 8-4
4-2” 4-2”
2” RN FROM BELOW 1 1 NIST Campus
n n G 6-90 -20 Gaithersburg, MD
ro
OO
CO 7
I 3
m

2” RN FROM BELOW

PEAK G
10 10 10
2
01
2
3-7
?L® ©J 2
6-100 9—OD
•ft U.S. Department of Energy ^
Research Toward Zero Energy Homes
I____ 5-5^ ^-11 8-4 €>1^ 6” n
CM
g D
4 T U.S. DEPARTMENT OF
CM
Energy Efficiency &
n n 20
47 ENERGY Renewable Energy
1
G:\projects\2009\09247.000\cadd\R submission\09-247 F-103.dwg, 8/5/2010 11:20:38 AM, PHOLTHAU

CM
2” RN FROM BELOW CO

10 10 10
G 5-5 2-11
G 8-4
G
1 1
G G G
© 2-30 iL 7-3 >-5 ©
© © 08/03/10 UPDATE
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 F-103
DRAWN BY:
B CHECKED BY:

COPYRIGHT O C 2009

A BUILDING SCIENCE CORPORATION

SHEET TITLE:

SECOND FLOOR PLAN


rA (A rA A.1

CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED

SECOND FLOOR PLAN SCALES MUST BE USED.

SCALE: >i" = 1’—O'


GRAPHIC SCALE
0 2’ 4’ 8’ 12’
1/4”=1’—0
F-103
GENERAL NOTES: (APPLY TO THIS SHEET ONLY) BUILDING SCIENCE
1. REFER TO F-001 FOR LEGEND, SYMBOLS, ABBREVIATIONS, AND DESIGN
CRITERIA. CORPORATION

DRAWING NOTES: (APPLY TO THIS SHEET ONLY)

(7) TYPICAL SMOKE SENSOR. COORDINATE FINAL LOCATION W/ ATTIC


^ EQUIPMENT AND CEILING SLOPE.

© NO SPRINKLERS IN THE ATTIC SPACE.

30 FOREST STREET SOMERVILLE, MA


T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

CONSULTANT:

EBL ENGINEERS, LLC


MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com

3 4 4.1 5 6 6.1

PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
F LICENSE NO: 18546 EXPIRATION DATE: 1-02-2012

H PROJECT:
2
National Institute of
Standards and Technology

r F Net Zero Energy


Residential Test
Facility
© s
NIST Campus
1
Gaithersburg, MD
f3 f3

7
U.S. Department of Energy ^
Research Toward Zero Energy Homes
ROOF
U.S. DEPARTMENT OF
Energy Efficiency &
L
n
D ENERGY Renewable Energy
r3 n 2
G:\projects\2009\09247.000\cadd\R submission\09-247 F-104.dwg, 8/4/2010 8:50:40 AM, aschafer

08/03/10 UPDATE
L J
i © © MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 F-104
DRAWN BY:
CHECKED BY:
J
r B
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION

SHEET TITLE:
A

ATTIC FLOOR PLAN

n (3 r3 r a. A.1
CAUTION:
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.

ATTIC FLOOR PLAN GRAPHIC SCALE


SCALE: fc” = 1’-0’
0 2’ 4’ 8’ 12’
1/4”=1’—0
F-104
FIRE ALARM EXPANSION NOTES:
1. FIRE ALARM SYSTEM IN THIS BUILDING IS REQUIRED TO BE CONNECTED TO CAMPUS
WIDE FIRE ALARM SYSTEM. CONNECTION WILL BE MADE FROM EXISTING BUILDING 226.
©—©—©—© © BUILDING SCIENCE
EQUIPMENT REQUIRED FOR NET ZERO ENERGY FACILITY IS SHOWN ON THE FIRE ALARM
RISER DIAGRAM. CORPORATION
2. NEW EQUIPMENT REQUIRED FOR CONNECTION TO CAMPUS FIRE ALARM
SYSTEM IS REQUIRED TO BE COMPATIBLE WITH SIMPLEX 4100U PANELS.
SEE FOLLOWING NOTES CONCERNING COORDINATION/CONNECTION TO
CAMPUS SYSTEM.

INSTALLATION NOTES: ATTIC


3. CONTRACTOR SHALL MOUNT NEW CONTROL EQUIPMENT AS SHOWN ON DRAWINGS AND
FIRE ALARM RISER.
4. CONTRACTOR SHALL PAINT CONDUITS WITH A RED STRIPE EVERY 10 FEET. PAINT ALL
CONDUIT BODY COVERS AND JUNCTION BOX COVERS WITH RED PAINT.
©©----©©----©©----©© ©
5. DO NOT SPLICE EXISTING OR NEW MAPNET, IDNET, NOTIFICATION APPLIANCE CIRCUITS, 8
OR 24VDC CIRCUITS. NO SPLICES OR ’’T-TAPS” SHALL BE PERMITTED UNDER ANY 30 FOREST STREET SOMERVILLE, MA
CIRCUMSTANCES. WP T: (978) 589-5100 F: (978) 589-5103

£
<j>
6.
7.
SIGNALING LINE CIRCUITS (SLC) SHALL BE WEST PENN#D975 (18/2 TSP).
SPEAKER NOTIFICATION APPLIANCE CIRCUITS SHALL BE WEST PENN #991 (16/2 TSP
RED & BLACK).
I TO FACP
www.buildingscience.com

8. STROBE NOTIFICATION APPLIANCE CIRCUITS SHALL BE RED AND BLACK CONDUCTORS, WF CONSULTANT:
MIN #12 AWG. SECOND FLOOR

9. 24V POWER CIRCUITS SHALL BE BLUE AND WHITE CONDUCTORS.


8 m VT
SUPERVISORY 1
WP
10. MONITOR MODULE CIRCUITS SHALL BE BLUE AND WHITE CONDUCTORS, MIN #14 AWG.
11. MINIMUM CONDUIT SHALL BE 3/4” EMT.
©©----©© ©© © 7 FACP FADC VT TROUBLE
AM
1

12. CONNECTIONS TO WATER FLOW SWITCH AND TAMPER SWITCHES SHALL BE VIA LIQUID AM
EBL ENGINEERS, LLC
TIGHT FLEXIBLE CONDUIT. □a ALARM
AM
1
MECHANICAL • ELECTRICAL • FIRE PROTECTION
13. CONSTRUCTION CONSTRAINTS REQUIRE THAT THE INSTALLING CONTRACTOR MUST STORM MESSAGE 2 The Professional Engineering Center
COMPLY WITH THE FOLLOWING: 3 3 8005 Harford Road, Baltimore, Maryland 21234—5701
A) ALL EXISTING DEVICES MUST REMAIN IN SERVICE WHEN THE NEW WORK IS
BEING INSTALLED. m m TVSS I I
SPARE
ZAM
1 (410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com
B) ALL NEW CIRCUITS SHALL BE NFPA 72 ’’CLASS A” (’’STYLE Z”, ’’STYLE 6”). IAM
C) PROVIDE COMPLETE AND ACCURATE AS-BUILT DRAWING IN AUTOCAD 2009
FORMAT. FIRST FLOOR GARAGE

TESTING NOTES: (DO <D© <D©—®c> 0


5 5

14. ALL TESTING SHALL BE PER MANUFACTURER’S INSTRUCTIONS AND NFPA 72.
CONTRACTOR SHALL COMPLETE INTERNAL TESTING PRIOR TO REQUESTING AN OFFICIAL
GOVERNMENT TEST. CONTRACTOR SHALL FLOW WATER TO CONFIRM ACTIVATION OF
WATER FLOW SWITCH.
WF
FIRE ALARM DEVICE CABINET
15. CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIONS PRIOR TO AND DURING VT ITVSS| (FADC) DETAIL PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY

5
TESTING: ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
NO SCALE
A) ALL SPEAKER AND STROBE TESTING SHALL BE DONE ON A SATURDAY.
VT J LICENSE NO: 18546 EXPIRATION DATE: 1-02-2012

B) ALL BATTERY TESTING SHALL BE DONE ON A SATURDAY. PROJECT:


C) SIMPLEX GRINNELL PANEL DATABASE CHANGES MUST BE DONE ON A MONDAY OR
TUESDAY, EXCEPT CAMPUS DOWNLOADS TO ADD NEW 4100U PANELS.
ay
D) ON A MONDAY OR TUESDAY, THE CONTRACTOR SHALL PROGRAM VIA A SIMPLEX BASEMENT National Institute of
GRINNELL AUTHORIZED PROGRAMMER (NIST COTR MUST APPROVE PROGRAMMER)
THE NIST SIMPLEX GRAPHIC COMMAND CENTERS (TOTAL OF FIVE). ALL Standards and Technology
PROGRAMMING ON THE GCC(S) SHALL START BEFORE 11AM.
E) THE CONTRACTOR SHALL TIE IN THE NEWLY PROGRAMMED DEVICES NO LATER FIRE ALARM RISER/DETAIL NOTES
THAN THE NEXT DAY AFTER PROGRAMMING.
F) WITHIN TWO DAYS AFTER PROGRAMMING, AND IN ACCORDANCE WITH NFPA 72 NO SCALE NET ZERO ENERGY
(2007) EDITION, THE CONTRACTOR SHALL PROVIDE TWO REPRESENTATIVES FAMILIAR
WITH SIMPLEX 4100U TO ASSIST WITH TESTING THE NEWLY INSTALLED DEVICES AND
UP TO 50 INITIATING DEVICES NOT AFFECTED BY THE PROGRAMMING CHANGES.
PROVIDE SIMPLEX 4090-9001 INDIVIDUAL ADDRESSABLE MODULE. RESIDENTIAL TEST
CONTRACTOR TESTING REPRESENTATIVES SHALL BE AVAILABLE FROM 7:45AM TO
NOON, AND 1:15PM TO 5PM. FROM 9:15AM TO 9:45AM, NOON TO 1:15 PM, AND
PROVIDE SIMPLEX 2190-9163 CONTROL RELAY ZONE ADAPTER MODULE. FACILITY
FROM 3:00PM TO 3:30PM NO TESTING WILL OCCUR. ALL TESTING WILL CONCLUDE PROVIDE SIMPLEX 2190-9169 LINE POWERED ISOLATOR.
AT 5:00PM. TESTING REPRESENTATIVES SHALL BE AT THE NDUCC AND IN THE
FIELD TESTING DEVICES. IF THE TEST REVEALS THAT DEVICES ARE NOT REPORTING PROVIDE CAMPUS FIRE ALARM DEVICE CABINET (FADC) MOUNTED ADJACENT TO FACP. NIST Campus
©0 © © ©©©0

CORRECTLY EITHER TEXTUALLY OR GRAPHICALLY, THE CONTRACTOR SHALL MOUNT DEVICES ON DIN RAIL IN CABINET. SEE DETAIL THIS SHEET FOR INTERNAL Gaithersburg, MD
CORRECT AND RETEST AS NOTED ABOVE, ANY ADDITIONAL TESTING MUST BE DEVICES.
APPROVED AND SCHEDULED BY THE NIST COTR.
EXTEND SPARE CONDUCTORS FROM EXTERNAL HANDBOX AND CONNECT TO FADC AS

EQUIPMENT NOTES: SHOWN. SEE ELECTRICAL AND SITE DRAWINGS FOR UG CONDUIT LOCATIONS AND
TERMINATIONS WITHIN GARAGE.
16. ALL EQUIPMENT MONITORED FROM CAMPUS FIRE ALARM SYSTEM SHALL BE CURRENT SEE ELECTRICAL DRAWINGS FOR UNDERGROUND FIRE ALARM WIRING FROM GARAGE
PRODUCTION MODELS MANUFACTURED BY SIMPLEX. ALL DEVICES SHALL BE TO HOUSE. U.S. Department of Energy ^
COMPATIBLE WITH EXISTING INSTALLED CAMPUS FIRE ALARM CONTROL EQUIPMENT. Research Toward Zero Energy Homes
120V FACP POWER SUPPLY. SEE ELECTRICAL DRAWING FOR CONTINUATION.

NEW 4100U PANEL TIE-IN’S EXTERNAL ELECTRICAL SPRINKLER ALARM BELL.


TO NET ZERO ENERGY HOUSE U.S. DEPARTMENT OF
Energy Efficiency &
SYSTEM ----------------------------------
ENERGY Renewable Energy
& INTEGRATION: TEST VALVE - PIPED TO
G:\projects\2009\09247.000\cadd\R submission\09-247 F-601.dwg, 8/6/2010 11:28:07 AM, PHOLTHAU

17. ALL FIBER OPTIC TIE-IN’S SHALL OCCUR ON A SATURDAY TO THE EXISTING CAMPUS INTERIOR FLOOR DRAIN-
FIRE ALARM NETWORK. EASY-RISER CHECK VALVE
WF W/ DRAIN
18. ALL PROGRAMMING TO INTEGRATE 4100U PANEL CONNECTIONS SHALL OCCUR ON A
SATURDAY UNTIL COMPLETED. ALL FIVE SIMPLEX GRINNELL GSSS SHALL BE
PROGRAMMED ALONG WITH ALL FIELD NODES ON THAT LOOP. PROVIDE 30 DAYS
TO GARAGE SYSTEM PIPE TO INTERIOR FLOOR
DRAIN -----------------------------
HP OS&Y VALVE W/ SUPERVISORY
TAMPER SWITCH

n-
NOTICE FOR CAMPUS TIE-IN.
SWING CHECK VALVE WITH
ED
WF BALL-DRIP I DOUBLE CHECK BACKFLOW
PREVENTION ASSEMBLY
TEST VALVE CONNECT TO EASY-RISER CHECK VALVE 1-INCH TO BUILDING DOMESTIC. 08/03/10 UPDATE
DRAIN PIPE TO EXTERIOR W/ DRAIN REFER TO PLUMBING DRAWINGS ED MARK DATE DESCRIPTION
FOR CONTINUATION -------------------
LAG SCREW & JUMBO
WASHER ------------ WOOD BEAM
FROM FDC
HP OS&Y VALVE W/ SUPERVISORY
OS&Y VALVE W/ SUPERVISORY
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
TAMPER SWITCH
TAMPER SWITCH
fit DRAIN TO EXTERIOR. PROVIDE EH DOUBLE CHECK BACKFLOW INCOMING 3” THRU
SIDE BEAM CONCRETE SPLASH BLOCK —
©
I PREVENTION ASSEMBLY BASEMENT WALL. REFER
TO CIVIL DRAWING FOR
PROJECT NO: NIST NZERTF
BRACKET- CAD DWG FILE: 09-247 F-601
CONTINUATION
ATR W/HEX NUT &
JUMBO WASHER
1—INCH TO GARAGE EH DRAWN BY:
DOMESTIC. REFER TO \
CHECKED BY:
PLUMBING DRAWINGS FOR *
CONTINUATION----------------- OS&Y VALVE W/ SUPERVISORY
COPYRIGHT O C 2009
TAMPER SWITCH
BUILDING SCIENCE CORPORATION
FLOOR
SWIVEL RING SHEET TITLE:

PIPE STAND
INCOMING 3”. REFER TO CIVIL

WOOD BEAM
CONCRETE/WOOD
DRAWING FOR CONTINUATION FLOOR FIRE PROTECTION
HANGERMATE
CONCRETE DETAILS AND MATRIX
\
COACH SCREW
ROD
A •
•< GARAGE FIRE SPRINKLER RISER DETAIL 1 BASEMENT FIRE SPRINKLER RISER DETAIL 2

ATR NO SCALE NO SCALE


F-102- F—601 F-101 F-601

NORTH
SWIVEL RING 1. PROVIDE SPARE SPRINKLER CABINET AND NFPA REQUIRED SPRINKLERS AND WRENCH. 1. SECURE PIPE STAND TO FLOOR AND PIPE. SCALE AS NOTED

2. PROVIDE SPARE SPRINKLER CABINET AND NFPA REQUIRED SPRINKLERS AND WRENCH.

F-601
SWIVEL RING

HANGER DETAILS
NO SCALE
GENERAL NOTES: (APPLY TO THIS SHEET ONLY) DRAWING NOTES:(APPLY TO THIS SHEET ONLY) BUILDING SCIENCE
1. COORDINATE ALL WALL PENETRATIONS WITH ARCHITECTURAL PLANS. © 80 GALLON WATER HEATER WITH ATTACHED HEAT PUMP. CORPORATION
2. ALL LAVATORY FAUCETS MUST HAVE AN AVERAGE FLOW RATE OF LESS © 3O”0x36” DEEP CONDENSATE SUMP PIT W/ DUPLEX SUMP PUMPS.
THAN OR EQUAL TO 1.5 GPM. DISCHARGE TO GRADE ON SPLASH BLOCK.
3. ALL SHOWERS MUST HAVE AN AVERAGE FLOW RATE OF LESS THAN OR
EQUAL TO 1.75 GPM. © PROVIDE TRAP PRIMER & CONNECT TO CW SYSTEM PER MANUFACTURERS
RECOMMENDATIONS.
4. ALL TOILETS MUST HAVE AN AVERAGE FLOW RATE OF LESS THAN OR (4) 3” UNDERGROUND COMBINATION DOMESTC/SPRINKLER. SEE CIVIL DRAWINGS
EQUAL TO 1.1 GPM.
FOR ALL WORK BEYOND 5 FEET OUTSIDE OF BUILDING.
5. FOR PLUMBING LEGEND AND ABBREVIATIONS SEE MECHANICAL LEGEND
AND ABBREVIATIONS ON SHEET M-001. © PEX WATER MANIFOLD SYSTEM. MAIN FEED FROM WATER HEATER TO
MANIFOLD SHALL BE LESS THEN OR EQUAL TO 6’-0”. BRANCH LINES FROM
MANIFOLD TO FIXTURES SHALL BE %” PEX TUBING NOT EXCEEDING 58’ IN
DEVELOPED LENGTH PER INDIVIDUAL RUN.

© TO HOUSE SPRINKLER SYSTEM


CONTINUATION.
SEE FIRE PROTECTION DRAWINGS FOR

30 FOREST STREET SOMERVILLE, MA


T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

CONSULTANT:

3 4 4.1 5 6 6.1

i____ i EBL ENGINEERS, LLC


F.1 MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com

4” FOUNDATION

L DRAIN

r -Jf n—rr
U Li
HI F PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,

2 4” PERFERATED SUB SOIL o LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012

OSD PROJECT:
VENT BEDDED IN STONE
4” V
UP
4” SUB SOIL VENT UP
AD-1
National Institute of
4” SAN
FROM — 2” V UP Standards and Technology
E ABOVE -
CO
HRV-1 AUXILIARY DRAIN
I 1
1
PAN. ROUTE 1”
NET ZERO ENERGY
H=
4” SAN BELOW
FLOOR
CONDENSATE LINE FROM
DRAIN PAN TO OSD--------- TP RESIDENTIAL TEST
4” SW
FACILITY
BASEMENT
(s)dwm-i
NIST Campus
E.1 o o 1 V PEX MANIFOLD
c\ 2” D BELOW Gaithersburg, MD
FLOOR
OSD
o 7 ®

DWH-1 © r 2” V r
I I
I____________I
h
2” D FROM

J ABOVE U.S. Department of Energy ^


MV-1 HIGH VELOCITY
AHU-3 FUTURE Gr 7I Research Toward Zero Energy Homes

rr
V
I o o :zl D U.S. DEPARTMENT OF
Energy Efficiency &
C.1 O o |—3 I
D—1

DOMESTIC WATER SOLAR 4” FOUNDATION


ENERGY Renewable Energy
G-l I BASEMENT
PRE-HEAT STORAGE DRAIN
I TANK (80 GALLON)
G:\projects\2009\09247.000\cadd\R submission\09-247 P-101.dwg, 8/3/2010 3:28:10 PM, PHOLTHAU

4” FOUNDATION OSD c i. 2” D BELOW


DRAIN DOMESTIC WATER SOLAR AHU-1 O
FLOOR 4” TO STORM
PRE-HEAT STORAGE
3 INCOMING COMBINATION WATER SEE CIVIL
DOMESTC/SPRINKLER SERVICE L M
TANK (120 GALLON)

i D-1
LX 2” D BELOW
FLOOR o
DRAWINGS FOR
CONTINUATION
UP TO GARAGE
t
Cl
INCOMING
WATER METER 4” SAN BELOW
FLOOR r i0
<D GAS CAPPED
FOR FUTURE-
L*=*
08/03/10 UPDATE
c 1” CW AHU-2 /
| OSD
MARK DATE DESCRIPTION
3” CW (FUTURES L J DISCHARGE TO
MAIN DOMESTIC WATER GRADE ON ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
SHUT-OFF AND DRAIN SUMP
PUMP(2 o
I SPLASH BLOCK
DOWN VALVE DH—1
I
©
4
\ 2” GAS FROM PROJECT NO: NIST NZERTF
4 4
INCOMING COMBINATION
o-X
OSD
D X
7 a e
L
ABOVE
CAD DWG FILE: 09-247 P-101
2” D BELOW FLOOR DRAWN BY: PJP
DOMESTC/SPRINKLER
fr?
L1 4” SAN BELOW CHECKED BY: EAH
FLOOR B
COPYRIGHT O C 2009
BUILDING SCIENCE CORPORATION
A
LP
L_
SHEET TITLE:

INVERT
ELEVATION
I 4” FOUNDATION
DRAIN
BASEMENT FLOOR
448.76’ PLAN PLUMBING
4” SAN SEE CIVIL
DRAWINGS FOR
L
© CONTINUATION © O CP A.1

CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.
BASEMENT FLOOR PLAN PLUMBING
GRAPHIC SCALE
SCALE: y4" = 1’-0’

0 2’ 4’ 8’ 12’
1/4”=1’—0
P-101
GENERAL NOTES: (APPLY TO THIS SHEET ONLY) DRAWING NOTES: (APPLY TO THIS SHEET ONLY) BUILDING SCIENCE
1. COORDINATE ALL WALL PENETRATIONS WITH ARCHITECTURAL PLANS. (?) 2” SAN UP TO WASHER BOX MOUNTED IN WALL
CORPORATION
2. ALL LAVATORY FAUCETS MUST HAVE AN AVERAGE FLOW RATE OF LESS
THAN OR EQUAL TO 1.5 GPM. © WASHER AUXILIARY DRAIN PAN.

3. ALL SHOWERS MUST HAVE AN AVERAGE FLOW RATE OF LESS THAN OR (5) 2” CONDENSATE FROM FCU-2 OPEN SITE DRAIN AND EMERGENCY DRAIN
EQUAL TO 1.75 GPM. PAIN LOCATED ABOVE WASHER AND DRYER.

4. ALL TOILETS MUST HAVE AN AVERAGE FLOW RATE OF LESS THAN OR


EQUAL TO 1.1 GPM.
© 2” CONDENSATE FROM ABOVE.

(?) 4” SUB SOIL VENT FROM BELOW.


5. FOR PLUMBING LEGEND AND ABBREVIATIONS SEE MECHANICAL LEGEND
AND ABBREVIATIONS ON SHEET M-001. (?) 4” SUB SOIL VENT UP.

