CALCULATION SUMMARY

Project Name : Santa Cruz 2 Project Location: Sótano 1

Drawing No. : City: Lima, Peru

Design Areas
Design Area Calc. Mode Occupancy Area of Total Water Pressure @ Min. Min. Min. Calculated Hose Margin To
Name (Model) Application Source Density Pressure Flow Heads Streams Source

(ft²) (gpm) (psi) (gpm/ft²) (psi) (gpm) # (gpm) (psi)

DesignArea_2 Demand (HW) 2304 895.4 161.1 0.254 33.7 65 9 250 5.2

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Sótano1.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 1
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : Santa Cruz 2

Contract No. : City: Lima, Peru

Project Location: Sótano 1 Date: 20/05/2019

Contractor Information
Name of Contractor: Engineering Services SAC

Address: Av. República de Panamá 4575 Oficina 803 - Surquillo City: Lima, Perú

E-mail: www.essac.com.pe
Phone Number: 445-8215

Name of Designer: H. Dávila

Authority Having Jurisdiction: CGBVP


Design
Remote Area Name DesignArea_2

Remote Area Location

Occupancy Classification

Density (gpm/ft²) 0.254

Area of Application (ft²) 2304

Coverage per Sprinkler (ft²) 256

Number of Calculated Sprinklers 9

In-Rack Demand (gpm) 0

Special Heads

Hose Streams (gpm) 250

Total Water Required (incl. Hose Streams) (gpm) 895.4

Required Pressure at Source (psi) 155.9

Type of System Wet

Volume - Entire System (gal) 398.4 gal

Water Supply Information


Date 20/05/2019

Location

Source W1

Notes

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Sótano1.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 2
Job : Santa Cruz 2 Node Labels: Off
Pipe Labels: Off

Diagram for Design Area : DesignArea_2

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Sótano1.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 3
Job : Santa Cruz 2

Hydraulic Analysis for : DesignArea_2


Calculation Info
Calculation Mode Demand
Hydraulic Model Hazen-Williams
Fluid Name Water @ 60F (15.6C)
Fluid Weight, (lb/ft³) N/A for Hazen-Williams calculation.
Fluid Dynamic Viscosity, (lb·s/ft²) N/A for Hazen-Williams calculation.

Water Supply Parameters

Supply 1 : W1 Flow (gpm) Pressure (psi)


0 213
750 175
1125 135

Hoses
Inside Hose Flow / Standpipe Demand (gpm) 250

Outside Hose Flow (gpm) 0

Additional Outside Hose Flow (gpm)

Other (custom defined) Hose Flow (gpm) 0

Total Hose Flow (gpm) 250

Sprinklers
Ovehead Sprinkler Flow (gpm) 645.4

InRack Sprinkler Flow (gpm) 0

Other (custom defined) Sprinkler Flow (gpm) 0

Total Sprinkler Flow (gpm) 645.4

Other
Required Margin of Safety (psi) 0

W1 - Pressure (psi) 155.9

W1 - Flow (gpm) 895.4

Demand w/o System Pump(s) N/A

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Sótano1.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 4
Job : Santa Cruz 2

Hydraulic Analysis for : DesignArea_2

System Demand

240

220 S1

200

S2
180

D2
160

S3
Pressure, psi

140
125.387

120

100

80

60

40

D1
20

0
0 400 500 600 700 800 900 1000 1100 1200
Flow, gpm

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Sótano1.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 5
Job : Santa Cruz 2

Hydraulic Analysis for : DesignArea_2

Graph Labels
Values
Label Description
Flow (gpm) Pressure (psi)
S1 Supply point #1 - Static 0 213
S2 Supply point #2 750 175
S3 Supply point #3 1125 135
D1 Elevation Pressure 0 18.9
D2 System Demand 895.4 155.9

