You are on page 1of 20

LAWS

P.D. 223 : Creation of the PRC


LOI 1000 : Guide to the Establishment of Professional Organizations
R.A. 545 : Act to Regulate the Practice of Architecture in the Philippines (2004)
R.A. 9266 : Architecture Act of 2004
R.A. 9285 : Alternative Dispute Resolution of 2004
ARCHITECT-OF-RECORD: has direct and professional responsibility
ARCHITECT-IN-CHARGE OF CONSTRUCTION: in charge of construction supervision
CONSULTING ARCHITECT: has recognized expertise or specialization

CERTIFICATE OF REGISTRATION
Grounds for Non-Issuance:
1. Moral Turpitude (Criminal Acts)
2. Immoral or Dishonorable Conduct
3. Unsound Mind
Grounds for Revocation:
1. Unauthorized Signing of Contracts
2. Paid to secure COR
3. Impersonation
4. Aid in the practice of unauthorized persons
5. Solicited projects without service / contract agreements
6. Violations of the Act and its IRR
METHODS OF SELECTION
1. Direct Selection
→ used for residential projects
2. Comparative
→ used for institutions, corporations, or public agencies
3. Design Competition
→ civic or monumental projects

METHODS OF COMPENSATION
1. Percent of Project Construction Cost
2. Multiple or Direct Personnel Expenses
→ Fee = ((manhour x rate)(multiplier)) + reimbursable expenses
→ multiplier ranges from 1.5 to 2.5, depending on office set-up, overhead,
Architect’s experience, and complexity of project
3. Professional Fee + Expenses
→ Fixed cost, used for single-architect project series
4. Per Diem + Reimbursable Expenses
5. Lump Sum or Fixed Fee
→ used for government projects, more paperwork and time-consuming
6. Mixed Methods of Compensation
PROGRESS OF PAYMENT
5% initial payment
→ based on owner’s budget
+10% of total basic fee = 15%
→ upon finishing Schematic Design Phase
+20% of total basic fee = 35%
→ upon finishing Design Development Phase
+50% of total basic fee = 85%
→ upon finishing Contract Documents
+15% of total basic fee = 100%
→ after construction
→ 5% civil liability; 10% site inspection
DIRECT COST: includes materials, labor, consumables, equipment, subcontract work
INDIRECT COST: includes mobilization / demobilization, transportation, overhead, taxes,
contingencies, and mark-up

TOTAL DIRECT COST = MATERIAL COST + LABOR COST


SUBTOTAL COST = TOTAL DIRECT COST + CONTINGENCY
→ contingency = 5% to 10%
FINAL COST = SUBTOTAL COST + CONTRACTORS’ PROFIT
→ contractor’s profit = 15% to 20%
PROJECT CLASSIFICATIONS
according to complexity: according to building type:
Grp. 1: Simplest Utilization and Character Grp. 4: Low Rise Residentials
6% of PCC for P50M or less 10% of PCC
P50 – 100M : +excess @ 5%
P101 – 200M : +excess @ 4% Grp. 5: Monumental Bldgs and Facilities
P201 – 500M : +excess @ 3% 12% of PCC
P501M – 1B : +excess @ 2%
P1B up : +excess @ 1%
Grp. 6: Repetitive Building
Grp. 2: Moderate Complexity 1st @ 100%, 2nd @ 80%, 3rd @ 60%, rest @ 40%
7% of PCC for P50M or less
Grp. 7: Repetitive Housing
Grp. 3: Exceptional Character 1st @ 10%
8% of PCC for P50M or less 2nd to 10th @ +60% for each additional
houses special equipment rest @ fee of 10 +30% for each add’l

Grp. 8: Interior Design + Site Planning


15% of PCC

Grp. 9: Renovations for Groups 1 to 5


150% of basic fee

Grp. 10: Technical Expertise


SPP201
PRE-DESIGN SERVICES

PRE-DESIGN SERVICES: identifying factors to be used in the formulation of the


architectural solution

SCOPE
1. Consultation: consultation to Client for advice
2. Pre-Feasibility Studies: getting analysis of relative information
3. Feasibility Studies: detailed analysis based on the pre-feasibility study
4. Site Selection and Analysis: evaluation and selection of the site
5. Site Utilization and Land Use Studies: detailed analysis of the site
6. Architectural Research: analysis of research for conclusion
7. Architectural Programming: identifying horizontal and vertical requirements
8. Space Planning: determining the size and configuration
9. Space Management Studies: analysis of space requirements
10. Value Management: minimizing negative effects of simplified operations
11. Design Brief Preparation: statement of TOR and other necessary requirements
12. Promotional Services: promotion for financial support, ARCHITECT STANDS
ONLY AS OWNER’S REPRESENTATIVE
SPP202
REGULAR DESIGN SERVICES

SCOPE OF SERVICES

→ define the project.