0 TO GARAGE SPRINKLER SYSTEM


CONTINUATION.
SEE FIRE PROTECTION DRAWINGS FOR

© CONNECT DISHWASHER DRAIN TO KITCHEN SINK ADJACENT TO DISHWASHER


PER MANUFACTURERS RECOMMENDATIONS.
(?) 4” SUB SOIL VENT ABOVE CEILING. 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

CONSULTANT:

3 4 4.1 5 6 6.1

EBL ENGINEERS, LLC


□ □ F.1 MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com

1 y-i v
%" cw FROM 2” SAN BELOW
HB 8
DWM- 1------\ FLOOR

F PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,

X’ CONDENSATE FROM 2 I1------ 1---- 1


LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012

P-5 PROJECT:
AHU-3 DISCHARGE ON P-4A
SPLASH BLOCK c r3»
4 SAN P-6
BATH m
FROM ABOVE National Institute of
E 4” SAN
®- o 2” V FROM
BELOW KITCHEN DINING Standards and Technology
DN X. ROOM

"is/ P—1A
li in
□ NET ZERO ENERGY
9 7T
2” V UP \/
X RESIDENTIAL TEST
GARAGE 6 /\I F1
o P-2A
J. 1 2
C□ FACILITY

E.1
X CONDENSATE
FROM AHU-3
ABOVE CEILING r 2” SAN
i Jw

W/D 4
LJ NIST Campus
Gaithersburg, MD

X cw
1 y2” v up
TO 2” VTR
P-7

t
ii D 7 ®
DN OSD
DWH-2 2” D BELOW
WH
1 AHU-3 MUDROOM FLOOR
U.S. Department of Energy ^
P-2 2” D DN
Research Toward Zero Energy Homes
—x
7*
LJ
U.S. DEPARTMENT OF
X cw Energy Efficiency &
C.1
ENERGY Renewable Energy

r
G:\projects\2009\09247.000\cadd\R submission\09-247 P-102.dwg, 8/3/2010 3:28:40 PM, PHOLTHAU

MAIN DOMESTIC
WATER ShlUT-OFF H
AND DRAIN DOWN
VALVE
2” SAN BELOW
FLOOR LJ
LIVING
ENTRY ROOM □
HALL 08/03/10 UPDATE
c
MARK DATE DESCRIPTION
© H ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

3” INCOMING
COMBINATION OFFICE/OPTIONAL
PROJECT NO: NIST NZERTF
BEDROOM 4 2” GAS DN
DOMESTC/SPRINKLER INVERT CAD DWG FILE: 09-247 P-102
ELEVATION GAS METER
2” SAN SEE CIVIL 456.00’ AND PRV DRAWN BY: PJP
DRAWINGS FOR
CHECKED BY: EAH
CONTINUATION ---- T7 a G

n COPYRIGHT C 2009 o
BUILDING SCIENCE CORPORATION
S m A
SHEET TITLE:
2” GAS SEE CIVIL
DRAWINGS FOR
CONTINUATION----- FIRST FLOOR PLAN
PLUMBING
A.1

CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.
FIRST FLOOR PLAN PLUMBING N
SCALE: y,“ = 1'-0'
GRAPHIC SCALE
0 2’ 4’ 8’ 12’
1/4”=1’—0
P-102
GENERAL NOTES: (APPLY TO THIS SHEET ONLY) DRAWING NOTES: (APPLY TO THIS SHEET ONLY) BUILDING SCIENCE
1. COORDINATE ALL WALL PENETRATIONS WITH ARCHITECTURAL PLANS. O 4” SUB SOIL VENT UP & DN. CORPORATION
2. ALL LAVATORY FAUCETS MUST HAVE AN AVERAGE FLOW RATE OF LESS
THAN OR EQUAL TO 1.5 GPM. © 4” VENT UP TO 4” VTR.
3. ALL SHOWERS MUST HAVE AN AVERAGE FLOW RATE OF LESS THAN OR
® 2” VENT FROM BELOW.
EQUAL TO 1.75 GPM.
4. ALL TOILETS MUST HAVE AN AVERAGE FLOW RATE OF LESS THAN OR
EQUAL TO 1.1 GPM.
5. FOR PLUMBING LEGEND AND ABBREVIATIONS SEE MECHANICAL LEGEND
AND ABBREVIATIONS ON SHEET M-001.

30 FOREST STREET SOMERVILLE, MA


T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

CONSULTANT:

3 4 4.1 5 6 6.1

EBL ENGINEERS, LLC


[f F.1 MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail eblOeblengineers.com

d F PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,

1 2 LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012

,fH> e=2A PROJECT:

P-4
X National Institute of
Standards and Technology
1
MASTER
E r n 4” SAN
BATH MASTER
DN BEDROOM
1 y2” v
p-i
P-2 P—2
NET ZERO ENERGY
®~Ts RESIDENTIAL TEST
i cm Vi” v
FACILITY
BATH §2 2” D BELOW
NIST Campus

r
P-3 1 FLOOR

i3?1
P—2
Gaithersburg, MD
E.1 n n P-1

7
Lrrj 2” D
2” D DN
FROM
I ABOVE U.S. Department of Energy ^
HALL Research Toward Zero Energy Homes
J
D U.S. DEPARTMENT OF
Energy Efficiency &
C.1 n n ENERGY Renewable Energy
G:\projects\2009\09247.000\cadd\submission 110%\09-247 P-103.dwg, 3/31/2010 3:44:02 PM, pplourde

OPEN TO
BEDROOM 2 BELOW BEDROOM 3

c MARK DATE DESCRIPTION


ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 P-103
DRAWN BY: PJP
CHECKED BY: EAH
B
COPYRIGHT O C 2009

BUILDING SCIENCE CORPORATION


I__ ___ i A
SHEET TITLE:

SECOND FLOOR PLAN


PLUMBING
o ra n A.1

CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.
SECOND FLOOR PLAN PLUMBING N
SCALE: y4” = 1’-0'
GRAPHIC SCALE
0 2* 4* 8’ 12’
1/4”=1’—0 P-103
GENERAL NOTES: (APPLY TO THIS SHEET ONLY) DRAWING NOTES:(APPLY TO THIS SHEET ONLY) BUILDING SCIENCE
1. COORDINATE ALL WALL PENETRATIONS WITH ARCHITECTURAL PLANS. O FCU-1 AUXILIARY DRAIN PAN SEE DETAIL ON SHEET M-502 FOR MORE
INFORMATION. CORPORATION
2. ALL LAVATORY FAUCETS MUST HAVE AN AVERAGE FLOW RATE OF LESS
THAN OR EQUAL TO 1.5 GPM.
3. ALL SHOWERS MUST HAVE AN AVERAGE FLOW RATE OF LESS THAN OR
EQUAL TO 1.75 GPM.
4. ALL TOILETS MUST HAVE AN AVERAGE FLOW RATE OF LESS THAN OR
EQUAL TO 1.1 GPM.
5. FOR PLUMBING LEGEND AND ABBREVIATIONS SEE MECHANICAL LEGEND
AND ABBREVIATIONS ON SHEET M-001.

30 FOREST STREET SOMERVILLE, MA


T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

CONSULTANT:

EBL ENGINEERS, LLC


MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail eblOeblengineers.com

3 4 4.1 5 6 6.1

F
“1 PROFESSIONAL CERTIFICATION:
1 2 I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012

PROJECT:

National Institute of
E
r i 4" V FROM BELOW
Standards and Technology
UP TO 4” VTR ATTIC

4” SUB SOIL VENT NET ZERO ENERGY


[
FROM BELOW UP
TO 4” VTR RESIDENTIAL TEST
FACILITY
2” D DN 2” D BELOW
E.1 O o FLOOR NIST Campus
Gaithersburg, MD
OSD 7

ani
U.S. Department of Energy ^
Research Toward Zero Energy Homes
FCU-1
n n
D
U.S. DEPARTMENT OF
C.1 O O Energy Efficiency &
ENERGY Renewable Energy
G:\projects\2009\09247.000\cadd\submission 110%\09-247 P-104.dwg, 3/31/2010 3:42:52 PM, pplourde

L J ATTIC
C i

MARK DATE DESCRIPTION


ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 P-104
J
r B
DRAWN BY: PJP
CHECKED BY: EAH

A COPYRIGHT C 2009 o
BUILDING SCIENCE CORPORATION

SHEET TITLE:

ATTIC FLOOR PLAN


o n n A.1
PLUMBING

CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED

ATTIC FLOOR PLAN PLUMBING N


SCALES MUST BE USED.

SCALE: J4' = 1’-0’


GRAPHIC SCALE
0 2* 4* 8’ 12’
1/4”=1’—0 P-104
BUILDING SCIENCE
1” HW 1” HW
CORPORATION
SHUT-OFF VALVE (TYP)
SEE DOMESTIC WATER MANIFOLD
SOLENOID VALVE
SCHEDULE DWM-1 ON SHEET
NORMALLY CLOSED
P-601 FOR DOMESTIC HOT AND
COLD WATER DISTRIBUTION LIST (BY OTHERS)

s--&—<|>—
HW-1
1 CW-1 —<*>—?
(TYP 24)

s—<j>— HW-2 CW—2 —cj>——?


s—<j>— HW-3 CW—3 —<j>—--i
s—<j>— HW-4 CW—4 —(j>—1&—?
s—<j>— HW-5 CW—5 —<j>—--i
s—<j>— HW-6 CW—6 —<j>—--? 30 FOREST STREET SOMERVILLE, MA
s—<j>— HW-7 CW—7 —<j>—--i T: (978) 589-5100 F: (978) 589-5103
s—<j>— HW-8 CW—8 —<j>—--? www.buildingscience.com
s—<j>— HW-9 CW—9 —<j>—--i
s—<j>— HW-10 CW-10 —<j>—--?
CONSULTANT:
)—1&—<i>—
HW-11 CW-11 —<j>—--i
HW-12 CW-12 —<j>—--?
HW-13 CW-13 —<j>—--i
CAPPED FOR HW-14 CW-14 —<j>—--?
FUTURE (TYP 7)
HW-15 CW-15 —
E-$— HW-16 CW-16 —$-3
EBL ENGINEERS, LLC
MECHANICAL • ELECTRICAL • FIRE PROTECTION
DWM-1
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail eblOeblengineers.com
DOMESTIC WATER MANIFOLD DETAIL
NO SCALE

MANUAL AIR VENT (TYP) MANUAL AIR VENT (TYP)


PROFESSIONAL CERTIFICATION:

4h|i- 4h|i- I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012
SOLAR COLLECTION SOLAR COLLECTION
PANELS ON ROOF PANELS ON ROOF PROJECT:

National Institute of
'' <'
GLYCOL RETURN GLYCOL RETURN Standards and Technology
H| — GR —
1 H| — GR —
1 NET ZERO ENERGY
DOMESTIC WATER DOMESTIC WATER
GS
I CIRCULATING PUMP GS
I CIRCULATING PUMP RESIDENTIAL TEST
GLYCOL SUPPLY
1
GLYCOL SUPPLY
H>- FACILITY
VALVED AND CAPPED
SERVICE PORT, PROVIDE
I UP VALVED AND CAPPED
SERVICE PORT, PROVIDE
1 T UP NIST Campus
CHAIN FOR CAP------------- '
i
|hh6|J
CHAIN FOR CAP------------- '
a 31
Gaithersburg, MD

GLYCOL SYSTEM GLYCOL SYSTEM


ET—3 EXPANSION TANK PUMP ET—2 EXPANSION TANK PUMP
''Buttotna
5
i.
SOLAR SYSTEM
HEAT
EXCHANGER
¥ SOLAR SYSTEM
HEAT
EXCHANGER
auA
U.S. Department of Energy ^
* Research Toward Zero Energy Homes

U.S. DEPARTMENT OF
1” 110* F HW Energy Efficiency &
OUTLET
BALL VALVE (TYP)
ENERGY Renewable Energy
II TEMPERATURE
G:\projects\2009\09247.000\cadd\submission 110%\09-247 P-501.dwg, 3/31/2010 3:38:52 PM, pplourde

GAUGE--------- THERMOSTATIC 1” HW X7
MIXING VALVE
MV-1
<(> 7 “ THERMOMETER
/—THERMOMETER
Z! r hw
l
/ (TYP) 1 2’ MIN- 1” cw 110’ F
□ ii
p
—(j>
NC 1
<p— i- i

•G- \ r cw ■e*
n" i i
MARK DATE DESCRIPTION
ET—1 EXPANSION TANK - DOMESTIC COLD TEMPERATURE &
WATER SUPPLY PRESSURE ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
THERMAL EXPANSION

11 11 s_t£i UNION (TYP) 11 11


PROTECTION
5—5_£i RELIEF VALVE

PROJECT NO: NIST NZERTF


TEMPERATURE &
PRESSURE RELIEF CAD DWG FILE: 09-247 P-501
VALVE (TYP)
DOMESTIC WATER DOMESTIC WATER DRAWN BY: PJP
C 3. DRAIN PIPE
SOLAR PRE-HEAT SOLAR PRE-HEAT
SPILL OVER DRAIN PIPE SPILL WATER HEATER DRAIN PIPE SPILL CHECKED BY: EAH
STORAGE TANK STORAGE TANK
FLOOR DRAIN OVER FLOOR DRAIN OVER FLOOR DRAIN
COPYRIGHT C 2009 o
4” CONCRETE 4” CONCRETE 4” CONCRETE BUILDING SCIENCE CORPORATION
DRAIN VALVE DRAIN VALVE DRAIN VALVE
PAD
L
—tXF^
PAD PAD
SHEET TITLE:

FLOOR

NOTES:
PLUMBING
1. CONTRACTOR TO FOLLOW THE MIXING VALVE MANUFACTURERS RECOMMENDED DETAILS
PIPING FOR COLD, HOT AND RECIRCULATING CONNECTIONS.
2. THE PIPE SIZE TO THE MIXING VALVE SHALL BE FED FULL LINE SIZE TO THE
MIXING VALVE CONNECTIONS.
3. GLYCOL SYSTEM PIPE SIZING SHALL BE PERFORMED BY SOLAR WATER HEATING
SYSTEM MANUFACTURER. FLUID VELOCITY SHALL NOT EXCEED 8 FT/SEC IN PIPING.
©

NORTH
SCALE AS NOTED

DOMESTIC WATER HEATINO SYSTEM DBTAII.


NO SCALE

P-501
BUILDING SCIENCE
M H NG VALVE SCHEDULE DOMESTIC WATER MANIFOLD-1 (DWM-l) PLUMBING FIXTURE SCHEDULE CORPORATION
CW CONN HW CONN DISCHARGE DISCHARGE
MAX GPM/MAX PORT PORT wssc
UNIT MANUFACTURER 8c PORT FIXTURE FIXTURE PORT UNIT MANUFACTURER
PRESSURE NOTES FIXTURE LOCATION NUMBER NUMBER FIXTURE LOCATION FIXTURE CW HW WASTE VENT NOTES HW CW TOTAL
NO (IN) (IN) CONN (IN) TEMP (*F) MODEL NO SIZE DESCRIPTION DESCRIPTION SIZE NO 8c MODEL NO
DROP (PSIG) 8c TYPE 8c TYPE DFU’S
SFU’S SFU’S SFU’S

MV-1 3/4' 3/4” 1 110 0.5 1 POWERS 1432—RB % LAVATORY BATH #1 HW-1 CW-1 WATER CLOSET BATH #1 % P-1 WATER CLOSET Vi 3” 2 2 4 2.2 2.2

% SHOWER BATH #1 HW-2 CW-2 LAVATORY BATH #1 % P—1 A WATER CLOSETVi 3 2 1,2 4 2.2 2.2
NOTES: BATH #1
% KITCHEN SINK KITCHEN HW-3 CW-3 SHOWER % P-2 LAVATORY Vi Vi 1V? 1 Vi 5 1 0.5 0.5 0.7
1. WALL MOUNTED
% DISHWASHER KITCHEN HW-4 CW-4 KITCHEN SINK KITCHEN % P-2A LAVATORY Vi Vi 1# 1 Vi 1,3 1 0.5 0.5 0.7

% CLOTHES WASHER CLOSET HW-5 CW-5 CLOTHES WASHER CLOSET % P-3 TUB Vi Vi 2 1%' 2 2 1.0 1.0 1.4
EXPANSION TANK SCHEDULE 30 FOREST STREET SOMERVILLE, MA
% LAVATORY BATH #2 HW-6 CW-6 WATER CLOSET BATH #2 % P-3A TUB Vi Vi 2 1 Vi 2 2 1.0 1.0 1.4 T: (978) 589-5100 F: (978) 589-5103
SIZE www.buildingscience.com
UNIT SIZE DxL PRV RV MANUFACTURER 8c
LOCATION SERVICES TYPE NOTES % TUB/SHOWER BATH #2 HW-7 CW-7 LAVATORY BATH #2 % P-4 SHOWER Vi Vi 2 1 Vi 2 2 1.0 1.0 1.4
NO (IN)x(IN) PSIG PSIG FILL SYSTEM MODEL NO
(GAL) (GAL)
% LAVATORY MASTER BATH HW-8 CW-8 TUB/SHOWER BATH #2 % P-4A SHOWER Vi Vi 2 1,2 2 1.0 1.0 1.4
DOMESTIC CONSULTANT:
ET—1 BASEMENT WATER 8.5x11.5 15 30 2.1 80 FLEXCON WH—8
WATER
SOLAR
% LAVATORY MASTER BATH HW-9 CW-9 WATER CLOSET MASTER BATH % P-5 KITCHEN SINK Vi Vi IV 1 Vi 5 2 1.0 1.0 1.4
ET—2 BASEMENT GLYCOL 12.5x19.2 15 30 8.5 80 FLEXCON WH-32
SYSTEM
SOLAR % TUB MASTER BATH HW-10 CW-10 LAVATORY MASTER BATH % P-6 DISHWASHER Vi Vi !Vi 5 2 1.4 1.4
ET—3 BASEMENT GLYCOL 12.5x19.2 15 30 8.5 120 FLEXCON WH-32
SYSTEM
NOTES: % SHOWER MASTER BATH HW-11 CW-11 LAVATORY MASTER BATH % P-7 CLOTHES WASHER Vi Vi 2 1 Vi 2 2 1.0 1.0 1.4

% HW-12 CW-12 TUB MASTER BATH %


NOTES: EBL ENGINEERS, LLC
1. HANDICAP 3. WALL MTD 5. COUNTERTOP MECHANICAL • ELECTRICAL • FIRE PROTECTION
% HW-13 CW-13 SHOWER MASTER BATH % 4. CARRIER 6. WALL OUTLET
The Professional Engineering Center
2. FLOOR OUTLET 8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
% HW-14 CW-14 HOSE BIBB EAST SIDE % e-mail eblOeblengineers.com

WATER HEATER SCHEDULE % HW-15 CW-15 %

STORAGE ELECTRIC MANUFACTURER 8c % HW-16 CW-16 %


UNIT NO CAPACITY INPUT KW RECOVERY NOTES
V/PH/HZ MODEL NO
GALLONS
1ST HR
DWH-1 80 4.0 240/1/60 RAITING 72 1, 2
GPH
0.5 GPM
DWH-2 N/A 3.4 240/1/60 3
@ 48’ RISE PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
NOTES: ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012
1. ASME LISTED 3. INSTANTANEOUS
PROJECT:
2. UL LISTED

4” VTR 4” SUB SOIL VTR National Institute of


ROOF v-f ■¥ Standards and Technology
4” V X NET ZERO ENERGY
2” V
ATTIC RESIDENTIAL TEST
FACILITY

£2 1
ROOF 2” V

NIST Campus

ATTIC
CEILING
f- MASTER
—\V{ v —1 Vi' v
MASTER 2” V J 2” V -A
Gaithersburg, MD

BATH #2 BATH BATH

P-2 P-2 P-2


MASTER MASTER MASTER MASTER MASTER MASTER MASTER MASTER
BATH #2 BATH #2 BATH #2 BATH BATH BATH BATH BATH BATH #2
T/\ BATH #2
T/\ I/N BATH BATH BATH U.S. Department of Energy ^
Research Toward Zero Energy Homes
SECOND P-1 P-1
P-3 3” SAN-i I E=4 ■ Pn±

b
1.4 0.7 2.2 2.2 0.7 0.7 1.4 1.4 FLOOR

I
U.S. DEPARTMENT OF
SFU SFU SFU SFU SFU SFU SFU SFU Energy Efficiency &
x ENERGY Renewable Energy
E=2 P-2 P-1 P-1 P-2 P-2 P-4
x
G:\projects\2009\09247.000\cadd\submission 110%\09-247 P-601.dwg, 3/31/2010 3:38:21 PM, pplourde

&

SECOND FLOOR CEILING


3” SAN
1 V£ V
I
Js
v 4” SAN-1
t 4” SAN 1 Vt V

CLOSET BATH #1 17 KITCHEN


DFU
BATH #1 BATH #1 BATH #1 KITCHEN CLOSET P-7 P-2A e=s. p=£

2” VTR
"ON BATH #1 BATH #1
MARK DATE DESCRIPTION
1.4 0.7 2.2 1.4 1.4 1.4 3
SFU SFU SFU SFU SFU SFU FIRST P—1 A
DFU P-4A ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
ROOF U|L FLOOR

^2
P-4A P-2A E=1 P—5 P-6 E=Z

1
2” V 2” SAN
CONNECT TRAP PRIMERS
FOR FLOOR DRAINS PRIOR PEX HW PIPING PEX CW PIPING \ l $
J PROJECT NO:
CAD DWG FILE:
NIST NZERTF
09-247 P-601
FIRST FLOOR TO DWM-1 TO FIXTURES TO FIXTURES
_______ /
-V-i I DRAWN BY: PJP
19.2
SFU
-y 1” CW —\

A—><---
1” HW 1” CW ET—1 CEILING
b CEILING 2” SAN
CHECKED BY: EAH

irnrs
T 21 6 COPYRIGHT C 2009 O
^—1 Vi’ v DFU DFU BUILDING SCIENCE CORPORATION

5
l BASEMENT
MAIN SHUT-OFF
AND DRAIN
DOWN VALVE-----
BASEMENT
Li P-2
"On
4” SUB SOIL VENT
SHEET TITLE:

PLUMBING
SEE DOMESTIC WATER MANIFOLD GARAGE BASEMENT ED ED
RISERS AND

u
MV-1 FLOOR
SCHEDULE DWM-1 ON THE FLOOR
SHEET FOR DOMESTIC HOT AND
COLD WATER DISTRIBUTION LIST
9.4
SFU HW
KJ 4” PERFERATED SUB SOIL SCHEDULES
VENT BEDDED IN STONE
SOLAR STORAGE SOLAR STORAGE
DWM-1 DWH-1
TANK TANK Z zy
BASEMENT FLOOR *

2” SAN 4” SAN t 4” SAN


©

NORTH
SCALE AS NOTED
1 30
DFU DFU
DOMESTIC WATER RISER DIAGRAM SANITARY PIPING RISER DIAGRAM
NO SCALE NO SCALE

P-601
GENERAL NOTES: (APPLY TO ALL DRAWINGS) MECHANICAL LEGEND MECHANICAL ABBREVIATIONS DUCTWORK LEGEND
1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES IS SHOWN IN AN APPROXIMATE SYMBOL ABBREV DESCRIPTION ABBREVIATION DESCRIPTION
DOUBLE LINE SINGLE LINE DESCRIPTION BUILDING SCIENCE
WAY ONLY. DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE
COMMENCING WORK. REPAIR ALL DAMAGES OCCASIONED BY FAILURE TO EXACTLY
LOCATE AND PRESERVE ANY AND ALL UNDER GROUND UTILITIES.
CW COLD WATER; DOMESTIC CUH
CX
CABINET UNIT HEATER
CONNECT TO EXISTING FLEXIBLE DUCT CONNECTION
CORPORATION
HW HOT WATER; DOMESTIC FC FC
2. RUN ALL SOIL, WASTE AND DRAIN PIPING WITH 2 PERCENT MINIMUM GRADE UNLESS D DIFFUSER
OTHERWISE NOTED. HORIZONTAL VENT PIPING SHALL BE GRADED TO DRIP BACK TO HWR HOT WATER RECIRC; DOMESTIC
AIR FLOW MEASURING DEVICE
THE SOIL OR WASTE PIPE BY GRAVITY. DIA DIAMETER
G G GAS
--------- 1 VD --------1 VD MANUAL VOLUME DAMPER
3. ELEVATIONS NOTED ARE TO CENTERLINES OF PIPES FOR ALL PRESSURE LINES AND DB DRY BULB
PD PD PUMPED DISCHARGE
TO INVERT FOR ALL GRAVITY FLOW LINES. DDC DIRECT DIGITAL CONTROL ----- BDD ----- BDD
SAN SANITARY BACKDRAFT DAMPER
4. MAINTAIN MINIMUM OF 3-0” COVER OVER UNDERGROUND WATER MAINS AND DP DIFFERENTIAL PRESSURE SWITCH FIRE DAMPER (1-1/2 HOUR UNLESS
MINIMUM OF 2-6” COVER OVER UNDERGROUND SEWERS AND DRAINS. V VENT
EA EXHAUST AIR OTHERWISE NOTED)
D D (A/C) CONDENSATE DRAIN
5. PROVIDE AN AIR VENT AT THE TOP OF ALL RISERS AND AT THE HIGH POINT OF EACH EAT ENTERING AIR TEMPERATURE SMOKE DETECTOR
DROP IN THE HEATING/CLOSED HEAT PUMP/GLYCOL/ AND CHILLED WATER SYSTEM. FDN FOUNDATION DRAIN
EER ENERGY EFFICIENCY RATIO
--------- O MOD --------O MOD MOTOR OPERATED DAMPER
6. UNLESS OTHERWISE NOTED, ALL PIPING AND DUCTWORK IS OVERHEAD, TIGHT TO .O CO CLEANOUT; LINE; FLOOR
EF EXHAUST FAN
UNDERSIDE OF SLAB, WITH SPACE FOR INSULATION IF REQUIRED.
IW INDIRECT WASTE EFT ENTERING FLUID TEMPERATURE
(^) DP
30 FOREST STREET SOMERVILLE, MA
7. INSTALL PIPING AND DUCTWORK SO THAT ALL VALVES AND DAMPERS ARE DIFFERENTIAL PRESSURE SWITCH
ACCESSIBLE.
D—1 FLOOR DRAIN EG EXHAUST GRILLE T: (978) 589-5100 F: (978) 589-5103
RG RG REFRIGERANT HOT GAS ESP EXTERNAL STATIC PRESSURE www.buildingscience.com
8. COORDINATE ALL MECHANICAL WORK WITH ELECTRICAL WORK, ETC., SHOWN ON SMOKE DAMPER
OTHER DRAWINGS. RL RL REFRIGERANT LIQUID ETR EXISTING TO REMAIN
—■-©
9. EXCEPT AS OTHERWISE NOTED, LOCATE ALL ROOM THERMOSTATS 60 INCHES ABOVE
FINISHED FLOOR. NOTIFY THE ENGINEER OF ANY ROOMS WHERE THE ABOVE
D—1 AREAWAY DRAIN EWT ENTERING WATER TEMPERATURE
t R ♦R RISE IN DUCT (DIRECTION OF AIR
FLOW) CONSULTANT:
LOCATION CANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION. l DOOR LOUVER EX EXISTING
DROP IN DUCT (DIRECTION OF AIR
10. CERTAIN ITEMS SUCH AS ACCESS DOORS, CLEANOUTS, RISE AND DROPS IN DUCTWORK t CENTERLINE
F FAHRENHEIT
I D Id FLOW)
AND PIPING, ETC., ARE INDICATED ON THE DRAWINGS FOR CLARITY OR A SPECIFIC FA FACE AREA
LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE
REQUIREMENTS FOR THESE ITEMS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
UC

