PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.

Connected Load and Maximum Demand


Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

A GROUND FLOOR

A Sub-Switchboard (Non-Essential)
(SSBGA)
1 DBGA (Ground Floor - Zone A) (NE)
- Lighting 1 0.4 1 0.8 1 0
- Lighting (Contractor) 1.16 0.16 1.16 1 1.16 0
- Powerpoints 0.9 0.6 0.9 0.3 0.9 0
- AC / Hand Dryer / Isolator 5.4 3 5.4 1.5 5.4 0
8.46 4.16 8.46 3.6 8.46 0
2 DBGB (Ground Floor - Zone B) (NE)
- Lighting 1.95 0.4 1.95 1.4 1.95 0
- Lighting (Contractor) 1.24 0.2 1.24 1 1.24 0
- Powerpoints 1.4 0.8 1.4 0.4 1.4 0
- AC / Hand Dryer / Isolator 2.4 1.2 2.4 0 2.4 0
6.99 2.6 6.99 2.8 6.99 0
3 DBGC (Ground Floor - Zone C) (NE)
- Lighting 0.71 0.3 0.71 0.6 0.71 0
- Lighting (Contractor) 0.4 0.2 0.4 0.4 0.4 0
- Powerpoints 1.2 0.6 1.2 0.3 1.2 0
- AC / Hand Dryer / Isolator 7.5 4.5 7.5 3 7.5 0
9.81 5.6 9.81 4.3 9.81 0
4 DBPT (Ground Floor Pantry) (NE)
- Lighting 0.1 0.1 0.1 0.1 0.1 0
- Lighting (Contractor) 0 0 0 0 0 0
- Powerpoints 1.4 0.8 1.4 0.3 1.4 0
1.5 0.9 1.5 0.4 1.5 0

Page 1
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

5 DB1A (First Floor - Zone A) (NE)


- Lighting 1.95 0.4 1.95 1.4 1.95 0
- Lighting (Contractor) 1.24 0.2 1.24 1 1.24 0
- Powerpoints 1.4 0.8 1.4 0.4 1.4 0
4.59 1.4 4.59 2.8 4.59 0
6 EDBAV (First Floor - Control Room) (E)
- Lighting 0.16 0.12 0.16 0.12 0.16 0
- Lighting (Contractor) 0 0 0 0 0 0
- Powerpoints 1.2 0.8 1.2 0.4 1.2 0
- AC / Hand Dryer / Isolator 4.4 3.4 4.4 2.4 4.4 0
5.76 4.32 5.76 2.92 5.76 0
7 EDBS1 (First Floor - Stadium Lighting) (E)
- Lighting (Contractor) 11.4 11 11.4 11 11.4 0
11.4 11 11.4 11 11.4 0

SSBGA
- Distribution Board 48.51 29.98 48.51 27.82 48.51 0

B Sub-Switchboard (Essential)
(ESSBGA)
1 EDBGA (Ground Floor - Zone A) (E)
- Lighting 1.95 0.4 1.95 1.4 1.95 0
- Lighting (Contractor) 1.24 0.2 1.24 1 1.24 0
- Powerpoints 1.4 0.8 1.4 0.4 1.4 0
4.59 1.4 4.59 2.8 4.59 0

Page 2
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

2 EDBGB (Ground Floor - Zone B) (E)


- Lighting 1.95 0.4 1.95 1.4 1.95 0
- Lighting (Contractor) 1.24 0.2 1.24 1 1.24 0
- Powerpoints 1.4 0.8 1.4 0.4 1.4 0
4.59 1.4 4.59 2.8 4.59 0
3 EDBGC (Ground Floor - Zone C) (E)
- Lighting 1.95 0.4 1.95 1.4 1.95 0
- Lighting (Contractor) 1.24 0.2 1.24 1 1.24 0
- Powerpoints 1.4 0.8 1.4 0.4 1.4 0
4.59 1.4 4.59 2.8 4.59 0
4 EDB1A (First Floor - Zone A) (E)
- Lighting 1.95 0.4 1.95 1.4 1.95 0
- Lighting (Contractor) 1.24 0.2 1.24 1 1.24 0
- Powerpoints 1.4 0.8 1.4 0.4 1.4 0
4.59 1.4 4.59 2.8 4.59 0
5 EDB1B (First Floor - Zone B) (E)
- Lighting 1.95 0.4 1.95 1.4 1.95 0
- Lighting (Contractor) 1.24 0.2 1.24 1 1.24 0
- Powerpoints 1.4 0.8 1.4 0.4 1.4 0
4.59 1.4 4.59 2.8 4.59 0
6 EDBAV (First Floor - Control Room) (E)
- Lighting 1.95 0.4 1.95 1.4 1.95 0
- Lighting (Contractor) 1.24 0.2 1.24 1 1.24 0
- Powerpoints 1.4 0.8 1.4 0.4 1.4 0
- AC / Hand Dryer / Isolator 2.4 1.2 2.4 0 2.4 0
6.99 2.6 6.99 2.8 6.99 0

