Pessimistic 21.7777777777778
Optimistic 12.2222222222222
Standard Deviation 2.185812841434
Probability of 22 weeks:
x=22 22 2.28747855498907
mean=17 Normal Distrbn 0.988916047123506
sqrt of tsd=2.18
z=x-m/sqrt of tsd
Probability of 22 wee 98.8916047123506
te=expected mean
tsd=expected variance 2
10
6
A-6
1 B-3 3
(Min) Backward Pass 0 7
(Max) Forward Pass 0 3
C-4
4
4
4
(SQRT OF tsd)
(Z Value)
Critical Path = C-F-H-J
D-2 5
12
8
E-3 8
9
6
6
17
9 17
F-5
H-5
G-3
7
14
14
Duration
Activity Predecessor a m b
A 0.08 0.13 0.15
B A 0.13 0.19 0.29
C 0.04 0.09 0.11
D B, C 0.04 0.09 0.11
E D 0.11 0.16 0.25
F E 0.13 1.64 1.72
G F 0.28 0.33 0.4
H G 0.16 0.24 0.33
I F 0.12 0.15 0.2
J H,I 0.48 0.6 0.88
K J 0.1 0.172 0.2
L K 0.1 0.168 0.2
M L 0.18 0.32 0.44
m - most likely
a - most favourable (optimistic)
b - unfavourable ( pessimistic Total duration to complete using average time:
Total Duration to complete via Critical Path:
0.460