PRV
UNDERCUT

PRESSURE REDUCING VALVE


FC FLEXIBLE CONNECTION □ [] ACCESS DOOR

THESE ITEMS AS REQUIRED ELSEWHERE IN THE CONTRACT DOCUMENTS. FCU FAN COIL UNIT

11. FLOW SCHEMATIC AND RISER DIAGRAMS INDICATE FLOW AND OPERATION CONCEPT AS
A SOLENOID VALVE FD FLOOR DRAIN
* BRANCH WITH 45* TAP
EBL ENGINEERS, LLC
A MECHANICAL • ELECTRICAL • FIRE PROTECTION

m
WELL AS GENERAL ARRANGEMENT OF EQUIPMENT. VALVES, PRESSURE GAUGES, ETC. 2-WAY CONTROL VALVE FLA FULL LOAD AMPS VD VD
PRE-FABRICATED ROUND BRANCH
ARE INDICATED FOR THIS PURPOSE. ADDITIONAL VALVES, PRESSURE GAUGES, ETC.
SHALL BE PROVIDED AS SHOWN ON VARIOUS EQUIPMENT DETAILS. SEE PLANS AND 3-WAY CONTROL VALVE FOT FLAT ON TOP -F* FITTING WITH VOLUME DAMPER
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
DETAILS FOR PIPE SIZES NOT INDICATED ON FLOW SCHEDULE AND RISER DIAGRAMS. FOB FLAT ON BOTTOM (410) 668-8000 FAX (410) 668-8001
GAS COCK VD VD e-mail eblOeblengineers.com
FLEXIBLE DUCTWORK BRANCH WITH
12 DUCTS ARE SIZED FOR COOLING TO ALLOW INSTALLATION OF CENTRAL COOLING
IF SPECIFIED. SEE MECHANICAL SPECIFICATION FOR COOLING LOAD.
©A
THERMOSTAT AHU W/8 20 GAUGE
SHIELDED WIRE CABLE TO ZONE
CONTROLLER IN BASEMENT
FPM
FV
FEET PER MINUTE
FACE VELOCITY )p— VOLUME DAMPER FROM ROUND
BRANCH FITTING
13. SIZES FOR BRANCH RUN-OUTS ARE GIVEN AS ROUND DUCT DIAMETER. WHERE OVAL G GRILLE
SECTIONS ARE USED, THESE ARE TO BE SIZED EQUIVALENT TO THE GIVEN ROUND DUCT
SIZES.
©B THERMOSTAT FCU GAL GALLONS V TRANSITION

14. AIRFLOWS BELOW 20 CFM ARE NOT SUBJECT TO TAB BALANCING REQUIREMENTS. THERMOSTAT BLANK W/8 20 GAUGE GPM GALLONS PER MINUTE
m SHIELDED WIRE CABLE TO ZONE
CONTROLLER IN BASEMENT
HD HEAD
/
A ”A
ft

3 WAY SPLIT IN MAINS AREA "A


M

15 ALL DUCTS TO BE SEALED WITH MASTIC AND LOCATED IN CONDITIONED SPACE. /


m TEMPERATURE SENSOR
HP HORSE POWER IS EQUAL TO SUM OF AREAS ”B”,

„j-4
B ,v> D B '--- f "D
C„_J
16. ALL DUCTS TO BE ARRANGED AND INSTALLED IN SUCH MANNER AS TO OFFER MINIMUM HRV HEAT RECOVERY VENTILATOR ”C” 8c ”D”
AIRFLOW RESISTANCE. © HUMIDISTAT
HVD HIGH VELOCITY DUCT C”
PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,

17. ALL REGISTERS TO HAVE ADJUSTABLE TURNING VANES AND CLOSE-OFF DAMPER. © SENSOR LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012
HVID HIGH VELOCITY INDUCTION DIFFUSER 2 WAY SPLIT IN MAINS AREA ”A
M

18. A MANUAL DAMPER TO BE LOCATED AT EACH TAKE-OFF / MAIN TRUNK JUNCTION TO


fi VACUUM BREAKER
ID INSIDE DIAMETER LA_ |----j..c IS EQUAL TO SUM OF AREAS ”B” &
PROJECT:

1 c
B J £n4”
CONTROL FLOW. SA SHOCK ABSORBER c” ALL SQUARE ELBOWS
INV INVERT ft
SHALL HAVE TURNING VANES National Institute of
19. A NORMALLY OPEN MOTORIZED DAMPER TO BE LOCATED AT EACH TAKE-OFF /MAIN £ MAV MANUAL AIR VENT IW INDIRECT WASTE
Standards and Technology
TRUNK JUNCTION TO ALLOW AUTOMATED CONTROL.
/ KW KILOWATT tt
/ HB HOSE BIBB WITH VACUUM BREAKER A A” 2 WAY SPLIT AT END OF MAIN,
20. TRANSFER GRILLES TO BE PROVIDED FOR PRESSURE RELIEF / PRESSURE EQUALIZATION KWH KILOWATT HOUR
$ HB AREA "A" IS EQUAL TO SUM OF
BETWEEN CLOSED ROOMS AND COMMON AREAS AND BETWEEN BEDROOM CLOSETS AND
»»
J’c ?—III—e”c AREAS ”B” & ”C
ft
NET ZERO ENERGY
BEDROOMS.
5 FLOW SWITCH
LAT LEAVING AIR TEMPERATURE B ■v v>v> B
21. DOORS TO BE UNDERCUT 3/4” BETWEEN TOP OF FINISH FLOOR AND UNDERSIDE OF DOOR.
A/WV FLEXIBLE PIPE CONNECTOR
LRA LOCKED ROTOR AMPS
RESIDENTIAL TEST
22. AIR HANDLER TO BE LOCATED AND ACCESSED WITHIN INTERIOR CONDITIONED SPACE. LFT LEAVING FLUID TEMPERATURE A A”
BACKFLOW PREVENTER; DIRECTION OF 2 WAY OVER 8c UNDER SPLIT AT
FACILITY
23. RETURN DUCT TO BE BUILT WITH TWO OFFSET BENDS TO REDUCE SOUND TRANSMISSION
AND A VIBRATION ISOLATION SECTION.
s
>
FLOW INDICATED
CONCENTRIC REDUCER
LWT
MBH
LEAVING WATER TEMPERATURE
1000 BTU/HR B
tt T3 }”C
U\£ rc
END OF MAIN, AREA ”A” IS EQUAL
TO SUM OF AREAS "B” 8c C”
NIST Campus
24. A FILTER WITH A MERV 13 RATING TO BE INSTALLED AT THE AIR HANDLER. ECCENTRIC REDUCER MOD MOTOR OPERATED DAMPER
VD VD FLEXIBLE DUCTWORK BRANCH WITH Gaithersburg, MD
PIPE GUIDE MTD MOUNTED
25. HEAT RECOVERY VENTILATOR TO BE INSTALLED TO SUPPLY FRESH AIR TO INTERIOR.
PIPE ANCHOR NC NORMALLY CLOSED
fH>~ VOLUME DAMPER FROM SQUARE TO
ROUND
26. ALL DUCTWORK TO BE SHEET METAL. SUPPLY TRUNKS IN BASEMENT TO BE INSULATED
TO R-4.2. NIC NOT IN CONTRACT
PIPE UNION
NO NORMALLY OPEN

HEAT RECOVERY VENTILATOR: 1 THERMOMETER


NTS NOT TO SCALE
RADIUS ELBOW
U.S. Department of Energy ^
J. PRESSURE/TEMPERATURE TEST PLUG OA OUTSIDE AIR Research Toward Zero Energy Homes
1. SUPPLY AND EXHAUST DUCTS BETWEEN HEAT RECOVERY VENTILATOR AND EXTERIOR TO
OBD OPPOSED BLADE DAMPER 3 SUPPLY
BE INSULATED ALONG THE ENTIRE LENGTH TO CONTROL CONDENSATION.
£ PRESSURE GAUGE WITH STOPCOCK
OD OUTSIDE DIAMETER
U.S. DEPARTMENT OF
Energy Efficiency &
2. SUPPLY AND EXHAUST DUCTS BETWEEN HEAT RECOVERY VENTILATOR AND EXTERIOR TO BE
POSITIONED SO THAT THERE IS A FALL / SLOPE TOWARD THE OUTSIDE AIR INLET TO DRAIN GAUGE COCK POD POINT OF DISCONNECT
13 RETURN
ENERGY Renewable Energy
ANY INCIDENT PRECIPITATION IN THE DUCT. SLOPE THE FIRST 4’ OF DUCT RUN FROM THE
13
G:\projects\2009\09247.000\cadd\submission 110%\09-247 M-001.dwg, 3/31/2010 3:26:00 PM, pplourde

SHUT OFF VALVE (SEE SPECIFICATION PRV PRESSURE REDUCING VALVE EXHAUST
EXTERIOR, OR THE ENTIRE FIRST SECTION IF SHORTER THAN 4’. FOR TYPE)
PSIG POUNDS PER SQUARE INCH-GAGE
3. HEAT RECOVERY VENTILATOR TO BE PLACED ABOVE PLUMBED DRAIN PAN. CHECK VALVE; DIRECTION OF FLOW
INDICATED
BALANCING VALVE
PSF
R
POUNDS PER SQUARE FOOT
REGISTER
Q ROUND DUCT UP

IS!
RA RETURN AIR DIFFUSER (4 WAY UNLESS NOTED)
<f> BALL VALVE NECK SIZE &c CFM NOTED)
RD ROOF DRAIN
* BUTTERFLY VALVE
RH RELATIVE HUMIDITY
BACKWATER VALVE; DIRECTION OF RETURN REGISTER OR GRILLE SIZE
a BWV
FLOW INDICATED RL REFRIGERANT LIQUID 8c. CFM NOTED

a IN-LINE CIRCULATING PUMP RLA RUNNING LOAD AMPS


EXHAUST REGISTER OR GRILLE SIZE
MARK
ISSUE:
DATE
03/31/10
DESCRIPTION
ISSUED FOR CONSTRUCTION
e CX CONNECT TO EXISTING RLX RELOCATE EXISTING
8c CFM NOTED
RPM REVOLUTIONS PER MINUTE
MECHANICAL ABBREVIATIONS RX REMOVE EXISTING
PROJECT NO: NIST NZERTF
DIFFUSER CONNECTED TO FLEX
ABBREVIATION DESCRIPTION DUCT CAD DWG FILE: 09-247 M-001
SA SUPPLY AIR
0 OR DIA DIAMETER DRAWN BY: PJP
SCT SATURATED CONDENSING TEMPERATURE
AT CHECKED BY: EAH
SD SMOKE DAMPER
ACH AIR CHANGES PER HOUR COPYRIGHT O C 2009

A/C AIR CONDITIONING


SENS/TOT SENSIBLE/TOTAL
MECHANICAL ABBREVIATIONS BUILDING SCIENCE CORPORATION
SP STATIC PRESSURE
SECTION DESIGNATION SHEET TITLE:
AFF ABOVE FINISHED FLOOR SST SATURATED SUCTION TEMPERATURE
AHU AIR HANDLING UNIT SV SECTION VALVE SECTION LETTER
AP ACCESS PANEL TEMP TEMPORARY A MECHANICAL LEGEND
1J1 SHEET NO. WHERE SECTION IS SHOWN
APD AIR PRESSURE DROP TYP TYPICAL SCHEDULES &
APG AIR PRESSURE GAUGE V VENT
ATC AUTOMATIC TEMPERATURE CONTROL V/PH/HZ VOLTS/PHASE/HERTZ
SHEET NO. WHERE SECTION IS CUT DETAILS
AVG AVERAGE VD VOLUME DAMPER PARTIAL PLAN/DETAIL DESIGNATION
AWG AMERICAN WIRE GAUGE

©
VTR VENT THRU ROOF
DETAIL NO.

NORTH
BDD BACK DRAFT DAMPER W WHITE/WATER/WEST SCALE AS NOTED
BHP BREAK HORSE POWER
1
WG WATER GAUGE SHEET NO. WHERE ITEM IS SHOWN
1J1
BTUH BRITISH THERMAL UNITS PER HOUR
WB WET BULB

M-001
BWV BACK WATER VALVE
WPD WATER PRESSURE DROP SHEET NO. WHERE ITEM IS TAKEN
§ OR CFM CUBIC FEET PER MINUTE W/0 WITHOUT
\ / BUILDING SCIENCE
/ /
GENERAL NOTES: (APPLY TO THIS DRAWING ONLY)

1. CONTRACTOR SHALL COORDINATE FINAL LOCATION OF VALVE HANDHOLES


CORPORATION
WITH LANDSCAPE ARCHITECT. HANDHOLE LOCATIONS SHALL BE OBSCURED
FROM VIEW BY LANDSCAPE FEATURES.

2. ELECTRICAL CONDUIT SHALL BE TERMINATED VERTICAL, 1-0” ABOVE GRAVEL


BASE WITHIN HANDHOLE. PROVIDE THREADED GLAND SEAL TERMINATION FOR
PASSAGE OF INSTRUMENTATION WIRE AT BOTH ENDS.

HORIZONTAL CIRCUIT-3

30 FOREST STREET SOMERVILLE, MA


f /
/ HORIZONTAL TRENCH HEAT EXCHANGER 3 PARALLEL
»» T: (978) 589-5100 F: (978) 589-5103
CIRCUITS, 2 TRENCHES/CIRCUIT, 2’-0” WIDE, 6’-0 www.buildingscience.com
/ DEPTH, 10-0” TRENCH SEPARATION, 115-0” LENGTH
[ _ PER TRENCH
HORIZONTAL CIRCUIT-2

CONSULTANT:

7.
HORIZONTAL CIRCUIT-1

t EBL ENGINEERS, LLC


7 /
/
MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
/
n 8005 Harford Road, Baltimore, Maryland 21234—5701

VALVE HANDHOLE
7 A %
A %
Jt
(410) 668-8000 FAX (410) 668-8001
e-mail eblOeblengineers.com

1
•1 y2”0 HPWR/HPWS & 34” PVC
\
M-502 INSTRUMENTATION WIRE / \\
CONDUIT WITH PULL STRING f W
M-502
44
;44
41 •< 44 44
■<
“44
*F
jt
If
.4* .A .a *
44

VERTICAL BORE WELL 44 44 ACCESSIBLE PATfO


HEAT EXCHANGER. -*^A VALVE HANDHOLE
jt 44
WEST DR

PARALLEL CIRCUITED A.
PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
44
20’—0” BORE SPACING, A
•V 44
■<
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
150 FT DEPTH—s. , !4
I
1 LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012
44
f ■wj
f A 44
-( PROJECT:
i
44 4*
[44
M-502
•<
■t^A
r

/
A
R4

.A
•f
M-502 National Institute of
44
yr GAS METER LOCATION
Standards and Technology
1 144
44
44
•< Jt

44

A ■(
44
.• 44

A
f
^A 44

^A
.• 1 y2”<l> HPWR/HPWS 8c %” PVC \ NET ZERO ENERGY
,4* A \*A INSTRUMENTATION WIRE CONDUIT'
.rf7
‘f
44
'*(44

•Jjf7
■v
L
44

.rf7 Jt WITH PULL STRING RESIDENTIAL TEST


.
FACILITY
’•Ks H
44
•f .4"
*r
.A .A
-• 44
VALVE HANDHOLE
A ■{
.4*
f
ACCESSIBLE WALKWAY
W7
44
■*^A NIST Campus
1 Gaithersburg, MD

M-502
M-502

_
U.S. Department of Energy ^
Research Toward Zero Energy Homes

U.S. DEPARTMENT OF
Energy Efficiency &
ENERGY Renewable Energy
G:\projects\2009\09247.000\cadd\submission 110%\09-247 M-002.dwg, 3/31/2010 3:26:39 PM, pplourde

SLINKY TUBE HEAT EXCHANGER 3 PARALLEL CIRCUITS,


44
V
A. 6 PITCH, 5-0” WIDE, 6-0” DEPTH, 10-0” SEPARATION
44

44
BETWEEN TRENCHES, 130-0” LENGTH PER TRENCH
'l
■(

44 ,44

A A MARK DATE DESCRIPTION


.A
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
EX WALKWAY

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 M-002
DRAWN BY: PJP
EX PARKING LOT
CHECKED BY: EAH

COPYRIGHT C 2009 o
BUILDING SCIENCE CORPORATION

SHEET TITLE:

MECHANICAL
SITE PLAN

MECHANICAL SITE PLAN N CAUTION:


©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALE: 1” = 20’-O’
SCALES MUST BE USED.

GRAPHIC SCALE

0 10’ 20’ 30’ 40’ 60’


1 ”=20’—0
»
M-002
3 4 4.1 5 6

SA UP TO
GENERAL NOTES: (APPLY TO THIS SHEET ONLY) BUILDING SCIENCE
7” SA
i
D—1 ABOVE
1.
2.
DUCT RUNOUTS ARE LOCATED WITHIN JOIST BAY 8c PARALLEL TO JOISTS
COORDINATE WITH ELECTRICAL, PLUMBING 8c ARCHITECTURAL PLANS.
CORPORATION
4x9 HRV
3. SEE SHEET M-501 FOR MECHANICAL DUCTWORK DETAILS.
EA UP
JL JL JL JL JL JI 4. COORDINATE ALL WALL PENETRATIONS WITH ARCHITECTURAL PLANS.
—/=T~ hvu" upn-a>^0)HVID-1 I. DINING ROOM 1 l><! 2” HVD UP TO^
TRANSFER

c
/ HVID-1 ABOVEQq)
6” HRV EA s HVID-1 ABOVE (jo)
GRILLE

5T7I
HPWR
HPWS
-H
4x12 SA UP
KITCHEN
£.
7” SA
l
i
i
i \\ BASEMENT i

14 M
FD DRAWING NOTES:(APPLY TO THIS SHEET ONLY)
4x9 HRV OA
INTAKE FROM MOD ^ MOD
4x9
HRV-1
(TYP 4)
D—2
60$
© UNIT ISOLATION OPPOSED BLADE DAMPER SEE SPECIFICATION.

c
ABOVE------------

1 y2 HPWS 8c
6” HRV OA ' r\
■p1

10x10 RA
FROM R—1
2” HVD UP © PEX FLOOR HEAT MANIFOLD FOR
PEX PIPING SYSTEM LAYOUT.
FUTURE SYSTEM. SEE SHEET M-106 FOR

6” HRV EA i r\ TO HVID=1
HPWR ROUTED

r
5a
ABOVE ABOVE F.1 (3) %”0 PVC INSTRUMENTATION CONDUIT W/PULLSTRING TO VALVE
IN JOIST
SPACE
Lv> 3x11 SA UP w HANDHOLE. SEE SHEET M-002.
30 FOREST STREET SOMERVILLE, MA
E 7”0 INSULATED HIGH VELOCITY DUCT (jo) (4) 1 y2" HPWS 8c HPWR TO SLINKY TUBE HEAT EXCHANGER VALVE HANDHOLE. T: (978) 589-5100 F: (978) 589-5103
^ SEE SHEET M-002. www.buildingscience.com
<' <jn)HVID-1 . 6” HRV
5” HRV EA FROM SA (i) 1 y2 HPWS 8c HPWR TO VERTICAL BORE VALVE HANDHOLE. SEE SHEET
4” SA (D) \ M-002.
ABOVE TO HRV

L 10x10 RA

3x8 SA UP
-0> BASEMENT
BATH 1

MOD
S
l
i

H-2
MOD
6” SA
(?) 1 y2 HPWS 8c HPWR TO HORIZONTAL TRENCH HEAT EXCHANGER VALVE
w HANDHOLE. SEE SHEET M-002.

© POINT OF DISCONNECT OF DUCTWORK FOR AHU-2 INSTALLED UNDER THIS


CONTRACT.
CONSULTANT:

OH i ii
I
CL 7” SA
t
© POINT OF DISCONNECT FOR THE HIGH VELOCITY OPTION DUCTWORK

CO

Q.
x
4x12 SA UP
KITCHEN
L 2
t
i
tr-S
\
i i
DINING ROOM
i i
7” SA

DINING ROOM
SA UP TO
D—1 ABOVE
©
INSTALLED UNDER THIS CONTRACT SERVING FUTURE AHU-4.
RETURN DUCTWORK SHOWN FOR HIGH VELOCITY UNIT AHU-4 IS FOR
COORDINATION ONLY. RETURN DUCT TAP FOR AHU-4 NOT INSTALLED EBL ENGINEERS, LLC
x 2” HVD UP TO —N
MOD
2” HVD UP HPWS

18x14 SA
5” SA UP HVID-1 ABOVE (jo) TO HVID-1 UNDER THIS CONTRACT. MECHANICAL • ELECTRICAL * FIRE PROTECTION
HPWR
MASTER BATH
2i ABOVE (g) E * (lO) HIGH VELOCITY OPTION. The Professional Engineering Center
4” SA UP I 8005 Harford Road, Baltimore, Maryland 21234-5701

MASTER CLOSET
2i (410) 668-8000 FAX (410) 668-8001

18x12 RA
e-mail ebl@eblengineers.com
1—
V 5” SA UP
D TO D—1
2

CD

X
(X
>
KITCHEN !
4” SA UP ABOVE-^
MASTER CLOSET i
6” SA UP 4x9 HRV

L0J
MASTER BEDROOM
213
i
4” HRV
\ SA UP
E.1

I I
5” SA UP
rx'<sE
»

3
i 8x6 RA
5” HRV EA BATH 2 i
FROM

HPWR
2” HVD UP
FROM ABOVE MOD (TYP 7)
$ ABOVE HVID-1 0
TO HVID-1 3x8 SA 9”0 INSULATED HIG
TO HRV —<T 7”0 INSULATED
ABOVE (j?)- UP VELOCITY DUCT UP
© 3x8 HRV 8x6 RA
HIGH VELOCITY

HPWS
SA UP- DUCT fin}
@HVID-1 13x5y2 RA FROM ABOVE PROFESSIONAL CERTIFICATION:
MOD I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
--------O \ 13x5y2 RA
ME. AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,

II
II
J 4” SA \i -- 2” HVD UP
LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012

I PROJECT:
MUDROOM 9”0 INSULATED HIGH VELOCITY DUCT(jo) l HPWR TO HVID-1
■*«
4 #> HPWS ABOVE @
I
i
8x6 SA L: 2
7 National Institute of
I D
vj/
r +i r \\ Standards and Technology
--O
1
o-----
i
MOD o_____
r
r ZONE CONTROL
1 8 8 1
© \ \
o
o
MOD

4” SA
MOD Or-
I
i
MOD CM

oh
-n|-

OH O--
a- -
l

------- o MOD (TYP 3) [


L PANEL

]
HIGH VELOCITY
AHU-4 FUTURE 9 i i (—2" HVD UP
TO HVID-1 rTRANSFER NET ZERO ENERGY
c
o i GRILLE
3 LaJ
o ABOVE(g)
O

19x5^ RA
p?
e
m m
I D RESIDENTIAL TEST
I
!■ BEDRM 2

• BEDRM 2

• BEDRM 2

co
FROM R—1
i FACILITY
cn
oo

ABOVE-------
<
X

i
SA UP
i £ D

1^
I

C.1 TO D—1 i
t I
MASTFR I
\ --FD NIST Campus
ABOVE I 5” SA UP
I BEDRM 3 I Gaithersburg, MD
5” SA UP
0 <3 5” SA UP
trs
i MASTER
<
OH @ HVID-1
L, 6, oo
16x18 SA

TO D—1 TO D—1 5” SA UP
X 7”0 INSULATED 1 y2” HPWS 8c HPWR
CO

I! BEDRM 3 I !>
CD

<
3
CL

ABOVE—^ 6” SA UP ABOVE------ oo
L. o------------------ 1 6” SA UP high vn OCITY ROUTED IN JOIST SPACE 'BnUti
I
I LIVING RM IE©- TO D—1 DUCT (10)

<!>MOD (TYP 5)
ABOVE
O

HPWR
U.S. Department of Energy ^
©n r
Research Toward Zero Energy Homes
T

BASEMENT
G:\projects\2009\09247.000\cadd\submission 2010-06-29\09-247 M-101-A1.dwg, 7/27/2010 1:58:11 PM, pplourde

2” HVD UP
T

TT

CO

oo

<
X)
\

X
11s /

TO HVID-1 /! /!
S

CO
✓ /
✓ \
\/

\/

HPWS
ABOVE ^o) x AHU-1 ✓ ✓ U.S. DEPARTMENT OF
Energy Efficiency &
X

11 /\ I I
00 / ✓
a II / \ ✓ ✓
ENERGY
\

Renewable Energy

11/ \ / I / I
/ T

JL
T

RG

111
III
BASEMENT RG
Q
O
o+-

• i i

• i i
RL
r
00 X

RG 8c
r

RL UP
(To) HVID-1
©
I

j
T

L
T

CD
J

oo

<
X)
X
\

\
/

___
------ T
\

\
\

X:

c
18x16
✓ \
\/

AHU-2
X

\
\
/ N

FUTURE
\

7”0 INSULATED HIGH HPWR


V:
\

\
\

HPWS 07/27/10 HIGH VELOCITY OPTION

CO
VELOCITY DUCT
L_
\

\J
\
/

^1

<
n
T

— HPWR
U
T

HPWS MARK DATE DESCRIPTION


I

R\
2” HVD UP I LIVING RM I I I I
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
TO HVID-1
ABOVE (io) £ I BASEMENT
I I

HE) D—2
a 2” HVD UP
i
5 ■/ M60$ PROJECT NO: NIST NZERTF
TO HVID-1 i LIVING RM 4” SA UP 5”0 SA
CAD DWG FILE:
SA UP TO
ABOVE (lo)- lr-5 6” SA UP
09-247 M-101-A1
I DRAWN BY: PJP
D—1 ABOVE i HALL
DH—1 i i
S
L 5” SA CHECKED BY: EAH
MOD =4
i MASTER
2
BEDROOM 4
3 IT-S
5” SA UP SA UP COPYRIGHT C 2009 o
16x18 SA

t 2” HVD UP TO D—1 BUILDING SCIENCE CORPORATION


11 11 I
• BEDROOM 3 ABOVE

3
TO HVID^I
(EDI BASEMENT
t
I
=4
5 ABOVE (jo) ... ....... : i j)~<!>~| iS J SHEET TITLE:
V. MOD 6

r
i BEDROOM 3
5” SA
HVID-1 0) D—2
60$
5” SA

I
L MOD 9 ~ MOD
i J
5” SA UP
6” SA SA UP TO GEOTHERMAL
BASEMENT FLOOR
£
BEDROOM 4 ii ii i (TYP 7) l J RETURN MANIFOLD
»
J
SMdH
11 D—1 ABOVE B
Mopy - r 9 MOD
T (S) GEOTHERMAL 2” HVD UP PLAN HVAC
E

J^l IJHALL j i ^living rm! £><Z\ (jq)jviD-i SUPPLY TO HVID-1

f
-t
MANIFOLD ABOVE (g)
HPWR

4” SA
A CAUTION:
SA UP TO TRANSFER SA UP TO 2” HVD UP TO ^
l 8x4 RA FROM
R—1 ABOVE
2” HVD UP TO^
©

NORTH
D—1 ABOVE GRILLE D—1 ABOVE HVID-1 ABOVE (10, HVID-1 ABOVE (6)
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.