Curve Intersections & Safety Margins


Intersection Safety Margin
Curve Name
Pressure (psi) Flow (gpm) Pressure (psi) @ Flow (gpm)
Supply 159.7 908.7 5.2 895.4

Open Heads
Required Calculated
Head Ref. Head Type Coverage K-Factor
Density Flow Pressure Density Flow Pressure

(ft²) (gpm/psi½) (gpm/ft²) (gpm) (psi) (gpm/ft²) (gpm) (psi)

Overhead
393 256 11.2 0.254 76.8 33.7 0.295 75.6 45.6
Sprinkler

Overhead
394 256 11.2 0.254 76.8 33.7 0.293 74.9 44.7
Sprinkler

Overhead
397 256 11.2 0.254 76.8 33.7 0.288 73.8 43.4
Sprinkler

Overhead
400 256 11.2 0.254 76.8 33.7 0.266 68 36.9
Sprinkler

Overhead
401 256 11.2 0.254 76.8 33.7 0.254 65 33.7
Sprinkler

Overhead
402 256 11.2 0.254 76.8 33.7 0.284 72.7 42.1
Sprinkler

Overhead
403 256 11.2 0.254 76.8 33.7 0.301 77.1 47.4
Sprinkler

Overhead
404 256 11.2 0.254 76.8 33.7 0.276 70.7 39.9
Sprinkler

Overhead
405 256 11.2 0.254 76.8 33.7 0.264 67.5 36.3
Sprinkler

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Sótano1.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 6
Job name: Santa Cruz 2 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
401 -4.13 11.2 65 32 1x(us.90)=3 0.66 120 33.7
108 -4.79 65 1.38 3 0.3027 0.3
3.66 1.1
108 -4.79 0 32 1x(us.90)=3 1.97 120 35.1
107 -4.79 65 1.38 3 0.3027 0
4.97 1.5
107 -4.79 0 32 14.46 120 36.6
105 -4.79 65 1.38 0 0.3027 0
14.46 4.4
105 -4.79 68 40 10.67 120 41
104 -4.79 133 1.61 0 0.538 0
10.67 5.7
104 -4.79 72.7 50 1x(us.Tee-Br)=10 4.4 120 46.7
090 -4.79 205.7 2.067 10 0.3572 0
14.4 5.1
090 -4.79 224.3 80 19.65 120 51.9
089 -4.79 430 3.26 0 0.1522 0
19.65 3
089 -4.79 215.3 80 23.16 120 54.8
073 -4.79 645.4 3.26 0 0.3228 0
23.16 7.5
073 -4.79 -219.3 80 1x(us.45)=4.03 17.75 120 62.3
075 -4.79 426.1 3.26 4.03 0.1496 0
21.78 3.3
075 -4.79 0 80 1x(us.Tee-Br)=20.16 25.12 120 65.6
019 -4.79 426.1 3.26 20.16 0.1496 0
45.28 6.8
019 -4.79 0 80 1x(us.90)=9.41 112.15 120 72.4
029 -4.79 426.1 3.26 9.41 0.1496 0
121.55 18.2
029 -4.79 0 80 1x(us.90)=9.41 2.3 120 90.5
030 -2.49 426.1 3.26 9.41 0.1496 -1
11.7 1.8
030 -2.49 0 80 1x(us.Tee-Br)=20.16 61.41 120 91.3
035 -2.49 426.1 3.26 20.16 0.1496 0
81.57 12.2
035 -2.49 0 80 1x(us.Tee-Br)=20.16 6.36 120 103.5
050 -2.49 426.1 3.26 20.16 0.1496 0
26.52 4
050 -2.49 469.3 100 1x(us.45)=5.27 13.88 120 107.5
204 -2.49 895.4 4.26 5.27 0.1608 0
19.14 3.1
204 -2.49 0 100 1x(us.45)=5.27 5.16 120 110.5
205 -2.49 895.4 4.26 5.27 0.1608 0
10.43 1.7
205 -2.49 0 100 1x(us.90)=13.17 1.31 120 112.2
206 -2.49 895.4 4.26 13.17 0.1608 0
14.48 2.3
206 -2.49 0 100 1x(us.90)=13.17 0.66 120 114.6
207 -2.49 895.4 4.26 13.17 0.1608 0
13.82 2.2
207 -2.49 0 100 1x(us.90)=13.17 7.9 120 116.8
208 -7.09 895.4 4.26 13.17 0.1608 2
21.07 3.4
208 -7.09 0 100 1x(us.90)=13.17 0.66 120 122.2
209 -7.09 895.4 4.26 13.17 0.1608 0
13.82 2.2

