TECHNICAL MANAGEMENT
PLANT ENGINEERING DEPARTMENT
M-700F-ING-REIN-RI-13-001
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
INDEX
Page
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
The customer and the End User will designate inspectors to expedite follow-up progress and witness
any stage of the manufacturing, testing and installation process of the components and system ordered.
The Supplier shall grant unrestricted admission to designated Customer and End User inspectors to all
facilities where any manufacturing, check or testing operation is being made to the components within
the scope of supply. In addition, the Supplier shall provide the inspectors any engineering
documentation that may be requested for review, to support any particular procedure applied to the
components ordered. Bidders shall confirm compliance with this requirement in their proposal.
These inspectors will witness acceptance tests according to paragraph 4.3., and quality assurance /
quality control inspection and testing plan ITP. All expenses related to Supplier’s factory and End
User’s Site acceptance tests shall be included in proposal. If required, according to migratory laws in
Supplier country, Supplier shall deal all permissions and visas required for End User’s personnel.
Expenses include: flights, transportation, accommodations, meals, and any other not explicitly described.
The Supplier shall provide a detailed inspection and testing plan ITP according to paragraph 10.5,
manufacturing and transport installation program, indicating the most probable dates for submission of
required documentation, contracted inspection and testing, for review and approval of the End User, via
express courier and copied to the Customer, within one week after the P.O. has been placed. This ITP
shall be reviewed and approved by End User prior to start material purchase and manufacturing of the
Equipment.
1.3._ SUPPLIER SCOPE OF WORK
The Work shall be done according to applicable codes, specifications, standards; good engineering
recommended practices and data sheet described in paragraph 1.4. EQUIPMENT DESCRIPTION
bellow. The Work involves, but not limited to, the following:
Detailed schedule to accomplish ITP and all activities involved in this scope.
Basic, and detail engineering for construction of the Equipment.
Materials procurement.
QA/QC Data Book Dossier, including but not limited to, Equipment Design, Fabrication, Welding,
Painting, and Testing procedures, reports and records, accord to 6.9. (Data Book).
Preparing and providing data book including but not limited to memory of calculations, operation,
servicing, running maintenance manuals (maintenance does not mean cleaning), spare parts lists
and catalogs, tools catalogs, general assembly, electrical, instrumentation, and mechanical
drawings, and electronic engine control manuals, control diagrams and P&ID. All information shall
be in both English and Spanish accord to paragraphs 5.5.4. (Language) and 10.11 (Documentation)
General, pneumatic, electrical and mechanical drawings. All drawings in .dwg electronic format.
Memory of calculation, including design criteria and considerations.
Equipment long term storage preparation and packaging from Supplier shops to Complex Moron,
VENEZUELA. PEQUIVEN S.A.
Interfacing with third Parties.
Equipment packaging / packing and shipping activities.
1.4._ EQUIPMENT DESCRIPTION
Rebuilt Diesel – Electric Freight Locomotive TAG PQ-004 is one (01) Rebuilt Freight Locomotive that
shall comply the specifications listed below, plus specifications included in paragraphs 6
(ENGINEERING) and 12 (DESIGN) of this document.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Couplers height 876 mm. Empty freight cars. Height from top of rail
Height 4.87m (16’) from top of rail to cooling fans guards
Width 3.15m (10’ 4”) over handrail supports
Length 18m (59’ 02”) over coupler pulling face
Locomotive weight 25 ± 3 ton / axle
Draft Gear / Coupler NC390 Self alignment / 28.5” type “E” bottom shelf and top
operated coupler with alignment at both ends
Design standard AAR Section M Locomotives
ITP Required. To be issued by Supplier for End User approval
according to paragraph 10.5. (Inspection and Testing Plan)
Sanding Sandbox capacity 23 ft³ per end. Min. 56 ft³ per locomotive
Dual sandbox at long hood end shall be equipped with single upper
filter. Each sandbox at short hood end shall have own filter, two
filter total per locomotive.
Sandboxes to be equipped with gasketed filler caps which close by
gravity to prevent water entry, and externally accessible clean outs.
Sandboxes equipped with “X” bar style protectors to prevent large
pieces dropping in during inspection or filling.
Screen type protectors are not allowed in sandboxes.
Weights To be specified by Supplier in quotation. Disassemble / main unit
components weight lists required
Cooling Fans Two speed operation. Located above radiator cores. AT least
Three Delco 48” required
Railroad Total 105 kms. Approx 100 kms from Morón Complex to Bachacal
load station at Riecito. One 200 km back and forth roundtrip/day.
Fuel consumption on To be specified by Supplier in quotation.
railroad / autonomy
Air Compressor Type To be specified by Supplier in quotation. End User existing
locomotives GP-38-2 use Gardner-Denver WBO Water Cooled.
Nameplate and rotation arrow into compressor casing.
Compressor auxiliaries Direct drive from engine power take off.
Compressor shall include dual element air filters and dryer, oil filter,
oil level dipstick and sight gauge.
Water cooled with min 400 CFM water.
Vessel stamp Air receiver, reservoir, oil cooler, dryer, if applicable, and any other
pressure vessel shall be ASME stamped.
Thread fitting connect. NPT
Cabin Fireproof, ergonomic, bathroom, rerailers (both right and left sides),
microwave oven 120VAC, refrigerator (ice box), air conditioning. No
electrical heater accepted. See additional specs in table 8.
Noise and vibration isolation required.
Two Electrical plugs 120VAC / 60 Hz are required
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Ground delay protection Both power and dynamic brake shall be protected.
module Electrical grounds shall be detected in traction alternator
circuitry. Single phase protection shall be provided for
traction alternator.
Equipment blower motor Two-speed blower motor with separate speeds for power
and brake. Blower shall provide cooling air to truck Nº 1
traction motors.
Truck blower motor Two-speed blower motor with separate speeds for power
and brake. Blower shall provide cooling air to truck Nº 2
traction motors.
Auxiliary power converter APC shall provide power source for 74 VDC control
APC system. Since APC receives its power from a dedicated
output winding of companion alternator, auxiliary generator
and all associated hardware previously used for this
application is to be eliminated in locomotive.
APC shall also regulate VDC level to optimize battery
charging.
Electrical locker blower / Two-speed blower motor shall provide optimum air flow
dust bin blower throughout engine speed range to cool electrical control
locker and dust bin. Blower motor current monitoring
provided to improve fault detection.
