PROPOSED

LANGKAWI DISCOVERY PARK, LANGKAWI, KEDAH


FOR TECHNIK SCHIFF SDN. BHD.

OSI INTERWERKS SDN BHD


2018 2019 2020 2021 2022 2023 2024
Activity Description A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

Current Timeline
STAGE 1
A1 Land Acquisition Application pending further info from TS
A2 Concept Paper & Preliminary Feasibility presented to PM presented to RMK/Funder
A3 Market Study pending land acquisition
A4 Land Evaluation/ Assessment pending land acquisition
A5 Land Acquisition Plan & Gazette pending land acquisition

STAGE 2
B1 Appoint Consultants & project team
B2 Validate Development Concept
B3 Feasibility Study
B4 Soil Investigation
B5 Land Survey
B6 Develop Ball-Park Budgetary Costing
B7 Establish Strategic Partnership
B8 Secure Project Financing
B9 Establish Needs Statements

STAGE 3
C1 Settle Land Acquisition
C2 Procurement
C3 Concept Design
C4 Development Review
C5 Project Costing
C6 Establish Project Plan & Strategy
C7 Establish Geotechnical Parameters

STAGE 4
D1 Submit for Development Planning Approval (UPEN)
D2 Submit for Layout Planning Approval
D3 Commence Site Preparations & Earthworks .
D4 Schematic Design Development

STAGE 5 Planning Approval


E1 Procure Planning Approval/ Development Order
E2 Develop Detailed Design & Drawings
E3 Coordinate General Arrangement Drawings
E4 Earthworks Works Construction Management
E5 Evaluate Specifications, Standards & Products
E6 Bridging Financing/ Project Funding Review
E7 Detailed Engineering Designs (Infrastructure) Costs Implications
E8 Pre-Comp. Plans & Titles
E9 Apply for Land Sub-Division & Titles
E10 Procure Land Titles
E11 Submit for Building Plan Approval Building Plan Approval
E12 Procuring Building Plan Approval
E13 Tender & Award

STAGE 6 Handover
F1 Airport Works CONSTRUCTION Management. 24 months construction period Handover
F2 Theme Park Works CONSTRUCTION Management. 24 months construction period
F3 Testing & Commissioning and O&M Manual.
F4 Monitor Project Expenditure Project Planning Project Monitoring

STAGE 7 CPC
G1 CPC Compliance & TCF/CF Application
G2 Applications to Utilities (Power/ Water/ Sewer/ Telco)
G3 Defects Rectification Management
G4 Property Management Matters
G5 Legal Action Case Management

STAGE 8
H1 Certificates of Fitness .
H2 Individual Land/ Strata Titles
H3 Handover to Authorities
H4 Obtain Titles
H5 Finalise Contracts & Final Payments . .