Air System Sizing Summary for FCU-01

Project Name: HGEC-F-1032-VIVAH JEWELLARY 12/18/2023


Prepared by: HAIDA GREEN ENGINEERING CONSULTANTS 05:55AM

Air System Information


Air System Name FCU-01 Number of zones 1
Equipment Class CW AHU Floor Area 55.0 m²
Air System Type SZCAV Location Dubai, United Arab Emirates

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 8.8 kW Load occurs at Dec 1500
Sensible coil load 7.0 kW OA DB / WB 37.9 / 24.8 °C
Coil L/s at Dec 1500 1100 L/s Entering DB / WB 20.4 / 17.2 °C
Max block L/s 1100 L/s Leaving DB / WB 15.1 / 14.8 °C
Sum of peak zone L/s 1100 L/s Coil ADP 14.5 °C
Sensible heat ratio 0.797 Bypass Factor 0.100
L/(s kW) 124.3 Resulting RH 73 %
m²/kW 6.2 Design supply temp. 14.4 °C
W/m² 160.9 Zone T-stat Check 1 of 1 OK
Water flow @ 9.0 K rise 0.24 L/s Max zone temperature deviation 0.0 K

Central Heating Coil Sizing Data


Max coil load 0.1 kW Load occurs at Des Htg
Coil L/s at Des Htg 1100 L/s W/m² 2.6
Max coil L/s 1100 L/s Ent. DB / Lvg DB 19.1 / 19.2 °C
Water flow @ 11.1 K drop 0.00 L/s

Supply Fan Sizing Data


Actual max L/s 1100 L/s Fan motor BHP 0.00 BHP
Standard L/s 1100 L/s Fan motor kW 0.00 kW
Actual max L/(sꞏm²) 20.00 L/(sꞏm²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 0 L/s L/s/person 0.00 L/s/person
L/(sꞏm²) 0.00 L/(sꞏm²)

Hourly Analysis Program 5.10 Page 1 of 3


Zone Sizing Summary for FCU-01
Project Name: HGEC-F-1032-VIVAH JEWELLARY 12/18/2023
Prepared by: HAIDA GREEN ENGINEERING CONSULTANTS 05:55AM

Air System Information


Air System Name FCU-01 Number of zones 1
Equipment Class CW AHU Floor Area 55.0 m²
Air System Type SZCAV Location Dubai, United Arab Emirates

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Zone Terminal Sizing Data

Reheat Zone Zone


Design Minimum Reheat Coil Htg Unit Htg Unit Mixing
Supply Supply Coil Water Coil Water Box Fan
Airflow Airflow Zone Load L/s Load L/s Airflow
Zone Name (L/s) (L/s) L/(sꞏm²) (kW) @ 11.1 K (kW) @ 11.1 K (L/s)
Zone 1 1100 1100 20.00 0.0 0.00 0.0 0.00 0

Zone Peak Sensible Loads

Zone Zone Zone


Cooling Time of Heating Floor
Sensible Peak Sensible Load Area
Zone Name (kW) Cooling Load (kW) (m²)
Zone 1 7.1 Nov 1400 0.2 55.0

Space Loads and Airflows

Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
GF-SALES COUNTER 1 3.7 Nov 1400 557 0.1 20.0 27.87
GF-OFFICE ROOM 1 0.5 Jul 1500 76 0.0 5.6 13.52
GF-RECEPTION COUNTER 1 2.9 Jul 1500 428 0.0 26.7 16.04
GF-STORE 1 0.3 Jul 1500 39 0.0 2.7 14.34

Hourly Analysis Program 5.10 Page 2 of 3


Zone Design Load Summary for FCU-01
Project Name: HGEC-F-1032-VIVAH JEWELLARY 12/18/2023
Prepared by: HAIDA GREEN ENGINEERING CONSULTANTS 05:55AM

Zone 1 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Nov 1400 HEATING DATA AT DES HTG
COOLING OA DB / WB 39.8 °C / 26.0 °C HEATING OA DB / WB 12.2 °C / 7.4 °C
OCCUPIED T-STAT 20.0 °C OCCUPIED T-STAT 19.0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 9 m² 1334 - 9 m² - -
Wall Transmission 2 m² 12 - 2 m² 4 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 9 m² 306 - 9 m² 120 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 55 m² 0 - 55 m² 35 -
Partitions 70 m² 1877 - 70 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 825 W 825 - 0 0 -
Task Lighting 825 W 825 - 0 0 -
Electric Equipment 0W 0 - 0 0 -
People 22 1806 1740 0 0 0
Infiltration - 139 71 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 7123 1811 - 159 0

Hourly Analysis Program 5.10 Page 3 of 3