Electrical control locker containing: traction inverter
equipment, control modules, motor control contactors and
switchgear, generator transition contactor, control relays,
circuit breakers, battery disconnect mechanism, cooling fan
controls, blower motor controls, traction alternator flield
excitation chopper assembly, 74VDC APC phase controller
and diode assembly; shall be located behind the cab.
Access to electrical locker shall be provided from engineer
walkway side. All equipment shall be easy reachable for
any required troubleshooting, maintenance, or service.
Internal lighting is required.
Guard labelled “CAUTION – KEEP ALWAYS ON TO
AVOID FREEZE DAMAGE” to be applied at auto water
drain valve circuit breaker. Internal lighting is required.
Speed control system Speed control to initiate in either power or dynamic
braking. Control functions on cab electronics display. Entry
and exit control keys and crew messages to be displayed.
Slow speed control provided in an speed range up to 10
miles/hour.
Throttle position must be placed in idle on controlling
locomotive before exiting speed control system.
Batteries Min. rating capacity 8 h.
Batteries shall be contained in battery box located on right
side of locomotive, behind rear cab door.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
General fuel system Fuel condensate drains to be provided at rear of the tank
features with protective cover.
Fuel tank vent line(s) shall be provided to prevent fuel
splash back on attendant after fuel filling, and minimum
fuel spillage in case of a locomotive roll over.
End of vent pipe shall be cut at 45 degrees.
Protective screen to be applied between the flange of
overflow pipe and top of fuel tank to prevent foreign
material from entering and plugging overflow pipe,
designed to minimize fuel leakage in case of a locomotive
roll over.
Table 7. Truck Specifications.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Cab type Std. wide carbody cab configuration, beige interior color.
Workstations Ergonomically designed for operator comfort and optimal
access to locomotive controls.
Engineer workstation Located at right hand side of cab. Ergonomically designed
for personnel comfort and optimal access to locomotive
controls, easily accessible / reachable without standing at
feet or sliding forward the seat.
Shall include all essential controls and display for
locomotive operation. All switches and controls shall be
labeled directly below or on side to appropriate switch.
Gauges / display Two (02) display computers, required for distributed power
and GPS features, with user interface and configuration
requirements per AAR Standard S-591 shall be located
directly in front engineer seat at engineer workstation.
No analog air brake gauges allowed.
Cab seats Three pedestal-mounted, height-adjustable, turn-able,
swing-down armrests, upholstered, cab seats (forward,
backward) performing and design according AAR RP-5104.
Observer seat shall be located at right, slightly aft, seen
from conductor seat.
Engineer and conductor seats shall be mounted on a steel-
composite, raised, platform with foot rest area under
console and display.
Flooring Anti-slip surface, steel sub surface. Cab vestibule shall be
painted with anti-skid paint.
Lighting Two stationary lights, soft bezel and integral switch, each
one at each side of cab, recessed in ceiling, over both
engineer and conductor seat.
Main light located close to guest seat, which will illuminate
guest area without glare engineer or conductor.
Floor lighting to be provided at interior vestibule steps, and
both engineer and conductor raised platform-seating areas.
Interior light, integral control switch, in toilet compartment.
No other electrical component, or additional plug, to be
installed in toilet compartment, only those components
required for toilet system itself.
Local lighting to be provided in short hood alcove,
electronics equipment compartment and electrical locker.
Climate control Main air conditioning system (see paragraph 2. Site
conditions) equipped with refrigerant and related duct
system. Air return to be filtered. Airflow distribution with
individual damper / louver controlled outlets. Comfort
condition 21ºC, 50% Relative Humidity, comfort zone
according to ASHRAE Std. 55. Temperature differential
between floor and 1 meter above floor not to exceed 1ºC.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Velocity range Not to exceed 350-450 FPM at airflow distribution, and not
to exceed 1500-1900 FPM at related duct system
Ventilation criteria Fresh air blower shall be provided with central climate
control system.
Electrical plugs Two additional free 120VAC.
Insulation Cab ceiling shall be lined with soft perforated vinyl bonded
to an acoustical insulation. Both cab side walls and cab
rear part to be acoustical insulated.
Windows Total four (04) windows, two front and two rear.
High impact resistant material shall be applied, including
etched FRA marking, as required in CFR part 223. All
glazing material shall comply AAR Standard S-5101.
Rectangular not pre-framed, electrically heated, certified
glass on front windows.
Window wipers Six self-parking, air-operated windows wipers shall be
provided at front and rear windows. Front windows to have
two wiper blades, one, weather protected, covered motor
per window. Two sets of recessed control valves shall be
included as part of overhead light assemblies located
above both engineer and conductor workstation.
Sun visors A total of four (04) black padded sun visors shall be
provided – one at each front and rear window.
Wind deflectors and mirrors Cab side wind deflector/rear view mirror shall be provided
on both sides in front of each sliding window.
Right side cab (engineer workstation) window shall have
dual mirror arrangement to provide engineer a view of right
front stairwell.
Exterior armrest Standard 2” wide, permanently mounted, armrest applied
at outside each side window.
Exterior doors Short hood nose door shall be suitably reinforced to
equivalent strength of surrounding short hood.
No window accepted or required in short hood nose door.
A doorstop shall be supplied to provide at least 12”
clearance between handrail and opened door.
Rear cab door shall be located behind engineer seat.
Rear cab door to be equipped with both interior/exterior
closure handle, and rubber hinge guard. Latch to hold rear
cab door open required.
Vestibule doors Separate interior doors shall acts as draft barrier to isolate
the vestibule area of short hood. No window accepted or
required in this doors.
Door locks Standard door lock arrangement on both rear cab and
inner vestibule doors shall be replaced with door
handle/latch mechanism 0nly – no lock or key.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Toilet compartment Shall meet all FRA CFR Part 229 requirements.
Exhaust rate 70 CFM shall be provided at toilet
compartment according to ASHRAE 62.1 for public toilet.
Slight negative pressure with extractor.
Floor to be sloped toward drain and include non-skid
feature. Floor drains to drain outside cab, on track.
Toilet compartment to be vented and lined with non-
metallic surface for ease of cleaning. Handholds to be
provided both sides of compartment.
Toilet compartment door to be equipped with ease lock
operable only from the inside, and able to be unlocked
from the outside in case of emergency. Door to be
contoured to provide adequate space inside compartment.
Adequate space shall be provided between toilet and door.
Toilet assembly to be enclosed in stainless steel to
eliminate trapping of debris behind toilet seat. Toe recess
in front of toilet. Corrosion resistant retention tank.
Paper towel dispenser/crew pack holder shall be included.
Electronic features Two display screens HMI, size 10 inch minimum. Display
to be settable on either English or Spanish language.
Panel secured with tamperproof screw provided with collar
to accept customized seal tag in front of the screw.
Communication system Motorola railroad Voice radio Astro Digital 9600 Baud:
• Model XTL5000, frequency bands 764 – 870 MHz,
Power level 10 – 35 Watt, Bandwidth receiver 12,5 KHz,
Modulation C4FM / QPSK-C family, protocol: project 25.
Roof mounted radio antenna.
• Model MVLP8000, frequency bands 806 – 960 MHz,
Bandwidth 154MHz, 3 dBi.
Handsets
• Radio handset to be provided on both conductor and
engineer workstation. Auxiliary radio speaker, remote
speaker, and microphone assembly to be located on
conductor workstation right side, easy accessible from
either conductor seat or helper seat position.
• Remote speaker shall include volume control. Additional
microphone summing amplifier to be provided to ensure
mic loads not to exceed AAR radio specifications.
GPS.
• Available on all cab electronic interfaces. GPS time to
be written on event recorder log every hour as universal
reference for analyzing event recorder logs. Radome
Antenna shall be included.
Event / Speed Recorder Shall be provided integrated in cab electronic system.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Event recorder data There shall be recorded, at minimum, data listed bellow:
• Date & Time
• Locomotive Speed
• Distance
• Throttle Position
• Reverser Handle Position
• Dynamic brake handle position
• Dynamic brake warning - train line
• Dynamic brake cutout
• Emergency brake applied
• Emergency brake - Engineer initiated
• Penalty brake - Cab electronics initiated
• Brake Pipe Pressure
• Brake Cylinder Pressure
• PCS Open
• Traction motor current
• Automatic brake handle in suppression
• Locomotive brake bailoff
• Isolate Switch
• Run Switch
• Generator Field Active
• Wheel Diameter
• Wheel Slip - Trainline
• Sanding
• Sanding - manual
• Rear to front comm ok
• Front to rear comm ok
• Brake pipe pressure
• Moving
• Marker light
• Battery low
• Valve failure
• Armed
• Emergency brake initiated
• Emergency brake applied
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
• Horn on
• Bell on
• Alerter visual/audio warning
• Overspeed active
• Overspeed test active
• Penalty brake – overspeed
• Radar Protection. Collision - warning device
• Fault diagnostic system
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Coupler / Draft gear NC390 draft gear and 28.5” type “E” bottom shelf, top
operated coupler with alignment control at both ends.
Nº 1 end arrangement Anti-climber complying AAR Specification S-580 to be
provided at cab end only. Horizontal grab irons to be added
on nose to ease access to locomotive from shop ramps.
Nº 2 end arrangement Vertical grab irons to be provided above rear step wells to
ease boarding locomotive.
Lights Internal light to be long life incandescent cool white.
Twin sealed beam, at both Nº 1 and Nº 2 ends. Label
applied near each headlight fixture warning the use of
lamps is required.
Twin sealed beam headlight fixture to be mounted on cab
roof between number boards.
Twin sealed beams headlight fixture to be mounted on both
ends of locomotive, located at a height accessible from
walkways.
Two auxiliary lights to be located at deck level at Nº 1 end
of locomotive to form a triangle with headlight, complying
FRA 49CFR Part 229.125 (d)(1).
Step lights, above bottom step, to be provided at all
locations.
Walkway step lights to be provided at step location along
walkways, both sides. All hardware used for bulb replace to
be captive attached to locomotive.
Cooling hood, inertial filter compartment, and electrical
locked and electrical compartment lights shall be provided.
Ground lights to be applied on both sides of Nº 1 truck
underneath cab side window.
Two crosswalk lights, one built into each locomotive end,
shall be provided.
Fire extinguishers Two 20 lbs dry powder fire extinguishers, rated for both
Class B and Class C fires shall be provided.
One extinguisher located in cab, second located at rear of
long hood, rear air compressor. Signed and dated
inspection tag to be applied on both extinguishers.
Lifting / Jacking device Lifting eyes shall be provided at each end of plate.
Combination sling/jacking pad welded to under-frame side
sill at all four locations to be provided.
Miscellaneous features All interior compartments shall have adequate drainage
that minimizes water ponds after washing unit and rains.
Main generator compartment to be equipped with
removable open grating walkways covering high voltage
cabling.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
General Before the start of painting, Supplier shall submit for End
User approval quality control, testing and documentation
procedures.
All coating shall be uniformly applied to form smooth,
continuous film free from sags, runs, spots or other
blemishes.
All compressed air used for abrasive blasting or painted
shall be free of oil and moisture. Suitable moisture
separators/traps and air filters shall be installed on all
abrasive blasting and painted pots.
Surface cleaned by abrasive blast cleaning shall be primed
as soon as practicable, before any visible rust occurs.
Coating shall be applied in strict compliance with the
recommendations of the material manufacturer.
Supplier shall submit for End User approval after P.O. the
list of surfaces in the Equipment that require no painting.
Unless otherwise listed by Supplier in quotation, all
surfaces shall be coated with anti-corrosion paint system.
The specified grade cleanliness shall exist immediately
prior to priming. Any steel no primed shall be re-blasted if
any rust develops.
Before abrasive blasting, protect Equipment parts that
could be damaged by blast, dust, or particulate material by
wrapping, taping, or other means to prevent damage.
Equipment shall include but not necessarily be limited to:
flange facings, machined surfaces, nameplate and tagging.
The blasting and painted sequence shall be planned to
prevent dusting and contamination of freshly coated
surface.
All surfaces to be painted shall first be cleaned of oil,
grease, soil, cutting compounds, and other soluble
contaminants, in accordance with SSPC-SP 1. Following
solvent cleaning procedures, surface shall be abrasive
blast cleaned in accordance with the SSPC. Abrasive shall
be free of all dust, dirt, chlorides, sulfates and other
foreigner material. Abrasives shall not contain more than
0,1% free crystalline silica.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Supplier shall establish and operate a quality management system that meets the requirements of
ISO 9001, or a similar approved system. Quality Management System shall also be in accordance
with this technical specification. This system shall cover management, engineering, procurement,
fabrication, construction, pre-commissioning and their related activities, materials inspection and
acquisition, certifications, and Subcontractor. This system shall also ensure that quality
management of the Work, as a whole from P.O. and raw materials reception through completion of
the Work. Supplier Quality Policy and the commitment of its Senior Management to the Quality of
Work shall be clearly defined.
