Demand Load
Sn. Floor Description Connected Load (KW) Demand Factor
Central ( KW )
TOTAL CARPET AREA (Sq.Ft) 3146
Lighting load 2.4 W / Sft ( LED light ) 7.6 1 7.6
Powerload 1kW /1000 Sqft 3.1 0.8 2.5
Computer load & cash tills 1 kW/ 1800 sft 1.7 0.9 1.6
Cash Back Led TV and Lollipop Led Load 4 1 4.0
1 Ground Floor
HVAC SYSTEM (IDU Load) 1.1 1 1.1
HVAC SYSTEM (ODU Load) 13.5 0.9 12.2
External Lighting Load (Facade) 5 1 5.0
Miscellaneous Load (5 %) 1.8 1 1.8
LOAD FOR GROUND FLOOR (KW) 38 KW 36

TOTAL CARPET AREA (Sq.Ft) 3122


Lighting load 2.4 W / Sft ( LED light ) 7.5 1 7.5
Powerload 1kW /1000 Sqft 3.1 0.8 2.5
2 First Floor HVAC SYSTEM (IDU Load) 1.0 1 1.0
HVAC SYSTEM (ODU Load) 13.5 0.9 12.2
Miscellaneous Load (5 %) 1.3 1 1.3
LOAD FOR FIRST FLOOR (KW) 26 KW 24

TOTAL CARPET AREA (Sq.Ft) 3190


Lighting load 2.4 W / Sft ( LED light ) 7.7 1 7.7
Powerload 1kW /1000 Sqft 3.2 0.8 2.6
Computer load & cash tills 1 kW/ 1800 sft 1.8 0.9 1.6
3 Second Floor
HVAC SYSTEM (IDU Load) 1.1 1 1.1
HVAC SYSTEM (ODU Load) 15.0 0.9 13.5
Miscellaneous Load (5 %) 1.4 1 1.4
LOAD FOR SECOND FLOOR (KW) 30 KW 28

TOTAL LOAD FOR ALL FLOOR (GF To SF) 94 KW 88

EB Requirement
Connected Load 94 kW
Maximum demand load 88 kW
Demand load for the facilities @ 0.9 power factor 98 kVA

Required Demand load of 98 KVA power from Electricity Board.

DG Requirement
Maximum demand load for facility 88 kW
KVA @ 0.8 PF 110 kVA
@85% Loaded DG set 129 kVA
Require 1 no. 140 KVA DG set for 100 % power back-up.
Recommended 100% power backup.

ELECTRICAL LOAD 1/2


STYLE UNION
AT
VIJAYNAGAR,MYSORE

We required Single feeder up to Main Electrical room after Auto Power factor correction system and auto
change over system (APFC 60 KVAR)

FEEDER REQUIREMENTS :
Breaker specs : 200 Amp. (25 KA) FP, MCCB. with Energy meter.

Feeder No-1 Recommended 1R x 3.5C x 150 sq.mm. XLPE AL armoured cable from Builder's Changeover panel
up to Main Electrical Panel as mentioned above also cabling from Main panel to all DB's & its End Termination
as per Style Union requirement. 2R # 25 x
3mm GI strip for Earthing purpose. Separate Earthing for the server & low system.

NOTE :
1 100% D.G. SET BACK UP REQUIRED.
2 We have considered Electrical load for HVAC as per VRV Unit.