Page 3
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

7 EDBS1 (First Floor - Stadium Lighting) (E)


- Lighting (Contractor) 1.95 0.4 1.95 1.4 1.95 0
11.34 4.2 11.34 4.2 11.34 0

ESSBGA
- Distribution Board 41.28 13.8 41.28 21 41.28 0

C Main Switchboard (Non-Essential)


(MSB)
1 EDB1B (First Floor - Zone B) (E)
- Lighting 1.95 0.4 1.95 1.4 1.95 0
- Lighting (Contractor) 1.24 0.2 1.24 1 1.24 0
- Powerpoints 1.4 0.8 1.4 0.4 1.4 0
4.59 1.4 4.59 2.8 4.59 0

2 SSBGA

Con
- Distribution Board 16.94 7.4 16.94 5.8 16.94 0

Page 4
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

C Main Switchboard (Non-Essential)


(MSB)
- SSBGA
- FPE1

2 EDBFCA (Fore Court Area - Zone A)


7.425 1.485 7.425 5.94 7.425 1.50
- Lighting
7.425 1.485 7.425 5.94 7.425 1.5

1.575 1.26 1.575 1.26 1.575 0.50


2.45 1.90 2.45 1.90 2.45 0.50
3 EDBGB (Public Concourse Area - Zone B) 1.40 1.40 1.40 1.40 1.40 1.40
- Lighting 9.09 2.73 9.09 2.73 9.09 0
- Lighting (Contactor)
- Signage
- Powerpoint
14.515 7.29 14.515 7.29 14.515 2.4

Page 5
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

69.638 44.518 69.818 34.064 69.818


4 E-PBGA (Essential Panelboard - Zone A) 18.50 6.00 12.00 6.00 12.00
- Distribution Boards 12.00 14.80 18.50 7.40 18.50
- Isolators
- Control Panels
100.318 56.8604 100.318 47.4649 100.318

17.959 10.67 17.959 10.67 17.959


5 E-PBGC (Essential Panelboard - Zone C) 3.00 20.80 3.00 10.40 3.00
- Distribution Boards 26.00 1.50 26.00 1.50 26.00
- Isolators
- Control Panels
46.959 32.97 46.959 22.57 46.959

6 CP-AHU/G-3 (Air Handling Unit 3)


- Control Panel 15.00 12.00 15.00 7.50 15.00 0
15 12 15 7.5 15 0

7 CP-AHU/G-2 (Air Handling Unit 2)


11.00 8.80 11.00 5.50 11.00 0
- Control Panel
11 8.8 11 5.5 11 0

8 CP-LIFT/L1 (Lift 1)
11.00 5.50 11.00 0
- Control Panel 11.00 8.8
11 8.8 11 5.5 11 0

9 40A SPN Isolator for Network Equipment 3.00 1.50 3.00 1.50 3.00 0
- Powerpoint 3.00 3.00 3.00
3 1.5 3 1.5 3 0

22.615 13.968 22.615 13.968 22.615


10 ET-SSBG (Essential Tenant Sub-Switchboard) 45.00 28.10 45.00 28.10 45.00
- Distribution Boards
- Isolators
67.615 42.068 67.615 21.384 67.615

Page 6
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

E-SSBG 25.984 11.105 25.984 15.56 25.984


- Distribution board 214.892 131.898 214.892 91.415 214.892
- Panel board / Sub Switchboard 37.00 29.60 37.00 18.50 37.00
- Control Panel 3.00 1.50 3.00 1.50 3.00
- Isolator
276.832 171.7734 276.832 276.832
SUBTOTAL 124.6489

B. Ground Floor - Essential Tenant Sub-


Switchboard
(ET-SSBG - Zone B)

1. EDBQ (Ground Floor - Operator Room) 0.19 0.15 0.19 0.15 0.19 0
- Lighting 1.20 0.60 1.20 0.50 1.20 0
- Powerpoint 0.045 0.03 0.045 0.03 0.045 0
- Fan Coil Unit
1.435 0.78 1.435 0.68 1.435 0