1.5._ FAN
Fan type, Air Flows, rpm, and required power shall be specified by Supplier according to air
requirements. Fan unit shall be furnished complete with fan, drivers, mounted on a common base plate
with all required auxiliaries. The base plate shall be common for fan and driver, and shall include earth
lugs, lifting lugs, and drain rim.
Fan Supplier shall supply:
Suction strainers, flexible connection, and anti vibration joint.
Special tools and devices necessary for lifting, erection, testing, and maintenance of fan, drivers,
and all related equipment. These shall be easily identifiable, and shall be supplied in a lockable steel
cabinet. Beams and lifting members can be supplied loose or recommended for End User purchase
to a third party. In both cases Supplier shall include design drawings.
Supplier's quotation shall be accompanied by a certified fan performance curve, showing
differential head, efficiency, and brake horsepower, all plotted against capacity. Operating point for
the fan shall also be shown,
Supplier's quotation shall be accompanied by drawings showing the following information:
Applicable codes and Purchaser's specifications.
Standard and alternate suction-discharge nozzle arrangements.
Drain connections.
Bearing lubrication plan.
Overall Fan dimensions.
Weights: Fan, baseplate and motor.
Identification: service, purchasers item number, project name and location, purchasers
requisition number, and sellers job number.
Design pressure, test pressure, design temperature, and restriction on testing or operation of
fan.
Examination and testing requirements.
Construction materials specification for all parts.
Nameplate details.
Supplier shall verify this requisition in order to satisfy the mechanical and performance guaranteed
requirements. Supplier's proposal shall contain a guarantee that his equipment will satisfy the
particular service. Supplier shall guarantee to replace or repair any equipment which proves to be,
under normal operating, structurally or mechanically defective within a year from the date of
equipment start up or 24 months from shipping date, whichever is the sooner. Approval of the
Supplier’s calculations, drawing and workmanship by Purchaser shall no in any way relieve
Supplier from his responsibility.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Supplier shall supply the following requirements during manufacturing stage of Fan and Drivers:
Installation, operation and maintenance manual (maintenance does not mean cleaning).
Data sheet.
Performance curves.
Cross-section drawings.
Part list with numbers refered to drawings and parts numbers.
Spare part list recommended for start up and two years of operation.
Seals drawing with parts list (drawing shall include installation and setting dimensions and
bill of materials).
Coupling maker, model and size.
Characteristics and parts list of electric motor.
Fan and motor bearing type and number.
Maker, model, volts, phases, r.p.m., S.F., frame, H.P., amps., type, class, casing mounting
cooling system, serial number, electric connection, control and instrumentation electric
drawings.
Basic Maintenance Schedule (Daily, weekly, monthly, every 3 months).
1.6._ COMPRESSOR
A rotation arrow shall be cast into the compressor casing or made of the same material as the
nameplate and attached to the compressor.
Supplier's quotation shall be accompanied by drawings showing the following information:
Applicable codes and Purchaser's specifications.
Drain connections.
Bearing lubrication plan.
Overall Compressor dimensions.
Weights: Compressor, baseplate and motor.
Identification: service, purchasers item number, project name and location, purchasers
requisition number, and sellers job number.
Design pressure, test pressure, design temperature, and testing or operation of compressor.
Examination and testing requirements.
Construction materials specification for all parts.
Nameplate details.
Supplier's Proposal shall be include the following information:
Competed Owner’s Data Sheets.
Driver data including typical drawings.
Complete list of brand, Manufacturer’s name, model and size of all auxiliary equipment,
valves and instruments.
Schematic of capacity control system.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Supplier shall clearly define the equipment being offered in compliance of this specification, and
shall take purchaser’s attention to any exceptions to the specifications herein. If it’s not done, it is
understood that the Equipment fully meets all of the requirements of this document.
Supplier shall provide proven technology, including a list where equipment like the quoted have
been installed and operate satisfactory, operating in similar conditions. End User will visit and inspect
one of these equipment operating in field; this inspection shall be included by Supplier in quotation.
(See paragraph 1.4.2.).
Supplier shall provide the End User a team of technical specialists a period specified in quotation,
but not less than five working days per Equipment for assembly, installation, start-up, testing, and
commissioning, until End User final approval. Cost of these services, including travel, transportation,
lodging, and food expenses shall be included in quotation.
Supplier shall train End User staff for work, operation, and maintenance of the different systems of
the Self Contained, Portable and Movable, Fertilizer Bagging System.
The documents listed in this scope shall be an integral part of this requisition. Internationally
recognized codes and standards shall also apply where called for in applicable project documents.
In case of conflict the order of precedence will be the latest revision of the above:
AAR standards.
This requisition.
Agreed deviation.
Individual data sheets.
Other applicable codes.
Other applicable standards and recommended practices.
1.9._ INFORMATION FOR PROPOSAL
Supplier’s proposal shall include the following information:
Complete fulfilled data sheet according to supplier’s standards including, but not limited to, the
following:
Design criteria.
Equipment description.
Price summary, detailing components, additional components and services, and including
FAT, SAT, ITP, kick-up meeting, and QA/QC inspection and test related expenses, including
End User’s personnel as detailed in paragraphs 1.2. and 1.4.2.
Commercial conditions.
Quotation compliance, including list of exception.
Paint specifications.
Electronic specifications.
Electric specifications.
Requirements and consumptions.
Preliminary outline drawings showing main dimensions of equipment, and auxiliaries and
conveyors dimensions and locations.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
IEC 62381 Activities during the Factory Acceptance Test (FAT), Site Acceptance Test (SAT) and
Site Integration Test (SIT) for automation systems in the process industry.
4._ FABRICATION
4.1._ WELDING
Welders and welding operators shall be qualified in accordance with ASME BPVC Section IX or AWS
applicable code prior to start fabrication. Records shall be checked by End User/Customer
representative. WPS, WPQ, and PQR are required. Supplier shall provide all workshop and field
welding procedures.
Supplier shall provide for each welding machine a valid calibration card of the amperage dials.
These dials shall have clear and visible scales, divisions and numbers of amperage selectors.
