Professional Documents
Culture Documents
03 Mark Lurvink - Herziening Eurocodes 2020 PDF
03 Mark Lurvink - Herziening Eurocodes 2020 PDF
1
NEN Onderzoek Toeleveranciers
Onderwijs Overige
Bevoegd gezag
NEN
• Onafhankelijke procesbegeleiding Eindgebruikers
2
Constructieve veiligheid
EN 1990
Veiligheid, bruikbaarheid en duurzaamheid
Weerstanden
(Ontwerp en detaillering)
EN 1992 EN 1993
Beton Staal
≥
EN 1994 EN 1995
Staal-beton Hout
EN 1997 Geotechniek
EN 1998 Aardbevingen
3
Constructieve veiligheid
Wetgeving
Nationale
normen/NPR
+
Aanvullende
informatie
Klantwensen en -eisen
4
5
Herziening Eurocodes
SC / WG
Task 1 Sub-task
etc Sub-task
Sub-task
Sub-task
Task 2
Sub-task
Sub-task
Sub-task
Task n Sub-task
Sub-task
Sub-task
Sub-task
Sub-task
6
Doelstellingen
• Behoud en vergroten vertrouwen (binnen en buiten Europa)
• Toekomstbestendig
• Verbeteren gebruiksgemak (Ease of Use)
• Verminderen NDP’s
(nu +/- 1200)
7
Herziening Eurocodes
58 4 33 80
normen fases lidstaten SCs/WGs/TGs/AHGs
1000 11 75 400
mede- M € EC/EFTA project teams PT leden
opstellers
programma
8
Voor wie
9
Voor wie
10
Ease of Use
RESOLUTION 280 (CEN/TC 250, Helsinki, 18th June 2010)
Subject: CEN/TC 250 – simplification of Eurocodes
CEN/TC 250 acknowledges the challenge established in the Programming Mandate
M/466 addressed to CEN in the field of the Structural Eurocodes to examine the
potential for simplification of rules in the further development of the Eurocodes.
CEN/TC 250 agrees to work towards achieving such simplification in the further
development of the Eurocodes to support the ease of their use by designers through:
(i) improving the clarity;
(ii) simplifying routes through the Eurocodes;
(iii) limiting, where possible, the inclusion of alternative application rules;
(iv) avoiding or removing rules of little practical use in design;
CEN/TC 250 agrees that such simplification should be limited to the extent that it is
technically justified and should seek to avoid additional and/or empirical rules for
particular structure or structural-element types.
The resolution was agreed by unanimity.
11
Ease of Use
12
Ease of Use
13
Ease of Use
14
Getrapt werkprogramma
15
Details
WG7 Eurocode 0 SC3 Staal SC4 Staalbeton
Design of Sections and Members
WG7.T1 Evolution of EN1990 – General SC3.T1 Respond to demands from
according to EN 1993-1-1 industry, including needs for
Evolution of EN1990 – Bridges specific Joints and Connections according to SC4.T1
WG7.T2 SC3.T2 harmonization with EN1992 and
issues EN 1993-1-8
EN1993
Cold-formed members and sheeting.
SC3.T3 Composite beams with large web
Revised EN 1993-1-3 SC4.T2
SC1 Belastingen Stability of Plated Structural Elements. openings
SC3.T4
SC1.T1 EN 1991-1-2 ( Fire) Revised EN 1993-1-5 Revised rules for shear
SC1.T2 EN 1991-1-3 (Snow loads) Harmonisation and Extension of Rules SC4.T3 connection in the presence of
for Shells and Similar Structures. modern forms of profiled sheeting
SC1.T3 EN 1991-1-4 (Wind) SC3.T5
Revised EN 1993-1-6 and EN 1993-1-
SC1.T4 EN 1991-1-5 (Thermal actions) 7 Develop new rules for composite
SC1.T5 Climate change Fire design of Steel Structures. SC4.T4 columns (concrete filled tubes) in
SC3.T6 fire
Revised EN 1993-1-2
Interdependence of climatic actions Development of rules covering
Stainless Steels. Revised EN 1993-1-
SC1.T6 (wind, snow, thermal and atmospheric SC3.T7
4 shallow floor construction, and
icing) and glass structure SC3.T8 Steel Fatigue. Revised EN 1993-1-9
SC4.T5
other flooring types using precast
SC1.T7 EN 1991-1-8 ( Waves and Currents) Material and Fracture. Revised EN concrete elements
SC3.T9
SC1.T8 EN 1991-1-9 (Atmospheric Icing) 1993-1-10
Extended scope of shear
Steel bridges and tension
SC1.T9 EN 1991-2 (Road and rail traffic loads) SC4.T6 connector and materials guidance
SC3.T10 components. Revised EN 1993-2 and
SC1.T10 EN 1991-4 (Silos and Tanks) EN 1993-1-11 to cover current industrial needs
Evolution of existing parts of EN 1991 Consolidation and rationalisation of Development of rules for
SC1.T11 SC3.T11
not included in the other tasks EN 1993-3 SC4.T7 composite frames and
Harmonisation and Extension of Rules prestressed elements
SC3.T12 for Storage Structures. Revised EN Further harmonization with
SC2 Beton 1993-4-1 and EN 1993-4-2 SC4.T8
EN1992 and EN1993
New and modified items in EN 1992-1- Evolution of existing parts of EN 1993
SC2.T1 SC3.T13
1, EN 1992-2, EN 1992-3 not included in the other tasks
SC2.T2 New Items in EN 1992-1-2
Further new items in EN 1992-1-1, EN
SC2.T3
1992-2, EN 1992-3
16
Details
SC5 Hout SC8 Aardbevingen HG-F Brand
New items in revised Eurocode 5, part Material independent sections of EN
SC5.T1 SC8.T1
1-1 1998-1 HG- Harmonization of fire parts of
New Eurocode 5 Part on Timber Material dependent sections of EN F.T1 Structural Eurocodes
SC5.T2 SC8.T2
Concrete Composites 1998-1
SC5.T3 Revisions to Eurocode 5, part 1-1 SC8.T3 Evolution of EN 1998-3
WG2 Bestaande bouw
SC5.T4 Revised Eurocode 5, part 1-2 (Fire) SC8.T4 Evolution of EN 1998-5
Assessment and
SC5.T5 Revised Eurocode 5, part 1-1 SC8.T5 Evolution of EN 1998-4 and EN 1998-6
Retrofitting of Existing
Evolution of existing parts of EN 1995 Evolution of existing parts of EN 1998 WG2.T1 Structures – General Rules
SC5.T6 SC8.T6
not included in the other tasks not included in the other tasks / Actions
Assessment and
SC6 Metselwerk Retrofitting of Existing
SC9 Aluminium
SC6.T1 Revised version of EN 1996-1-1
Update and Simplification of all parts WG2.T2 Structures – Concrete
SC6.T2 Revised version of EN 1996-1-2 SC9.T1 Structures. This task is
of EN 1999.
