Bill No.

1 : Preliminaries

ITEM DESCRIPTION UNIT CONTRACT SUM


AMOUNT
NO QTY RATE (RM)

1.10 Mobilization of boring and deep sounding (Piezocone) plants 10,780.00


and equipment

1.20 Insurance of Works, Contractor All Risks, Third Party Insurance, 500.00
Public Liability Policy

1.30 Workmen's Compensation Policy or Socso 500.00

1.40 Photographs 250.00

1.50 Construct Exploratory Hole Markers 3,500.00

1.60 Allow for all work (including preparation of access & 750.00
necessary staging)

1.70 Provide full time Site Agent 2,000.00

1.80 Liquidated damages for non-completion works 1,000.00

1.90 Allow for performances Bond (5% of Contract Sum) 1,000.00

1.10 Interim Report 1,000.00

1.11 Final Report 1,000.00

Total Sum Carried to Collection 22,280.00

BQ 1/1
Bill No. 1 : Preliminaries

ITEM DESCRIPTION UNIT CONTRACT SUM


AMOUNT
NO QTY RATE (RM)

1.12 Any work which require "standing" supervision 500.00

1.13 WATER FOR THE WORKS 500.00


(for both items
1.13 & 1.14)

1.14 Allow for the expenditure in complying with any in the Contrac
document considered necessary by Contractor to achieve specific
provisions. The particular clauses should be listed & prices
stated seperately herein

1. Traffic Safety and Control


2. …………………………………………

Total Sum Carried to Collection 1,000.00

BQ 1/2

Bill No. 1 : Preliminaries


ITEM DESCRIPTION UNIT CONTRACT SUM
AMOUNT
NO QTY RATE (RM)

SUMMARY PAGE

Page BQ 1/1 22,280.00

Page BQ 1/2 1,000.00

Total Sum Carried to Summary 23,280.00

BQ 1/3

Bill No. 2 : Deep Boring with Boring Plants


ITEM DESCRIPTION UNIT CONTRACT SUM
AMOUNT
NO QTY RATE (RM)

2.10 Boring in Soil (For 4 boreholes)

The Contractor is to provide the Original


Ground Level at all positions of borehole LS 2,000.00

2.1.1 Carry out boring whether case or uncased

2.1.1.1 Depth from existing ground level not exceeding (n.e.) 10m metre 40.00 28.00 1,120.00

2.1.1.2 - ditto - exceeding 10m but n.e. 20m metre 40.00 28.00 1,120.00

2.1.1.3 - ditto - exceeding 20m but n.e. 30m metre 40.00 28.00 1,120.00

2.1.1.4 - ditto - exceeding 30m but n.e. 40m metre 40.00 28.00 1,120.00

2.1.1.5 - ditto - exceeding 40m but n.e. 50m metre 40.00 28.00 1,120.00

2.1.1.6 - ditto - exceeding 50m but n.e. 60m metre 40.00 28.00 1,120.00

2.1.1.7 - ditto - exceeding 60m but n.e. 70m metre Rate Only 35.00 -

2.1.1.8 - ditto - not exceeding 80m metre Rate Only 45.00 -

2.20 Drilling in Rock (For 4 boreholes)

2.2.1 Carry out diamond core drilling of 30.2mm


minimum diameter into any kind of rock at
any depth including delivery of cores in
standard boxes to the approved Laboratory metre 40.00 80.00 3,200.00

2.2.2 Extra over Items 2.2.1 if the core is of


54.0mm minimum diameter, taken as
directed by the S.O. metre Rate Only 65.00 -

Total Sum Carried to Collection 11,920.00

BQ 2/1

Bill No. 2 : Deep Boring with Boring Plants


ITEM DESCRIPTION UNIT CONTRACT SUM
AMOUNT
NO QTY RATE (RM)

2.30 Drilling in Limestone (For 4 boreholes)

2.3.1 Carry out diamond core drilling of 30.2mm


minimum diameter into any kind of rock at
any depth including delivery of cores in
standard boxes to the approved Laboratory metre 40.00 30.00 1,200.00