0.55 0.44 0.55 0.27 0.55 0


2. EDBIM1 (Ground Floor - Immigration Office 1) 3.00 1.50 3.00 0.50 3.00 0
- Lighting 0.11 0.11 0.11 0.11 0.11 0
- Powerpoint
- Fan Coil Unit
3.66 2.05 3.66 0.87 3.66 0

0.56 0.44 0.56 0.28 0.56 0


3. EDBIM2 (Ground Floor - Immigration Office 2) 5.60 3.30 5.60 1.60 5.60 0
- Lighting 0.144 0.144 0.144 0.10 0.144 0
- Powerpoint
- Fan Coil Unit
6.304 3.884 6.304 1.88 6.304 0

4. EDBCUS (Ground Floor - Custom Office) 0.940 0.75 0.940 0.45 0.940 0
- Lighting 3.20 1.60 3.20 0.96 3.20 0
- Powerpoint 1.462 1.15 1.462 0.45 1.462 0
- Fan Coil Unit
5.602 3.22 5.602 1.86 5.602 0

Page 7
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

0.370 0.29 0.370 0.18 0.370 0


5. EDBTCO (Ground Floor - Traffic Control Office) 1.10 0.50 1.10 0.33 1.10 0
- Lighting 1.20 0.90 1.20 0.50 1.20 0
- Powerpoint
- Split Unit
2.67 1.69 2.67 1.01 2.67 0

6. EDBPO (First floor - Police Office) 0.37 0.29 0.37 0.18 0.37 0
- Lighting 1.20 0.50 1.20 0.35 1.20 0
- Powerpoint 0.11 0.11 0.11 0.11 0.11 0
- Fan Coil Unit
1.68 0.89 1.68 0.64 1.68 0

7. EDBAS (Ground Floor - Airport Security) 0.38 0.29 0.38 0.18 0.38 0
- Lighting 2.30 1.10 2.30 0.70 2.30 0
- Powerpoint 0.064 0.064 0.064 0.064 0.064 0
- Fan Coil Unit
2.744 1.454 2.744 0.944 2.744 0

8. 63A TPN Isolator for MAS Office 4.00 3.20 4.00 1.20 4.00 0
- Lighting 6.00 3.00 6.00 1.80 6.00 0
- Powerpoint
10.00 6.2 10.00 3 10.00 0

9. 40A TPN Isolator for Ticketing Office 1 4.00 3.20 4.00 1.20 4.00 0
- Lighting 6.00 3.00 6.00 1.80 6.00 0
- Powerpoint
10.00 6.2 10.00 3 10.00 0

10. 40A TPN Isolator for Ticketing Office 2 4.00 3.20 4.00 1.20 4.00 0
- Lighting 6.00 3.00 6.00 1.80 6.00 0
- Powerpoint
10.00 6.2 10.00 3 10.00 0

11. 40A TPN Isolator for Ticketing Office 3 4.00 3.20 4.00 1.20 4.00 0
- Lighting 6.00 3.00 6.00 1.80 6.00 0
- Powerpoint
10.00 6.2 10.00 3 10.00 0

Page 8
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

12. 40A TPN Isolator for Airline Office 2.00 1.80 2.00 0.60 2.00 0
- Lighting 3.00 1.50 3.00 0.90 3.00 0
- Powerpoint
5.00 3.3 5.00 1.5 5.00 0

ET-SSBG 24.091 13.968 24.091 7.884 24.091


- Distribution board 45.00 28.10 45.00 13.50 45.00
- Isolator
69.10 42.068 69.10 21.384 69.10 0
SUBTOTAL

C. Ground Floor - Essential Panelboard


(E-PBGA - Zone A)

1. EDBVIP (Ground Floor - VIP Area) 3.015 2.40 3.015 2.40 3.015 0
- Lighting 3.23 1.60 3.23 1.00 3.23 0
- Powerpoint 19.75 15.80 19.75 9.875 19.75 0
- Split Unit 2.00 0.40 2.00 0.40 2.00 0
- Hand Dryer Point
27.995 20.2 27.995 13.675 27.995 0

2. EDBSA (Ground Floor - Service Area) 0.655 0.524 0.655 0.3275 0.655 0
- Lighting 3.11 1.50 3.11 1.20 3.11 0
- Powerpoint 0.55 0.30 0.55 0.20 0.55 0
- Fan Coil Unit
4.315 2.324 4.315 1.7275 4.315 0

