Agency - Any Project Director - Any: Measurement Book
Agency - Any Project Director - Any: Measurement Book
EarthWork Reinforcement
DATE
S.NO. Total Used
upto
Type TOTAL Type Dia (mm) weight on Weight
site (kg)
1 EXCAVATION STEEL 8
2 STEEL 10
3 FILLING STEEL 12
4 STEEL 16
5 DEMOLITION STEEL 20
6 STEEL 25
7 STEEL 32
0.00
SUREMENT BOOK
CONTRACTOR - Any
Formwork
ent Concrete BRICK WORK
(Shuttering)
M25
0.00
EarthWork
Excavation for
1 12/7/2017 west stair Wing Wall PCC Excavation 1 40.50 4.50
Excavation 2 9.16 4.50
Filling 1 35.39 11.26
west side below
2 2nd Row of Column level Excavation 10 1.50 1.50
2 12/12/2016 Noth Side Near temple Demolition Stair Demolition 1 9.00 2.00
Demolition
Floor Demolition 1 23.50 3.00
2.00 364.50
2.50 206.10
Excavation (m3) 636.98
3.80 1514.27
0.35 7.88
1.50 27.00
Filling (m3)
10 mm 0.00 0.00
12 mm 0.00 0.00
16 mm 0.00 0.00
20 mm 2.00 4.94
25 mm 0.00 0.00
32 mm 0.00 0.00
Side in
S.NO. Date Detail Type Type Nos Length
Each
1 Example Column 5L 1 1 4 0.60
Net Total
(m2) = Ft2 =
4.80 51.64032
Height/
Total (m2)
Depth
2.00 4.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CONCRETE
Total
Total PCC
Height M25/M2 M25/M20 (m3) = 0.32
(m3)
0 (m3)
PCC (m3) =
0.90 0.32 0.32
0.90 0.32 Total 0.65
BRICK WORK
S.No. Description Type Nos Length Width Height Total (m3)