Site Acceptance Test Report For 33Kv Cable: Project: Construction of 306 Villas - Al Saad
Site Acceptance Test Report For 33Kv Cable: Project: Construction of 306 Villas - Al Saad
2. VISUAL CHECKS:
Results OK OK OK
SIGNATURE
06.02.2020 06.02.2020 06.02.2020
DATE
Page: 2 of 3
Project: CONSTRUCTION OF 306 VILLAS – AL SAAD
Date: 06.02.2019
Client: MUSANADA Contractor: Al Jaber Building
End User AADC
Testing Company: Alphapower
Consultant: Al Suweidi
SITE ACCEPTANCE TEST REPORT FOR 33 kV CABLE
From Station: NRMAH-GD Feeder No: A05 To Station: SAAD PY H06
From Joint loc. 33kV OHL Dead end terminal tower To Joint Loc. Joint location no.12
6. VLF TEST:
Leakage Current (mA)
Applied Freq
Ref. Duration
Voltage . 1 min 5 min 10 min 15 min 30 min
SIGNATURE
06.02.2020 06.02.2020 06.02.2020
DATE
Page: 3 of 3
Project: CONSTRUCTION OF 306 VILLAS – AL SAAD
Date: 06.02.2019
Client: MUSANADA Contractor: Al Jaber Building
End User AADC
Testing Company: Alphapower
Consultant: Al Suweidi
SITE ACCEPTANCE TEST REPORT FOR 33 kV CABLE
From Station: NRMAH-GD Feeder No: A05 To Station: SAAD PY H06
From Joint loc. 33kV OHL Dead end terminal tower To Joint Loc. Joint location no.12
7. FORMULA USED:
Applied RMS Voltage = 3U0 / √2 kV
Where U0 = 33/√3 = 19.05 kV
Applied RMS Voltage = ( 3x19.05 )/ √2
= 40.4 kV RMS
8. REMARKS:
9. EQUIPMENT DETAILS:
Calibration
Sl.No Instrument Name Make / Model Serial No
Valid
1 IR Tester Megger/MIT515 101365331 11.06.2020
SIGNATURE
06.02.2020 06.02.2020 06.02.2020
DATE