2.3.2 Extra over Items 2.3.1 if the core is of


54.0mm minimum diameter, taken as
directed by the S.O. metre Rate Only 65.00 -

2.40 Insitu Field test

2.4.1 Carry out standard penetration test:

2.4.1.1 Depth from existing ground level not exceeding (n.e.) 10m no. 40 20.00 800.00

2.4.1.2 - ditto - exceeding 10m but n.e. 20m no. 40 20.00 800.00

2.4.1.3 - ditto - exceeding 20m but n.e. 30m no. 40 20.00 800.00

2.4.1.4 - ditto - exceeding 30m but n.e. 40m no. 40 20.00 800.00

2.4.1.5 - ditto - exceeding 40m but n.e. 50m no. 40 20.00 800.00

2.4.1.6 - ditto - exceeding 50m but n.e. 60m no. 40 20.00 800.00

2.4.1.7 - ditto - exceeding 60m but n.e. 70m no. Rate Only 30.00 -

2.4.1.8 - ditto - not exceeding 80m no. Rate Only 40.00 -

Total Sum Carried to Collection 6,000.00

BQ 2/2

Bill No. 2 : Deep Boring with Boring Plants


ITEM DESCRIPTION UNIT CONTRACT SUM
AMOUNT
NO QTY RATE (RM)
2.50 Sampling

2.5.1.1 Depth from existing ground level not exceeding (n.e.) 10m no. 40 3.00 120.00
2.5.1.2 - ditto - exceeding 10m but n.e. 20m no. 40 3.00 120.00
2.5.1.3 - ditto - exceeding 20m but n.e. 30m no. 40 3.00 120.00
2.5.1.4 - ditto - exceeding 30m but n.e. 40m no. 40 3.00 120.00
2.5.1.5 - ditto - exceeding 40m but n.e. 50m no. 40 3.00 120.00
2.5.1.6 - ditto - exceeding 50m but n.e. 60m no. 40 3.00 120.00
2.5.1.7 - ditto - exceeding 60m but n.e. 70m no. Rate Only 4.00 -
2.5.1.8 - ditto - not exceeding 80m no. Rate Only 5.00 -
2.5.2 Obtain undisturbed samples with thin-wall tube sampler
2.5.2.1 Depth from existing ground level not exceeding (n.e.) 10m no. Rate Only 15.00 -
2.5.2.2 - ditto - exceeding 10m but n.e. 40m no. Rate Only 20.00 -

2.60 Mazier undisturbed sampling

2.6.1.1 Depth from existing ground level not exceeding (n.e.) 10m no. 4 60.00 240.00
2.6.1.2 - ditto - exceeding 10m but n.e. 20m no. 4 65.00 260.00
2.6.1.3 - ditto - exceeding 20m but n.e. 30m no. 4 70.00 280.00
2.6.1.4 - ditto - exceeding 30m but n.e. 40m no. 4 75.00 300.00
2.6.1.5 - ditto - exceeding 40m but n.e. 50m no. Rate Only 75.00 -
2.6.1.6 - ditto - exceeding 50m but n.e. 60m no. Rate Only 80.00 -
2.6.1.7 - ditto - exceeding 60m but n.e. 70m no. Rate Only 85.00 -
2.6.1.8 - ditto - not exceeding 80m no. Rate Only 90.00 -

Total Sum Carried to Collection 1,800.00

BQ 2/3

Bill No. 2 : Deep Boring with Boring Plants


ITEM DESCRIPTION UNIT CONTRACT SUM
AMOUNT
NO QTY RATE (RM)

SUMMARY PAGE

Page BQ 2/1 11,920.00

Page BQ 2/2 6,000.00

Page BQ 2/3 1,800.00

Total Sum Carried to Summary 19,720.00

BQ 2/4

Bill No. 3 : Other Field Tests


ITEM DESCRIPTION UNIT CONTRACT SUM
AMOUNT
NO QTY RATE (RM)

