LIST OF PROJECTS REQUIRING PRIOR ENVIRONMENT CLEARANCE OR PRIOR ENVIRONMENT PERMISSION, AS THE CASE MAY BE Item Project Category with threshold limit Conditions if any A B1 B2 (1) (2) (3) (4) (5) (6) 1 (a) Mining of Minor >100 hectare of > 5 hectares and ≤ < 5 hectares of Note: Minerals mining lease area 100 hectares of mining lease area mining lease area (1) Mining of minor mineral projects with mine lease area more (b) Mining of Major >100 hectare of ≤ 100 hectares of Dump mining than 2 hectare and up to Minerals including mining lease area mining lease area (excavation or 5 Ha shall be shall be Coal handling of dump referred to Distract Level or overburden or Expert Appraisal waste material) Committee (2) Mining lease area includes cluster situation
2 Offshore and Onshore
Oil & Gas including CBM and Shale Gas a) Exploration -- -- All projects
b) Development and All projects -- --
Production (including infrastructure facilities e.g. Gas Collecting or Gathering Station, Early production Systems, pipelines, etc.). 3 River Valley > 75 megawatts ≤ 75 Up to 25 Note: hydroelectric power megawatts>25 megawatts Category ‘B1’ river generation; megawatts hydroelectric valley projects falling in hydroelectric power generation more than one State or power generation; Union Territory shall be appraised at the Central Government Level. 4 Irrigation 50,000 hectares of >10,000 hectares > 2000 hectare and culturable command and < 10,000 hectares area <50,000 hectares of culturable of culturable command area. command area. 5 Thermal Power 500 megawatts > 5 megawatts (coal/lignite/naphtha and < 500 & gas based); megawatts (coal / lignite / naphtha & gas based);