Assessment Type:(Please tick as applicable) Environment Energy & Sustainability HSE Ref No: KHI-HSE-RA-GA-018
&Safety
Facility Name: Gate and Arc Towers Assessment Date: April 2019 Review Date: Annually or as required
Page 1 of 3
Document No: KHI-HSE-F-011
RISK ASSESSMENT Revision No: 4.0
Effective Date: April 2019
Further
Additional Actions
Who might be What is already being done to control the risk? Controls
ACTIVITY HAZARD P C RF (Fill up the table below for further action and P C RF
harmed and how? (Existing control measures) Needed
by whom)
(Y/N)?
Work environment
Lack of comfort, Organizing of work during summer and
Temperature
fatigue, stress, have enough drinking water. (break &
deafness, PPE)
insecurity
Having breaks and lunch
Page 2 of 3
Document No: KHI-HSE-F-011
RISK ASSESSMENT Revision No: 4.0
Effective Date: April 2019
No. Further Action Required Action By Whom Action Due By Completion Date
1.
2.
3.
4.
5.
Page 3 of 3