Professional Documents
Culture Documents
for 48' and 54' [14 630 and 16 459 mm] Diameter
Commercial Grain Bins
A Supplement to
MCB1604, BROCK® Commercial Grain Bin Construction Manual (Narrow Corrugation)
MCB1605, BROCK® Commercial Grain Bin Construction Manual (Wide Corrugation), and
MCB1945, BROCK® Farm Grain Bin Construction Manual (Narrow Corrugation)
General
NOTE: The original, authoritative version of this Manual is the [English] version produced by CTB, Inc. or any of its subsidiaries or
divisions, (hereafter collectively referred to as "CTB"). Subsequent changes to any Manual made by any third party have not been reviewed
nor authenticated by CTB. Such changes may include, but are not limited to, translation into languages other than [English], and additions
to or deletions from the original content. CTB disclaims responsibility for any and all damages, injuries, Warranty claims and/or any other
claims associated with such changes, inasmuch as such changes result in content that is different from the authoritative CTB-published
[English] version of the Manual. For current product installation and operation information, please contact the Customer Service and/or
Technical Service Departments of the appropriate CTB subsidiary or division. Should you observe any questionable content in any Manual,
please notify CTB immediately in writing to: CTB Legal Department, P.O. Box 2000, Milford, IN 46542-2000 USA.
This symbol is used throughout this Manual to identify particular stages where the Grain Bin Contractor and/or Operator
need to take special note and precautions regarding the danger described in these Instructions. Please read all the
SAFETY information and the instructions completely prior to beginning the construction.
Support Information
BROCK® products are designed for grains and/or free flowing materials. Using this equipment for any other
purpose or in a way not within the operating recommendations specified in this Manual will void the
Warranty and may cause injury or death. This Manual is designed to provide comprehensive planning and
construction information for this BROCK® product. The Table of Contents provides a convenient overview of
the information in this manual.
Dealers: Please provide the Customer with the information to complete the easy reference below.
Dealer or Customer: Complete the following information about your BROCK® product. Store this Manual in a
safe, dry place for future reference.
2 MCB1484i
Contents
Topic Page User
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Remember! Think SAFETY First • Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Distributor and Installer Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
DANGER of Suffocation/SAFETY Near Moving Equipment . . . . . . . . . . . . . . . . . . . . . . . . . 4
About This Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Identification of Parts and Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Planning Before Your Bin Arrives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Choose The Bin Site • Check Delivery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Tools and Equipment Needed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Adequate Center Support • Allowable Peak Load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Roof Loads and Temperature Cable Support Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Venting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Planning and Placement of Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Top Body Sheet Ring/Tier and Top Stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
Marking the Circle for Body Sheet Placement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Roof Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-11
Roof Anchor Bracket . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-13
Rafter Set Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Compression Ring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Rafter Sets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
48' [14 630] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
54' [‘6 459] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Lower-to-Middle Rafter Connection • Middle-to-Upper Rafter Connection. . . . . . . . . . . 17
Upper Rafter-to-Compression Ring (Bracket) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Lower Rafter-to-Stiffener Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Rafter Bracing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
X-Braces and Tie Braces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Wind Rings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Roof Sheeting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Assembly Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Keep the Structure Level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Walk Ring and Stiffener Rings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24-25
Brackets • Tubing • Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Roof Ladder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Ladder Rungs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26-27
Roof Ladder Handrail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27-28
Flat Top Roof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
48' [14 630] Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
54' [16 459] Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Roof Top Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Transition Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Guard Rail Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33-34
Roof Flashing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Manhole. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36-37
Removal of Center Support. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Parts Listing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
MCB1484i 3
General BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
SAFETY
Outside Inside
4 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] About This Manual
IMPORTANT! Read ALL instructions carefully, including the Base Manual, before
starting construction. Your Base Manual will be listed on the front cover
of this Manual.
IMPORTANT! Pay particular attention to all SAFETY information in the Base Manual
and on Page 6 of this Manual.