Calibration of welding machines and elaboration of the tables mentioned before shall be made in a
properly certified fixed resistance calibration bank, and the bank calibration register shall be attached to
the tables.
Supplier shall register and maintain documentation of effective certification of calibration of the
machines to weld to use in the Work. Calibration registers shall indicate real values of amperage by
interval of the dial indicated in the calibration pattern. The welder and assistant shall know how to
interpret the values of this calibration.
Field welding is not allowed. If required, Supplier shall provide all field welding procedures and be
responsible for all welding made by End User’s Staff.
All jagged edges, burrs, knurls or other sharp surface profiles shall be rounded to a 1/8 inch radius.
Weld spatter or burning slag shall be removed. Flame impingement is not allowed at all time.
Painting of weld is not allowed before the accomplishment of applicable nondestructive examination
and testing.
Welds bevels on carbon steel or low alloy steel surfaces that are to be welded on site shall be coated
on the inside and outside 3 inches from the end of the joint edge with Deoxyaluminite or equivalent. The
following inspection point shall be established:
Prior to start Work.
Immediately following the surface preparation.
Immediately prior to the coating application
Following the application and curing of each coat.
After final inspection.
Repairs made in field shall also be documented and inspected as outlined above.
4.2._ PRODUCTION TEST AND TEST SPECIMENS
Production test specimens shall be provided by the Supplier.
Test specimens shall be prepared from the test coupons taken from the pipe or tube to be used for
Equipment fabrication and designated on the drawings approved for Construction.
Coupons shall be welded using the same consumable and welding procedure, shall be made for
every WPS, WPQ, and PQR used for Equipment fabrication, and shall undergo the same heat
treatment as the Equipment, in the same furnace, and the same time.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Dimensions of the test specimens shall be as required for welding procedure and performance
qualifications, in accordance with ASME BPVC, SECTION IX. Welding codes AWS as stated in
paragraphs 3.9. and 3.13.
The Supplier shall use test specimens to perform all the mechanical tests required for the approval
of the corresponding welding procedures.
Results of the test shall satisfy the same criteria as for welding procedure, shall be certified by End
User/Customer representative.
4.3._ ACCEPTANCE TESTS
Acceptance tests shall be done in Suppler’s Workshop (FAT) and End User’s site (SAT and SIT),
witnessed by End User’s Automation and Engineering departments personnel according to IEC 62381.
End user’s witnesses’ expenses shall be furnished by the Supplier.
4.4._ POSTWELD HEAT TREATMENT
Welding on the base metal (including such items as repairs to base metal) shall be completed and
accepted by the inspector prior to postweld heat treating.
Flange facings / ends shall be protected against oxidation during heat treatment.
Thermocouples shall be located of the vessel surface to insure that all portions of Equipment are
properly and uniformly heat treated, without the presence of detrimental thermal gradients.
During heat treatment Equipment shall be supported and stiffened to prevent distortions.
Supplier shall in ITP for End User approval post weld heat treatment procedures including related
curves, and shall include post weld heat treatment results in data book, including actual curves and
hardness testing registers.
4.5._ PROJECT ACCEPTANCE
Design shall cover all common parts for engineering works, such as: memorandum of calculations,
metric calculations, specifications and drawings, which shall be submitted in front of the End User for
approval prior to start the manufacture or fabrication, by using the decimal metric system. The drawings
shall be prepared in the A2 and A3 format. After approval of the design, it shall be registered on the
name of End User, becoming a property of it’s, under all rights and obligations arising therefore. The
use of the design on the part of the Supplier, or by third parties for purposes other than those stipulated
in these specifications shall be realized after preliminary written approval of the End User.
The End User shall approve the design, submitted to it by the Supplier, and shall announce its
decision by writing. The design approval does not release the Supplier from any responsibility in
connection with the design, at the design stage, as well as at the production stage. After the
manufacture of locomotive and before the official and final handling over of documentation to the End
User, the Supplier shall reflect in the design all amendments, improvements, modifications, etc.
showing the peculiarities and specifications “AS BUILT”.
5._ GENERAL WORK
5.1._ PARTIES INVOLVED
The following Parties will be involved in the execution of the Work.
This list is intended to be all-inclusive, but may not be limited to those parties shown.
End User
Customer
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Suppliers
Subcontractor
Project Management Team (PMT)
Any Third Party Agencies appointed by End User and/or Supplier, and approved to carry out
certain inspection and testing tasks.
5.2._ GENERAL WORK REQUIREMENTS
5.2.1._ SECURITY
In supplier’s facilities, worksite security shall be the sole responsibility of Supplier. All losses
due to theft or vandalism are solely the Supplier responsibility. Supplier shall provide 24 hour
security coverage (weekends and Public Holidays included) to cover Worksites, where the Work
is performed or documentation or other items in any way connected with the Work are kept.
5.2.2._ QUALITY ASSURANCE/QUALITY CONTROL
5.2.3._ INTERFACES COORDINATION
Supplier shall be responsible for coordinating and managing interfaces associated with the
Work.
5.2.4._ OPERABILITY AND MAINTENANCE REQUIREMENT
Supplier shall ensure that the equipment and materials incorporated in the Equipment are
consistent with the Work specifications. Operability and maintenance requirements shall be
considered in the rebuilt of the Equipment.
5.2.5._ COMPLETION ACTIVITIES
Supplier shall carry out the completion activities through pre-commissioning in accordance
with approved preparation and execution specifications and procedures for such activities.
5.2.6._ TECHNICAL REVIEW
Supplier shall perform necessary technical, safety, and quality audits throughout the course
of the Work as defined in the procedures.
In addition, End User may perform audits at its complete discretion, and Supplier shall bear
its costs associated with providing necessary support during such audits.
5.3._ SPECIFICATIONS
Supplier shall review End User's specifications. After review of End User's specifications, Supplier
shall submit proposed addendum changes to End User for approval. Supplier shall not rewrite any
specification(s) or prepare new specifications without End User's written approval. Supplier shall also
identify and submit for End User approval any additional specifications, guidelines or general practices
that shall be observed in the design, procurement and execution of the Work.
5.4._ DELIVERABLES
5.4.1._ FINAL DELIVERABLES
Supplier shall submit final deliverable as indicated below.
Mechanical, Electrical, structural, and assembly Drawings, modified and updated according
to rebuilt.
Data Books (See DOCUMENTATION Section 10.11).
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Final Report (when the Work is 100% complete), with the required number of copies to be
determined by End User.
