You are on page 1of 3

SECTION 15

125 VDC BATTERY CHARGER INSPECTION


FIELD INSPECTION AND TEST REPORT

BATTERY CHARGER

Plant : . Customer : .
Location : . Project : .
Unit : . Device No : .
Panel : . Feeder : .

TECHANICAL DATA

Manufacture : .
Type : .
Serial No : .
DC Output voltage : .
DC Output current : .
AC Input voltage : .
AC Input current : .
Mfg Date : .

GENERAL INSPECTION Checked


1. Verify the charger ventilation system is operable ☐
2. Inspection of physical and mechanical condition ☐
3. Inspection of Ground connection ☐
4. Check cabling and terminal fastened properly ☐
5. Check for lamp test and lamp reset function ☐
6. All alarm indications are correctly operating ☐
7. Inspection for capacitors and resistors ☐
8. Inspection and clean ventilation air filter ☐
9. Verify the unit is clean ☐

SYSTEM FUNCTION CHECK


1. System Measurement
1.1 Measured input Voltage by multimeter.
Voltage : L - N = .

1.2 Measured ripple voltage(No-Load) by multimeter.


Voltage : P - N = .

1.3 Measured output voltage by multimeter.

Select Mode
Measurement condition
Float Boost
Battery voltage ( Vdc )
Lode voltage ( Vdc )
Test Instrument:

Tested by Reviewed by Witnessed by

Date Date Date


INSULATION RESISTANCE MEASUREMENT

Test connection Test voltage ( Vdc ) Insulation Resistance ( MΩ )

AC ( L+N – Gnd )
DC ( P+N – Gnd )
Test Instrument:

Comment: .
.
.
.
.

Tested by Reviewed by Witnessed by

Date Date Date