CLIENT: ADANI
Chainage (RM) Embankment for Carraige Way only
Cleaning & GSB for Carriage WMM for BM for Carriage BC for Carriage Road Marking with
SL NO Carriage Way & installtion of Sign
From To Grubbing 1st layer 2nd layer 3rd layer 4th layer Way & Shoulder Shoulder Way only Way only Boards
NOTE: The above work programme subjected to clear the Land or area of Internal Road & as depend upon weather conditions.
The C/Line of Road with co ordinates must be provided to us on or before 20.01.2021 to start the excustion the Job.