Data report, including all of ASME certification registers.
5.4.2._ DELIVERABLE FORMAT
End User store and control deliverables in electronic format, including MS Office. Drawings
are to be turned over in AutoCAD 2009 version. In addition, drawings are to be turned over in
their native format. That is, if 3D PDS model was used to generate MicroStation Issued for
Construction drawings, 3D PDS model and converted AutoCAD drawings would be the required
deliverable to End User. It is required that no information on the drawing be lost during
conversion. End User also store original file format for future emergency Work. Furthermore,
any hard copy documents, such as supplier documents, shall be scanned into a TIF file format
for delivery to End User. The scanned image shall have a resolution of at least 200 DPI.
Scanned Work deliverables should also be of microfilm quality.
Supplier shall supply five data book copies: two in electronic format plus three color-printed.
Supplier drawings are to be delivered to End User according to the same requirements as the
Supplier. The native file format and the AutoCAD deliverable shall be turned over to End User.
Deliverable Format
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Supplier shall be responsible for issuing QA/QC and Pre-start meetings after P.O. with End
User’s personnel in Supplier’s office.
Supplier shall also request meetings as required to enhance communication resolve issues
and accelerate execution of Work.
5.5.4._ LANGUAGE
The Bidder shall refer to the contract for all issues related to official language. The intent of
the Upstream is that all onshore activities and documents shall be in Spanish and all offshore
documents shall be both in Spanish and English language.
5.5.5._ FUNCTIONS
Supplier shall also provide the following Work Management items:
Distribution of Work drawings, documents etc.
Documentation in detail of any minutes of meetings and action items arising therefrom.
Control and filing of documents requiring review and comment.
Documentation in hard copy and electronic format. This shall include, but is not limited to,
mechanisms for filing, accessing, and archiving electronic correspondence.
Documentation retention for a period of not less than five (5) years.
5.5.6._ WORK PERSONNEL
Supplier shall assign suitable Work personnel to lead each discipline and/or activity involved
in the Work.
5.5.7._ PERSONNEL COMPETENCY
If End User deems that Work is not being performed to End User's exclusive and entire
satisfaction, such dissatisfaction being reported to the Supplier, Supplier shall immediately
correct this situation.
6._ ENGINEERING
6.1._ GENERAL REQUIREMENTS
Supplier shall fully design the Work, and prepare contract deliverables as required for the efficient
and cost effective procurement of goods, materials, machinery and Equipment, fabrication, installation,
hook-up and testing of the Work. Supplier shall number documents in accordance with End User's
numbering system specification.
The Work shall include but not be limited to the following contract deliverables for each of the areas
listed above.
6.2._ AS-BUILT DOCUMENTATION
Supplier shall provide updated As-Built reviews of all the design documentation including, but not
limited to (see DOCUMENTATION. Section 10.11):
General Arrangement Drawings, including material lists.
Spare parts.
Assembly and disassembly.
Data sheets.
Operation and Maintenance Manuals (maintenance does not mean cleaning).
SOLO PARA USO DE PEQUIVEN M-FE-XX-XX-X-000
TECHNICAL MANAGEMENT M-700F-ING-REIN-RI-13-001
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
QA / QC Plan.
ITP.
Test and acceptance documentation.
6.3._ ENGINEERING REQUIREMENTS
Work engineering procedures
Technical reports.
Manuals.
Computer analysis.
Drawings and diagrams (mechanical and electrical).
Material specifications.
Equipment specifications.
Construction specifications.
Data sheets.
Material and Equipment requisitions and Purchase Orders.
Instrument Lists.
Engineered Item Lists.
Part lists, including materials, technical specification, and part number of spares.
Air piping diagram.
6.4._ ELECTRICAL
Electric diagrams.
Equipment list.
Equipment specifications.
Locomotive schematic & conduit diagram.
6.5._ INSTRUMENTS AND AUTOMATION
Control diagrams
End User´s programs (PLC) and software licenses.
Instrument Lists
Automation diagrams
Drawings for instrument connection, and installation
P&ID’s
6.6._ MECHANICAL
Mechanical calculations.
Equipment drawings: general assembly, disassembly, general truck arrangement, and mechanical,
issued for construction and “as built”.
Equipment specifications and data sheets, including weights and dimensions.
SOLO PARA USO DE PEQUIVEN M-FE-XX-XX-X-000
TECHNICAL MANAGEMENT M-700F-ING-REIN-RI-13-001
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Materials Certificates
Results and Witness of the Achieved Tests
PWHT procedures.
NDT procedures.
Capacity and performance curves.
Lists of components and spares, including supports and foundations specifications, if apply
Materials bills and materials specification drawings.
Equipment Handling: List and specifications of recommended lifting and transportation trucks.
Dynamic curves.
6.7._ TRANSFER CARE, CUSTODY, AND CONTROL (TCCC)
Supplier shall develop and submit to End User a Transfer Care, Custody and Control procedure that
defines the interfaces and steps to be taken for Transfer Care, Custody and Control of the Work from
the Supplier to End User. The internal End User practices policies and requirements shall be
accommodated in such procedure.
6.8._ INSTALLATION, START UP, OPERATING AND MAINTENANCE MANUALS
Supplier shall prepare and submit to End User required installation, start-up, operations and
maintenance (maintenance does not mean cleaning) manuals, or revisions to manuals, in accordance
with statutory requirements and End Users operating and maintenance. Manuals shall describe the final
Equipment and procedures in which the Equipment should be operated and maintained. Supplier shall
assemble the operations and maintenance manuals in hard copy and complete electronic format.
Supplier shall collect and catalogue supplier data in accordance with the supplier data requirements
for ultimate transfer care custody and control to End User as part of the operations and maintenance
manual. End User will develop and submit to Supplier, required number of manuals to be prepared. All
operations, and maintenance manuals, and instructions to properly operate and maintain the Equipment
shall be prepared both in Spanish and English.
When referred herein, drawings, lists, manuals, and documentation include both modified information
related to rebuild and unmodified information related to original Equipment.
6.9._ DATA BOOKS
Supplier shall assemble and check data books provided by the equipment and material suppliers.
Supplier shall assemble the supplier data books in hard copy and electronic format, together with
Supplier’s design, procurement, and inspection data into Mechanical Data Books for each piece of
Equipment. Supplier information shall be supplied in English and Spanish when available.