Project Definition Phase
→ owner consultation
→ design the scheme.
Schematic Design Phase
→ program schedule, initial line drawings, SPPCC
→ develop the design.
Design Development Phase
→ drawings, outline specs, diagrammatic layout
→ document the design.
Contract Document Phase
→ 5 sets of CDs, technical specifications, bldg permit
Bidding or Negotiation → bid for the design.
Phase → preparation of bid documents

Construction Phase → construct the project.


SPP203
SPECIALIZED ALLIED SERVICES

METHOD OF COMPENSATION/FEE
SERVICE
UAP DOC SPP DOC
Architectural Interiors 12 – 20% of work percentage of
→ planning of indoor / enclosed areas cost work
Acoustic Design Services 15 – 20% of work depending on
→ planning for sound transmission design cost work complexity
Architectural Lighting Layout and Design Depending on depending on
→ planning for light transmission work complexity work complexity
Site Development Planning 10 – 15% of work
depending on
→ planning for spaces surrounding a specific building estimated civil
cost
in relation to the existing conditions work cost
based on type:
Site and Physical Planning - Industrial
→ planning of arrangement of vertical structures within Estates: P5,000
a piece of land for first 50ha
FRDP: Framework Development Plan - Subdivisions
CMDP: Conceptual Master Development Plan w/in urban
*PMDP: Preliminary Master Development Plan areas: P3,000
*DMDP: Detailed Master Development Plan for first 50ha
*physical layout including roads - Subdivisions
w/in non-urban
areas: P2,000
for first 50ha
- Subdivisions
w/in
mountainous
non-urban
areas: P3,000
for first 50ha
Comprehensive Design and Planning Multiple Direct Multiple Direct
→ non-physical and non-engineering components Personnel Expense Personnel Expense
→ Data Gathering  MDP  EIA
Historical and Heritage Conservation Planning1
→ R&D for historical and heritage conservation
Security Evaluation and Planning1
→ rating the security value of structures
Building Systems Design1
→ production of building components
Facilities Management Support1
→ ensuring proper function and maintenance of the building
Building Testing and Commissioning1
→ recommending a systematic process for the structural system and materials
Building Environment Certification1
→ development of a building environment rating system
Forensic Architecture1
→ scientific study on the well-being of the built environment
Building Appraisal1
→ placing appropriate value on the building
Structural Conceptualization1
→ conceptualization and arrangement of structural components
Preliminary Services1
→ services under SPP201
Contract Documentation and Review1
→ knowledge on contract documents, specifications, estimate and quantity survey, etc.
Post-Design Services1
→ services under SPP204, SPP206, SPP207
Dispute Avoidance and Resolution1
→ knowledge on the ADR Act of 2004 and its IRR
Architectural Research Methods1
→ knowledge on research, materials, building types, design trends, writing, and photography
Special Building / Facility Planning and Design1
→ knowledge on the planning and design process of facilities and communities
Building Components1
→ knowledge on building materials and construction
Management of Architectural Practices1
→ knowledge on architectural office management

1 Method of compensation is Multiple Direct Personnel Expense


SPP204A
FULLTIME SUPERVISION SERVICES

SCOPE:
1. Quality Control
2. Evaluation of Construction Work
3. Preparation of Daily Inspection Reports
4. Filing of Documents

PARTIES INVOLVED IN BUILDING DESIGN AND CONSTRUCTION:


1. Owner: orders for the implementation of the project
2. Architect and Specialist Consultants: renders plan and design services
3. Contractors: performs construction work
4. Work Delivery and Supervision Assistants

CLERK-OF-WORKS: assisting construction inspector


CONSTRUCTION SUPERVISION GROUP (CSG): normally recommended by the Architect,
responds to administrative matters
SPP204B
CONSTRUCTION MANAGEMENT SERVICES