3.10 Mackintosh or JKR Probes

3.1.1 Carry out Mackintosh or JKR Probes no - 75.00 -


to depth not exceeding 15 metres

3.20 Piezometer

3.2.1 Supply and install standpipe piezometer in borehole


as specified by the Engineer including taking reading
each during the site work in progress. The depth of
piezometer tip is not (n.e.) 5m no 4 150.00 600.00

3.2.2 For depth exceeding 5m but n.e. 10m no 4 50.00 200.00

3.2.3 For depth exceeding 10m but n.e. 20m no 4 200.00 800.00

Total Sum Carried to Summary 1,600.00

BQ 3

Bill No. 4 : Collection of Soil and Water Samples in Bulk


ITEM DESCRIPTION UNIT CONTRACT SUM
AMOUNT
NO QTY RATE (RM)

4.10 Water Sample

4.1.1 Collect 1 litre of representative ground water sample in a


water sample in a water - tight clean container from a hand
bore or deep bore no 1.00 50.00 50.00

Total Sum Carried to Summary 50.00

BQ 4

Bill No. 5 : Laboratory Testing


ITEM DESCRIPTION UNIT CONTRACT SUM
AMOUNT
NO QTY RATE (RM)
5.10 Classification Tests
5.1.1 Carry out classification test:
5.1.1.1 Moisture content no 20 3.00 60.00
5.1.1.2 Liquid Limit no 20 6.00 120.00
5.1.1.3 Plastic Limit no 20 6.00 120.00
5.1.1.4 Plasticity index no 20 2.00 40.00

5.1.1.5 Specific Gravity no 20 10.00 200.00


5.1.1.6 Particle Size Distribution for coarse-grained soils no 20 12.00 240.00
5.1.1.7 Particle Size Distribution for fine-grained soils no 20 17.00 340.00
5.20 Soil Strength Tests
5.2.1 Carry out strength tests on undisturbed samples:
5.2.1.1 Unconsolidated Undrained triaxial test no 2 50.00 100.00
5.2.1.2 Consolidated undrained triaxial compression series 8 300.00 2,400.00
5.2.1.3 One-dimensional consolidation test no 4 100.00 400.00
5.2.1.4 Direct Shear Box Test (DSB) no 4 180.00 720.00
5.30 Soil Chemical Tests
5.3.1 Carry out chemical tests on soil or water samples
5.3.1.1 Organic matter content no 3 35.00 105.00
5.3.1.2 Total sulphate content no 3 35.00 105.00
5.3.1.3 Sulphate content of ground water no 3 35.00 105.00
5.3.1.4 Chloride content of ground water no 3 35.00 105.00
5.3.1.5 pH value no 3 20.00 60.00
4.40 Rock Cores Testing
5.4.1 Unconfined Compressive Strength of Rock Core no 4 130.00 520.00

Total Sum Carried to Summary 5,740.00


BQ 5

Bill No. 6 : 3 Dimensional (3D) Soil Maping

ITEM DESCRIPTION UNIT CONTRACT SUM


AMOUNT
NO QTY RATE (RM)

6.10 3 Dimensional Soil Maping

6.1.1 Contractor to Provide 3 Dimensional Soil Maping of not


less than 5 sections for the entire area based on the result
of the soil investigation (2 sets on Interim Report and
4 sets on Final Report)

i) Coloured Hard Copy no 0 900.00 -

ii) Soft Copy in Autocad format no 0 200.00 -

Total Sum Carried to Collection -

BQ 6
GRAND SUMMARY

UNIT CONTRACT SUM


BILL
AMOUNT (RM)

BILL NO. 1 : GENERAL CONDITION & PRELIMINARIES BQ 1/3 23,280.00

BILL NO. 2 : DEEP BORING WITH BORING PLANTS BQ 2/4 19,720.00

BILL NO. 3 : OTHER FIELD TESTS BQ 3 1,600.00

BILL NO. 4 : COLLECTION OF SOIL AND WATER SAMPLES IN BQ 4 50.00


BULK
BILL NO. 5 : LABORATORY TESTING BQ 5 5,740.00

BILL NO. 6 : 3 DIMENSIONAL (3D) SOIL MAPING BQ 6 -

Total 50,390.00