©i ©© GRAPHIC SCALE
BASEMENT FLOOR PLAN - HVAC
SCALE: y2” = 1’-0’
N
0 1’ 2’ 4’ 6’
1/2"=1-0' M-101
l J
5
4 4 4 SA UP TO
D—1 ABOVE
I GENERAL NOTES: (APPLY TO THIS SHEET ONLY)
1. DUCT RUNOUTS ARE LOCATED WITHIN JOIST BAY 8c PARALLEL TO JOISTS
BUILDING SCIENCE
< F.1
2.
3.
COORDINATE WITH ELECTRICAL, PLUMBING 8c ARCHITECTURAL PLANS.
SEE SHEET M-501 FOR MECHANICAL DUCTWORK DETAILS.
CORPORATION
LlJ
f f 4. COORDINATE ALL WALL PENETRATIONS WITH ARCHITECTURAL PLANS.
>

4y1 ? 9A
X
x 4x9 HRV EA
FROM BELOW L
© HVID-1

HVID-1 FROM BELOW


in O [^<3 ©
^ ~7| <
© 4x9 HRV OA
INTAKE DN-
ins)
*-nL
x
x
LU
------------- >^-1
D—1
110$ DRAWING NOTES: (APPLY TO THIS SHEET ONLY)

: I D—2
110$ x
TRANSFER
GRILLE------
(?) (FUTURE)(NOT INSTALLED UNDER THIS CONTRACT) FCU-2
^ DRAIN PAN SEE DETAIL ON SHEET M-502 FOR MORE INFORMATION.
WITH AUXILIARY

o
© PIPE SLEVE FOR REFRIGERANT PIPE SEE ARCHITECTURAL DRAWINGS FOR

■B HRV OA EF—1 3x8 SA UP

L
in EXACT LOCATION.
o m

71
O
x 10x10 RA DN
o © HVID-1 F.1 © POINT OF DISCONNECT OF DUCTWORK FOR FCU-2 INSTALLED UNDER THIS
CONTRACT.
6” DRYER o

E
(SO ^1
HRV EA
\
®
®
J in
<
EXHAUST ABOVE
CEILING 3x11 UP
X
Q
Ld
CD
<§> © POINT OF DISCONNECT OF RG 8c RL LINES FOR FCU-2 INSTALLED UNDER
THIS CONTRACT.
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
I Vjt
4
FROM BELOW
1/

r ii
5” SA
© POINT OF DISCONNECT OF RG 8c RL LINES FOR FCU-1 AND FCU-2 www.buildingscience.com
5” HRV EA DN co © HVID-1 INSTALLED UNDER THIS CONTRACT.

EG-1
3x8 SA UP
<
x 3x8 HRV
© \
\ B
D—1
105$ ECU © HIGH VELOCITY OPTION.
50 £

Ifi
TTl 3x8 UP x CONDENSING CONSULTANT:
D—1 LxJ SA UP
X
BATH m FROM UN T
25$ JU
BELOW KITCHEN J\ x
U) R—1 FUTURE

4x12 SA FROM D-2


\
\/
/ >-
x
o Ri-V 360$
DINING D—1
105$ Fy.v?y.—• .-.vl
BELOW-------------- 110$ x 3x8
ROOM 5
/\ SA UP
5” SA FROM XC
*”7I / \ 3x8 SA UP
BELOW----------------
KITCHEN fix)
I
EBL ENGINEERS, LLC
■/ M 1 1 RL F
RG MECHANICAL • ELECTRICAL * FIRE PROTECTION
4” SA FROM
BELOW I

MASTER BATH V D—1
60I/I
D-
120$
<
J
The Professional Engineering Center

4
co 8005 Harford Road, Baltimore, Maryland 21234-5701
(410) 668-8000 FAX (410) 668-8001
MASTER CLOSET >
O' I__________I e-mail ebl@eblengineers.com
[ l (fi) HVID-1 x
4” SA FROM
6” SA FROM
BELOW r BELOW 3x8 FROM BELOW
MASTER CLOSET I 3x8 HRV
SA UP
in

4x9 HRV SA
X

o
x
RL 8c RG TO
5” SA FROM HEADER AT
E.1 BELOW Si MASTER BEDROOM I i FROM FROM BELOW CONDENSING
© HVID-1
5 EA R—1
BELOW
\ (-3x8 SA SA UP TO
UNIT

©
r?-f ari^3
FROM UP D—1 ABOVE
285$ 5” HRV SA
TO
©
3x8 UP © FCU-2
3 ■=r^ 8x6 RA
UP 8c DN
FROM
FUTURE Qy RL-
D—1 PROFESSIONAL CERTIFICATION:

t
BELOW 11 // 1 40$ 14x3y2 RA
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
RG ME. AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
3x8 SA UP V OF THE STATE OF MARYLAND,

in
UP

<
cr
(HRV) LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012
4 RL 8c RG UP
13x5^ 9”0 INSULATED HIGH VELOCITY TO FCU-1 IN PROJECT:

MASTER
7
D—1
25$
RA DN DUCT UP TO ATTIC
© ATTIC

r? National Institute of

©
BEDROOM 4

i

i
MUDROOM LIVING RM
7\ 3x8 HRV SA UP
Standards and Technology
19x5fc RA 3x8 SA UP^ 3x8 SA
DN
t—-J
5" HRV SA UP NET ZERO ENERGY
R—1
400$ 6” SA 3x11
ii ll ] & D RESIDENTIAL TEST
3x11 SA

y^ FACILITY

§
14x15 FROM SA UP
BELOW
©

*
HVID-1
^ 130$

4
3x8 UP

C.1 TRANSFER
GRILLE
i
FROM
BELOW
6” SA UP
FROM BELOW
3x8 HRV SA UP
TO D—1 ABOVE
5” SA FROM
BELOW----------
»
)
BEDROOM 3
MASTER
nX ©
TRANSFER
NIST Campus
Gaithersburg, MD
\ G\

!+'t 4
L J
3x8 UP GRILLE------
FROM 5” SA FROM ,) BEDROOM 3 ACCU-1

t
T AIR TO AIR
BELOW- BELOW----------
6” SA UP ) MASTER CONDENSING UNIT
FROM BELOW
D—1
3x11 UP
D—1
'S*tdi
D—1 FROM XI
50$ 50$ BELOW- 110$
U.S. Department of Energy ^
Research Toward Zero Energy Homes
G:\projects\2009\09247.000\cadd\submission 2010-06-29\09-247 M-102-A1.dwg, 7/27/2010 1:58:28 PM, pplourde

r
■ ix)

U.S. DEPARTMENT OF
Energy Efficiency &
ENERGY Renewable Energy

© x

Io
m

2 o
x
LIVING
ENTRY
J
BEDRM 2

BEDRM 2

HALL ROOM
('FUTURE') ACCU-2
RG 8c RL DN AIR TO AIR
CONDENSING UNIT
O

07/27/10 HIGH VELOCITY OPTION

I---- --------------1 5/7/10 UPDATED


MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
4
3x8 UP FROM
OFFICE/OPTIONAL
© BEDROOM 4
BELOW-----------v 3x8 UP FROM
L J
PROJECT NO: NIST NZERTF

© HVID-1 BELOW
CAD DWG FILE: 09-247 M-102-A1

D—1 HVID-1 ( 6 D—1


30$ -vl-3 D—1
110$
DRAWN BY:
CHECKED BY:
PJP

EAH
50$
PJ
fil HVID-1
s MASTER
D—1 COPYRIGHT C 2009 o
5” SA FROM
110$ BUILDING SCIENCE CORPORATION
BEDROOM 3
BELOW----------
fi) HVID-1
© SHEET TITLE:
6” SA 6” SA HVID-1

SA UP
TO D—1
-SA UP
TO D—1
© HVID-1
©
,)
El 5” SA
5” SA

SA UP TO FIRST FLOOR PLAN


BEDROOM 3
ABOVE ABOVE 8x4 RA DN \ D—1 ABOVE B
TO DH—1 —
•SA UP TO
D—1 ABOVE D—1 © HVAC
D-
50$
-r, TRANSFER
GRILLE i
D-
30$
110$
© HVID-1

A
CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.

GRAPHIC SCALE
FIRST FLOOR PLAN - HVAC
SCALE: K’ = t'-0'
N
0 1’ 2’ 4’ 6’
1/2”=1’—0
M-102
GENERAL NOTES: (APPLY TO THIS SHEET ONLY)
BUILDING SCIENCE
1. DUCT RUNOUTS ARE LOCATED WITHIN JOIST BAY & PARALLEL TO JOISTS
2.
3.
COORDINATE WITH ELECTRICAL, PLUMBING & ARCHITECTURAL PLANS.
SEE SHEET M-501 FOR MECHANICAL DUCTWORK DETAILS.
CORPORATION
4. COORDINATE ALL WALL PENETRATIONS WITH ARCHITECTURAL PLANS.

30 FOREST STREET SOMERVILLE, MA


T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
ACCU-3
GARAGE 2
CONDENSING
UNIT CONSULTANT:

E EBL ENGINEERS, LLC


MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail eblOeblengineers.com

PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012

PROJECT:

o
£T
National Institute of
E.1 OL Standards and Technology
I I I
NET ZERO ENERGY
n 1
RESIDENTIAL TEST
FACILITY
NIST Campus
GARAGE AHU-3 i i
Gaithersburg, MD
r.

'BuUti
VG
U.S. Department of Energy ^
Research Toward Zero Energy Homes

U.S. DEPARTMENT OF
Energy Efficiency &
C.1 ENERGY Renewable Energy
G:\projects\2009\09247.000\cadd\submission 110%\09-247 M-103.dwg, 3/31/2010 3:29:34 PM, pplourde

MARK DATE DESCRIPTION


ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF

"<£>A CAD DWG FILE: 09-247 M-103


DRAWN BY: PJP
CHECKED BY: EAH
c COPYRIGHT C 2009 o
BUILDING SCIENCE CORPORATION

SHEET TITLE:

FIRST FLOOR PLAN


GARAGE HVAC

CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.

FIRST FLOOR PLAN GARAGE HVAC GRAPHIC SCALE


SCALE: y2” = 1’-0’
N
0 1’ 2’ 4’ 6’
1/2”=1’—0 M-103
3 4 4.1 5 6
GENERAL NOTES: (APPLY TO THIS SHEET ONLY)
BUILDING SCIENCE
1. DUCT RUNOUTS ARE LOCATED WITHIN JOIST BAY & PARALLEL TO JOISTS
I T I

A- F.1
2.
3.
COORDINATE WITH ELECTRICAL, PLUMBING & ARCHITECTURAL PLANS.
SEE SHEET M-501 FOR MECHANICAL DUCTWORK DETAILS.
CORPORATION
4. COORDINATE ALL WALL PENETRATIONS WITH ARCHITECTURAL PLANS.
D—1
eo$ r^i ©
(T)hvid-i m)hvid-i
s
[ ]
5 D—1
10$
X
DRAWING NOTES:(APPLY TO THIS SHEET ONLY)
3x8 UP FROM
BELOW
O HIGH VELOCITY OPTION.

EG-1
50$

r
tJ D—2
© HVID-1 F.1
30 FOREST STREET SOMERVILLE, MA
E
E5>
V.
35$ 3x8 UP
FROM
BELOW
B D—2
70$
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

D—1 3x8 HRV SA UP


MASTER
35$ FROM BELOW CONSULTANT:
BATH
x
(T)hvid
A__ D—1 MASTER
x
® 40$
(HRV)
BEDROOM

D—1

410$

E-f- D—1
60$ F EBL ENGINEERS, LLC
MECHANICAL • ELECTRICAL * FIRE PROTECTION

EG-1
© HVID-1
®
3x8 UP 3x8 UP FROM
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234-5701
(410) 668-8000 FAX (410) 668-8001
BATH #2 FROM BELOW
e-mail ebl@eblengineers.com
50$ BELOW-

5” HRV EA DN
V. A
D—1

E.1 4
TT=TP"
25$
3x8 UP\
FROM
BELOW
(—14x3y2 TRANSFER DUCT UP
TO ATTIC PROVIDE FIRE
DAMPER AT ATTIC FLOOR D—1 (?) HVID-1
R—1 D—1 60$

t ®
9”0 INSULATE
i HIGH VELOCIT
DUCT UP TO
ATTIC
© r
L J
170$
9x10
oi
r.'-'-l J
13x5y2 RA UP
TO FCU-1 4
60$
PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME. AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,

14x3)1 7
4
LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012
©B©A TRANSFER 3x8 UP RL & RG
TRANSFER RA DN-' GRILL-------- FROM UP &c DN PROJECT:
----- 13x5)1 RA DN GRILLE----- BELOW TO FCU-1
R—1 R—1 205$ IN ATTIC
13x5)1 RA 270$ 5” HRV EA DN (ABOVE DOOR) 7 National Institute of
FROM 12x12
ABOVE
\
\ TRANSFER GRILL
HALL 3x8 UP 3x8 HR/
Standards and Technology
\ TRANSFER

4. TRANSFER SA UP

3x11 UP
FROM
r
L
it J
i
GRttLE 14x3)1 TRANSFER DUCT UP
TO ATTIC PROVIDE FIRE
DAMPER AT ATTIC FLOOR
GRILLE—v
L
FROM
BELOW

3x8 UP
rn
D
NET ZERO ENERGY
RESIDENTIAL TEST
FROM

®
(T)hvid-i
BELOW -

f
D—1
4 D—1 b x
3x11 UP
FROM
BELOW 4 t
D—1
ft
D—1 D—1
BELOW
®
(T) HVID-1
FACILITY
C.1 75$
75$
65$ 35$ 65$ NIST Campus
(HRV) Gaithersburg, MD

3x8 HRV SA UP
FROM BELOW—'
D—1
'BnUti
35$
(HRV) U.S. Department of Energy ^
Research Toward Zero Energy Homes
G:\projects\2009\09247.000\cadd\submission 2010-06-29\09-247 M-104-A1.dwg, 7/27/2010 1:58:46 PM, pplourde

BEDROOM 2

M
D—2 U.S. DEPARTMENT OF
D—2 Energy Efficiency &
50$
50$ ENERGY Renewable Energy
OPEN TO BELOW

T T

BEDROOM 3

c
07/27/10 HIGH VELOCITY OPTION
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 M-104-A1
DRAWN BY: PJP
CHECKED BY: EAH

COPYRIGHT C 2009 o
BUILDING SCIENCE CORPORATION

SHEET TITLE:

SECOND FLOOR PLAN


B
(T) HVID-1
D—1 D—1
(j) HVID-1 (T) HVID-1 (T) HVID-1
D—1 D—1
(T) HVID-1 HVAC
® 75$ 75$ © ® © 65$ 65$ ©

4 A
CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.

SECOND FLOOR PLAN HVAC N GRAPHIC SCALE


SCALE: y2” = 1-0’

0 1’ 2’ 4’ 6’
1/2"=1-0' M-104
3 4 4.1 5 6

GENERAL NOTES: (APPLY TO THIS SHEET ONLY) BUILDING SCIENCE


l

F
1.
2.
DUCT RUNOUTS ARE LOCATED WITHIN JOIST BAY Sc PARALLEL TO JOISTS
COORDINATE WITH ELECTRICAL, PLUMBING Sc ARCHITECTURAL PLANS.
CORPORATION
3. SEE SHEET M-501 FOR MECHANICAL DUCTWORK DETAILS.
4. COORDINATE ALL WALL PENETRATIONS WITH ARCHITECTURAL PLANS.
2” HVD DN 2” HVD DN
TO HVID-1 TO HVID-1
BELOW
© BELOW
©
DRAWING NOTES: (APPLY TO THIS SHEET ONLY)

2 HVD DN (T) (FUTURE) (NOT INSTALLED UNDER THIS CONTRACT) FCU-1 WITH AUXILIARY
TO HVID-1 DRAIN PAN SEE DETAIL ON SHEET M-502 FOR MORE INFORMATION.

5” SA DN TO
BELOW (4) 5” SA DN TO
D—2 BELOW © POINT OF DISCONNECT OF DUCTWORK FOR FCU-1 INSTALLED UNDER THIS
CONTRACT.
D—2 BELOW 30 FOREST STREET SOMERVILLE, MA
POINT OF DISCONNECT OF RG Sc RL LINES FOR FCU-1 INSTALLED UNDER
E T: (978) 589-5100 F: (978) 589-5103
<$> MASTER BATH MASTER BEDROOM 2> THIS CONTRACT.

© HIGH VELOCITY OPTION. www.buildingscience.com

2” HVD DN 7”0 INSULATED HIGH


TO HVID-1
BELOW
VELOCITY DUCT
© y CONSULTANT:

a y

7”0 INSULATED HIGH EBL ENGINEERS, LLC


VELOCITY DUCT
© MECHANICAL • ELECTRICAL * FIRE PROTECTION

CO
cn
5” SA

>
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234-5701
D (410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com

2” HVD DN
7”0 INSULATED TO HVID-1
HIGH VELOCITY BELOW
©
E.1
DUCT
© 13x5^ RA DN 2” HVD DN
TO HVID-1
9”0 INSULATED HIGH BELOW
©
\

L_ j
\
i
VELOCITY DUCT UP
FROM BELOW
©
TRANSFER
GRILL

FIRE DAMPER
1
AT ATTIC PROFESSIONAL CERTIFICATION:

13x5/2 RA FD - FLOOR 7 I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME. AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS

DN TO RA 2 OF THE STATE OF MARYLAND,


LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012

DEVICE IN 14x3^
TRANSFER & PROJECT:
7”0 INSULATED
WALL
BELOW
r ~l/© DUCT DN o
RL & RG UP & DN
HIGH VELOCITY 14x3/2 TRANSFER 13x5/2 RA DN TO FCU-1 IN ATTIC
National Institute of
© DUCT DN i/ TO RA DEVICE
DUCT i/
IN WALL BELOW
\i
\i FIRE DAMPER
1/
JL
Standards and Technology
M AT ATTIC
X FLOOR J
T NET ZERO ENERGY
RL
i--FD
D RESIDENTIAL TEST
7+ KD FCU-1 n FACILITY
7

T TRANSFER FUTURE D
CO
<
Ol
BEDROOM 2

GRILL------
2” HVD DN 2” HVD DN
C.1 TO HVID-1 TO HVID-1 NIST Campus
BELOW
© BELOW
© Gaithersburg, MD
9”0 INSULATED 5” SA
HIGH VELOCITY
DUCT
'BnUti
I

U.S. Department of Energy ^


5” SA DN TO Research Toward Zero Energy Homes
G:\projects\2009\09247.000\cadd\submission 2010-06-29\09-247 M-105-A1.dwg, 7/27/2010 1:57:47 PM, pplourde

D—2 BELOW

Jm U.S. DEPARTMENT OF
Energy Efficiency &
BEDROOM 3
7”0 INSULATED HIGH ENERGY Renewable Energy
5” SA DN TO
D—2 BELOW
VELOCITY DUCT
©

C 07/27/10 HIGH VELOCITY OPTION


5/7/10 UPDATED
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

7 0 INSULATED HIGH

L VELOCITY DUCT
© PROJECT NO:
CAD DWG FILE:
DRAWN BY:
NIST NZERTF
09-247 M-105-A1
PJP
CHECKED BY: EAH

COPYRIGHT C 2009
BUILDING SCIENCE CORPORATION
o
SHEET TITLE:

2” HVD DN
2” HVD DN
r ATTIC FLOOR PLAN
TO HVID-1 i
B
BELOW
© 2” HVD DN 2” HVD DN 2” HVD DN TO HVID-1 | HVAC
a y TO HVID-1 TO HVID-1 TO HVID-1
BELOW
© V: D
BELOW
©
BELOW
© BELOW
©
A CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.

ATTIC FLOOR PLAN HVAC GRAPHIC SCALE


SCALE: /2” = 1’-0’
N
0 1’ 2’ 4’ 6’
1/2"=1-0'
M-105
4.1 5 6

GENERAL NOTES: (APPLY TO THIS SHEET ONLY) BUILDING SCIENCE


FT T T
i
F.1
1.
2.
DUCT RUNOUTS ARE LOCATED WITHIN JOIST BAY & PARALLEL TO JOISTS
COORDINATE WITH ELECTRICAL, PLUMBING & ARCHITECTURAL PLANS.
CORPORATION
3. SEE SHEET M-501 FOR MECHANICAL DUCTWORK DETAILS.
JL 1 JL 4. COORDINATE ALL WALL PENETRATIONS WITH ARCHITECTURAL PLANS.

aa
DRAWING NOTES: (APPLY TO THIS SHEET ONLY)

(?) PEX FLOOR HEAT MANIFOLD.

F.1
30 FOREST STREET SOMERVILLE, MA
E T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

CONSULTANT:

F EBL ENGINEERS, LLC


MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
RADIANT FLOOR HEAT (410) 668-8000 FAX (410) 668-8001
SPACED 8” APART e-mail eblOeblengineers.com
MAXIMUM CIRCUIT
LENGTH 250’ (TYP)

E.1

W w w W w v_y W PROFESSIONAL CERTIFICATION:


I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY

WwWWwW ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012

BASEMENT
wwww PROJECT:

wwww
1 7 National Institute of
Standards and Technology

NET ZERO ENERGY


o D RESIDENTIAL TEST
r\ r\ r\ r\ r\ FACILITY
C.1 NIST Campus
Gaithersburg, MD
r\ r\ r\ r\ r\ r\

U.S. Department of Energy ^


Research Toward Zero Energy Homes

U.S. DEPARTMENT OF
Energy Efficiency &
ENERGY Renewable Energy
G:\projects\2009\09247.000\cadd\submission 110%\09-247 M-106.dwg, 3/31/2010 3:32:40 PM, pplourde

MARK DATE DESCRIPTION


ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 M-106
DRAWN BY: PJP
CHECKED BY: EAH

COPYRIGHT C 2009 o
wwWwwW BUILDING SCIENCE CORPORATION

SHEET TITLE:

wwwwwwwwwwwwWwwWwwWwwWwwW B
BASEMENT FLOOR
PLAN RADIANT
FLOOR HEAT
A
CAUTION:
©

NORTH
IF THIS PLAN IS A REDUCTION, GRAPHIC SCALE AS NOTED
SCALES MUST BE USED.

