Intertanko Dry Dock Checklist
Intertanko Dry Dock Checklist
Criticality
VIQ #7 item Completed
Item per category Timing Verified by REMARKS Exposure Index
No. by
(CEI)
1 General Information
2. Certification and
2
Documentation
New Certificates / Test Records /
2.1 Receipts issued during DD period 2 PDT
verified to be onboard.
Confirm Certificates / Endorsements
2.2 are correct (forward copies to office 2 PDT
ASAP).
Navigation / Communication/intercom
equipment (inclusive of emergency
devices) / instruments operation test
4.2 4.7 PDT, DST
(Radars/ ARPA, Gyro Compasses,
ECDIS, Steering gear/ Auto pilot,
GMDSS/ Batteries, EPIRB/ SARTs)
6 6. Pollution Prevention
Garbage (oily liquids) rags delivery
6.1 receipts supplied to Master (all slops 6.20 PDT
sent ashore).
7 7. Maritime Security
Security inspection carried-out and
7.1 7.3 to 7.13 PS
entry made in bridge logbook.
Cyber Security awareness/ policy
7.2* implemented onboard. Measures to 7.14 to 7.17 PS
prevent any breach in place.
All I/T & O/T systems secured after
7.3* 7.15 PS
updates
8. Cargo and Ballast Systems -
8
Petroleum
Confirm tightness no hydraulic leaks
8.1 8.3 & 8.62 PDT
from valves / joints.
MMC vapour locks check for
8.2 8.12 PDT
damages / gas tightness.
COW machines manual operation
8.3 8.34 PDT
test-check for damages.
Heating coils pressure test-check for
8.4 8.15 PDT
leaks-damages.
Hydraulic system activation-valves
operation test i.w.o Deck-P/R-COT-
8.5 8.11 PDT
WBT. Test all cargo valves and
assess opening/shutting times.
P/V valves manual operation test. P/V
8.6 breaker level to be checked (as/ if 8.21 & 8.28 PDT
applicable).
C.O.Ps-W.B. Pumps, AUS (as far as
practicable) operation test-
lines/valves-joints pressure check for
8.7 leaks. Including automation and 8.8 & 8.10 PDT. DDT
emergency trip. Cargo/ ballast hatch
covers structurally intact and water
tight.
IG / N2 system activation-
8.8 8.22 to 8.26 DDT
performance/alarms & trips test.
COTs-WBTs level/ pressure gauges
8.19, 8.24,
8.9 performance-accuracy check- DDT
8.25, 8.26
indicators in CCR.
Check operation of deck seal unit and
8.10* supply pump including water 8.27 DDT
supply/level safety devices
Calibrate and check operation of
8.11* Oxygen analysers and O2 content 8.26 DDT
recording function
IG inlet branch – Mast Riser – main
valves(inclusive of boiler uptake
8.12 8.20 DDT
valves) operation test-check security
pins-sockets.
Check individual lG / N2 remote tanks
8.13 8.13 & 8.19 DDT
pressure indicators.
8.14 P/V valve leakage test. 8.21 DST
8.15 IGS failure. 8.22 DST
Gas monitoring system (if vacuum
8.16 system utilised ensure tubing is free 8.46 DST
and clear of obstructions).
Manifolds are blanked, fully bolted
8.17 and manifold valves and drains closed 8.3 & 8.41 PS
after pressure testing.
8.18 Mast riser leakages. 8.19 DST
Cargo tanks High-level and overfill
8.19* 8.14 DST
alarms tested and in good order.