0.37 0.29 0.37 0.11 0.37 0


1.00 0.50 1.00 0.30 1.00 0
3. EDBMDF (Ground Floor - Main Dist. Frame) 0.72 0.60 0.72 0.60 0.72 0
- Lighting 1.90 1.60 1.90 1.60 1.90 0
- Powerpoint
- Fan Coil Unit
- Split Unit
3.99 2.99 3.99 2.88 3.99 0

Page 9
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

4. EDBPABX (Ground Floor - PABX Room) 0.19 0.19 0.19 0.19 0.19 0
- Lighting 1.00 0.50 1.00 0.50 1.00 0
- Powerpoint 1.00 0.80 1.00 0.80 1.00 0
- Split Unit
2.19 1.49 2.19 1.49 2.19

0.40 0.28 0.40 0.28 0.40 0


5. EDBCIC (Ground Floor - Common Check-In) 13.20 6.60 13.20 4.00 13.20 0
- Lighting
- Powerpoint
13.6 6.88 13.6 4.28 13.6 0

6. EDBDH (Ground Floor - Departure Hall) 1.648 1.3184 1.648 1.3184 1.648 0
- Lighting 3.78 2.646 3.78 3.024 3.78 0
- Lighting (Contactor) 1.80 1.44 1.80 1.44 1.80 0
- Signage 2.54 0.76 2.54 0.76 2.54 0
- Powerpoint
9.768 6.1644 9.768 6.5424 9.768

1.54 1.07 1.54 1.07 1.54


0.84 0.70 0.84 0.70 0.84
7. EDBGA (Public Concourse Area - Zone A) 0.20 0.20 0.20 0.20 0.20
- Lighting 5.20 2.50 5.20 1.50 5.20
- Lighting (Contactor)
- Signage
- Powerpoint
7.78 4.47 7.78 3.47 7.78

8. 40A SPN Isolator for PA Equipment 3.00 1.50 3.00 1.50 3.00
- Powerpoint
3 1.5 3 1.5 3

9. 40A SPN Isolator for PABX Equipment


3.00 1.50 3.00 1.50 3.00
- Powerpoint
3 1.5 3 1.5 3

10. 40A SPN Isolator for FIDS Equipment


3.00 1.50 3.00 1.50 3.00
- Powerpoint
3 1.5 3 1.5 3

Page 10
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

11. CP-AHU/G-1 (Air Handling Unit 1)


18.50 14.80 18.50 7.40 18.50
- Control Panel
18.5 14.8 18.5 7.4 18.5

3.00 1.50 3.00 1.50 3.00


12. 40A SPN Isolator for Network Equipment
- Powerpoint
3 1.5 3 1.5 3

69.638 44.518 69.638 34.064 69.638


E-PBGA 18.50 14.80 18.50 7.40 18.50
- Distribution board 12.00 6.00 12.00 6.00 12.00
- Control Panel
- Isolator
100.138 58.4384 100.138 47.4649 100.138
SUBTOTAL

D. Ground Floor - Essential Panelboard


(E-PBGC - Zone C)

1. EDBAH (Ground Floor - Arrival Hall) 1.096 0.85 1.096 0.85 1.096
- Lighting 3.15 2.80 3.15 2.80 3.15
- Lighting (Contactor 1.80 1.50 1.80 1.50 1.80
- Signage 0.07 0.07 0.07 0.07 0.07
- Powerpoint
6.116 5.22 6.116 5.22 6.116

1.313 1.20 1.313 1.20 1.313


2.38 1.90 2.38 1.90 2.38
2. EDBGC (Ground Floor - Public Concourse C) 1.40 1.00 1.40 1.00 1.40
- Lighting 6.75 3.35 6.75 3.35 6.75
- Lighting (Contactor)
- Signage
- Powerpoint
11.843 5.45 11.843 5.45 11.843

Page 11
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

3. CP-AHU/G-4 (Air Handling Unit 4)


11.00 8.8 11.00 4.40 11.00
- Control Panel
11 8.8 11 4.4 11

4. CP-AHU/G-5 (Air Handling Unit 5)


15.00 12.00 15.00 6.00 15.00
- Control Panel
15 12 15 6 15

3.00 1.50 3.00 1.50 3.00


5. 40A SPN Isolator for Network Equipment
- Powerpoint
3 1.5 3 1.5 3

E-PBGC 17.959 10.67 17.959 10.67 17.959


- Distribution board 26.00 20.80 26.00 10.40 26.00
- Control Panel 3.00 1.50 3.00 1.50 3.00
- Isolator
46.959 32.97 46.959 22.57 46.959
SUBTOTAL