GRAPHIC SCALE
BASEMENT FLOOR PLAN - RADIANT FLOOR HEAT
SCALE: = 1-0’
N
0 1’ 2’ 4’ 6’
1/2”=1’—0 M-106
BUILDING SCIENCE
SHEET METAL SOUND
GWB AND LIGHT BAFFLES
CORPORATION

BACK TO BACK STUD CAVITY AS


TRANSFER GRILLES TRANSFER PLENUM

Supply Supply

t t
10"x6" TRANSFER GRILLE I I
OVER BEDROOM DOOR

Supply
4-
JOINT BETWEEN BOOT AND Remote
DRYWALL SEALED WITH MASTIC Kitchen Dehumidistat Transfer
30 FOREST STREET SOMERVILLE, MA
Range
OR FIBERGLASS MESH AND Hood grille Return T: (978) 589-5100 F: (978) 589-5103

fczfc
MASTIC OR CAULK www.buildingscience.com
BEDROOM DOOR ELEVATION
FROM HALLWAY

WALL FRAMING WITHIN


WALL CONSULTANT:

\ UNDERCUT DOOR 34"

Integrated AHU
/ FLOOR ASSEMBLY Dehumidifier
« / E_r l□ EBL ENGINEERS, LLC
A MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
\ (410) 668-8000 FAX (410) 668-8001
e-mail eblOeblengineers.com

WALL REGISTER AIR SEALING DETAIL DOOR TRANSFER GRILLE DETAIL DEHUMIDIFIER SCHEMATIC
NO SCALE SCALE: y2” = 1 0 NO SCALE

PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012

PROJECT:

National Institute of
Standards and Technology

NET ZERO ENERGY


RESIDENTIAL TEST
JOINT BETWEEN BOOT AND SUBFLOOR
SEALED WITH MASTIC OR FIBERGLASS
MASTIC
FACILITY
MESH AND MASTIC OR CAULK

NIST Campus
Gaithersburg, MD

U.S. Department of Energy ^


Research Toward Zero Energy Homes

INTERIOR WALL U.S. DEPARTMENT OF


Energy Efficiency &
2"
4"x10" TRANSFER GRILLE
TO FIRST FLOOR CONDITIONED ENERGY Renewable Energy
SPACE
W
G:\projects\2009\09247.000\cadd\submission 110%\09-247 M-501.dwg, 3/31/2010 3:35:37 PM, pplourde

DUCT OPEN TO
BASEMENT SUBFLOOR

FLOOR JOIST
MASTIC

BASEMENT TRANSFER GRILLE DETAIL FLOOR BOOT AIR SEALING DETAIL AIR HANDLER AIR SEALING DETAIL MARK DATE DESCRIPTION
SCALE: y2” = 1’-0' NO SCALE NO SCALE
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 M-501
DRAWN BY: PJP
CHECKED BY: EAH

COPYRIGHT C 2009
BUILDING SCIENCE CORPORATION
o
SHEET TITLE:

MECHANICAL
DETAILS

CAUTION; ©

NORTH
SCALE AS NOTED
IF THIS PLAN IS A REDUCTION, GRAPHIC
SCALES MUST BE USED.

GRAPHIC SCALE
0 1* 2’ 3’ 4’ 5’ 6’
^/2n=^•-0n M-501
BUILDING SCIENCE
RETURN AIR DUCT

3” LAYER OF POLYISOCYANURATE BOLTED AND GASKETED LID CORPORATION


BOARD INSULATION ATTACHED TO SUPPLY AIR DUCT

L
GRADE SLOPE AWAY 3’x3’x3’ DEEP PRE-CAST REINFORCED PLASTIC,
HANDHOLE LID—v
FROM BOX ON ALL SIDES OPEN BOTTOM PLASTIC HANDHOLE. OLDCASTLE
CARSON SERIES OR APPROVED EQUAL

3/4” CDN
t
t --------g DRAIN PAN

20 GAGE GALVANIZED STEEL


WITH HEMMED EDGES
3” MIN CLEARANCE
AHU’S PERIMETER SET AHU ON 4 RUBBER ISOLATORS IN
i-BALANCING 2” MIN HEIGHT--------- DRAIN PAN IN LINE WITH SUPPORTS
VALVE (TYP)

L
ononoLonona monoi
AUXILIARY CONDENSATE DRAIN PAN DETAIL
NO SCALE
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

M
6” GRAVEL BED (EXTEND 1 ’—0
BEYOND BOX ON ALL SIDES) CONSULTANT:

V HPWR HPWR

GEOTHERMAL HEAT PUMP GEOTHERMAL HEAT PUMP


WATER TO WELL FIELD — WATER FROM HOUSE
r SEALANT - JOINT
SECTION A-A 1/4” MINIMUM WIDE
BY 3/8” DEEP EBL ENGINEERS, LLC
MECHANICAL • ELECTRICAL • FIRE PROTECTION
7
/ / The Professional Engineering Center

H
'-------WATERSTOP 8005 Harford Road, Baltimore, Maryland 21234—5701
HPWS FROM
FIELD CIRCUIT-1
HPWS FROM FIELD CIRCUIT-2
HPWS FROM FIELD CIRCUIT-3
POLY BACKUP
MATERIAL-------
E2'
1 J FLOOR
(FOR CONCRETE (410) 668-8000 FAX (410) 668-8001
e-mail eblOeblengineers.com

V T
PIPE SLEEVE OR
CORE DRILLED
OPENING--------- "
/
//
7 PENETRATIONS)

------- PIPE SLEEVE

t t*
i i i
1
i ESCUTCHEON
\A
7
METAL JACKET
ID
a. CL CL CL GEOTHERMAL HEAT PUMP WATER PIPE INSULATION
A X XX X RETURN TO FIELD
l II

PROFESSIONAL CERTIFICATION:
PIPE WITHOUT INSULATION PIPE WITH INSULATION I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
3’x3’x3’ DEEP PRE-CAST REINFORCED ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
PLASTIC, OPEN BOTTOM HANDHOLE. LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012

OLDCASTLE CARSON SERIES OR PROJECT:


MANUAL APPROVED EQUAL
BALANCING 4 PIPE SLEEVE THRU FLOOR DETAIL
VALVE (TYP) SHUTOFF VALVE NO SCALE National Institute of
A Standards and Technology
TERMINATE INSTRUMENTATION

II
CONDUIT VERTICALLY, 1-0” NET ZERO ENERGY
I I
ABOVE GRAVEL BASE
RESIDENTIAL TEST
+ n PVC INSTRUMENTATION WIRE

A t
co
L1 y2”0 MANIFOLD
I
DC
5|
I
CONDUIT WITH PULL STRING
FACILITY
CL 0- | PRESSURE CIRCULATING CHECK VALVE
X x -L PUMP NIST Campus
GAUGE (TYP)

1
I I MANUAL BALANCING Gaithersburg, MD
I I VALVE

GEOTHERMAL HEAT
PUMP WATER SUPPLY
TO HOUSE v_
J
GEOTHERMAL HEAT PUMP WATER STRAINER WITH UNION (TYP) BALL VALVE
(BELOW GRADE)-------- / BLOW-OFF VALVE (TYP)
RETURN FROM HOUSE (BELOW
GRADE) AND CAP & CHAIN U.S. Department of Energy ^
Research Toward Zero Energy Homes

GEOTHERMAL SYSTEM VALVE HANDHOLE DETAIL 1 IN-LINE PUMP DETAIL U.S. DEPARTMENT OF
Energy Efficiency &
NO SCALE
M-002 M-502
NO SCALE
ENERGY Renewable Energy
G:\projects\2009\09247.000\cadd\submission 110%\09-247 M-502.dwg, 3/31/2010 3:35:14 PM, pplourde

ESCUTCHEON
BACKUP MATERIAL -SEALANT - JOINT
v */ 1/4” MINIMUM WIDE
SEALANT - JOINT BY 3/8” DEEP
1/4” MINIMUM WIDE METAL JACKET
BY 3/8” DEEP-----------
7771

PIPE S 3
MARK
ISSUE:
DATE
03/31/10
DESCRIPTION
ISSUED FOR CONSTRUCTION

SLEEVE
siisprrL
»■

•t
INSULATION PROJECT NO: NIST NZERTF
EXTERIOR WALL
WATERSTOP (FOR CONCRETE CAD DWG FILE: 09-247 M-502
INTERIOR SIDE
WALL PENETRATIONS)------------
DRAWN BY: PJP
CHECKED BY: EAH
PIPE SLEEVE FOR
INSULATED PIPE THRU WALL
COPYRIGHT C 2009
BUILDING SCIENCE CORPORATION
o
-ABOVE GRADE DETAIL SHEET TITLE:
NO SCALE

MECHANICAL
DETAILS

NORTH
SCALE AS NOTED

M-502
BUILDING SCIENCE
CORPORATION

SPLIT SYSTEM HEAT PUMP SCHEDULE


FAN COOLING HEATING OUTDOOR UNIT
MANUFACTURER
UNIT NO. O.A. ESP TOT/SENS EAT SUPP KW- COMP. FAN NOTES
CFM RPM HP-V/PH/HZ SEER MBH HSPF LOCATION MOCP V/PH/HZ Sc MODEL NO.
CFM (IN WG) MBH DB/WB V/PH/HZ RLA FLA

240/1/60 AAON
AHU-1 1200 0.75 36.6/27.9 80/67 14.8 25.6 8.5 7.5-240/1/60 GRADE 18.6 2.8 40 240/3/60 5
F1—A-036—1—V-B
CARRIER 30 FOREST STREET SOMERVILLE, MA
AHU-3 570 0.5 240/1/60 24.0/18.0 75/63 20.7 26.0 9.5 GRADE 12 0.75 30 230/1/60 1,2,3,4 RAV-SP240UT—UL T: (978) 589-5100 F: (978) 589-5103
RAV—SP240AT2—UL
www.buildingscience.com
FCU-1 300 0.4 12.0/9.0 13.5
(FUTURE)
FCU-2 300 0.3 8.0/6.0 9.0
CONSULTANT:

NOTES:
1. COOLING BASED ON 95T O.A. TEMPERATURE 5. 15.6 MBH HOT GAS REHEAT.
2. HEATING BASED ON 68‘F R.A. TEMPERATURE, 0*F O.A. TEMPERATURE
3. SUPPLEMENTAL HEATER W/1 STAGE
4. INDOOR UNIT (AHU) POWERED FROM OUTDOOR UNIT (HPU).
EBL ENGINEERS, LLC
MECHANICAL * ELECTRICAL * FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234-5701
WHOLE HOUSE DEHUMIDIFER: (410) 668-8000 FAX (410) 668-8001
ULTRA-AIRE 65H OR APPROVED EQUAL 65 PINT PER e-mail ebl@eblengineers.com
DAY EXTRACTION, 4.3 PINTS/KWH EFFICIENCY INTEGRAL
MERV 11 FILTER.

HEAT RECOVERY VENTILATOR:


VENMAR EKO 1.5 OR APPROVED EQUAL

ZONE DAMPER SYSTEM:


HONEYWELL HZ 432 OR APPROVED EQUAL.

PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
AIR DEVICES: ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO: 17696 EXPIRATION DATE: 2-19-2012
NOTES:
PROJECT:
1. AIR DEVICES SHALL BE AS SPECIFIED OR APPROVED EQUAL.
2. AIR DEVICE COLOR SHALL BE SELECTED BY ARCHITECT.

FLOOR DIFFUSERS:
National Institute of
MANUFACTURER: HART Sc COOLEY Standards and Technology
MODEL: 411 DELUXE FLOOR DIFFUSER
FINISH: STEEL - BRIGHT WHITE
SIZES: 4”x10’ 85 CFM OR LESS SUPPLY NET ZERO ENERGY
105 CFM OR LESS SUPPLY
4”x12’
4”x14’ 125 CFM OR LESS SUPPLY RESIDENTIAL TEST
WALL REGISTERS: FACILITY
MANUFACTURER: HART Sc COOLEY
MODEL: A611MS REGISTER NIST Campus
FINISH: ALUMINUM - BRIGHT WHITE Gaithersburg, MD
SIZES: 6”x10” - 100 CFM OR LESS SUPPLY
6”x12” - 120 CFM OR LESS SUPPLY
8”x10” - 130 CFM OR LESS SUPPLY

CEILING DIFFUSERS:

MANUFACTURER: HART Sc COOLEY


U.S. Department of Energy ^
MODEL: A504MS SQUARE CEILING DIFFUSER
Research Toward Zero Energy Homes
FINISH: ALUMINUM - BRIGHT WHITE
SIZES: 8”x8” - 90 CFM OR LESS SUPPLY
U.S. DEPARTMENT OF
10”x10” - 135 CFM OR LESS SUPPLY Energy Efficiency &
RETURN GRILLES:
ENERGY Renewable Energy
G:\projects\2009\09247.000\cadd\submission 120%\09-247 M-601.dwg, 5/7/2010 9:40:06 AM, pplourde

MANUFACTURER: HART Sc COOLEY


MODEL: 650 RETURN AIR GRILLE
FINISH: STEEL - BRIGHT WHITE
SIZES: 10”x20! FIRST EAST
16”x14’ FIRST WEST
10”x10’ MASTER SUITE
12”x12’ SECOND HALL
10”x8” DEHUMIDIFIER 5/7/10 UPDATED
16”x10’ FIRST FLOOR MULTI SPLIT 4/16/10 UPDATED
10”x10’ SECOND FLOOR MULTI SPLIT
MARK DATE DESCRIPTION
6”x6” - HRV
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 M-601
DRAWN BY: PJP
CHECKED BY: EAH

COPYRIGHT C 2009
BUILDING SCIENCE CORPORATION
o
SHEET TITLE:

MECHANICAL
SCHEDULES

NORTH
SCALE AS NOTED

M-601
LIGHTING FIXTURE SCHEDULE ABBREVIATIONS ELECTRICAL LEGEND BUILDING SCIENCE
A AMPERE
TYPE MOUNTING VOLTS
LAMPS MANUFACTURER & CAT.# DESCRIPTION NOTES AC ALTERNATING CURRENT
SYMBOL DESCRIPTION
CORPORATION
NUMBER & TYPE ACU AIR CONDITIONING UNIT I O I f 1—OH LIGHTING FIXTURE - FLUORESCENT - TYPE AS INDICATED
LED AFF ABOVE FINISHED FLOOR
C1 SURFACE 120 MIN 180 LUMENS ALBEO TECHNOLOGIES WHITE UNDER CABINET LED AHU AIR HANDLING UNIT o,cx,<> LIGHTING FIXTURE - CEILING, WALL MOUNTED, DIRECTIONAL
TALE A-HP - TYPE AS INDICATED
MAX 6 WATTS AIC AMPERES INTERRUPTING CAPACITY
MINKA AIRE ATS AUTOMATIC TRANSFER SWITCH 5,S3fS4|ST(SP SWITCH - SINGLE POLE, THREE WAY, FOUR WAY,
F SURFACE 120 F514—ORB FAN IN LIVING ROOM - BRONZE AUX AUXILIARY TIME DELAY, PILOT LIGHT
C CONDUIT - MOUNTING HEIGHT 4-0” UNLESS NOTED OTHERWISE
MINKA AIRE FAN AND LIGHT COMBINATION IN BEDROOMS - DH DEHUMIDIFIER - SEE A-204/A-205/A-206 FOR SWITCH LOCATIONS
F/L SURFACE 120 2-13W DWH DOMESTIC WATER HEATER ON INTERIOR ELEVATIONS
F514—ORB BRONZE
EF EXHAUST FAN - ”P” SUBSCRIPT DENOTES A PILOT LIGHT
ENERGY STAR FAN AND LIGHT ON PORCH WITH ENERGY STAR LIGHT EMT ELECTRICAL METALLIC TUBING
F/L SURFACE 120 GOSSAMER LIGHTHOUSE DIMMING SWITCH - MOUNTING HEIGHT 4-0"
LIGHT KIT KIT - GALVANIZED ALUMINUM EX EXISTING
F FUSED OR FUSIBLE DUPLEX RECEPTACLE - 20A., 125V. - MOUNTING HEIGHT
ANTIQUE BRONZE - FIVE LIGHT DINING ROOM AND FA FIRE ALARM 18” UNLESS NOTED OTHERWISE 30 FOREST STREET SOMERVILLE, MA
LITHONIA
P1 PENDANT 120 5-13W
11535 BZA
ENTRY HALL PENDANT LIGHT. COORDINATE PENDANT FACP FIRE ALARM CONTROL PANEL - SEE A-204/A—205/A—206 FOR RECEPTACLE T: (978) 589-5100 F: (978) 589-5103
TYPE AND MOUNTING HEIGHT WITH ARCHITECT LOCATIONS ON INTERIOR ELEVATIONS www.buildingscience.com
FAAP FIRE ALARM ANNUNCIATOR PANEL
LED CREE LED LIGHTING WHITE DIMMABLE 6” LIVING ROOM LIGHT FCU FAN COIL UNIT
R1 RECESSED 120 MIN 650 LUMENS DOUBLE DUPLEX RECEPTACLE - 20A., 125V. - MOUNTING
LR6 LIGHTING QUALITY - CCT 2700’K, MIN. CRI 90 FLA FULL LOAD AMPERES
MAX 11 WATTS HEIGHT 18” UNLESS NOTED OTHERWISE
GFI GROUND FAULT INTERRUPTER
- SEE A-204/A—205/A—206 FOR RECEPTACLE CONSULTANT:
LED WHITE DIMMABLE 6” KITCHEN LIGHT WITH DAYLIGHT HP HORSEPOWER
CREE LED LIGHTING LOCATIONS ON INTERIOR ELEVATIONS
R2 RECESSED 120 MIN 650 LUMENS SENSOR HRU HEAT RECOVERY UNIT
LR6 GFI
MAX 11 WATTS LIGHTING QUALITY - CCT 2700‘K, MIN OF CRI 90
KVA KILO-VOLTS-AMPERES GFI RECEPTACLE - 20A., 125V. - MOUNTING HEIGHT
LED KW KILOWATTS 18” UNLESS NOTED OTHERWISE
CREE LED LIGHTING WHITE 4” LED FIXTURE
R3 RECESSED 120 MIN 500 LUMENS KWH KILOWATT HOURS - SEE A-204/A—205/A—206 FOR RECEPTACLE
LR4 LIGHTING QUALITY - CCT 2700X, MIN OF CRI 90
MAX 11 WATTS
MAX MAXIMUM LOCATIONS ON INTERIOR ELEVATIONS
LED
R4 RECESSED 120 MIN 650 LUMENS
CREE LED LIGHTING WHITE 6” LED FIXTURE MCC
MIN
MOTOR CONTROL CENTER
MINIMUM CEILING RECEPTACLE - 20A., 125V. - DUPLEX EBL ENGINEERS, LLC
LR6 LIGHTING QUALITY - CCT 2700’K, MIN OF CRI 90
MAX 11 WATTS - FLUSH IN CEILING MECHANICAL • ELECTRICAL • FIRE PROTECTION
NFSS NON-FUSED SAFETY SWITCH
P POLE (1P., 2P., 3P.) The Professional Engineering Center
RW RECESSED 120 18—DDT
LITHONIA
L7XF
WHITE BATHROOM 6” FIXTURE WITH WET LOCATION
TV TELEVISION
©,Gh JUNCTION BOX - CEILING, WALL MOUNTED - SIZE PER NEC 8005 Harford Road, Baltimore, Maryland 21234—5701
LENS OR AS INDICATED (410) 668-8000 FAX (410) 668-8001
UL UNDERWRITERS LABORATORIES e-mail eblOeblengineers.com
V VOLTS »
LEVI TON ATTIC PORCELAIN SOCKET, KEYLESS SINGLE CIRCUIT, PANELBOARD - TYPE AS NOTED - MOUNTING HEIGHT 6-6
S1 SURFACE 120 23W-CF W WATTS
8829-CW1 WHITE OUTLET BOX MOUNT TO TOP
WP WEATHERPROOF
0 PHASE CONDUIT - IN OR ON CEILING OR WALLS
LITHONIA
S2 SURFACE 120 2-31W T8 11235RE WH OR EQUAL WHITE BASEMENT FIXTURE
CONDUIT - IN OR UNDER FLOOR
HOMERUN TO PANEL - PROVIDE 2#12 AND #12, NEC TYPE ’NM’
LITHONIA
S3 SURFACE 120 2-31W T8 WHITE GARAGE FIXTURE UNLESS OTHERWISE INDICATED
11235RE WH OR EQUAL

5f FAN CONTROLLER - FURNISHED BY FAN SUPPLIER. WIRED


S4 SURFACE 120 15W-T8 LITHONIA WHITE CLOSET FIXTURE
PROFESSIONAL CERTIFICATION:

CUC 15T8PHH 120 LP AND CONNECTED BY ELECTRICAL CONTRACTOR I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
- MOUNTING HEIGHT 4-0” AFF UNLESS NOTED OTHERWISE OF THE STATE OF MARYLAND,
LICENSE NO: 13434 EXPIRATION DATE: 4-26-2011
- SEE A-204/A—205/A—206 FOR SWITCH LOCATIONS
LITHONIA ANTIQUE BRONZE FOUR LIGHT MASTER BATH VANITY PROJECT:
W1 SURFACE 120 4-13W ON INTERIOR ELEVATION
11534 BN FIXTURE
- NUMBER OF WIRES AS REQUIRED
National Institute of
W2 SURFACE 120 2-13W
LITHONIA
11532 BN
ANTIQUE BRONZE TWO LIGHT BATHROOM VANITY
FIXTURE GENERAL NOTE: MAGNETIC STARTER, COMBINATION TYPE STARTER - TYPE
AND RATING AS INDICATED Standards and Technology
1. PROVIDE A MAXIMUM OF TWO CONTROL DEVICES PER
PROGRESS COVER PLATE. SEE ARCHITECTURAL DRAWINGS EP, CH DISCONNECT SWITCH, UNLESS NOTED OTHERWISE
W3 SURFACE 120 26 W ANTIQUE BRONZE WALL SCONCE
P7047—20EBWB A-204/A-205/A-206 FOR INTERIOR ELEVATIONS. - FUSED, NON-FUSED - TYPE AND RATING AS INDICATED
NET ZERO ENERGY
MOTOR - HORSEPOWER AS NOTED
W4 SURFACE 120 1-18W THOMAS LIGHTING
PL9007—7
MATTE BLACK EXTERIOR LANTERN RESIDENTIAL TEST
ELECTRIC METER SOCKET AND METER BY ELECTRICAL CONTRACTOR.

SPECIAL RECEPTACLE. TYPE AND RATING AS INDICATED ON


FACILITY
W5 SURFACE 120 2-13W PROGRESS WHITE BASEMENT STAIR WALL SCONCE
P—7093—09EBWB KITCHEN EQUIPMENT ELECTRICAL SCHEDULE. COORDINATE
MOUNTING HEIGHT WITH EQUIPMENT BEING SERVED NIST Campus
REMARKS:
Gaithersburg, MD
<£H SPECIAL PURPOSE RECEPTACLE - WALL MOUNTED
30
1. THIS IS A BRAND NAME OR APPROVED EQUAL SCHEDULE. SALIENT FEATURES OF THE SPECIFIED FIXTURE INCLUDE LAMP - NEMA 14-30R FLUSH RECEPTACLE
TYPE AND WATTAGE, ENERGY STAR, QUALITY, STYLE, AND FINISH. - PASS & SEYMOUR CATALOG# 3864 OR EQUIVALENT
- 3#10 AND #10 GROUND

<5H SPECIAL PURPOSE RECEPTACLE - WALL MOUNTED


50 U.S. Department of Energy ^
- NEMA 14-50R FLUSH RECEPTACLE
- PASS & SEYMOUR CATALOG# 3894 OR EQUIVALENT Research Toward Zero Energy Homes
- 3#6 AND #10 GROUND
U.S. DEPARTMENT OF
TELEPHONE/DATA OUTLET - WALL MOUNTED, PHONE AND DATA JACKS Energy Efficiency &
- MOUNTING HEIGHT 2-0”
- SEE DETAIL ON ELECTRICAL DRAWING E-502
ENERGY Renewable Energy
G:\projects\2009\09247.000\cadd\submission 110%\09-247 E-001.dwg, 3/31/2010 3:33:05 PM, jwilkie

—o o— MOLDED CASE CIRCUIT BREAKER

F/L FAN AND LIGHT COMBINATION (F/L) OR FAN ONLY (F)

TV TV OUTLET - SEE DETAIL ON ELECTRICAL DRAWING E-502


- COMBINE WITH TELEPHONE/DATA WHERE LOCATED ADJACENT

|WAP| JUNCTION BOX FOR OWNER FURNISHED WIRELESS ACCESS POINT MARK DATE DESCRIPTION

m TRANSFORMER ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

© PHOTO SENSOR - ADJUSTABLE TO TURN LIGHTS OFF AT USER


DEFINED LEVEL - WORKS WITH RELAY PANEL SOFTWARE PROJECT NO: NIST NZERTF
CAD DWG FILE: 09-247 E-001
DRAWN BY: JEM
CHECKED BY: FJL
COPYRIGHT C 2009 o
BUILDING SCIENCE CORPORATION

SHEET TITLE:

CONVENTIONS ELECTRICAL LEGEND,


SECTION CUT ABBREVIATIONS,
SECTION LETTER SYMBOLS & LIGHTING
SHEET NUMBER WHERE SECTION IS SHOWN FIXTURE SCHEDULE
SHEET NUMBER WHERE SECTION IS CUT

NORTH
DETAIL
SCALE AS NOTED
DETAIL NUMBER
SHEET NUMBER WHERE DETAIL IS SHOWN
SHEET NUMBER WHERE DETAIL IS TAKEN
E-001
DRAWING NOTES: (APPLY TO THIS SHEET ONLY)

(?) 2P-30A NFSS IN NEMA 1 ENCLOSURE. MOUNT AT UNIT. BUILDING SCIENCE


© 2P-30A NFSS IN NEMA 1 ENCLOSURE.
CORPORATION
(5) CONTROL POWER TRANSFORMER - 1000VA, 120-24V, 10. MOUNT NEAR MANIFOLD
WITH SOLENOIDS.

