SERVICEREPORT

DATE:. PROJECT SITE:


TIME: LOCATION:
Repair PV modules Brand
Troubleshooting (Minor repair) Module support structure Description
Warranty DC cable and wiring Location
Maintenance Combiner box Remarks
Installation Monitoring System
Other Inverters
Others
Problem Statement :
During Monthly PM patrolling Over head 33KV T/L from plant end to substation end. We found in some places tree leaves near to
touching with our 33kv T/L.

Corrective actions taken :


We hired locally 2 manpower and cut upto 2 feets where branch of tree touched with Line. After that we again patrolling T/L from
GSS End to Plant end and found no any places Trees touching with T/L.

Preventive actions taken :


Before Tree Cutting After Tree Cutting
Problem fixed upon departure: (Y / N)
If not, Why?

Parts Supplied / Measurements & Test Conducted

Technician / Engineer Rep: Signature and comments

Date and Time Arrival AM/PM


Date and Time Departure Am/PM
Date Prepared: Date Received: