Bio Gas Treatment Plant

Planning Designing Construction Engineering Installation Testing and Training Maintenance

Periodic Inspection of the


Project Plan Fixed Dome design Engineering Drawings Pre Treatment Unit Sensors Test equipments plant
requirements

Safety Measures
Budgeting Piping and Values Trail run result
underground tanks Construction materials Intake Works
design

Biogas Storage Emergency Protocols


Location Selection
Skilled labours and Pumping Feedback
Sensors Location Foundation work

Approval from city Slurry Disposal Cleaning services


counsil/Government Raw Waste Storage
areas Inspection of materials

Electrical controls Waste disposal


Slurry Tank
Inventory Management

Mixing Tank