(7) TOGGLE SWITCH DISCONNECT. MOUNT ADJACENT TO CONTROL POWER TRANSFORMER


ON ZONE CONTROL PANEL SUPPORT RACK.

(?) MAKE CONNECTION TO PLUMBING SOLENOIDS. SEE MECHANICAL PLANS FOR QUANTITY.

(?) CONTROL POWER TRANSFORMER - 1000VA, 120-24V, 10. MOUNT ON ZONE CONTROL
PANEL SUPPORT RACK.

(7) MAKE CONTROL POWER CONNECTIONS AS DIRECTED BY GOVERNMENT.

© PROVIDE THREE WIRES AND GROUND FOR EACH HOMERUN TO WIREWAY AT RELAY
PANEL, CONNECT BRANCH CIRCUIT THROUGH RESPECTIVE RELAY AND THEN TO
PANELBOARD. SEE RELAY SCHEDULE. TERMINATE THIRD WIRE AT EACH END FOR
FUTURE USE. ALLOW SUFFICIENT SLACK IN WIREWAY FOR TERMINATING ON A RELAY.
LABEL THE LOAD THAT IS SERVED BY THE WIRE. SEE DRAWING E-502, DETAIL 1. 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
© MOUNT ON ZONE CONTROL PANEL SUPPORT RACK. www.buildingscience.com

3 4 4.1 5 6 6.1 3 4 4.1 5 6 6.1 CONSULTANT:

I____ I I____ I
F.1 F.1
EBL ENGINEERS, LLC
MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail eblOeblengineers.com

n------rr n-----rr n-----rr F TT TT TT TT TT TT F


JL JL u LL u LL JL JL JL JL JL JL
PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND.
LICENSE NO: 13434 EXPIRATION DATE: 4-26-2011

HRV-1 PROJECT:

g—© National Institute of


5

3
1
25(RP—B)
Standards and Technology

NET ZERO ENERGY


S2 S2 4
RESIDENTIAL TEST
30(RP—BB)------
PEX MANIFOLD FACILITY
© NIST Campus
26,28(RP—B) Gaithersburg, MD
7
© 7
DWH-1
ZONE CONTROL
L
17(RP-B)
2 #10 & PANEL
S2 S2 7
#10 GW- 9 U.S. Department of Energy ^
C p: o -i :=l D o: S' o ;zl D Research Toward Zero Energy Homes
I
© SWH-1 •1(RP-BB)
© 32(RP—BB) U.S. DEPARTMENT OF
Energy Efficiency &
4 3(RP—BB)
21,23(RP—B)
GFI
ENERGY Renewable Energy
25(RP—B) 3(RP—B)
2 #10 & SWH-2
L
G:\projects\2009\09247.000\cadd\submission 110%\09-247 E-101.dwg, 3/31/2010 3:33:29 PM, jwilkie

#10 GW-
AHU-1
© 22,24(RP—B)
S2 S2 S2
-1(RP—B) L
UP TO FIXTURE S3 O
AT TO OF STAIR nGFI AHU-2
COMMUNICATION CABINET

i:
(?)5(RP-B)-«- PANEL ’RP-BB’

33(RP—BB)
B PANEL ’RP-BA’
19(RP—B)
4(RP—B)
MARK
ISSUE:
DATE
03/31/10
DESCRIPTION
ISSUED FOR CONSTRUCTION

DH—1
PANEL ’RP-B’
PROJECT NO: NIST NZERTF
S2
2(RP—B) CAD DWG FILE: 09-247 E-101
If
GFI SUMP PUMP- DRAWN BY: JEM
B B
3fc CHECKED BY: FJL

A A COPYRIGHT O C 2009

BUILDING SCIENCE CORPORATION

SHEET TITLE:

BASEMENT FLOOR
© o o 0 A.1 © © © 0 A.1 PLAN - ELECTRICAL
L J L

BASEMENT FLOOR PLAN LIGHTING BASEMENT FLOOR PLAN POWER N ©

NORTH
SCALE AS NOTED
SCALE: y4” = 1-0' SCALE: y4" = 1-0’

CAUTION:
IF THIS PLAN IS A REDUCTION,
GRAPHIC SCALES MUST BE USED.
GRAPHIC SCALE
0 2’ 4’ 8’ 12’
1 /4”=1’—0 E-101
DRAWING NOTES:(APPLY TO THIS SHEET ONLY) BUILDING SCIENCE
© PROVIDE THREE WIRES AND GROUND FOR EACH HOMERUN TO WIREWAY AT
RELAY PANEL, CONNECT BRANCH CIRCUIT THROUGH RESPECTIVE RELAY AND
THEN TO PANELBOARD. SEE RELAY SCHEDULE. TERMINATE THIRD WIRE AT
EACH END FOR FUTURE USE. ALLOW SUFFICIENT SLACK IN WIREWAY FOR
CORPORATION
TERMINATING ON A RELAY. LABEL THE LOAD THAT IS SERVED BY THE WIRE.
SEE DRAWING E-502, DETAIL 1.

(i) SWITCH FOR RECEPTACLE. SEE ’’FIRST FLOOR PLAN - POWER” ON DRAWING
w E-103 FOR CIRCUIT.

(?) PROVIDE PHOTO SENSOR FOR RELAY INPUT FOR KITCHEN TYPE ’R2’
LIGHTING FIXTURE CONTROL. TYPE ’R2’ SHALL REMAIN OFF WHEN EXTERIOR
LIGHT SATISFIES PHOTO SENSOR.

30 FOREST STREET SOMERVILLE, MA


T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

3 4 4.1 5 6 6.1
CONSULTANT:

□ □ F.1
EBL ENGINEERS, LLC
SCREEN MECHANICAL • ELECTRICAL • FIRE PROTECTION
PORCH The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
F/L e-mail eblOeblengineers.com

W4 W4

F
C1 32
2 3 L
R2 PROFESSIONAL CERTIFICATION:

R I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY


ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
C OF THE STATE OF MARYLAND,
/ LICENSE NO: 13434 EXPIRATION DATE: 4-26-2011
BATH m
W4 1 1J34(RP-BA) PROJECT:
1J34(RP—BA)

E
W4 £ [
O
TCI
KITCHEN


National Institute of
Standards and Technology
$1 R2 K — Tfl
R
©\ w:
/\
X
NET ZERO ENERGY
(?)34(RP-BAb Cl f- P1 C□
S3 S3
(/) R3
RESIDENTIAL TEST
(T)34(RP-BA)
J)34(RP-BA)
DINING
FACILITY
;4
E.1 ROOM
(Y)34(RP-BA)

(T)34(RP-BA)
2 □ 7
NIST Campus
Gaithersburg, MD

1 34(RP—BA) R4 4 Q34(RP-BA)
GARAGE

F)
MUDROOM
3SP
^T©
W4 W4 U.S. Department of Energy ^
D
S4 Q32(RP-BA^ 'siLDfc)P53S4 Research Toward Zero Energy Homes
WS
C.1 (RP-G) U.S. DEPARTMENT OF
S3 S3 3' Energy Efficiency &
R1 m R1
ENERGY Renewable Energy
^?)34(RP-BA)
(?)32(RP-BA)
G:\projects\2009\09247.000\cadd\submission 110%\09-247 E-102.dwg, 3/31/2010 3:33:54 PM, jwilkie

F
OFFICE /OPTIONAL
W4 □
c£ BEDROOM 4
P1 1j32(RP—BA)
c
m
W4 W4
PANEL ’RP-G
F/L

W3
1j32(RP—BA) LIVING ROOM Wp

CL R1 m R1
MARK DATE DESCRIPTION
K) ENTRY R3 ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
HALL

(])32(RP-BA A(i)32(RP-BA)
PROJECT NO: NIST NZERTF
“\l)32(RP-BA) CAD DWG FILE: 09-247 E-102
B
7% 1J32(RP-BA)

A
DRAWN BY:
CHECKED BY:
JEM
EJL

COPYRIGHT O C 2009
(?)34(RP-BA
W4 W4w BUILDING SCIENCE CORPORATION

SHEET TITLE:

FIRST FLOOR PLAN


e A.1 LIGHTING

rtimoN: ©

NORTH
SCALE AS NOTED
IF THIS PLAN IS A REDUCTION, GRAPHIC
SCALES MUST BE USED.
FIRST FLOOR PLAN LIGHTING N
SCALE: y4” = 1’—0’
GRAPHIC SCALE
0 2’ 4’ 8’ 12’
1/4”=1’—O' E-102
DRAWING NOTES: (APPLY TO THIS SHEET ONLY)
BUILDING SCIENCE
(T) TO RELAY PANEL, CONNECT BRANCH CIRCUIT THROUGH RESPECTIVE RELAY AND THEN TO PANELBOARD. SEE © MOUNT 48” ABOVE FINISHED FLOOR.
W RELAY SCHEDULE. LABEL THE LOAD THAT IS SERVED BY THE WIRE.

© RECEPTACLE FOR MICROWAVE UNDER COUNTER. COORDINATE EXACT LOCATION WITH ARCHITECTURAL DRAWINGS.
© FEEDER FROM PANEL ’RP-A’. CORPORATION
© WIREWAY FOR TERMINATING COMMUNICATION CONDUITS AND SEPARATING VOICE, DATA AND
© MAKE CONNECTION TO RANGE HOOD. FIRE ALARM CABLE. PROVIDE 2-2”C BETWEEN WIREWAY AND FIRE ALARM CABINET. PROVIDE
2-3” BUSHED OPENINGS FOR VOICE AND DATA CABLE. SIZE WIREWAY AS REQUIRED.
(4) MOUNT 2%“ ABOVE FINISHED FLOOR TO CENTER LINE.
(|) MOUNT 4’-%” ABOVE FINISHED FLOOR. ALIGN WITH TOP OF TILE. © TERMINATE WITH BUSHED END IN GARAGE ATTIC AT ACCESS HATCH.

© COORDINATE EXACT MOUNTING HEIGHT WITH MANUFACTURERS RECOMMENDATIONS. (19) TERMINATE WITH BUSHED END IN SECOND FLOOR FRAMING BELOW BEDROOM #2 FLOOR HATCH.

© COORDINATE EXACT LOCATION IN CEILING WITH GARAGE DOOR MOTOR. (20) TERMINATE WITH BUSHED END AT GARAGE FLOOR.
@ TERMINATE CONDUIT APPROXIMATELY 36” ABOVE FINISHED FLOOR OF BASEMENT AND PROVIDE
® MOUNT RECEPTACLE IN GARAGE 60” ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE.
A BUSHED END. TERMINATE AT FOUNDATION WALL.
(9) SEE DRAWING E-502; DETAIL-3 FOR INSTRUMENT POWER WIRING DIAGRAM.
(22) 2P-60A NON-FUSED SAFETY SWITCH IN A NEMA 1 ENCLOSURE. MOUNT AT EQUIPMENT.
© JUNCTION BOX FOR FIRE ALARM CONTROL PANEL (FACP). EXTEND BRANCH CIRCUIT TO FACP.
(23) MOUNT BEHIND DISHWASHER. FIELD COORDINATE EXACT LOCATION.
© 2P-60A NON-FUSED SAFETY SWITCH IN NEMA 3R ENCLOSURE. MOUNT AT EQUIPMENT.
30 FOREST STREET SOMERVILLE, MA
© 2P-100A NON-FUSED SAFETY SWITCH IN NEMA 1 ENCLOSURE. MOUNT AT EQUIPMENT. T: (978) 589-5100 F: (978) 589-5103
@ 2P-30A NON-FUSED SAFETY SWITCH IN NEMA 1 ENCLOSURE. MOUNT AT EQUIPMENT. www.buildingscience.com
© TERMINATE COMMUNICATION CONDUITS WITH BUSHED END INSIDE BASEMENT.

CONSULTANT:

3 4 4.1 5 6 6.1

F.1
EBL ENGINEERS, LLC
MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore. Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com

□ SCREEN
PORCH

WP
1J9(RP-BA)^GARBAGE DISPOSAL-
sV wp 5 GFI

r
PROFESSIONAL CERTIFICATION:
ACCU-3 I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
GFI 1J10(RP—BA) % OF THE STATE OF MARYLAND,
1 2 M H ©,10(RP-B) LICENSE NO: 13434 EXPIRATION DATE: 4-26-2011

5 PROJECT:
T—1 T-2 23
6(RP—G) WP 13,15(RP-BA) 40(RP—BA)
BATH m
NEMA 6-20R
RECEPTACLE,
WP
11 1J29(RP-BB) KITCHEN
National Institute of
I 3
E
240V, 20A
I ©9(RP-B) ^31(RP-BB) ^H(RP-BA) 9(RP—BB) 1J20,22(RP-BA) Standards and Technology
Qi(RP-g), NEMA 6-20R M [

X
RECEPTACLE,
240V, 20A
HRV
21
5
I
□ 11
NET ZERO ENERGY
©—o— \/ MOUNT 4%’’ FCU CONDENSING
15(RP—G)
2(RP—G)
4” INSTRUMEN TATI ON ©4(RP-BB)
8(RP—B) GFI
GFI i / yn
X
1J12(RP-E!A)
AFF TO
CENTERLINE nb UNIT FUTURE RESIDENTIAL TEST
10(RP—G) \I 14(RP—G)
CONDUIT---- —
1 )11(RP- kKrA\ DINING
□ I I FACILITY
Mg) GFI 11 ROOM I I
1 (DP—1) &
\ GARAGE
© ©)8(RP-B)~ -6(rp-bb;
NIST Campus
E.1
2(DP—1) TO © ri—\
I
30 '
©8(RP-BB) WP
1J11(RP-BB)
Gaithersburg, MD
TRANSFORMER
’T—1’ & ’T-2’
PRIMARY
i AHU-3
12

J
JUNCTIOI X FOR
GARAGE DOOR OPENER
MOUNT 48” ABOVE LANDING
©)2(RP-BB) 8(RP-BAK
9 I I
□ 7
©JUNCTION BOX
FOR GARAGE
DISCONNECT-
4 3” INSTRUMENTATION
MUDROOM
y Sp
FCU-2 FUTURE
18,20(RP—B) 9
DOOR PHOTO CONDUIT 17(RP—B)
5(RP—BB) 22
SENSOR/WIRING DWH-2
36,38(RP-BA WAP 16,18(RP—BA) U.S. Department of Energy ^
h(rp-g;
■ —© ©7(RP-BB)
n 1)13(RP-B) 1J15(RP-BB) Research Toward Zero Energy Homes
RECEPTACLE FOR LIFT
.19
17(RP—G) 9 D U.S. DEPARTMENT OF
POWER ©7(RP-B)= Q-—© Energy Efficiency &
I ENERGY Renewable Energy
C.1
r-
7 9(RP-G) ('
m 1J24,26(RP-BA)
G:\projects\2009\09247.000\cadd\submission 120%\09-247 E-103.dwg, 5/6/2010 3:34:30 PM, pplourde

4”C. TERMINATE 5-0” OUTSIDE ^J^5(RP-G) | ACCU-1


OF BUILDING. SEE CIVIL DRAWINGS
FOR CONTINUATION AND
COORDINATE EXACT LOCATION-------- L ©15(RP-B)
4

2—3”C FOR VOICE, DATA AND FIRE 34(RP—B)


PANEL ’DP-G’ 13(RP—BB) b11
ALARM. TERMINATE 5-0” 21
4” INSTRUMENTATION

i i®qr
OUTSIDE OF BUILDING. SEE CIVIL 20
GFI GFI WP CONDUIT
DRAWINGS FOR CONTINUATION AND A11
ENTRY HALL LIVING ROOM h" wp
COORDINATE EXACT LOCATION-------- /- CFT OFFICE /OPTIONAL
c 29(RP-B)^ 30 M V BEDROOM 4
©11(RP-B) TV ACCU-2
5/7/10 UPDATED
MARK DATE DESCRIPTION
FOR ELECTRIC CAR 36(RP—B) % PANEL 10(RP-BB) 1J16(RP-BB)
©JUNCTION BOX 1J1(RP—G)
CHARGING------------- ’RP-G’ ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
FOR GARAGE
DOOR PHOTO 4
SENSOR/WIRING
4’x8'x%” □
(1219mmx 2438mm ©12(RP-BB) PROJECT NO: NIST NZERTF
xT9mm) F'RE FEEDER TO 1J14(RP—B) 1J16(RP-B) 1J28,30(RP-BA)

6
14(RP—BB) CAD DWG FILE: 09-247 E-103
RETARDANT-" PANELBOARD INVERTER UTILITY 4
PLYWOOD FOR ’RP-BB’ DISCONNECT------- DRAWN BY: JEM
COMMUNICATION
EQUIPMENT. PAINT
TO MATCH WALL I L ©12(RP-B)
WF
El .14,
©15(RP-B)
4
B CHECKED BY:

COPYRIGHT O
FJL

FINISH-------------------
M
a WP
C 2009
BUILDING SCIENCE CORPORATION
4—1)£”C. ONE FOR FIBER; ONE FOR
A
COPPER TELECOMMUNICATION CABLE; SHEET TITLE:
ONE FOR VIDEO AND ONE FOR FIRE HOUSE TO
SYSTEM---------------------------------------------- ELECTRICAL PANELBOARD
METER ’RP-B’ FIRST FLOOR PLAN
POWER
B A.1

rtnnoN; ©

NORTH
SCALE AS NOTED
IF THIS PLAN IS A REDUCTION, GRAPHIC
SCALES MUST BE USED.

FIRST FLOOR PLAN POWER N GRAPHIC SCALE


SCALE: y4" = 1-0’

0 2’ 4’ 8’ 12’
1 /4”=1’—0
E-103
DRAWING NOTES: (APPLY TO THIS SHEET ONLY)

(T) TO RELAY PANEL, CONNECT BRANCH CIRCUIT THROUGH RESPECTIVE RELAY


W AND THEN TO PANELBOARD. SEE RELAY SCHEDULE. LABEL THE LOAD THAT BUILDING SCIENCE
IS SERVED BY THE WIRE.

(2) SWITCH FOR RECEPTACLE. SEE ’’SECOND FLOOR PLAN - POWER” ON THIS
CORPORATION
SHEET FOR SWITCH CIRCUIT.

© UP TO ATTIC LIGHTING FIXTURES.

© SEE DRAWING E-502 FOR INSTRUMENT POWER WIRING DIAGRAM.

© FEEDER FROM PANEL ’RP-A’.

30 FOREST STREET SOMERVILLE, MA


T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

3 4 4.1 5 6 6.1 3 4 4.1 5 6 6.1


CONSULTANT:

fr F.1 IT F.1
EBL ENGINEERS, LLC
MECHANICAL • ELECTRICAL • FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234—5701
(410) 668-8000 FAX (410) 668-8001
e-mail eblOeblengineers.com

d F F
^Itv
w 4
3 2 PROFESSIONAL CERTIFICATION:
S4 t
5 I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO: 13434 EXPIRATION DATE: 4-26-2011

MASTER
BATH
02(RP-BA)
R
2
i
(T)2(RP-BA)
MASTER
BEDROOM
Ql7(RP-BB)
(T)19(RP-BB>
HRV-

MASTER
1J3(RP-BA)
MASTER
T PROJECT:

National Institute of
Standards and Technology
S4 T>
(l)2(RP-BA)
BATH
BEDROOM

.JD> NET ZERO ENERGY


i

TUFFS' (?)2(RP-BA)
T)2(RP-BA^
r*
5(RP—BA)^
^ GF!
GH T)3(RP-bK)

1J6(RP—BA) 21(RP—BB) RESIDENTIAL TEST


R4 (l)2(RP-BA)
2
BATH U2
1J2(RP-BA)
HRV
M (V)4(RP-BA)
BATH #2
^T^23(RP—BB) FACILITY
o r3 {T)l(RP-BA)
18(RP-BB) NIST Campus
^^(j)2(RP-BA) GFI I Gaithersburg, MD
n-T\-n—^ 3 s ss 7 02o(rp-bb; ^□n□i
2 3L 7

(l)2(RP-BA)
2
I
S3
R4
HALL
©K “5
R4. S4
&2(RP—BB)—-
(l)4(RP-BA)

HALL
(])5(RP-BA) ~J~7|wa|/
S4, ■d-
(T)g4(RP-BB)—
(/) @2(RP-BA) 2
(l)2(RP-BA) CL
D D U.S. Department of Energy ^
o—© Research Toward Zero Energy Homes
n
^7 (T^2(RP—BA)
W3
Q2(RP-BA)
) (j)2(RP—B/4

1J2(RP—BA)
r7
4 U.S. DEPARTMENT OF

ENERGY
Energy Efficiency &
Renewable Energy

1
TV TV
G:\projects\2009\09247.000\cadd\submission 110%\09-247 E-104.dwg, 3/31/2010 3:34:43 PM, jwilkie

BEDROOM 2
OPEN TO 4 OPEN TO
BELOW 25(RP—BB) BELOW
26(RP—BB)------

(?)27(RP-BB) (j)28(RP-BB)
I
BEDROOM 3

BEDROOM 3 MARK DATE DESCRIPTION


BEDROOM 2
□ □ ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
Qg(rp-ba) (?)7(RP-BA)

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 E-104
B B
DRAWN BY: JEM
CHECKED BY: FJL
I__ ___ i A I__ A
COPYRIGHT O C 2009

BUILDING SCIENCE CORPORATION

SHEET TITLE:

SECOND FLOOR PLAN


o n n A.1 n n n A.1 - LIGHTING & POWER

CATTTION: ©

NORTH
SCALE AS NOTED
IF THIS PLAN IS A REDUCTION, GRAPHIC
SECOND FLOOR PLAN LIGHTING N SECOND FLOOR PLAN POWER SCALES MUST BE USED.

SCALE: y4” = 1-0’ SCALE: y4” = 1’-0’ GRAPHIC SCALE


0 2’ 4’ 8’ 12’
1/4”=1’—0 E-104
BUILDING SCIENCE
DRAWING NOTES:(APPLY TO THIS SHEET ONLY) CORPORATION
© 2P-60A NON-FUSED SAFETY SWITCH IN NEMA 1 ENCLOSURE.
AT EQUIPMENT.
MOUNT

© 2P-30A NON-FUSED SAFETY SWITCH IN NEMA 1 ENCLOSURE. MOUNT


AT EQUIPMENT.

© LOCATE RECEPTACLE ADJACENT TO RADON VENT.


THE EXACT LOCATION.
FIELD COORDINATE

30 FOREST STREET SOMERVILLE, MA


T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

CONSULTANT:

EBL ENGINEERS, LLC


MECHANICAL • ELECTRICAL * FIRE PROTECTION
The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234-5701
(410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com

3 4 4.1 5 6 6.1

F
n PROFESSIONAL CERTIFICATION:

1 2 I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY


ME. AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO: 13434 EXPIRATION DATE: 4-26-2011

PROJECT:

National Institute of
E
r i Standards and Technology
1(RP—BA)

\ NET ZERO ENERGY


r® RESIDENTIAL TEST
FACILITY
O O NIST Campus
E.1
35(RP—B) 37,39(RP—B) Gaithersburg, MD
2
© 7
FCU-1 FUTURE
'BnUti
S1 S1 si I S1
O' I GFI
U.S. Department of Energy ^
l
Research Toward Zero Energy Homes
EE D
DOWN TO THREE COORDINATE EXACT n U.S. DEPARTMENT OF
Energy Efficiency &
n n WAY SWITCH AT LOCATION WITH STAIR PANELBOARD ’RP-A’
C.1 BOTTOM OF STAIR ENERGY Renewable Energy
INVERTER m.
OUTPUT: 3KVA, 120/240V, 10 7 PROVIDE MOUNTING
RACK FOR MOUNTING
INVERTER S2. INVERTERS AND
OUTPUT: 3KVA, 120/240V, 10 PANELBOARD
INVERTER #3.
OUTPUT: 3KVA, 120/240V, 10

L J 6/29/10 REVISIONS
c 1
5/7/10 UPDATED
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION

PROJECT NO: NIST NZERTF


CAD DWG FILE: 09-247 E-105
J DRAWN BY: JEM
r j.
B
CHECKED BY: FJL

A
COPYRIGHT C 2009 o
BUILDING SCIENCE CORPORATION

SHEET TITLE:

ATTIC FLOOR PLAN


r a. - ELECTRICAL
n n n A.1

CAUTION: ©

NORTH
SCALE AS NOTED
IF THIS PLAN IS A REDUCTION, GRAPHIC
SCALES MUST BE USED.