© 2006 National Fire Protection Association Page 7


Job name: Santa Cruz 2 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
209 -7.09 0 100 1x(us.90)=13.17 3.55 120 124.4
210 -7.09 895.4 4.26 13.17 0.1608 0
16.71 2.7
210 -7.09 0 100 1x(us.90)=13.17 5.5 120 127.1
211 -7.09 895.4 4.26 13.17 0.1608 0
18.67 3
211 -7.09 0 100 1x(us.90)=13.17 0.65 120 130.1
212 -7.09 895.4 4.26 13.17 0.1608 0
13.82 2.2
212 -7.09 0 150 1x(us.90)=17.6 30 120 132.3
213 -37.09 895.4 6.357 17.6 0.0229 13
47.6 1.1
213 -37.09 0 150 1x(us.90)=17.6 3.28 120 146.4
214 -37.09 895.4 6.357 17.6 0.0229 0
20.88 0.5
214 -37.09 0 150 1x(us.90)=17.6 0.88 120 146.9
215 -37.09 895.4 6.357 17.6 0.0229 0
18.48 0.4
215 -37.09 0 150 1x(us.90)=17.6 9.45 120 147.3
216 -41.68 895.4 6.357 17.6 0.0229 2
27.05 0.6
216 -41.68 0 150 1x(us.90)=17.6 1.09 120 149.9
217 -41.68 895.4 6.357 17.6 0.0229 0
18.69 0.4
217 -41.68 0 150 1x(us.90)=17.6 3.19 120 150.3
218 -41.68 895.4 6.357 17.6 0.0229 0
20.79 0.5
218 -41.68 0 150 1x(us.90)=17.6 11.95 120 150.8
219 -41.68 895.4 6.357 17.6 0.0229 0
29.56 0.7
219 -41.68 0 150 1x(us.90)=17.6 8.65 120 151.5
226 -41.68 895.4 6.357 17.6 0.0229 0
26.25 0.6
226 -41.68 0 150 1x(us.90)=17.6 8.15 120 152.1
227 -41.68 895.4 6.357 17.6 0.0229 0
25.75 0.6
227 -41.68 0 150 1x(us.90)=17.6 6.06 120 152.7
228 -47.74 895.4 6.357 17.6 0.0229 2.6
23.66 0.5
228 -47.74 0 150 5.04 120 155.8
W1 -47.74 895.4 6.357 0 0.0229 0
5.04 0.1
405 -4.13 11.2 67.5 32 1x(us.90)=3 0.66 120 36.3
112 -4.79 67.5 1.38 3 0.3246 0.3
3.66 1.2
112 -4.79 0 32 14.46 120 37.8
111 -4.79 67.5 1.38 0 0.3246 0
14.46 4.7
111 -4.79 70.7 40 13.76 120 42.5
110 -4.79 138.2 1.61 0 0.5776 0
13.76 7.9
110 -4.79 77.1 50 1x(us.Tee-Br)=10 1.31 120 50.4
089 -4.79 215.3 2.067 10 0.3888 0
11.31 4.4
400 -4.13 11.2 68 32 1x(us.90)=3 0.66 120 36.9
106 -4.79 68 1.38 3 0.3289 0.3
3.66 1.2