E. Ground Floor - Non-Essential Panelboard


(NE-PBGB - Zone A,B,C)

0.1 0.1 0.1 0.1 0.1


1.12 0.90 1.12 0.9 1.12
1. DBGB (Ground Floor - Public Concourse B) 1.70 0.80 1.70 0.8 1.70
- Lighting 0.096 0.075 0.096 0.05 0.096
- Lighting (Contactor)
- Powerpoint
- Fan Coil Unit
3.016 1.875 3.016 1.85 3.016

2. DBFCA (Ground Floor - Fore Court A)


- Lighting (Contactor) 7.425 1.48 7.425 5.90 7.425
7.425 1.48 7.425 5.9 7.425

Page 12
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

1.40 0.84 1.40 1.12 1.40


2.60 1.10 2.60 2.10 2.60
3. DBGA (Ground Floor - Public Concourse A) 10.00 3.00 10.00 3.00 10.00
- Lighting 1.00 0.80 1.00 0.50 1.00
- Powerpoint
- Hand dryer
- Split Unit
15 5.74 15 6.72 15

0.70 0.56 0.70 0.56 0.70


4. DBDH (Ground Floor - Departure Hall) 2.52 1.55 2.52 2.10 2.52
- Lighting 2.20 1.10 2.20 1.10 2.20
- Lighting (Contactor) 6.00 2.00 6.00 2.00 6.00
- Powerpoint 1.625 1.10 1.625 0.80 1.625
- Hand Dryer
- Fan Coil Unit
13.045 6.31 13.045 6.56 13.045

0.41 0.246 0.41 0.41 0.41


1.26 0.76 1.26 1.10 1.26
5. DBGC (Ground Floor - Public Concourse C) 3.60 1.50 3.60 1.50 3.60
- Lighting 4.00 1.50 4.00 1.50 4.00
- Lighting (Contactor) 0.064 0.064 0.064 0.064 0.064
- Powerpoint
- Hand Dryer
- Fan Coil Unit
9.334 4.07 9.334 4.574 9.334

6. DBAH (Ground Floor - Arrival Hall) 0.16 0.16 0.16 0.16 0.16
- Lighting 0.84 0.50 0.84 0.50 0.84
- Lighting (Contactor) 0.60 0.20 0.60 0.20 0.60
- Powerpoint 6.00 2.00 6.00 2.00 6.00
- Hand Dryer
7.6 2.86 7.6 2.86 7.6

7. DBBA (Basement Floor - Basement B) 0.11 0.11 0.11 0.11 0.11


- Lighting 1.89 0.56 1.89 1.50 1.89
- Lighting (Contactor) 0.50 0.30 0.50 0.30 0.50
- Powerpoint

Page 13
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

2.5 0.97 2.5 1.91 2.5

8. DBBB (Basement Floor - Basement A) 0.615 0.25 0.615 0.49 0.615


- Lighting 3.33 1.00 3.33 2.66 3.33
- Lighting (Contactor) 6.28 2.50 6.28 2.00 6.28
- Powerpoint
10.225 3.75 10.225 5.15 10.225

9. CP-ESC/1 (Escalator Control Panel 1) 11.00 5.60 11.00 5.60 11.00


- Control Panel
11 5.6 11 5.6 11

10. CP-ESC/2 (Escalator Control Panel 2)


11.00 5.60 11.00 5.60 11.00
- Control Panel
11 5.6 11 5.6 11

11. CP-ACG-5 (Split Unit Control Panel 5)


10.32 6.20 10.32 3.10 10.32
- Control Panel
10.32 6.2 10.32 3.1 10.32

12. CP-ACG-6 (Split Unit Control Panel 6)


10.32 6.20 10.32 3.10 10.32
- Control Panel
10.32 6.2 10.32 3.1 10.32

NE-PBGB
- Distribution board
- Control Panel
- Isolator

110.785 50.655 110.785 52.924 110.785


SUBTOTAL

F. Ground Floor - Non-Essential Tenant Sub-


Switchboard
(T-SSBG - Zone A,B,C)

Page 14
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

1. 63A TPN Isolator for Food & Beverage 1 4.00 3.20 4.00 3.20 4.00
- Lighting 11.00 6.60 11.00 6.60 11.00
- Powerpoint
15 9.8 15 9.8 15 0