ATTIC FLOOR PLAN ELECTRICAL


SCALE: fc” = 1’-0*
N GRAPHIC SCALE
0 2’ 4’ 8’ 12’
1 /4”=1 ’—0 E-105
BUILDING SCIENCE
DRAWING NOTES:(APPLY TO THIS SHEET ONLY) CORPORATION
© TO GROUND BUS IN PANELBOARD.

© PROVIDE WARNING LABEL: ’’CAUTION - EQUIPMENT IS BACKFED FROM A


PHOTO VOLTAIC POWER SOURCE”.

© 75KVA - 480-120/240V, 10 IN WEATHERPROOF ENCLOSURE.

© 50KVA - 480-120/240V, 10 IN WEATHERPROOF ENCLOSURE.

SEVEN PANELS AT 230 WATTS EACH © 2P-400A NFSS IN NEMA 3R ENCLOSURE. MOUNT AT TRANSFORMER.

(TYP OF 6) © 2P-200A NFSS IN NEMA 3R ENCLOSURE. MOUNT AT TRANSFORMER.

© #6 AWG COPPER IN %” CONDUIT TO SERVICE ENTRANCE GROUND.


PV ARRAYf
PV ARRAY 30 FOREST STREET SOMERVILLE, MA
PV ARRAY T: (978) 589-5100 F: (978) 589-5103
HOUSE- EXTERIOR GARAGE www.buildingscience.com
PV ARRAY
2#4 AND #8
PV ARRAY GROUND WIRE
IN 1” CONDUIT
ROOF PV ARRAY
CONSULTANT:

EXTERIOR
INVERTER #1
OUTPUT -
S 3000W, 240/
J 120V, 10
2#10 AND #10
GROUND WIRE IN
34” CONDUIT-------
EBL ENGINEERS, LLC
© o»
MECHANICAL • ELECTRICAL * FIRE PROTECTION

INVERTER #2
oo 14 The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234-5701
OUTPUT -
3000W, 240/
© (410) 668-8000 FAX (410) 668-8001
e-mail ebl@eblengineers.com

120 V, 10 oo
2#10 AND #10
GROUND WIRE IN
oOJ
2#4 AND #8
GROUND WIRE
%” CONDUIT------- ©
o 0—
IN 1” CONDUIT-
INVERTER #3
2#10 AND #10
GROUND WIRE IN
wJT
o o------
OUTPUT - %” CONDUIT-x ^GROUND
3000W.240/
120 V, 10
© Y)V
O' O'
PANELBOARD ’RP-A-

2#4 AND #8 GROUND NEUTRAL- PROFESSIONAL CERTIFICATION:


I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME. AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
WIRE IN 1” CONDUIT-
© OF THE STATE OF MARYLAND,
LICENSE NO: 13434

PROJECT:
EXPIRATION DATE: 4-26-2011

ATTIC

National Institute of
Standards and Technology
3#6 AND #10
GROUND WIRE
IN MC CABLE- NET ZERO ENERGY
RESIDENTIAL TEST
SECOND FLOOR
FACILITY
INVERTER UTILITY
DISCONNECT
2P-60A NFSS IN PANELBOARD PANELBOARD NIST Campus
NEMA 3R ’RP-G’ ’DP-1’ Gaithersburg, MD
ENCLOSURE--------
X X 214 213

HOUSE METER
(400 AMP SERVICE) fll
tyty
fjl "Buttoi
U.S. Department of Energy ^
T—2 T—1
Research Toward Zero Energy Homes
FIRST FLOOR
U.S. DEPARTMENT OF
BUILDING Energy Efficiency &
3#6 AND #10 GROUND
WIRE IN MC CABLE LL J METER- I_____ J ENERGY Renewable Energy
II J —2(DP-1)_____ | 1 (DP-1)
3#1 AND #8 GROUND I I I_____
WIRE IN 1 y2” CONDUIT X7 I L J
3—600KCMIL AND TO BUILDING 226.
#1/0 GROUND WIRE SEE CIVIL PLAN
AC
) O' ) 3—300KCMIL & #2
GW IN 3^”C
o
3—600KCMIL & #1/0 6/29/10 REVISIONS
GW IN 3^”C
PANELBOARD ’RP-BB’ PANELBOARD ’RP-B’ MARK DATE DESCRIPTION

PANELBOARD ’RP-BA’ ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION


BASEMENT
PROJECT NO: NIST NZERTF
CAD DWG FILE: 09-247 E-501
ELECTRICAL RISER DIAGRAM DRAWN BY: JEM
NO SCALE CHECKED BY: FJL

COPYRIGHT C 2009 O
BUILDING SCIENCE CORPORATION

SHEET TITLE:

ELECTRICAL
RISER DIAGRAM

NORTH
SCALE AS NOTED

E-501
BUILDING SCIENCE
ROOM ROOM ROOM ROOM ROOM ROOM
LIGHT LIGHT LIGHT LIGHT LIGHT LIGHT CORPORATION
ROOM SWITCHES r**i r#i r#i ROOM SWITCHES r**i r#i r**i
TO NEXT GROUPING JUNCTION BOX. TO NEXT GROUPING
OF SWITCHES. PROVIDE TERMINAL OF SWITCHES.
WIRING SIMILAR TO STRIP FOR WIRING SIMILAR TO
THIS DIAGRAM------ TERMINATING \ \ \ THIS DIAGRAM------ i JUNCTION BOX \ \ \
i CABLES y? y? /? i y? y? y?
PANELBOARD PANELBOARD

0 __ y^ 0 y>
120 VOLTS- 120 VOLTS
N N
30 FOREST STREET SOMERVILLE, MA
it o T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com

t\
RELAY CONTACT IN TYPICAL RELAY CONSULTANT:
RELAY PANEL CONTACT IN
O o o o RELAY PANEL

1 l EBL ENGINEERS, LLC


MECHANICAL • ELECTRICAL • FIRE PROTECTION
TYPICAL SPDT WITH CENTER OFF The Professional Engineering Center
20 AMP MAINTAINED CONTACT SWITCH. 8005 Harford Road, Baltimore, Maryland 21234—5701
LABEL SWITCH FOR AREA SERVED TYPICAL SPDT WITH CENTER OFF (410) 668-8000 FAX (410) 668-8001
20 AMP MAINTAINED CONTACT SWITCH e-mail eblOeblengineers.com

1 TYPICAL WIRING DIAGRAM FOR ROOM SWITCHES 2 TYPICAL FUTURE WIRING DIAGRAM FOR ROOM SWITCHES
NO SCALE NO SCALE
E—102, E-102,
E-104- E-502 E-104- E—502

PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO: 13434 EXPIRATION DATE: 4-26-2011

PROJECT:

National Institute of
RELAY IN RELAY
PANEL------------- SPDT WITH CENTER Standards and Technology
TYPICAL SWITCHED OFF MAINTAINED
RECEPTACLE IN CONTACT SWITCH
ROOM PANELBOARD
NET ZERO ENERGY
rn o
o
y^
ATTIC
RESIDENTIAL TEST
FACILITY
O
WAP ATTIC
a VOICE DATA
NIST Campus
Gaithersburg, MD
y^ MASTER MASTER VIDEO
BEDROOM BEDROOM MASTER
BEDROOM
L___I VOICE
MASTER
DATA
MASTER
TYPICAL QUAD RECEPTACLE IN BEDROOM BEDROOM VIDEO
ROOM FOR INSTRUMENT POWER BEDROOM 2
VOICE DATA U.S. Department of Energy ^
BEDROOM 2 BEDROOM 2 Research Toward Zero Energy Homes

TYPICAL ROOM INSTRUMENT VOICE DATA


VIDEO
BEDROOM 3
U.S. DEPARTMENT OF
Energy Efficiency &
BEDROOM 3 BEDROOM 3 ENERGY Renewable Energy
3 POWER WIRING DIAGRAM SECOND FLOOR
WAP
SECOND FLOOR
NO SCALE
G:\projects\2009\09247.000\cadd\submission 110%\09-247 E-502.dwg, 3/31/2010 3:35:49 PM, jwilkie

E-102,
E-104- E—502 VOICE DATA
LIVING ROOM LIVING ROOM VIDEO
TYPICAL RJ-45 JACK. /-TYPICAL RJ-45 JACK. LIVING ROOM
MAKE CONNECTION TO / MAKE CONNECTION TO
CABLE AS REQUIRED r CABLE AS REQUIRED
VOICE DATA
OFFICE OFFICE
VIDEO
OFFICE
SINGLE GANG THREE PORT SINGLE GANG THREE PORT VOICE DATA MARK DATE DESCRIPTION
QUICKPORT DECORA QUICKPORT DECORA KITCHEN KITCHEN
FIRST FLOOR FIRST FLOOR ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
MULTIMEDIA INSERT - MULTIMEDIA INSERT -
TYPICAL OF TWO TYPICAL OF TWO
QUICK PORT PROJECT NO: NIST NZERTF
Y CONNECTOR
VOICE JACK - RJ-45
CAT 6 QUICK PORT
VOICE JACK - RJ-45
CAT 6 QUICK PORT h: □ □ □—1 TYPICAL RG—6 COAX
CAD DWG FILE: 09-247 E-502
CONNECTOR------------ CONNECTOR------------ U □ □ D TO EACH LOCATION.
DRAWN BY: JEM

DATA JACK - RJ-45 DATA JACK - RJ-45 a □ □ Q NO SCALE TERMINATE WITH ’F’ CHECKED BY: FJL
CAT 6 QUICK PORT^ CAT 6 QUICK PORT^ a □ □ Q CONNECTORS
COPYRIGHT O
CONNECTOR---^ z CONNECTOR---^ z 0 □ □ D
C 2009

BUILDING SCIENCE CORPORATION


DOUBLE GANG
DECORA FACE PLATE
SINGLE GANG
DECORA FACE PLATE 0 □ □ D SHEET TITLE:
□ □ D
BLANK INSERT BLANK INSERT
TYPICAL CAT-6 CABLE TO ALL OUTLETS □ □ D VIDEO DISTRIBUTION
1x8
VIDEO DISTRIBUTION
1x8 ELECTRICAL
1” CONDUIT WITH BUSHED
END TO BASEMENT HEAD
1” CONDUIT WITH BUSHED
END TO BASEMENT HEAD TYPICAL CAT-6 RJ-45 CONNECTOR □ □
END EQUIPMENT LOCATION. END EQUIPMENT LOCATION. 110 PATCH PANEL
□ □ TYPICAL CAT-6 CABLE TO ALL OUTLETS
MOUNT IN COMMUNICATION CABINET
DETAILS
PROVIDE TWO RACEWAYS / PROVIDE TWO RACEWAYS / I TYPICAL CAT-6 RJ-45 CONNECTOR
PER BACK BOX--------^ PER BACK BOX--------' BASEMENT BASEMENT
MULTIPAIR TELEPHONE CABLE BY DATA SWITCH/ROUTER BY GOVERNMENT
GOVERNMENT. PUNCH DOWN ON PATCH PANEL
MOUNT IN COMMUNICATION CABINET
VOICE. DATA AND VOICE AND ©

NORTH
SCALE AS NOTED
4 VIDEO OUTLET NO SCALE
5 DATA OUTLET NO SCALE
6 VOICE/DATA RISER VIDEO RISER
NO SCALE NO SCALE
E-502 E-502 E-502 E-502 E-502 E-502 E-502 E-502
E-502
PANEL SCHEDULE ’RP-A’ BUILDING SCIENCE
120/240 VOLTS - 1 PHASE - 3 WIRE - SURFACE MOUNTED
CORPORATION
BREAKER AMPERES/PHASE BREAKER
CIR FOR CIR FOR
POLE TRIP A B POLE TRIP PANEL SCHEDULE ’RP-B’ PANEL SCHEDULE ’RP-BA’
1 INVERTER NO. 1 2 20 12.5 12.5 2 INVERTER NO. 2 2 20 120/240 VOLTS - 1 PHASE - 3 WIRE - SURFACE MOUNTED 120/240 VOLTS - 1 PHASE - 3 WIRE - SURFACE MOUNTED

3 12.5 12.5 4 BREAKER AMPERES/PHASE BREAKER BREAKER AMPERES/PHASE BREAKER


CIR FOR CIR FOR CIR FOR CIR FOR
5 INVERTER NO. 3 2 20 12.5 0.0 6 SPACE 1 POLE TRIP A B POLE TRIP POLE TRIP A B POLE TRIP
7 12.5 0.0 8 SPACE 1 1 RECEPT - BASEMENT 1 20 7.5 7.5 2 RECEPT - BASEMENT 1 20 1 ATTIC RADON VENT MOTOR 1 20 10.5 8.4 2 LIGHTS - SECOND FLOOR 1 20
9 SPACE 1 0.0 0.0 10 SPACE 1 3 RECEPT - BASEMENT 1 20 6.0 7.2 4 RECEPT - SUMP PUMP 1 20 3 RECEPT - MASTER BATH 1 20 4.0 5.5 4 RECEPT - BATH #2 1 20
11 SPACE 1 0.0 0.0 12 SPACE 1 5 SPARE 1 20 0.0 0.0 6 LIGHTS - FIRST FLOOR 1 20 5 RECEPT - MASTER BATH 1 20 10.0 10.5 6 RECEPT - BATH #2 1 20
25.0 12.5 25.0 12.5 7 SPARE 1 20 0.0 3.0 8 GFI RECEPT - BATH #1 1 20 7 SPARE 1 20 9.0 10.0 8 RECEPT - REFRIGERATOR 1 20 30 FOREST STREET SOMERVILLE, MA
TOTALS A= 37.5 B= 37.5 9 RECEPT - OUTSIDE NORTH 1 20* 3.0 1.5 10 RECEPT - SCREEN PORCH 1 20 9 RECEPT - KITCHEN COUNTER 1 20 3.0 5.8 10 RECEPT - GARBAGE DISPOSAL 1 20
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
11 RECEPT - OUTSIDE EAST 1 20* 4.5 3.0 12 RECEPT - OUTSIDE SOUTH 1 20* 11 RECEPT - KITCHEN COUNTER 1 20 3.0 1.5 12 RECEPT - KITCHEN ISLAND GFI 1 20
MAIN BREAKER 2P.60A 13 SPARE 1 20 6.0 10.5 14 RECEPT - OFFICE/BEDROOM 4 1 20 14 RECEPT - MICROWAVE/FAN 1
13 RECEPT - RANGE 2 50 40.0 12.0 20
MAIN LUGS ONLY AMPERES-TOP/BOTTOM CONNECTED LOAD 9.0 KVA 15 RECEPT - ENTRY HALL 1 20 4.5 9.0 16 SPARE 1 20 CONSULTANT:
15 40.0 0.0 16 FCU-2 (FUTURE)(FIRST FLOOR) 2 40
MINIMUM AIC RATING =
10,000 AMPERES SYMMETRICAL 17 RECEPT - WASHER 1 20 10.0 21.0 18 RECEPT - DRYER 2 30 17 SWH-1 2 25 19.0 0.0 18 (AH SYSTEM HTR)
19 DEHUMIDIFIER DH-1 1 20 0.0 21.0 20 19 19.0 0.0 20 HPU-4 (11.45A, 230V) 2 25
21 AHU-1 - HEATER 2 80 60.0 0.0 22 AHU-2 - HEATER 2 80 21 AHU-3 2 0.0 0.0 22 (AH SYSTEM)
MAIN DISTRIBUTION PANEL SCHEDULE DP-1 23 60.0 0.0 24 23 0.0 25.6 24 HPU-1 (5 TON) 2 50
EBL ENGINEERS, LLC
480/277 VOLTS, 3 PHASE, 4 WIRE
25 HEAT RECOVERY UNIT HVR-1 1 15 1.2 22.0 26 WATER HEATER DWH-1 2 30 25 SWH-2 2 25 19.0 25.6 26 (FOR AHU-1) MECHANICAL • ELECTRICAL * FIRE PROTECTION
BREAKER NUMBER OF CONDUIT CDT.
CIR LOAD KVA CONDUIT REMARKS
FR POLE CAL SIZE SIZE 27 OUTSIDE LIGHTS 1 20 0.0 22.0 28 27 19.0 0.0 28 HPU-2 2 50 The Professional Engineering Center
8005 Harford Road, Baltimore, Maryland 21234-5701
1 TRANSFORMER ’T-1’ 400 2 250 75 1 3 3—250KCMIL & #4GW (410) 668-8000 FAX (410) 668-8001
29 VEHICLE CHARGER OUTLET 2 30 20.0 0.0 30 AHU-2 (ALTERNATE SYSTEM) 1 20 29 SPACE 1 1.5 0.0 30 (AH SYSTEM FOR AHU-2)
2 TRANSFORMER ’T-2’ 225 2 175 50 1 3 3#2/0 & #6GW e-mail ebl@eblengineers.com
3 EQUIPPED SPACE ONLY 225 3 31 20.0 10.0 32 AHU-1 1 20 31 SPACE 1 0.0 5.0 32 LIGHTS 1ST FLOOR 1 20
4 EQUIPPED SPACE ONLY 225 3
33 INVERTER POWER 2 60 0.0 0.0 34 VEHICLE CHARGER OUTLET 1 20 33 SPACE 1 0.0 5.0 34 LIGHTS 1ST FLOOR 1 20
3P-400 AMP MAIN CIRCUIT BREAKER
35 FCU-1 (FUTURE)(ALT SYSTEM) 1 15 0.0 4.5 36 GARAGE RECEPTACLE 1 20 35 SPACE 1 0.0 0.0 36 FCU-2 (FUTURE)(ALT SYSTEM) 2 15
37 FCU-1 (FUTURE)(HEATER) 2 40 0.0 0.0 38 SPACE 1 37 SPACE 1 0.0 0.0 38
39 (ALTERNATE SYSTEM) 0.0 0.0 40 SPACE 1 39 SPACE 1 0.0 15.0 40 DISHWASHER 1 20
RELAY PANEL SCHEDULE 41 SPARE 1 20 0.0 0.0 42 SPACE 1 41 SPACE 1 0.0 0.0 42 SPACE 1
RELAY NUMBER BRANCH CIRCUIT LOAD SERVED
1 34(RP—BA) BATH #1 LIGHTS 107.7 62.5 95.0 79.7 103.0 67.3 94.0 62.6 PROFESSIONAL CERTIFICATION:
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME. AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
2 34(RP—BA) BATH #1 CLOSET LIGHTS PROVIDE ARC FAULT 156.
* GFCI BREAKER TOTALS A= 170.2 B= 174.7 TOTALS A= 170.3 B= LICENSE NO: 13434 EXPIRATION DATE: 4-26-2011

3 34(RP—BA) KITCHEN LIGHTS WEST WALL BREAKERS AS REQUIRED 6 PROJECT:


4 34(RP—BA) KITCHEN LIGHTS NORTH WALL PROVIDE WITH THRU FEED PROVIDE WITH BRANCH CIRCUIT
LUGS MONITORING
5 34(RP—BA) KITCHEN LIGHTS PENINSULA
PROVIDE WITH BRANCH CIRCUIT PROVIDE ARC FAULT BREAKERS
National Institute of
6 34(RP—BA) DINING ROOM LIGHTS NORTH WALL MAIN BREAKER 2P, 400A
MONITORING AS REQUIRED
7 34(RP—BA) DINING ROOM LIGHTS NORTH WALL
Standards and Technology
AMPERES-TOP/BOTTOM CONNECTED LOAD 41.4 KVA MAIN LUGS ONLY 400A AMPERES-TOP/BOTTOM CONNECTED LOAD 39.2 KVA
8 32(RP—BA) LIVING ROOM LIGHTS SOUTH WEST WALL
MINIMUM AIC RATING =
9
10
32(RP—BA) ENTRY HALL LIGHTS SOUTH WALL
OFFICE/OPTIONAL BEDROOM #4 LIGHTS/FAN SOUTH EAST WALL
MINIMUM AIC RATING = 22,000 AMPERES SYMMETRICAL
22,000
AMPERES SYMMETRICAL
NET ZERO ENERGY
32(RP—BA)
11 34(RP—BA) MUDROOM LIGHTS WEST WALL RESIDENTIAL TEST
12 32(RP—BA) BASEMENT STAIRS LIGHTS
13 32(RP—BA) FIRST FLOOR STAIRS LIGHTS FACILITY
14 34(RP—BA) GARAGE EXTERIOR LIGHTS
PANEL SCHEDULE ’RP-BB’ (INSTRUMENTATION) PANEL SCHEDULE ’RP-G’
15 2(RP—BA) MASTER BEDROOM LIGHTS/FAN SOUTH WALL 120/240 VOLTS - 1 PHASE - 3 WIRE - SURFACE MOUNTED 120/240 VOLTS - 1 PHASE - 3 WIRE - SURFACE MOUNTED NIST Campus
16 2(RP—BA) MASTER BEDROOM CLOSET #1 LIGHTS Gaithersburg, MD
BREAKER AMPERES/PHASE BREAKER BREAKER AMPERES/PHASE BREAKER
17 2(RP—BA) MASTER BEDROOM CLOSET #2 LIGHTS CIR FOR CIR FOR CIR FOR CIR FOR
18 2(RP—BA) MASTER BATH LIGHTS EAST WALL POLE TRIP A B POLE TRIP POLE TRIP A B POLE TRIP
19 2(RP—BA) BEDROOM #2 LIGHTS/FAN NORTH WALL RECEPT - BATH #1 'BnUti
1 RECEPT - BASEMENT 1 20 1.5 1.5 2 1 20 1 RECEPT - OUTSIDE 1 20* 3.0 4.5 2 RECEPT - NORTH WALL 1 20
20 2(RP—BA) BEDROOM #3 LIGHTS/FAN NORTH WALL
3 RECEPT - BASEMENT 1 20 1.5 1.5 4 RECEPT - BATH #1 1 20 3 RECEPT - GARAGE DOOR 1 20 9.8 0.0 4 SPARE 1 20
21 2(RP—BA) BEDROOM #3 CLOSET LIGHTS NORTH WALL U.S. Department of Energy ^
22 2(RP—BA) HALL LIGHTS NORTH EAST WALL 5 RECEPT - MUDROOM 1 20 1.5 1.5 6 RECEPT - KITCHEN 1 20 5 RECEPT - GARAGE DOOR 1 20 9.8 15.0 6 GARAGE (HPU-3) 2 25 Research Toward Zero Energy Homes
23 23(RP—BB) MASTER BEDROOM INSTRUMENT POWER
7 RECEPT - MUDROOM 1 20 1.5 1.5 8 RECEPT - KITCHEN 1 20 7 SPARE 1 20 0.0 15.0 8
U.S. DEPARTMENT OF
24 1(RP—BA) MASTER BEDROOM RECEPTACLES Energy Efficiency &
25
26
3(RP—BA)
3(RP—BA)
MASTER BATH HRV
MASTER BATH RECEPTACLES
9
11
RECEPT - DINING ROOM

