Professional Documents
Culture Documents
Drawings of Kuwatini River Bridge at KM 13+103 Revision R1
Drawings of Kuwatini River Bridge at KM 13+103 Revision R1
STRUCTURE DRAWINGS
FOR KUWATINI BRIDGE KM 13+103
CLIENT:
UGANDA NATIONAL ROADS AUTHORITY
PLOT NO.3-5, NEW PORTBELL ROAD
NAKAWA UAP BUSINESS PARK
P.O. BOX 27187
KAMPALA, UGANDA
DESIGN CONSULTANT :
LEA International Ltd., in Joint Venture with LEA
Associates South Asia Pvt. Ltd.,and in association with
KOM Consulting Ltd.
REVISION- R1 CONTRACTOR :
CHINE STATE CONSTRUCTION ENGINEERING
DATED- 24.10.2019 CORPORATION LIMITED (CSCEC)
LIST OF DRAWINGS
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: DURBA
SEPTEMBER 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-03\TC-01 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD TABLE OF CONTENT FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD KUWATINI BRIDGE KM 13+103
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
(A) GENERAL
(E) CONSTRUCTION JOINTS
(G) WORKMANSHIP/DETAILING
(C) REINFORCMENT
P-R
OW
P-R
TO SUAM
OW
N
P-R
OW
P-R
OW
P-
OR
W
P-R
OW
P-
RO
W
P-R
P-
OW
RO
W
P-R
OW
P-RO
P-
W
P-ROW
R
O
W
P-ROW P-ROW
P-
RO
W
P-R
OW
P-R
OW
P-R
OW
P-RO
W
P-ROW
P-ROW P-ROW
P-ROW
NOTES :-
A1
D/S
TO SUAM
LEGENDS:-
U/S
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: RAJU
AUGUST 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-13\GA-13 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD GENERAL ARRANGEMENT DRAWINGS FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD RIVER BRIDGE KM 13+103 (SHEET 1 OF 2)
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
(SCALE 1:75)
NOTES :-
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: DURBA
AUGUST 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-03\GA-03 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD GENERAL ARRANGEMENT DRAWINGS FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD RIVER BRIDGE KM 13+103 (SHEET 2 OF 2)
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
1
ABUTMENT MARKED
FRL
OF ABUTMENT
ABUTMENT CAP TOP LEVEL
GROUND LEVEL
OF ALIGNMENT
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: RAJU
SEPT. 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-03\SUB-01 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD DIMENSION DETAILS OF SUBSTRUCTURE FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD BRIDGE AT CH: KM13+103 (SHEET 1 OF 2)
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
NOTES :-
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: RAJU
SEPT. 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-03\SUB-01 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD DIMENSION DETAILS OF SUBSTRUCTURE FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD BRIDGE AT CH: KM13+103 (SHEET 2 OF 2)
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
SCHEDULE OF REINFORCEMENT
BAR BAR
DESCRIPTION REMARKS
MKD. SHAPE
3 cg1 6-Y20
cg2 6-Y16
cg3 6-Y20
cg4 6-Y20
cg5 6-Y20
cg6 14-Y16
cg9 3-Y16
cg10 Y12 @ 250 c/c
br1 Y25 @ 125 c/c
SPACING SAME
br2 Y12
AS br1 & br1a
br3 4L-Y10 @ 100c/c (3 Layers)
br6 2-Y10
br7 2L-Y10 @ 400c/c (3 Layers)
a1 Y32 @ 90 c/c
a2 Y20 @ 90 c/c
a3 Y20 @ 125 c/c
3 NOTES :-
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: RAJU
SEPT. 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-03\SUB-02 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD REINFORCEMENT DETAILS OF SUBSTRUCTURE FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD BRIDGE AT CH: KM13+103 (SHEET 1 OF 2)
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
PART PLAN OF CROSS GIRDER SHOWING
REINF. DETAILS OF BRACKET FOR ABUTMENT
JUNCTION DETAILS
OF RCC ABUTMENT
AND SOLID RETURN WALL
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: RAJU
SEPT. 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-03\SUB-02 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD REINFORCEMENT DETAILS OF SUBSTRUCTURE FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD BRIDGE AT CH: KM13+103 (SHEET 2 OF 2)
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
A1
TO SUAM
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: RAJU
SEPTEMBER 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-03\SS-01 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD DIMENSION DETAILS OF SUPERSTRUCTURE FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD BRIDGE AT CH: KM13+103
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
SPECIAL NOTES:
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: RAJU
SEPTEMBER 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-03\SS-02 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD REINFORCEMENT DETAILS OF SUPERSTRUCTURE FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD BRIDGE AT CH: KM13+103
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
SCHEDULE OF REINFORCEMENT
BAR BAR SHAPE REMARKS
DESCRIPTION
MKD.
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: RAJU
SEPTEMBER 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-03\SS-03 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD REINFORCEMENT DETAILS OF SUPERSTRUCTURE FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD BRIDGE AT CH: KM13+103
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
SECTION A - A
SECTION THROUGH APPROACH SLAB FOR BRIDGE
DETAIL-Y
SCHEDULE OF REINFORCEMENT
BAR BAR
DESCRIPTION REMARKS
MKD. SHAPE
at1 Y12 @ 150 c/c
at2 Y12 @ 150 c/c
ab1 Y12 @ 150 c/c
ab2 Y12 @ 150 c/c
as1 Y16 - 6 nos. EACH SIDE
as2 Y16 - 1 nos. EACH SIDE
br8 Y16 @ 150 c/c
DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: DURBA
SEPTEMBER 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-03\MISC-02 REV. R1
NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD TYPICAL DETAILS OF APPROACH SLAB FOR SCALE:
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD KUWATINI BRIDGE KM 13+103
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 2410 2019 REVISED AS PER UNRA RAJU LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
LETTER No.SRVCS/SRVCS/15/16/00090
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3