2. 40A TPN Isolator for Retail Shop 2 2.00 1.60 2.00 1.60 2.00
- Lighting 3.00 1.80 3.00 1.80 3.00
- Powerpoint
5 3.4 5 3.4 5 0

3. 63A TPN Isolator for Retail Shop 3 3.00 1.60 3.00 1.60 3.00
- Lighting 7.00 1.80 7.00 1.80 7.00
- Powerpoint
10 3.4 10 3.4 10 0

4. 63A TPN Isolator for Retail Shop 4 3.00 1.60 3.00 1.60 3.00
- Lighting 7.00 1.80 7.00 1.80 7.00
- Powerpoint
10 3.4 10 3.4 10 0

5. 63A TPN Isolator for Retail Shop 5 3.00 1.60 3.00 1.60 3.00
- Lighting 7.00 1.80 7.00 1.80 7.00
- Powerpoint
10 3.4 10 3.4 10 0

6. 63A TPN Isolator for Retail Shop 6 3.00 1.60 3.00 1.60 3.00
- Lighting 7.00 1.80 7.00 1.80 7.00
- Powerpoint
10 3.4 10 3.4 10 0

7. 63A TPN Isolator for Retail Shop 7 3.00 1.60 3.00 1.60 3.00
- Lighting 7.00 1.80 7.00 1.80 7.00
- Powerpoint
10 3.4 10 3.4 10 0

8. 63A TPN Isolator for Retail Shop 8 3.00 1.60 3.00 1.60 3.00
- Lighting 7.00 1.80 7.00 1.80 7.00
- Powerpoint

Page 15
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

10 3.4 10 3.4 10 0

9. 63A TPN Isolator for Retail Shop 9 4.00 1.60 4.00 1.60 4.00
- Lighting 16.00 1.80 16.00 1.80 16.00
- Powerpoint
20 3.4 20 3.4 20 0

10. 40A TPN Isolator for Retail Shop 10 2.00 1.60 2.00 1.60 2.00
- Lighting 3.00 1.80 3.00 1.80 3.00
- Powerpoint
5 3.4 5 3.4 5 0

11. 40A TPN Isolator for Retail Shop 11 2.00 1.60 2.00 1.60 2.00
- Lighting 3.00 1.80 3.00 1.80 3.00
- Powerpoint
5 3.4 5 3.4 5 0

12. 63A TPN Isolator for Food & Beverage 3 3.00 2.40 3.00 2.40 3.00
- Lighting 7.00 4.20 7.00 4.20 7.00
- Powerpoint
10 6.6 10 6.6 10 0

13. 40A TPN Isolator for Food & Beverage 4 3.00 2.40 3.00 2.40 3.00
- Lighting 7.00 4.20 7.00 4.20 7.00
- Powerpoint
10 6.6 10 6.6 10 0

2.00 1.00 2.00 1.00 2.00


14. 40A TPN Isolator for Storage 1 at Service Area 8.00 4.00 8.00 4.00 8.00
- Lighting
- Powerpoint
10 5 10 5 10 0

2.00 1.00 2.00 1.00 2.00


15. 40A TPN Isolator for Storage 2 at Service Area 8.00 4.00 8.00 4.00 8.00
- Lighting
- Powerpoint
10 5 10 5 10 0

Page 16
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

2.00 1.00 2.00 1.00 2.00


16. 40A TPN Isolator for Storage 3 at Service Area 8.00 4.00 8.00 4.00 8.00
- Lighting
- Powerpoint
10 5 10 5 10 0

5.50 4.10 5.50 4.10 5.50


17. 150A TPN Isolator for Food & Beverage 2 24.50 14.70 24.50 14.70 24.50
- Lighting
- Powerpoint
30 18.8 30 18.8 30 0

18. 300A TPN Isolator for Restaurant 7.00 2.10 7.00 5.60 7.00
- Lighting 73.00 43.80 73.00 35.00 73.00
- Powerpoint
80 55.9 80 40.6 80 0

T-SSBG
- Isolator 280.00 146.70 280.00 126.40 280.00 0
280 146.7 280 126.4 280 0
SUBTOTAL

G. Basement Floor - Essential Tenant Sub-


Switchboard
(E-SSBB - Zone A,B,C)

1. EDBBA (Basement Floor - Basement A) 0.901 0.45 0.901 0.70 0.901


- Lighting 5.51 1.653 5.51 4.408 5.51
- Lighting (Contactor) 2.00 1.50 2.00 1.20 2.00
- Powerpoint
8.411 3.603 8.411 6.308 8.411