RECEPT - DINING ROOM


1
1
20

20
1.5 1.5
1.5 1.5
10
12
RECEPT - OFFICE/BEDROOM 4

RECEPT - OFFICE/BEDROOM 4
1
1
20

20
9
11
LIFT

AHU-3 HEATER PKG


1
2
20

40
12.0 12.0
31.0 12.0
10
12
RECEPT - NORTH WALL 2 20
ENERGY Renewable Energy
27 5(RP—BA) MASTER BATH RECEPTACLES 13 RECEPT - ENTRY HALL 1 20 1.5 1.5 14 RECEPT - LIVING ROOM 1 20 13 31.0 12.0 14 RECEPT - NORTH WALL 2 20
28 4(RP—BA) BATH #2 RECEPTACLES
15 RECEPT - ENTRY HALL 1 20 1.5 1.5 16 RECEPT - LIVING ROOM 1 20 15 RECEPT - NORTH WALL 1 20 12.0 12.0 16
29 6(RP—BA) BATH #2 RECEPTACLES
30 18(RP—BB) BATH #2 INSTRUMENT POWER 17 RECEPT - MASTER BATH 1 20 1.5 1.5 18 RECEPT - BATH #2 1 20 17 DWH-2 2 20 14.6 10.0 18 FACP 1 20
31 4(RP—BA) BATH #2 HRV 19 RECEPT - MASTER BATH 1 20 1.5 1.5 20 RECEPT - BATH #2 1 20 19 14.6 0.0 20 SPARE 1 20
32 27(RP—BB) BEDROOM #2 INSTRUMENT POWER
21 RECEPT - MATER BEDROOM 1 20 1.5 1.5 22 RECEPT - HALL 1 20 21 SPACE 1 0.0 0.0 22 SPACE 1
33 6(RP—BA) BEDROOM #2 RECEPTACLES 6/29/10 REVISIONS
34 7(RP—BA) BEDROOM #3 RECEPTACLES 23 RECEPT - MATER BEDROOM 1 20 1.5 1.5 24 RECEPT - HALL 1 20 23 SPACE 1 0.0 0.0 24 SPACE 1 5/7/10 UPDATED
35 28(RP—BB) BEDROOM #3 INSTRUMENT POWER 25 RECEPT - BEDROOM 2 1 20 1.5 1.5 26 RECEPT - BEDROOM 3 1 20 25 SPACE 1 0.0 0.0 26 SPACE 1 MARK DATE DESCRIPTION
36 9(RP—B) EXTERIOR RECEPTACLES NORTH WEST
27 RECEPT - BEDROOM 2 1 20 1.5 1.5 28 RECEPT - BEDROOM 3 1 20 27 SPACE 1 0.0 0.0 28 SPACE 1 ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
37 10(RP—B) SCREEN PORCH
CONTROL POWER FOR 29 SPACE 1 0.0 0.0 30 SPACE 1
38 11(RP—B) EXTERIOR RECEPTACLES SOUTH EAST 29 RECEPT - KITCHEN 1 20 1.5 10.0 30 1 15
SOLENOID TRANSFORMER PROJECT NO: NIST NZERTF
39 12(RP—B) EXTERIOR RECEPTACLES SOUTH 31 SPACE 1 0.0 0.0 32 SPACE 1
31 RECEPT - KITCHEN 1 20 3.0 10.0 32 CONTROL POWER 1 15 CAD DWG FILE: 09-247 E-601
40 8(RP—B) BATH #1 HRV
33 SPACE 1 0.0 0.0 34 SPACE 1
41 8(RP—B) BATH #1 RECEPTACLES 33 BASEMENT LIGHTS 1 20 2.0 0.0 34 SPACE 1 DRAWN BY: JEM
42 4(RP—BB) BATH #1 INSTRUMENT POWER 35 SPACE 1 0.0 0.0 36 SPACE 1 CHECKED BY: FJL
35 SPACE 1 0.0 0.0 36 SPACE 1
43 7(RP—BB) MUDROOM INSTRUMENT POWER 37 SPACE 1 0.0 0.0 38 SPACE 1
44 7(RP—B) CENTER HALL
37 SPACE 1 0.0 0.0 38 SPACE 1 COPYRIGHT C 2009 O
39 PANEL RP-BB 2 100 21.0 0.0 40 SPACE 1 BUILDING SCIENCE CORPORATION
45 11(RP—BA) KITCHEN RECEPTACLES WEST WALL 39 SPACE 1 0.0 0.0 40 SPACE 1
41 21.0 0.0 42 SPACE 1 SHEET TITLE:
46 9(RP—BA) KITCHEN RECEPTACLES NORTH WALL 41 SPACE 1 0.0 0.0 42 SPACE 1
47 10(RP—BA) GARAGE DISPOSAL NORTH WALL 91.4 53.5 88.4 39.0
14.0 20.5 13.5 20.5
48
49
12(RP—BA) KITCHEN PENINSULA RECEPTACLES
TOTALS A= 34.5 B= 34.0 * GFCI BREAKER TOTALS A= 144.9 B= 127.4 ELECTRICAL PANEL
8(RP—BB) KITCHEN PENINSULA INSTRUMENT POWER
50 13(RP—B) DINING ROOM RECEPTACLES PROVIDE ARC FAULT BREAKERS SCHEDULES
AS REQUIRED
51 15(RP—B) ENTRY HALL RECEPTACLES NORTH EAST
MAIN BREAKER 2P, 250A
52 15(RP—B) ENTRY HALL RECEPTACLES SOUTH MAIN BREAKER 2P, 100A
AMPERES-TOP/BOTTOM CONNECTED LOAD 32.7 KVA
53 15(RP—BB) LIVING ROOM INSTRUMENT POWER AMPERES-TOP/BOTTOM CONNECTED LOAD 8.2 KVA

©
54 16(RP-B) LIVING ROOM RECEPTACLES MINIMUM AIC RATING =
MINIMUM AIC RATING = 22,000 AMPERES SYMMETRICAL

NORTH
AMPERES SYMMETRICAL
55 16(RP—BB) LIVING ROOM INSTRUMENT POWER 22,000 SCALE AS NOTED
56 12( RP-BB) OFFICE/OPTIONAL BEDROOM INSTRUMENT POWER
57 14(RP—B) OFFICE/OPTIONAL BEDROOM INSTRUMENT RECEPTACLES

NOTE: 1. PROVIDE ALL REQUIRED SUB FEED LUGS FOR ADDING FUTURE ADDITIONAL RELAY PANELS.

E-601
REVISION DESCRTHON BY DATE
9SX CD SET 01/29/10
100X CD SET 02/24/10
ISSUED FOR CONSTRUCTION 03/31/10

PROFESSIONAL CERTIFICATION
*1 HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MARYLAND,
LICENSE NO. 12564, EXPIRATION DATE 08/10/2011."

UTILITY AND SITE DESIGN


MARCH 2010

NET ZERO ENERGY RESIDENTIAL TEST FACILITY


UNITED STATES DEPARTMENT OF COMMERCE
THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
GAITHERSBURG, MARYLAND
£ 7. iMisr
or /
o 724 .STOKAV&...
Nsitfivtisi Institute- of Svandarrk and Teduiofo^y
& SHED
r/ff GATE “3“

3
it'
Q
(355) ' Z;
■ ' s-- '■: v

77 CD
§ X: ... GATH. *C*

I H; %
■i
ir
1 ".ir
kh a-/-
ihPj-nCa
SITE
^/DIAMOND ■CCOIIKC-TO^-R-
:•
i 32' ■
■muon
fcl " I ' GOT- fiATEW

qL north
Or/ L_pn
rU 3]
$
X'V‘
v
.M
•2r? STANDARD
B’JJT jSiKC. 38;.
.EXPASJSiOK
ips it;
P
PHI WEST

2:?:
\
K INDEX OF DRAWINGS
I
:-*y 30i
m o
,> Hi"
3/
^3if.
RriPESENCS
M.ViI?.RlAL$
BUILDING
EX17YNSK3N.-.

X 30-iA
r CEE-TEE KTST ZHM.
t24 ^,-RiJlLOVNS
V X

}
<3 3 WEST
"•a.: t xa.
>f
o

J24)
O
70
o

SITE % :1
Y 1
LAfcfSJON

~\2
\\
ljouid
:^^W.C;C3VNRY

, ' XT'* r *N
MOUTH
EXPANSION;
■282
'coP&oSBa:
2:V;
i

jS„|
2MB

\r 224A
2268

i‘>: 226A
GI5

GA
------VLSITOit
fi&i
BUT
' ' -8 C-001 COVER SHEET KEAST&HOOD CO.
I
70
>.../ Structural Engineers
1
42i-m: CENTER
A
<\
C-101 EXISTING CONDITIONS / DEMOLITION PLAN
' ■

221B 4'M /I
2K-E 222P>
1
lOUTH dr ;
A i: WB ^...........v 21 y.A 221'A 223A ‘C% 1850 M Street NW Washington, DC 20036
NIST d> I’l\ 1 >i"KV
..L-. If
>f;4t
} : ^f- &
' —J31S
r'A
:R->:

tj
, "s/iMr
C-201 SITE / GRADING PLAN (202) 223-1941 Fax (202) 223-1942
Vs 3
3T:iLOURAL
mai
2Nf

GIAAP-'
Rv4 2Ah
|U;

221:
221 J'i As MDl4-i0'1
AND i:
MAiN
ENTRANCE
C-202 SITE DETAILS
"n ATV.M
t7l nG$n~AKc i;

m
IJSEXXNSSOSii R iF.ESEAlCHy

3
• A :>A
XL Jf / s/GMm ’‘A"

70
[37<
>-x
■' ROBOT TINT
FACILITY E
:=
>1:1
t 1 220

»
225A N": 227A:'o’ FA X: A4f C-203 SITE DETAILS
o GATE ,CE"
■A. \
ilkiJ
225B. 2278 CO EE

[7 79J As a. :ts: ' L'


f
; a f i i.
E" ,'" AAA
f'HORTR !‘C ON Cl Ik C-301 UTILITY PROFILES

AAV
j .jf i -\!
f f 8!6A
A
1\ ,N i?
& A
:j 21 fill :r> 2'R315 f:;
ir-
222X1 ::

-J f
A S- 11 C-401 EROSION AND SEDIMENT CONTROL PLAN
s\pi.VO
Z
cf/Ofe* XNAX3\l>:
v>

V\
■gate: G'h
K *.
T
i&M fX
XT
C-402 EROSION AND SEDIMENT CONTROL DETAILS
GRAPHIC SCALE
iittlki i:\t-

Ej - P.XRDHC3 ' -i
NiS
rr :-iC3
,/J-
k' A

VICINITY - PSTN::STOM INTENDED CO('if.7*'c5C.TIONstarts zm


1. KIT
\ ( ,
; ;*/• .'/f-f
s f"
C-403 EROSION AND SEDIMENT CONTROL NOTES A. Morton Thomas and Associates. Inc.
MAP V = 2000' O’ 2000* 4000* - NOT SUNBED; USB AND
2‘-'i.iJGiMAL >,TiTX;::R FLAkZYTtV
:N-':?1?nVFT) 'fiv 3SR3PC 'IX X •cw
C-404 EROSION AND SEDIMENT CONTROL NOTES Consulting Engineers
SSI'S :--: j V! SisSr-'i'sATO w:t.. '' 12750 TWINBROOK PARKWAY ROCKVILLE, MD 20652
MONTGOMERY COUNTY nN
i

1;
LOCATION MAP C-501 PLANTING PLAN (301) 881-2545 FAX: (301) 881-0814
EMAIL: AMT19AMTEN6INEERING.COM
MAPS WAND 11 GRID \
NOT TO SCALE
..n'
C-502 PLANTING PLAN NOTES AND DETAILS

PROPERTY OWNER/APPLICANT Nisr


PROPERTY ADDRESS UNITED STATES DEPARTMENTS OF COMMERCE FOR OFFICIAL USE ONLY
NIST CAMPUS THE NATIONAL INSTITUTE OF STANDARDS
U.S. DEPARTMENT OF COMMERCE
WEST STREET AND TECHNOLOGY NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
PLANT DIVISION
GAITHERSBURG, MARYLAND GAITHERSBURG, MARYLAND
(301)975-8339 NET ZERO ENERGY RESIDENTIAL TEST FACILITY
CONTACT PERSON: SILVIO BARUZZI COVER SHEET

APPROVED BY £AX£, SPONSOR MAINTENANCE ENG. OFF. FIRE PROTECTION SVS. S.H. & E. DIV. FACILITIES ENGR. OFF. PROJECT LEADER
KS/DN
DRA™ BY
02/01/10
MS&
SB134109CQ0026/69331
PROJECT/W-O. DESIGN PROJ. *
SH.N0. OF DWG. C-001
o REVISION DESCMPHON BY DATE
LEGEND DEMOLITION NOTES: 3D
3D > 9SX CD SET 01/29/10
GRATE INLET D> w w' w w
o
ID
<
D> 100X CD SET 02/24/10
© TELEPHONE MANHOLE 1 SAWCUT ic REMOVE EXISTING SIDEWALK. CONCRETE WALK ND
o ISSUED FOR CONSTRUCTION
GJ
03/S1/I0
COMMUNICATIONS MANHOLE 453.26 4 53.50/ 1 453.73 454.05 453.59 452.85
■4r
© ELECTRIC MANHOLE
SANITARY SEWER MANHOLE
REMOVE EXISTING CONCRETE CURB.
8 GJ
o
CONCRETE CURB

WEST DRIVE
4s 4- 4- 4s
STORM DRAIN MANHOLE Oi CJi Ln Cn
3 SAWCUT & REMOVE EXISTING ASPHALT PAVING. _ >Gj >Gj >GJ
LIGHT POLE o FO a 3D 00 4-
GJ —-453^ 4- I ' O
OO

SIGN
X
\ GJ
I \
\ ho ASPHALT PAVEMENT 4s- Oi

12” RCP 30” RCP 3D Q 0

4
WATER VALVE
FIRE HYDRANT
4 REMOVE EXISTING TREES.
453.05 UGE UGE
00 UGE
// \\
\ U
\
\
\
UG
3.70 UGE UGE
454.Q;;E
CONCRETE CURB
UGE UGE
453.5^ge—co 0 UGE
S

UGE
452.82
UGE UGE
PROFESSIONAL CERTIFICATION
/ j- r
MW
MONITORING WELL \\ 453.81 CD 453.13 452.50 451 96 *1 HEREBY CERTIFY THAT THESE DOCUMENTS WERE
BENCHMARK \\ 0 W-QQ4£24”-#
CJ1
1 PREPARED OR APPROVED BY ME, AND THAT I AM A
STUMP
4-
Cn
\\ \ •G 262.19
DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
=G4 \ BM# 2 LAWS OF THE STATE OF MARYLAND,
CONCRETE CURB xl ) \\
/ SQUARE CUT ON / •X
V. LICENSE NO. 12564, EXPIRATION DATE 08/10/2011."
CONCRETE CURB & GUTTER DEMOLITION LEGEND: \ 4-Y ,^<c~xv
\\ GJ

STM STEAM PAINT WHITE


I CJA
\ N>
/\ oo
4s-
Cn
// <o
Q>

/
r 1 LIGHTPOLE BASE
ELEV. = 453.99
N)
O(
x
\
\w
I

/ i
t

/
o \
i
\
/
*o f
\/ \\ ' \!\ if/ / \\
i
\\ / I

COMM COMMUNICATION LINE PAINT MARK


/ cn \\ \ / // \ \* • / i \ \ i
i \\
N3
/ \ 1 /I \ I I t I
> 1
REMOVE EXISTING / /' I l
UGE ELECTRIC PAINT MARK ( i 0
\\
> (
TD *—
010 > 3D /
I

GJ
I
ASPHALT/GRAVEL/CONCRETE i
\ / X
W WATERLINE PAINT MARK X / GJ \\G / I ■/N1 ■A l
V
m \ \
1/
\ / K>
i
m \
c / \ V \\ //
i i
\ \\
SIDEWALK / /"/ I ^__ ^ / \ X
\\ CD / \
f
I X \ \ t , I
/ /\ l
/ \ t \
\
I
y
/ \ /
i
N>.
\ \ W I / // // / \ \ #/ \\ \ \
X
f
PAVEMENT (EDGE) X i
-X I
GJ !v
i
\\ \\ \ >
\ W I
ITEM TO BE REMOVED cn // \ ll I i
K) \
i

77/7777777 BUILDING K3
J
> \ \\ 3D ^ O^ \ u • // t ft
i I

\\
"s.
3D r—
// V / A\ hO I I
3E \\ I
00
04
I
3D m( t \\ \\Vi i
/A
//
t
/ / \ O
o FENCE (CHAIN-LINK) N3 t i mt / N3 s ' \l a 'sPI
\m 3D V v
\V'/1>
1 f
\ // -
>c
\
//
I
t / i
i \ 3D \ i
f 3D \\
// /> i i
m i l\D
i / \\ \ 3D o,
// m \ \
i \
1
\ ^
i
f
s \\\ m // \ \
i
\\ i
\
\ N3 t
\ \ i

\ \
i

\\\ / / \
f >i y \ \ \ /
4^ " N
\ ( / I ^___ i
/ i \ \\ I
^
Cn \ \ NO i / \ \\ >x j
\ V
i

0
N
f
\ ^ x--"/ I
i
oo
s
X
\ \\ 3D
jj
12" RCP 9? GO \ \ cn
NO \ \ \\ N
\ \
0 \
\ \
\
l
/ f' \> o
L
N
\\ \\
7 \ > i
\ >
e i
33 \ ,r-
i
\ \\
STORM DRAIN DATA SANITARY SEWER DATA \ 3D
?--------
1 3D s m
X
\\ \
6 \
t
m m X

/ \ m
s
3-—- m
Gl 4s- \
1. CURB INLET A MANHOLE / H O cn \ GO
T0P=453.30 TOP=452.05 \ ho \
O cn \ X 4-
INV. IN=439.02 (N) INV. IN=428.40
3D. \ \\ cn 4-
cn
INV. 0UT=438.92 (E) INV. IN=428.85 \ 00
XnI
\/ \ X

2. CURB INLET
(S) INV. 0UT=428.40
2 3D \ 1 \
\
ro
4s-
X •
■<o
00
\ \ \\
T0P=453.22 B MANHOLE \ \ 3D, 4s -
INV. IN=439.25 \ \ 31 > cn cn
X
x
T0P=451.17 \
INV. 0UT=439.15
(N) INV. IN=444.99
N.
\ /
3
L m KV o
X
\\
\\
\ / (y i
co
04
\
(E) INV. IN=429.75 \ / 00<
//
3. MANHOLE O X

T0P=452.93 (S) INV. 0UT=429.22 I / ^55- X


X

\ \ l
\
X
X
(E) INV. IN=439.28 / o \ X

c MANHOLE 3D
X
\

©
(S) INV. IN=444.53 i >
o GO l
>u / X

INV. 0UT=439.18
T0P=453.11 \ O \ 4s-
cn 3\ G
x
X
\
(N) INV. IN=448.59 /
i
O o 3D ' >.\ cn m S

/ \ / X
X
4. CURB INLET (S) INV. 0UT=445.89 * W / 3D \ / / / X

/ CO > m \ / X
4s-
//
X
T0P=450.97 / 00 " 3 \ / I y cn
D MANHOLE / / 3D GO —I
\ / o X
\
INV. 0UT=447.17
T0P=461.08 (-> \ I m 3D m \
I
/ / /
X
\
>o 2 \ / / X
N)

5. CURB INLET (N) INV. IN=455.53 m o > \ I / \


X ^J

'.I: r" / X
>- \ / \\
T0P=450.02 (S) INV. 0UT=454.98 i \ / AX. -4
cn
O —I 3D 7\ i / rn>>< \
INV. 0UT=443.72 l / >4- \
4s- \ 31.K \
//
E MANHOLE OD
On
3D i OJ \
6. CURB INLET T0P=452.80 l / X
\\ LO
T0P=450.25 (S) INV. IN=448.55 OJ
OD i / X
X
\ CNI o
o I I x X
\\
(SW) INV. IN=442.80 (E) INV. IN=447.60 I
/ X 4s-
X
X
00
in o
(SE) INV. IN=441.55 4 cn
v X o
(W) INV. 0UT=446.65 4s - I X Xg
X
Oi ro
(E) INV. IN=440.85 cn i 4s-
X
x 00
F / CD OJ
o CJi
x
(W) INV. OUT=440.55 MANHOLE
T0P=452.90
N) 4s
cn
i
X
X
x ca 4-
cn
cn
7. CURB INLET (S) INV. IN=448.18
.N)
9 70 oo x
X
>0j

ois o
X "'x.xj
T0P=450.30 I A >
(E) INV. IN=448.10 CD I I / 7T
X
x OJ
X
INV. 0UT=442.10 (W) INV. OUT=447.90 X oI I I I
X
X

f. l I / / / X
X X
X
X
► CD
/ / / / / X
8. GRATE INLET CM \ I / I Ij
X X X

\ I
/
-—S.-I
\ \ \\ X
\\

©
T0P=450.61
/ / f+ —cp^C* s \\ \
(SW) INV. IN=445.96 X f i z' \\ s
\ \ cn
(SE) INV. IN=445.96 \ / / / X >0i
\ / / / X
X
X
(E) INV. IN=443.61 \ I / I
/
I / o X X
X CO
(W) INV. 0UT=443.21 \\ 1 I I / > X
X

SURVEY CONTROL DATA 4s-


cn
o NO
3D \
l
/
/
l J
3\ X
X
X
X
9. GRATE INLET \ I
I X X
X
X
\\
4s C/-J \ I CD X X
X
\\
T0P=450.65 TRAVERSE NORTHING EASTING ELEV. Oi CJI \ \\ \\
(SW) INV. IN=446.65
(SE) INV. IN=446.65
203
204
90749.986 -59932.294
90345.238 -59933.965
452.24
452.71
Oi o i
L?
l(
7
3

)o
\
Oi
\\
\
\\
\\ \\
I / / :> >00
X
\\ X
\\
(W) INV. 0UT=444.55 78" / \x
O’ I / I oo x \ 20’ 10’ 0’ 20’ 40’
GENERAL NOTES
7c cn
4s
cn
Pi /
I
/
/
/
/
/
/ X
X
X
4s
\\
\\
\\
\\ cn 1”=20’
I) JlOi I y
Oi I
I /
/ / /
X
X
x
>Gl
cn
x X
x ;•OO
>Cn
/ //
X
/ / 4s - X x
x
1. HORIZONTAL DATUM: NIST COORDINATES BASED FROM / / / / cn 4-
oo
X
x
/ / / >6o X X
MONUMENTS NBS-104 AND NBS-105 I / / / / X X
\
I / / / I
X
\\ X
/ / / / / Oi
\X
x
VERTICAL DATUM: NIST ELEVATIONS BASED FROM I / / i
X
X
x
I I X
MONUMENTS NBS-104 AND NBS-105 I
I
X
\\
X
\\
I
460 \\ \\ \\
2. SEE ADDITIONAL SPOT SHOTS ON FROZEN —HIDN LAYERS
3 I /
//
\\
\\
\\
N
\\
\\
\\
N
\\
\\
\\
KEAST&HOOD CO.
3. NO BOUNDARY WORK WAS PERFORMED WITH THIS SURVEY. I / \ \\ \ Structural Engineers
f / \\
I i / \\
f l /
/ \\ \\ 1850 M Street NW Washington, DC 20036
r l I I / \\ \
1 I i
/
/ X
X
X
(202) 223-1941 Fax (202) 223-1942
\ I
/ \\ X

Q> I
/
I I
/ \\
X
\\
/ / \ \
CONCRETE CURB
l
/ / i / 4- X
X

I I / CD X X
X I
I
I / / XU 4s- X x
453.1^cU-A 452.6 452.02 ' <
4- i
/ / CD 4-
X
x x

\X o i \
X

(2)s^5 OAKS \
\
\
A
222222m
.
I
I
I I
/ /
// -P-
IV) /
/
/
/ CD
ho
x^.
cn
x
\x
X
\\
cn
XO
X
\ X
X
x
x
x
x
xxg
4-
cn

AAV
v\ COMM !/ CC@U| / •O cni I I I G-J / OJ CD
I
/ \ /
X
X

m \ 00 x
I

00(0 E \ CD, I I I / \\ X K3
\ / x i \ i
i \ <0
)
I
/ / I I 4-
cn
X
I I \/' I I / \
X
\\ y y I I I
/
Xa X

//
a' /
/
I /
I
r-
I

I
i
/
y
/
I
I
I
I I I
I
i /
/ cn \\
\
X
X
X
\
I / ~1
/ I i
\\
X
X
i y\ / / I I X

\v-— \ I / '"-"SL1 76 / \
X

\ \ X
X
E UGE -- _^5QJA /
I
\ X
4^T.66V 2 /
I
/ I \ X
X
x \ X A. Morton Thomas and Associates. Inc.
CD I I I
I \
GD / \ Consulting Engineers
0 0 I
i

/
I I I
\
\ 12750 TWINBR00K PARKWAY ROCKVILLE, MD 20652
/ I
I „o,M'S OQ’13’59" E X
(301) 881-2545 FAX: (301) 881-0814
i \\ \
CD
m / o CD 299.78 \ EMAIL: AMT19AMTENGINEERING.COM
6” PVC i l
6’I rVc' 2” PVC \\ \
© / /• \
X
4-
Ui
\^_ cn (4- \ \
O
4-
pi cn l I
/ \\ \
□D ,o \ \ \
450.89* Cn I 1 \ \\ \
4- 1(D
4
to | cn
s 1 I
I \\ 4s- / 4-
4s-
cn 4s-
\
e
NIST
452.06 -U451.96 451.63 451.45 451.09 N l I \\ & / X-A cn
>o
4-
cn
\ l x
CD
CONCRETE \\ \ \ \\ GJ
00 >G INORTK
CD \ i Cn / i \\
CD xj
452.30
------ \ Os 4- CD GJ
cn
STM c 5520 f O' 451.71 \ I cn i o X
STM i X
STM o STI s™\---- Q O
X.
i I i \\
m STM Cn I \x
\ ND
I I
w W 03W \ W w w / I
X

G G r
\
i

G-t; Vg ■0"G G G
I x
\X
N
FOR OFFICIAL USE ONLY
i \ \ r CAP i \ N
w
I
/
I \ I N

w W
\ w WA to w CAP I X
X
U.S. DEPARTMENT OF COMMERCE
4- cm 0W- \
-\W0%
6DA 4-
/
NO \ gg > o oo \ /| I
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
3D O : \ Ui
Oi C-
c> m z ^ \ I I PLANT DIVISION
I —' GJ \
-N
>o Q \ » I i/ !
I
I I
/ o c
\ I

You might also like