• Metric measurements are shown in millimeters and in square brackets and italic,
unless otherwise specified, and will follow the English measurement. " equals
inches and ’ equals feet in English measurements.
Example: 15' [4 572] 24' [7 315]
• "Horizontal” (—) and “Vertical” (|), “bottom” and “top,” in the instructions refer
to the bin as it is standing.
• Optional equipment contains necessary instructions for assembly or operation.
• Major changes from the last printing will be listed on the back cover of this Manual.
• This Planning Symbol is used in areas where planning needs to take place before
construction continues on your particular installation.
1
4 PARTS
5
2 4
HARDWARE/
1 * 3
CONNECTION
Item Description
1 Transition Ladder Rung
2 Dimension (length)
3 Hex Head Bin Seal Bolt
Figure 2. Parts and Hardware Identification 4 Grade 8.2 Markings
5 Hex Nut
MCB1484i 5
Planning Before Your Bin Arrives BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
The Roof Sub-Structure is assembled on the concrete pad. The Compression Ring is
lifted onto the Center Support. Rafters are then lifted and attached to the
Compression Ring and top Body Sheet Ring.
Check Delivery
Your Grain Bin Roof is made up of many parts and checked carefully at the time of shipment.
However, use the packing slip and check your shipment on arrival to be sure it is complete.
IMPORTANT! How to control “Wet Storage Stain” (RUST!) on galvanized Body
Sheets... Do not permit moisture from weather, condensation, or other
sources to remain between Body Sheets. If moisture is present,
separate Body Sheets IMMEDIATELY for good air circulation. Where
possible, store sheets in a warm, dry place. If this is not done, white/red
rust will appear.
Tools and Equipment Needed
7/16 - 1'' [11.1 - 25.5] Box End Wrenches
Adjustable Wrenches up to 1 1/2'' [38] - for use on adjustable expanders
Drill with a 3/8'' [9.5] bit
12'' [305] Long Drift Punches
Hammer
Screwdriver
Speed Wrench and Sockets
Impact Wrench and Sockets
Lifting Jacks
Lifting Brackets
Protective gloves and eyewear
Nail aprons are useful for holding a supply of bolts and nuts during assembly.
IMPORTANT! Hard hats must be worn during construction.
IMPORTANT! No Hardware substitutions are permitted unless noted.
IMPORTANT! The number of lifting jacks and brackets required is determined by factors
such as bin size, soil compaction, wind velocity, design of jacks, etc.
A 3/8'' Grade 8.2 Bin Seal Bolt has an approximate safe load of 2,650 lbs. [1 202 kg].
Keep this in mind for the number of Bolts you use to lift Grain Bins during assembly.
A 5/16'' Grade 8.2 Bin Seal Bolt has an approximate safe load of 1,840 lbs. [835 kg].
Keep this in mind for the number of Bolts you use to lift the Grain Bin during assembly.
Bolt Installation
CAUTION! All Hardware should be tightened from the NUT side. Bin Seal Bolts
MUST be tightened from the Nut side. Failure to do so can damage the
sealing Washer and cause leaks.
Tighten 5/16'' Nuts to 15-20 ft-lb of torque.
Tighten 3/8'' Nuts to 25-30 ft-lb of torque..
Tighten 1/2'' Nuts to 45-50 ft-lb of torque.
6 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Planning Before Your Bin Arrives
1*
2
5 3 4
Item Description
1 1 6' - 4'' [1 937]
2 5' [1 524]
3 3 Compression Ring
30°
2
Figure 4. Peak Load
load. Temperature Cables are optional on the 48' and 54' Bin and require a
Temperature Cable Kit (9-51316 and 9-38597). The Kit contains additional Rafters,
which must be installed between a pair of standard Rafters at the same time the entire
sub-structure is being installed.