CONSTRUCTION MANAGER: hired by the owner to coordinate and supervise


FEE: 1.5 – 3% of PCC

SPP205
POST-CONSTRUCTION SERVICES

SCOPE OF SERVICES:
1. Building and Facilities Administration
a. Building Maintenance
b. Grounds and Landscape Supervision
c. Building Equipment Maintenance
d. Business Development and Management
2. Post-Construction Evaluation

METHOD OF COMPENSATION: 4% to 6% of gross rentals or monthly salary


SPP206
COMPREHENSIVE ARCHITECTURAL SERVICES

- Covers Pre-Design Services, Regular Design Services, Specialized Allied


Services, Construction Services, and Post-Construction Services

PROJECT MANAGER: member of the A+E Team


FEE: 2 – 5% of PCC

SPP207
DESIGN-BUILD SERVICES

BY ADMINISTRATION
→ construction management and labor supervision
FEE: 7% of PCC

BY GUARANTEED MAXIMUM COST


→ guarantees maximum cost of labor and materials
FEE: 10% OF PCC
> excess of over 10% will be shouldered by the Architect and Owner
SPP208
ARCHITECTURAL DESIGN COMPETITION

SPP209
PROFESSIONAL ARCHITECTURAL CONSULTING SERVICES

PFPA: Philippine Federation of Professional Associations


CBNE: Council for the Built and Natural Environment
PCA: Professional Consulting Architect
RLP: Registered and Licensed Professional

COMPENSATION OF A PCA:
1. Per Diem or Hourly Basis
2. Retainer
→ when PCA services are required at intervals
3. Salary cost times multiplier, plus direct cost or reimbursable expenses
→ Fee = (Salary Cost x Multiplier) + Reimbursable Expenses
4. Fixed / Lump Sum Payment
5. Percentage of Total Project Cost
SPECIFICATIONS
- a written document that provides information needed in construction which
cannot be placed in the drawings.

TYPES OF SPECIFICATIONS:
- Closed Specifications: fixed and unchangeable
- Open Specifications: allows the use of a number of products
- Reference Specifications: indicates a reference standard
- Performance Specifications: installation requirements that the product must
meet are given
- Brand Name Specifications

BILL OF MATERIALS: prepared by the Contractor; summarization of materials regardless


of work
COST ESTIMATE: prepared by the Architect; classified into work items for ordering and
budgeting
GENERAL CONDITIONS
CONTRACT DOCUMENTS:
- Agreement
- General Conditions
- Special Provisions
- Specifications and Supplementary Specifications
- Drawings

TYPES OF BONDS:
- Proposal Bond: guarantee to enter into a contract if awarded
- Performance Bond: guarantee to execute work accordingly
- Payment Bond: guarantee to pay all obligations based on contract
- Guarantee Bond: guarantee of workmanship quality for 1 year (30% of contract
amount)

BIDDING DOCUMENTS:
- Proposal: financial (project cost); technical (organization)
- Tender Documents: construction drawings and specifications
- Invitation to Bid
- Bid Bulletin: additional information provided before the bidding date
- Instruction to Bidders
- Site Conditions
DURATION PERIODS
- Notice to Proceed: within 7 days
- Architect’s action on Contractor’s payment: within 15 days
→ Request for Payment should be once a month, less 10% for retention
- Owner’s action on Approved Certificate of Payment: within 15 days
- Period for which the Claim for Adjustment should be asserted: 15 days
- Termination of Contract with Contractor: within 15 days
→ a written notice should be submitted to the Owner and Architect
- Period for which the Claim for Extra Cost of subcontractor should be asserted:
10 days
- Issuance of notice to begin, suspend, or resume work: 10 days prior
- Issuance of Request for Owner-Furnished Materials: 10 days before use
- Issuance of Request for Drawings: 2 weeks
- Period of Issuance of Request for Time Extension (due to Non-Contractor
causes): 15 days after occurrence of delay
- Period of Rectification of Defects and Faults: up to 60 calendar days
→ will be at the Contractor’s expense; but if fault is non-contractor, it will be
shouldered by the Architect
- Release of Retention: within 3 months after final payment
- Repairs and corrective works after final payment: within 1 year from work
acceptance date; response within 5 days of owner’s without notice
REQUIREMENTS FOR ISSUANCE OF FINAL PAYMENT
- Certificate of Building Occupancy (issued by Contractor)
- Certification of Final Inspection (issued by Building Official)
- 3 copies of panel board and circuit directory
- 3 sets of as-built drawings
- 3 copies of equipment manuals
- 3 copies of keying schedule