THOMAS MARANON
TRHU : ENGR. REYNALDO DIAZ
BID ITEM SCOPE OF WORKS UNIT QTY. UNIT COST Total Cost
I.
1.0 GENERAL REQUIREMENTS
BID ITEM SCOPE OF WORKS UNIT QTY. UNIT COST Total Cost
I.
1.0 GENERAL REQUIREMENTS
1.1 Mobilization and Demobilization LOT 1.00 30,000.00 30,000.00
1.2 Bond and Insurance ( If Necessary LOT 1.00 80,000.00 80,000.00
1.3 Temporary Facilities (If Necessary) LOT 1.00 30,000.00 30,000.00
1.4 Preparation of Plans (As-built) (If Necessary) LOT 1.00 30,000.00 30,000.00
1.5 Safety and Security Requirements LOT 1.00 20,000.00 20,000.00
1.6 Temporary Enclosures, Barricade and Signages (If Necessary) LOT 1.00 45,000.00 45,000.00
1.7 Permits (If Necessary) LOT 1.00 -
7.00 235,000.00
TOTAL FOR GENERAL REQUIREMENT LOT
Rehabilitation -
- Ceiling insulation, extruded polystyrene foam or sandwich panel, at least 2″ (50mm SQM 280.00 7,500.00 2,100,000.00
- Drain canal, cladded with SS sheet, 1.0mm thick, slope to drain and complete with LI.M. 15.00 4,850.00 72,750.00
Electrical -
- Lighting fixture should be covered with diffuser, use 300 lumens (0.2x1.2m) SETS 26.00 10,500.00 273,000.00
Air Curtain -
- Replace existing with high cfm capacity LOT 1.00 225,000.00 225,000.00
- Install additional Chandler unit complete with evaporator SET 1.00 350,000.00 350,000.00
- Feeder and power supply line for the chandler unit LOT 1.00 75,000.00 75,000.00
5,521,750.00