6.10._ DOCUMENT REVIEW AND APPROVAL CYCLE
All document review and approval cycles shall be included in Supplier's planning, scheduling and
budgeting. Supplier shall promptly incorporate changes and reissue drawings so that formally issued
documentation reflects the current approved design.
6.11._ DOCUMENT TRANSMITTALS
Supplier shall produce the number of copies of each document required by End User for each of the
End User personnel and/or departments identified on the approved document distribution matrix and
transmit said documentation in accordance with an approved procedure.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
how the Supplier will fulfill the applicable requirements of the following subsections of Section 9. When
accepted by End User, the QA Plan will become the basis for evaluating quality assurance activities on
the Work. For all Factory inspections related to this plan, End User’s witnesses’ expenses shall be
furnished by the Supplier. Factory inspections will be carried out by End User’s QA/QC and
engineering departments’ personnel.
10.2.1._ ORGANIZATION
The QA Plan shall contain an organization chart showing Supplier's total organization
responsible for performing the Work and clearly showing the assignments and number of
personnel responsible for Supplier's QA program for all phases of the Work. The chart shall
show reporting relationships from inspectors up to and including Senior Work Management as
well as the interface between Supplier and suppliers or subcontractor. The organization chart
shall be supported with a description of each person's reporting and functional responsibility.
10.2.2._ CONTROL OF PURCHASED MATERIALS, EQUIPMENT AND SERVICES
The QA Plan procedures shall clearly specify the sequence of activities during the preparation,
review, approval, and control of procurement documents. This includes the measures which
assure that changes or revisions to procurement documents are subject to the same review and
approval requirements as the original documents. Documents for material procurement,
equipment, and services, whether purchased by the Supplier or by its suppliers or
subcontractor, shall include, but not limited to the following:
Applicable codes, standards and design specification requirements referenced in
procurement requisitions.
The Work shall be engineered, designed, constructed, fabricated and tested to the End
User specifications and last edition of standards and codes specified herein in paragraph
1.4. and section 3 (REFERENCES). In the event of a conflict, the more stringent
requirements shall apply.
Provision for End User/Customer right of access to Suppliers facilities and Work documents
for inspection and audit.
The Suppliers engineering and quality assurance groups, prior to issuance, shall review the
procurement document, to ensure that requirements are specified.
The Supplier shall maintain "receiving" inspection to ensure that arriving materials and
equipment are properly identified, and comply the requirements of the purchase documents.
Nonconforming items shall be controlled by clearly identifying and segregating them into a
quarantined area until proper disposition is made. Similarly, documentation shall be maintained
confirming that services purchased directly or through Subcontractor conform to procurement
requirements. Certification documentation from suppliers or Subcontractor shall either be
originals or verified copies noting the actual location of where the originals are held.
10.3._ IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, AND COMPONENTS
Supplier shall maintain a materials identification procedure and a materials tracking procedure
comprising materials, parts, compounds, and components. Each item shall be identified by addressing
tags, stamps, stencils or labels or by traceable records throughout fabrication and shipment.
The location and the method of identification shall not affect the function or quality of the identified
item. The procedure shall require verification of correct material, parts, and components identification
and shall be documented prior to release for fabrication, assembling and shipping.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
include the responsible author and source of information and indicate format, type of information
required and distribution, as well as outline provisions for retention, including possible microfilming.
Suitable documentation procedures shall be developed by the Supplier and implemented to ensure
those all-pertinent performance criteria and design factors have been considered and that appropriate
instructions and procedures are developed and followed. Checklists should be used to acknowledge in
writing that the required activities have been completed.
Retained records shall include operating logs; result of reviews, inspections, tests, audits, and
materials analyses; monitoring of Work performance; qualification of personnel, procedures, and
equipment and other documentation such as drawings, specifications, procurement documents,
calibration procedures and reports, and nonconforming and corrective action reports. Charts, reports
and other engineering data, including photographs, microfilm and radiographs shall:
Be processed to produce an agreed upon archival life;
Be stored and filed in a safe and controlled manner, and
Become the property of the End User upon completion of the Work.
Reporting and communication procedures shall be established to provide timely quality assurance
information at End User Work meetings. Such procedures shall identify and give reasons for
procurement/construction problems and provide for feedback to Supplier or Subcontractor.
Supplier identifying the quality problem areas and corrective steps to be taken shall issue a monthly
Quality Program Report.
Supplier shall prepare and submit data and drawings as required by specifications and general
terms of the contract. Supplier's performance of his obligations hereunder shall not be deemed
complete until the End User is in receipt, on proper forms, of Technical Data and other documents to be
submitted to the End User as part of Supplier's Scope of Work.
Electronic documents shall not be scanned. In case of signed documents, each scanned signed
document shall be accompanied with original emission, printed in viewer format directly from original format.
As stated in paragraph 18 TRAINING, official language in Bolivarian Republic of Venezuela is Spanish,
and all required manuals and supporting materials, as whole documentation shall be performed in Spanish.
If not possible, all information shall be performed in English. Information in other languages non translated is
not permitted.
The Supplier shall deliver the documents listed in Table 3, ongoing and final the Work to the End User:
Manufacture data reports shall be furnished in accordance with the provisions of the Code. Charts and
reports on pressure tests, PWHT, radiography and other NDT results. Mill test reports or certificates for
tubes, fittings, pipes, forgings and bolting shall be furnished. The certificates for welding consumables and
fluxes shall be included in the data reports.
Data Books shall be complied as specified below and each section shall be identified, numbered and
collated accordingly. This Data Book shall be delivered before shipping of the Equipment.
Index to the book:
Information of the Equipment (Data sheet, Manufacturer’s Data Report, Register ASME, etc).
Procurement Data (Materials Bill, Materials Quality Certificates, Chemical analysis reports, etc).
Design studies, equations, design calculations for all components of the Equipment, computer analysis,
etc. WPS, PQR, PWTH Report, Hydro Test Report, Surface Preparation Report, etc. Name Plate Copy, etc.
Start Up, Operating and Maintenance Manuals (maintenance does not mean cleaning).
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
Supplier shall recommend minimum spares to be stored in local stock by End User and replace
frequency for most frequent consumables and spares in final data book or maintenance manual.
Supplier shall include data sheets and spare lists as defined in this document (Spare lists by both part
number and technical specifications, including at least description, manufacturer, model, size, material and
quantity).
