Jobsite Inspection Checklist

Firm Name ______________________ Project _________________________


Supervisor ______________________ No. of Employees ________________
Inspected by ____________________ Date ___________________________

1. SITE ACCESS OK Not OK Proper angle (extension) ___


Clean, level ground ___ _________
_________ Proper size and type ___
Adequate ramps ___ _________
_________ Safe, usable condition ___
Adequate stairs ___ _________
_________ Properly used ___
Adequate ladders ___ _________
_________ Proper handrails and landings ___
_________
2. PROTECTIVE EQUIPMENT OK Not OK Non-slip bases ___
Hard hats worn ___ _________
_________
Foot protection ___ 5. FIRE PREVENTION OK Not OK
_________ Extinguishers where required ___
Eye & face protection: Worn ___ _________
_________ Fully charged ___
Available ___ _________
_________ Adequately identified ___
Hearing protection: Worn ___ _________
_________ Master emergency plan ___
Available ___ _________
_________
Respiratory protection: Worn ___ 6. PUBLIC WAY PROTECTION OK Not OK
_________ Properly located (within 4.5 m) ___
Available ___ _________
_________ Covered where required ___
_________
3. GUARDRAILS, BARRICADES OK Not OK Min. height, width requirement ___
Located where required ___ _________
_________ Proper rail on street side ___
Properly constructed ___ _________
_________ Proper lighting, where required ___
Adequately secured ___ _________
_________ 7. HOUSEKEEPING OK Not OK
Clear walkways ___
4. LADDERS OK Not OK _________
Secured ___ Clear work areas ___
_________ _________
Clear access and landing ___ Properly planked ___
_________ _________
Proper guardrails, toe boards ___
8. FALL PROTECTION OK Not OK _________
CSA approved ___ Proper access to platform ___
_________ _________
Properly worn ___ Acceptable loading ___
_________ _________
Safe, usable condition ___
_________ Working from: Ladders 11. POWER TOOLS, EQUIPMENT OK Not OK
___ _________ General condition ___
Scaffolds ___ _________
_________ Proper guards, cords, PPE ___
Swing stages ___ _________
_________ Use of defective tags ___
Unprotected openings and edges ___ _________
_________
12. EXTENSION CORDS OK Not OK
9. STAIRWELLS & RAMPS OK Not OK Outdoor-type, rated over 300 volts ___
Proper filler blocks in metal stairs ___ _________
_________ General condition of casing,
Proper cleats on ramps ___ ends, and connections ___
_________ _________
Adequate lighting in stairwells ___
_________ 13. COMPRESSED GAS CYLINDERS OK Not OK
Proper handrails or guardrails ___ Properly located ___
_________ _________
Properly secured ___
10. SCAFFOLDS OK Not OK _________
Properly erected (all parts used) ___ Properly moved or lifted ___
_________ _________
Properly secured ___
_________
Adequate number of qualified first
14. WORKER EDUCATION OK Not OK aiders on jobsite ___
WHMIS training ___ _________
_________ First aid boxes: Adequate number ___
Company safety policy & program ___ _________
_________ Adequate contents ___
Injury reporting ___ _________
_________
Hazard reporting ___ 16. CRANES, HOISTS, etc. OK Not OK
_________ Safe setup of equipment ___
OH&S Act and Regulations ___ _________
_________ Maintenance log available ___
Personal H & S responsibilities ___ _________
_________ Competent operator ___
_________
15. FIRST AID REQUIREMENTS OK Not OK
Condition of slings, hardware ___ Properly identified ___
_________ _________
Safety clips on all hooks ___ Overhead lines flagged & secured ___
_________ _________
Proper use of tag lines ___ Surface cables buried or protected ___
_________ _________
Proper lifting containers ___
_________
Competent signaler ___
_________

17. WELDING OK Not OK


Rods & cylinders properly labeled ___
_________
MSDSs readily available ___
_________
Properly secured ground cables ___
_________
Proper eye protection worn ___
_________
Proper screens and exhaust ___
_________
Cylinders upright and secured ___
_________
Fire extinguisher readily available ___
_________

18. ELEVATING WORK PLATFORM OK Not OK


Worker training ___
_________
Properly used ___
_________
Safe, useable condition ___
_________
Acceptable loading ___
_________
Manufacturer’s operating manual ___
_________

19. TRAFFIC CONTROL OK Not OK


Trained traffic controllers ___
_________
Properly located ___
_________
Clean, regulation sign ___
_________
Properly dressed (including vest) ___
_________

20. TEMPORARY POWER SUPPLY OK Not OK


21. SIGNS & PRINT MATERIAL OK Not OK Outgoing air monitored ___
OH&S Act and Regulations ___ _________
_________ Entry permit system ___
WSIB Form 82 poster ___ _________
_________
MSDS copies ___ 25. SUSPENDED SCAFFOLDS OK Not OK
_________ Properly attached and capable of
Warning signs ___ at least 4 times maximum load ___
_________ _________
Emergency phone list ___ Outrigger beam tied to fixed support
_________ with adequate counterweight ___
Report forms ___ _________
_________ All mechanical/electrical devices
in good working condition ___
22. MATERIALS STORAGE OK Not OK _________
Properly located ___ Independent lifelines for each
_________ worker (extend to ground) ___
Safely piled, stacked, bundled ___ _________
_________ Engineers drawing on site if req’d. ___
Properly moved or lifted ___ _________
_________
Properly labeled (WHMIS) ___ 26. FORMWORK OK Not OK
_________ Guardrails and fall-arrest system ___
_________
23. TRENCHES & EXCAVATIONS OK Not OK Design drawings kept on project ___
Properly angled, where required ___ _________
_________ Inspection statement by engineer or
Excavated materials properly placed___ competent worker ___
_________ _________
Appropriate shoring used ___
_________ 27. HYGIENE OK Not OK
Proper access to trench ___ Cleanliness of facilities ___
_________ _________
Proper storage of materials in and
above trench ___
_________

24. CONFINED SPACES OK Not OK


Proper access ___
_________
Air testing before entry ___
_________
Rescue equipment readily available ___
_________
Safety harness, lifeline properly
anchored and used ___
_________
Second person for rescue ___
_________