You are on page 1of 1

Aquatherm Standard Pressure Test Submission Form (All fields are required)

Primary Tester: Test Details:


Aquatherm Installer Number: Test Start Time:
Email: Test End Time:
Signature: Test Date:

Additional Installer Numbers: Installation Details:


System Operating Pressure:
System Operating Temperature:
Is there Copper In the System:
Does System Contain a
Dom. Hot Water Recirc. line?

Preliminary Test:
Contractor License Number: Preliminary Test Pressure:
Company Name: Pressure after 30 minutes:
Company Telephone: Preliminary Test Passed:

Building Details: Principal Test:


Building Name: Principal Test Pressure:
Street Address: Time Elapsed:
City: Pressure after:
State/Province: End Time:
Zip/Postal Zone: Test Date:
Buidling Owner/Manager: Principle Test Passed:

Installation Description: Final Test:*


Project Name: Final Test Pressure:
Project Type: First Cycle Completed:
Stories/Floors in Building: Second Cycle Completed:
Applications: Third Cycle Completed:
Fourth Cycle Completed:
*Depressurrize the pipe between each cycle.

Systems Tested: Aquatherm pipe must be fused by qualified installers only.


Aquatherm SDR 11 Blue Pipe: Observe all information regarding test pressure and
Aquatherm SDR 17.6 Blue Pipe: safety procedures as noted in the Aquatherm Pressure
Aquatherm SDR 7.4 Green Pipe: Testing Procedure before and during this testing.
Aquatherm SDR 11 Green Pipe:
Aquatherm SDR 9 Blue Pipe: Test should be submitted online at:
Aquatherm SDR 11 Lilac Pipe: http://www.aquatherm.com/pressure-test-submission
Aquatherm SDR 7.4 Red Pipe:

You might also like