SC6.T3 Revised version of EN 1996-2 solely coordination with
SC9.T2 New types of Connection SC2
SC6.T4 Revised version of EN 1996-3 SC9.T3 Roofing Assessment and
SC9.T4 Bridging Retrofitting of Existing
SC7 Geotechniek
SC9.T5 Facades WG2.T3 Structures – General Rules
SC7.T1 Harmonization and ease-of-use / Actions. Preparation of
SC7.T2 General rules HG-B Bruggen EN
SC7.T3 Ground investigation Bridges - consultation activities and
HG-B.T1
Foundations, slopes and ground ease of use review
SC7.T4
improvement Bridges - ease of use and technical
HG-B.T2
Retaining structures, anchors, and consistency review
SC7.T5
reinforced ground
SC7.T6 Rock mechanics and dynamic design
17
Details
WG3 Glas
WG5 Membranen
Structural Glass – Preparation of
WG3.T1 Membrane Structures – Preparation of
Scientific and Policy Report WG5.T1
Scientific and Policy Report
Structural Glass – Preparation of CEN
WG3.T2 Membrane Structures – Preparation of
TS WG5.T2
CEN TS
WG3.T3 Structural Glass – Preparation of EN
18
Details
19
20
Detail planning
Year 2016 2017 2018 2019 2020
September
September
September
September
November
November
November
November
November
December
December
December
December
February
February
February
February
October
October
October
October
January
January
January
January
August
August
August
August
March
March
March
March
April
April
April
April
June
June
June
June
May
May
May
May
July
July
July
July
Month
Month number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
Preparation
Start of the Project (January 1st 2017) x
Preparation for Call for experts x x
Publication of the call for experts (Dec 19th 2017) x
Call for Experts x x x
Deadline for applications (Feb 6th 2017) x
PT Assesments (preselection teams) x x
Final Assesment (March 10th 2017) x
Approval by EC/EFTA on PTs x x x
Start of the Project Team(s) x
End of the Project Team(s) x
Administrative (note: important for PTs)
Progress report by PT x x x x x x x x x x x
Half yearly progress report including latest (as-is) draft(s) by PT x x x x x
PT Invoicing of Milestone 0 pre-financing x
PT Invoicing of labour costs (Milestones 1, 2 and 3) x x x
preparation of consolidated report to EC/EFTA by TC250 mgt. group x x x x x x
external audit of consolidated report to EC/EFTA x x x x x x
deadline submission of report to EC/EFTA by NEN and CEN x x x
EC/EFTA assesment of consolidated report x x x x x x
Task specific (the schedule represents the deadlines for these tasks)
Start of the Project Team x
Preparation of first Draft by PT x x x x x x x x x
preparation of background document(s) by PT x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Delivery of first Draft by PT to NEN x
Review of first Draft by SC or WG x x
Preparation of Second Draft by PT, taking into account comments from SC or WG x x x x x x x x x x x
Delivery of second draft by PT to NEN x
review by SC or WG x x
preparation of Final Draft by PT, taking into account comments from SC or WG x x x x x
Delivery of Final Draft by PT to NEN x
Commenting period for NSBs (Enquiry) x x x
Preparation of Final document by PT, taking into account comments from NSBs x x
Delivery of Background document(s) by PT to NEN x
Delivery of Final document by PT to NEN x
End of the Project Team x
21
Planning publicatie
22
Organisatie
23
Organisatie TGB Plenair
vz. prof.dr.ir. J.C. Walraven
TGB Betonconstructies
vz. prof.ir. S. Wijte
TGB Houtconstructies
vz. ir. G.J.P. Ravenshorst
TGB Metselwerkconstructies
vz. prof ir D.R.W. Martens
TGB Staalconstructies
vz. A.G. van der Sluis
TGB Staalbetonconstructies
vz. ir. C.Q. Klap
Geotechniek
vz. ir. A. van Seters
24
Oproep vanuit NEN
25
26
28