You are on page 1of 3

For confirming the specifications and performances of an electrical power

transformer it has to go through a number of testing procedures. These tests


are broadly divided in to two based on where the test is conducted - 

(i) tests done at factory during manufacturing process and 


(ii) tests done at site at the time of transformer installation.

Type of transformer testing: 

Tests done at Factory:

1. Type Tests 
2. Routine Tests 
3. Special Tests 
Tests done at Site: 

1. Pre Commissioning Tests 


2. Periodic/Condition Monitoring Tests 
3. Emergency Tests 
4. Each of the above tests contain a series of tests which are briefly
explained below. We will discuss each of the test in detail in coming
articles.
Type tests of transformer
To prove that the transformer meets customer's specifications and design
expectations, the transformer has to go through different testing procedures in
manufacturer premises. Some transformer tests are carried out for confirming
the basic design expectation of that transformer. These tests are done mainly
in a prototype unit not in all manufactured units in a lot. Type test of
transformer confirms main and basic design criteria of a production lot. 

Type tests of transformer include: 

1. Transformer winding resistance measurement 


2. Transformer ratio test 
3. Transformer vector group test 
4. Measurement of impedance voltage/short circuit impedance and load
loss (Short circuit test).
5. Measurement of no load loss and current (Open circuit test) 
6. Measurement of insulation resistance 
7. Dielectric tests of transformer 
8. Temperature rise test of Transformer 
9. Tests on on-load tap-changer 
10. Vacuum tests on tank and radiators
Routine tests of transformer
Routine tests of transformer are mainly for confirming operational
performance of individual unit in a production lot. Routine tests are carried
out on every unit manufactured. 

Routine tests of transformer include:


1. Transformer winding resistance measurement 
2. Transformer ratio test 
3. Transformer vector group test 
4. Measurement of impedance voltage/short circuit impedance (principal
tap) and load loss (Short circuit test) 
5. Measurement of no load loss and current (Open circuit test) 
6. Measurement of insulation resistance 
7. Dielectric tests of transformer 
8. Tests on on-load tap-changer 
9. Oil pressure test on transformer to check against leakages past joints
and gaskets.
Special tests of transformer
Special tests of transformer are done as per customer requirement to obtain
information useful to the user during operation or maintenance of the
transformer. 

Special Tests of transformer include: 

1. Dielectric Tests 
2. Measurement of zero-sequence impedance of three-phase transformers
3. Short-Circuit Test  
4. Measurement of acoustic noise level 
5. Measurement of the harmonics of the no-load current 
6. Measurement of the power taken by the fans and oil pumps 
7. Tests on bought out components / accessories such as Buchhloz relay,
temperature indicators, pressure relief devices, oil preservation system
etc. 
Pre-Commissioning test of transformer
In addition to these, the transformer also goes through some other tests,
performed on it, before actual commissioning of the transformer at site. The
transformer testing performed before commissioning the transformer at site is
called pre- commissioning test of transformer. 

These tests are done to assess the condition of transformer after installation
and compare the test results of all the low voltage tests with the factory test
reports. 