Page 17
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

2. EDBBB (Basement Floor - Basement B) 1.148 1.00 1.148 1.00 1.148


- Lighting 4.52 1.35 4.52 3.90 4.52
- Lighting (Contactor) 1.50 1.00 1.50 1.00 1.50
- Powerpoint
7.168 3.35 7.168 5.9 7.168

3. CP-SPR (Sprinker Pump Control Panel) 82.40 0 82.40 0 82.40 65.90


- Fire Mode
82.4 0 82.4 0 82.4 65.9

4. CP-HR (Hose Reel Pump Control Panel)


11.00 0 11.00 0 11.00 8.80
- Fire Mode
11 0 11 0 11 8.8

15.00 12.00 15.00 12.00 15.00


5. DBCP-DCW (Domestic Cold Water Control Panel)
- Control Panel
15 12 15 12 15
6. CP-PBB/1 (Passenger Boarding Bridge Control
Panel 1) 27.00 18.00 27.00 18.00 27.00
- Control Panel
27 18 27 18 27
7. CP-PBB/2 (Passenger Boarding Bridge Control
Panel 2) 27.00 18.00 27.00 18.00 27.00
- Control Panel
27 18 27 18 27

8. Rain Water Harvesting Pump


- Control Panel 2.20 1.80 2.20 1.80 2.20
2.2 1.8 2.2 1.8 2.2

3.00 1.50 3.00 1.50 3.00


9. 40A SPN Isolator for Network Equipment
- Powerpoint
3 1.5 3 1.5 3

Page 18
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

12.00 7.00 12.00 7.00 12.00


10. CP-BHS/B1-1 (Baggage Handling Control Panel 1)
- Control Panel
12 7 12 7 12

12.00 7.00 12.00 7.00 12.00


11. CP-BHS/B1-2 (Baggage Handling Control Panel 2)
- Control Panel
12 7 12 7 12

15.00 7.5 15.00 7.5 15.00


12. CP-BHS/B1-3 (Baggage Handling Control Panel 3)
- Control Panel
15 7 15 7 15

E-SSBB
- Distribution board
- Control Panel
- Isolator

222.179 79.253 222.179 84.508 222.179

H. First Floor - Essential Sub-Switchboard


(E-SSBF - Zone A,B,C)

1. EDBMAB (First Floor - MAB Office) 6.885 3.44 6.885 6.885


- Lighting 14.00 7.00 14.00 14.00
- Powerpoint 1.908 1.52 1.908 1.908
- Fan Coil Unit 6.70 4.02 6.70 6.70
- Split Unit
29.493 15.98 29.493 29.493

2. EDBFTCB (First Floor - Transfer Corridor Void 0.99 0.45 0.99 0.99
Area B)
- Lighting

Page 19
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

0.99 0.45 0.99 0.99

0.74 0.37 0.74 0.74


3. EDBEOC (First Floor - EOC Meeting Room) 1.50 0.45 1.50 1.50
- Lighting 0.55 0.44 0.55 0.55
- Powerpoint
- Fan Coil Unit
2.79 1.26 2.79 2.79

4. EDBCCTV (First Floor - CCTV Room) 0.19 0.15 0.19 0.19


- Lighting 1.10 0.5 1.10 1.10
- Powerpoint 0.032 0.032 0.032 0.032
- Fan Coil Unit 1.20 0.80 1.20 1.20
- Split Unit
2.522 1.482 2.522 2.522

5. EDBS (First Floor - Shift Room) 0.61 0.45 0.61 0.61


- Lighting 2.10 1.50 2.10 2.10
- Powerpoint 0.077 0.077 0.077 0.077
- Fan Coil Unit
2.787 2.027 2.787 2.787

6. EDBS2 (First Floor - Shift Room 2) 0.38 0.28 0.38 0.38


- Lighting 2.50 1.20 2.50 2.50
- Powerpoint 0.11 0.11 0.11 0.11
- Fan Coil Unit
2.99 1.58 2.99 2.99

7. EDBFB (First Floor - Public Concourse B) 1.525 1.22 1.525 1.525


- Lighting 6.57 3.285 6.57 6.57
- Lighting (Contactor) 1.00 0.8 1.00 1.00
- Signage 0.51 0.15 0.51 0.51
- Powerpoint
9.605 5.455 9.605 9.605

Page 20
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

8. EDBFC (First Floor - Public Concourse C) 0.36 0.28 0.36 0.36


- Lighting 2.97 1.485 2.97 2.97
- Lighting (Contactor) 0.50 0.20 0.50 0.50
- Powerpoint
3.83 1.965 3.83 3.83