© 2006 National Fire Protection Association Page 8


Job name: Santa Cruz 2 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
106 -4.79 0 32 1x(us.Tee-Br)=6 1.97 120 38.4
105 -4.79 68 1.38 6 0.3289 0
7.97 2.6
404 -4.13 11.2 70.7 32 1x(us.Tee-Br)=6 0.66 120 39.9
111 -4.79 70.7 1.38 6 0.3537 0.3
6.66 2.4
402 -4.13 11.2 72.7 32 1x(us.90)=3 0.66 120 42.1
109 -4.79 72.7 1.38 3 0.372 0.3
3.66 1.4
109 -4.79 0 32 1x(us.Tee-Br)=6 1.97 120 43.7
104 -4.79 72.7 1.38 6 0.372 0
7.97 3
397 -4.13 11.2 73.8 32 1x(us.90)=3 0.66 120 43.4
099 -4.79 73.8 1.38 3 0.3829 0.3
3.66 1.4
099 -4.79 0 32 5.27 120 45.1
095 -4.79 73.8 1.38 0 0.3829 0
5.27 2
095 -4.79 0 50 9.19 120 47.1
094 -4.79 73.8 2.067 0 0.0535 0
9.19 0.5
094 -4.79 74.9 65 10.67 120 47.6
092 -4.79 148.7 2.469 0 0.0824 0
10.67 0.9
092 -4.79 75.6 65 1x(us.Tee-Br)=12 4.4 120 48.5
091 -4.79 224.3 2.469 12 0.1765 0
16.4 2.9
091 -4.79 0 80 9.82 120 51.4
090 -4.79 224.3 3.26 0 0.0456 0
9.82 0.4
394 -4.13 11.2 74.9 32 1x(us.Tee-Br)=6 0.66 120 44.7
094 -4.79 74.9 1.38 6 0.3935 0.3
6.66 2.6
393 -4.13 11.2 75.6 32 1x(us.Tee-Br)=6 0.66 120 45.6
092 -4.79 75.6 1.38 6 0.4002 0.3
6.66 2.7
403 -4.13 11.2 77.1 32 1x(us.Tee-Br)=6 0.66 120 47.4
110 -4.79 77.1 1.38 6 0.4152 0.3
6.66 2.8
his1 -10.33 250 65 1x(us.90)=8.24 0.66 120 61.3
118 -10.33 250 2.635 8.24 0.1571 0
8.89 1.4
118 -10.33 0 80 1x(us.90)=9.41 5.54 120 62.7
117 -4.79 250 3.26 9.41 0.0557 -2.4
14.95 0.8
117 -4.79 0 80 1x(us.90)=9.41 1.31 120 61.1
116 -4.79 250 3.26 9.41 0.0557 0
10.72 0.6
116 -4.79 0 80 1x(us.Tee-Br)=20.16 8.73 120 61.7
072 -4.79 250 3.26 20.16 0.0557 0
28.89 1.6
072 -4.79 219.3 80 1x(us.90)=9.41 97.8 120 63.3
065 -4.79 469.3 3.26 9.41 0.1789 0
107.21 19.2
065 -4.79 0 80 1x(us.90)=9.41 2.3 120 82.5
064 -2.49 469.3 3.26 9.41 0.1789 -1
11.7 2.1

© 2006 National Fire Protection Association Page 9


Job name: Santa Cruz 2 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
064 -2.49 0 80 1x(us.Tee-Br)=20.16 61.41 120 83.6
055 -2.49 469.3 3.26 20.16 0.1789 0
81.57 14.6
055 -2.49 0 80 1x(us.Tee-Br)=20.16 31.78 120 98.2
050 -2.49 469.3 3.26 20.16 0.1789 0
51.94 9.3
073 -4.79 0 80 1x(us.Tee-Br)=20.16 2.28 120 62.3
072 -4.79 219.3 3.26 20.16 0.0437 0
22.44 1

* Discharge shown for flowing nodes only