Supplier shall supply all gaskets, blind flanges, and external bolting for all opening which require blind
flange or cover for testing. Three sets of gaskets are to be furnished (one set for shop testing and shipping
and two set unused and shipped separately with proper protection). Also to be provide is full service bolting
for these connections (bolting used in shop hydrotest are not acceptable) including 10% extra bolting for
each size, special length studs, alloy or size 2” and greater.
14._ PATENTS USE
The Supplier shall be obliged to pay for the rights to use any means or processes, protected by
commercial patents, and the Supplier shall be the only person bearing responsibility for any raised claim
based on presumptive or actual infringement of such rights.
15._ PACKAGING AND PREPARATION FOR SHIPPING
Supplier shall prepare the Equipment for export shipping and long term storage.
The Equipment shall be thoroughly drained, cleaned inside and outside and free of all dirt and loose
materials.
All flanged openings shall be provided with blinds capable to support the nitrogen pressure.
Vessels shall be filled with nitrogen and positive pressurized, and kept during storage, transportation and
erection. There shall be provided all respective accessories.
All beveled openings shall be covered or capped to protect rust and moisture inside the Equipment.
Suitable temporary supports, marked and tagged for removal after Equipment installation, shall be
provided for internal parts not separately shipped to prevent damage during shipment.
The Equipment package shall be appropriately marked for exportation, and shall be protected from
breaking, bending, or any other type of damage during freight / transportation, including anti-corrosion
temporary coating / protection for sea water, sea ship. All finished surfaces shall be coated with heavy rust
preventive grease or other approves corrosion preventive.
All packages, boxes, cans, and any bagged material or device for the Equipment shall be clearly
identified by marking, showing their content. Correlate numbering of packages to ease tracking is required.
All expenses for packaging shall be borne by Supplier. Spare parts, such as gaskets, bolts, nuts and
washers shall be packaged separately from Equipment.
The Equipment shall be delivered in complete sets. The assembly of any component shipped loose, as
for example bogies, in End User workshop or at Venezuelan local port, shall be done at expenses and
under obligations of Supplier. They will provide necessary workmanship, labor, tools, and materials
required to this assembly operation.
16._ SHIPMENT AND ASSEMBLING
Supplier, in accordance with Customer, will transport whole Equipment from Supplier workshop to
End User Venezuelan facilities. Railcar bodies, bogies, and all components shipped loose shall be
assembled on railroad ramp rails using adequate tools and devices. All expenses for shipment,
transportation and delivery shall be borne by Supplier and included in bid.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
During assembly on End User railroad ramp rails, End User will provide materials, basic tools, cranes
and heavy equipment required. Supplier will provide service, manuals, and any special tool required.
Supplier will determine prior to shipment assembly schedule, time and tools required.
Supplier shall deliver the Equipment in accordance with delivery schedule.
17._ TECHNICAL ASSISTANCE
After delivery and taking over of Equipment the Supplier shall provide to End User a team of technical
specialists for a period not shorter than ten (10) working days for assembly of Equipment bodies to bogies,
auxiliaries, testing, acceptance tests SAT / SIT, supervision upon commissioning on railroad of Equipment,
until the final approval of the End User. Besides, the Supplier shall train End User specialists in operation
and maintenance of the Equipment supplied. Cost of these services, including travel expenses for the
technical experts’ team, shall be included in the Offer Price in proposal.
18._ TRAINING
Training is to be planned for at least twenty (20) participants, after completion of assembly and
commissioning of the equipment on End User site.
According to the stipulation of Article 9 of National Constitution, the official language in Bolivarian
Republic of Venezuela is Spanish, because of which all required manuals and supporting materials, as
whole documentation in general listed in section 10.11, DOCUMENTATION, arising out of present
negotiations, shall be performed in the above mentioned Spanish language.
Regardless of which, in case of technical information contained in manuals, instructions, drawings, lists,
or any other sources is hardly liable to translation, electronic or printed copies in English language shall be
supplied also, with respective Spanish translation, which shall reflect precisely the contents of the original.
Training shall be performed by the Supplier and shall be aimed at successful preparation of the End
User staff for work, maintenance, and operation of the different systems comprising the Equipment. For
that purpose the Supplier undertakes that the trainers appointed by him shall fully complete this technical
and trainer’s task.
The End User shall preserve the right to make partial changes in the content, for which the End User
shall inform the Supplier within two (02) weeks form the date of receiving of the aforementioned material by
the End User. The content shall include, for the whole Equipment, the following main points, listed only for
information purposes here and not having any limiting effect:
• Functioning of the Equipment.
• Servicing, routine / running maintenance and operation.
• Troubleshooting, problem detection.
• Most common troubles.
• Spare parts lists, including identification of Part number for each by number, description and technical
specification, according to AAR standard ordering information / data sheets for spare parts. Use of spare
parts catalog.
• Drawing review and working with manuals.
• Detailed list of tools for maintenance.
• Brake system.
• Cooling and lubrication system.
• Use of all drawings and manuals included with data book by Supplier.
Issue: Technical Specifications for Design, Fabrication, and Supplying of Rebuilt Diesel – Electric
Freight Locomotive, Morón Riecito Railroad, 2000 hp, TAG PQ-004
End User will also specify: training place, training type, requirements for Qualification of staff partaking
in the activities and training plan. Supplier shall include in quotation all related expenses, including travel,
transportation, lodging, food along with technical specialists team expenses listed above in paragraph 1.8.
Outline of Scope of Work.
Information in any different language is neither accepted nor allowed.
19._ GUARANTEE
Supplier shall issue an individual certificate of warranty for each locomotive.
Supplier shall guarantee the use of best materials, equipment, tools, devices, and qualified labor for the
best manufacture of rebuilt locomotive without any defects in design, as well as the perfect operational
condition and in compliance with all specifications contained herein.
Supplier shall guarantee that the Equipment fulfills all conditions as stated in this Specification and that
it is free from fault in design, Workmanship and material.
In case of design or fabrication defects arise during the first year of operation, the Supplier agrees to
make all necessary alterations, repairs and replacements free of charge to End User.
Supplier shall guarantee immediate replacement of any component or part which proves to be, under
normal operating conditions, electrically, electronically, structurally or mechanically defective within a year
from the date of equipment start-up, 24 months from shipping date or 100.000 kms, whichever the sooner, if
proven that failure is caused by defective design or manufacture. 6 months guarantee will not be accepted.
Approval of Supplier’s calculations, design, drawings, and workmanship by purchaser will not relieve
Supplier from their responsibility.