3.00 1.50 3.00 3.00


9. 40A SPN Isolator for Network Equipment
- Powerpoint
3 1.5 3 3

3.00 2.40 3.00 3.00


10. CP-AHU/F-2 (Air Handling Unit Control Panel 2)
- Control Panel
3 2.4 3 3

4.40 3.50 4.40 4.40


11. CP-AHU/F-3 (Air Handling Unit Control Panel 3)
- Control Panel
4.4 3.5 4.4 4.4

111.50 0 111.50 111.50


12. CP-SSF-2 (Smoke Spill Fire Control Panel 2)
- Fire Mode
111.5 0 111.5 111.5

13. E-PBFA (Essential Panelboard - Zone A) 9.04 9.04 9.04


- Distribution Boards 3.00 3.00 3.00
- Isolators 127.9 127.9 127.9
- Control Panels
139.94 104.91 139.94 139.94

Page 21
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

E-SSBF
- Distribution board
- Panelboard / Sub Switchboard
- Control Panel
- Isolator

316.847 142.509 316.847 316.847


SUBTOTAL

I. First Floor - Essential Panelboard


(E-PBFA - Zone A)

1. EDBFA (First Floor - Public Concourse A) 0.43 0.34 0.43 0.43 0.43
- Lighting 3.71 1.85 3.71 2.90 3.71
- Lighting (Contactor) 1.92 0.60 1.92 0.60 1.92
- Powerpoint 1.00 0.80 1.00 0.80 1.00
- Split Unit
7.06 3.59 7.06 4.73 7.06

1.98 0.80 1.98 1.60 1.98


2. EDBFTCA (First Floor - Transfer Corridor A)
- Lighting
1.98 0.8 1.98 1.6 1.98

4.40 3.52 4.40 2.20 4.40


3. CP-AHU/F-1 (Air Handling Unit Control Panel 1)
- Control Panel
4.4 3.52 4.4 2.2 4.4

112.50 0 112.50 0 112.50


4. CP-SSF-1 (Smoke Spill Fire Control Panel 1)
- Fire Mode
112.5 0 112.5 0 112.5

5. CP-LIFT/L2 (Lift Control Panel 2)


11.00 5.50 11.00 5.50 11.00
- Control Panel
11 5.5 11 5.5 11

Page 22
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

3.00 1.50 3.00 1.50 3.00


6. 40A SPN Isolator for Network Equipment
- Powerpoint
3 1.5 3 1.5 3

E-PBFA
- Distribution board
- Control Panel
- Isolator

139.94 14.91 139.94 15.53 139.94


SUBTOTAL

J. First Floor - Non-Essential Panelboard


(NE-PBFB - Zone B,C)

0.56 0.56 0.56


1. DBFB (First Floor - Public Concourse B) 3.255 3.255 3.255
- Lighting 1.10 1.10 1.10
- Lighting (Contactor) 0.83 0.83 0.83
- Powerpoint 10.00 10.00 10.00
- Fan Coil Unit
- Hand Dryer
15.745 15.745 15.745

2. DBFC (First Floor - Public Concourse C) 0.18 0.18 0.18


- Lighting 3.255 3.255 3.255
- Lighting (Contactor)
- Powerpoint
3.435 3.435 3.435

2.25 2.25 2.25


3. DBFTCB (First Floor - Transfer Corridor B)
- Lighting
2.25 2.25 2.25

Page 23
PROPOSED CONSTRUCTION AND COMPLETION FOR WUSHU TRAINING & COMPETITION CENTRE, PETRA JATA, KUCHING DIVISION.
Connected Load and Maximum Demand
Day Load Night Load Fire Mode
Description Connected Load Maximum Demand Connected Load Maximum Demand Connected Load Maximum Demand
(kW) (kW) (kW) (kW) (kW) (kW)

4. DBFA (First Floor - Public Concourse A)


- Lighting 0.16 0.16 0.16
- Lighting (Contactor) 5.215 5.215 5.215
- Powerpoint 0.90 0.90 0.90

6.275 6.275 6.275

1.92 1.92 1.92


5. DBFTCA (First Floor - Transfer Corridor A)
- Lighting
1.92 1.92 1.92

E-PBFA
- Distribution board
- Control Panel
- Isolator

29.625 29.625 29.625


SUBTOTAL

K. Essential Main Switchboard


(EMSB - Inside CUB)