MCB1484i 7
Planning Before Your Bin Arrives BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Venting
A BROCK® “Mushroom” Roof Vent provides 1.25 sq. ft. [.116 m ] of opening. 2
See Figure 5.
A BROCK® “Elbow” Vent provides 1.33 sq. ft. [.124 m ] of opening. See Figure 6.
2
CAUTION! For a Vacuum System, venting must be added at the rate of 1 sq. ft [.093
m ] of vent per 1000 cfm of air.
2
For a Pressure System, venting must be added at the rate of 1 sq. ft.
[093 m ] of vent per 2000 cfm of air.
2
Roof Vents should be installed as high up on the Panels as possible for best venting
results. Vents should be installed before assembling Roof Sheets. Vents require
field-cutting a hole in the Roof Sheet before installation.
IMPORTANT! Avoid cutting vent holes in the Stiffener Ring placement area of the
Roof Panel.
See the charts on Pages 24 and 25 for Stiffener Ring placement and avoid this area.
Installation instructions are also packed with the Vents in the BROCK® Vent
Instruction MGB1359.
Figure 7.
Avoid Vent Placement at Stiffener Ring:
(This example resulted in both dent damage to the Vent and installation
difficulty at a Ring/Expander location.)
8 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Top Body Sheet Ring/Tier and Top Stiffeners
Item Description
1 Rafter
2 Ladder
2 3 Stiffener
4 Door
4
3
Figure 8. Outside Ladder with Outside Stiffeners
The Body Sheet Radius of the 48' bin is 23' - 10 1/2'' [7 277].
The Body Sheet Radius of the 54' bin is 26' - 10 1/4'' [8 816].
Assemble the Top Body Sheet ring/tier and Top Stiffeners according to instructions
in your Base Construction Manual.
Then return to this Manual.
MCB1484i 9
Roof Overview BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Roof Overview
1 2
3
4
10
9 8
11
Item Description
1 Compression Ring. See Page 14.
2 Upper Rafter. See Pages 14-16.
3 Middle Rafter See Pages 14-16.
4 Lower Rafter See Pages 14-16.
5 Wind Ring. See Page 21.
6 Tie Brace. SeePage 20
7 X-Braces. See Page 20.
8 Tension Strap, See Pages 18 and 20.
9 Top Stiffener. See Pages 9 and 14.
10 Compression Ring Bracket. See Page 17.
11 Roof Anchor Bracket. See Pages 12-13.
10 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Roof Overview
13 14
12
11 15
10
2
8
3
4
Item Description 6 5
1 Standard Roof Panel. See Pages 22-23. 7
2 Top Body Sheet Ring. See Pages 12-13.
3 Top OS Stiffener. See Pages 9 and 14.
4 Roof Manhole Panel. See Page 30.
5 Manhole Opening. See Page 31.
6 Roof Ladder Panel. See Page 26.
7 Roof Ladder Rung. See Pages 26 and 27.
8 Roof Anchor Bracket. See Pages 12-13.
9 Stiffener Ring. See Pages 24-25.
10 Walk Ring. See Pages 24-25.
11 Transition Panel. See Pages 32-34.
12 Guardrail. See Pages 35-36.
13 Roof Top Panel. See Pages 32-33.
14 Fillhole location. See Page 33.
15 Roof Flashing. See Page 37.
MCB1484i 11
Roof Anchor Bracket BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
.
Use the top hole of the Roof Anchor Bracket, as the Roof must be in the “down” position.
5 6
5 6
7
12 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Roof Anchor Bracket
10 12 8
13
1 12
13
1 10
11
13
12
3 10
10
10
11 Detail A Detail A
7 8
3
4
Detail B
5
Item Part No. Description 3 8
Top Body Sheet Detail B
1
(3-Stiffener)
Top Body Sheet 1
2
(2-Stiffener)
3 9-12865 Roof Anchor Bracket
4 28 1/8'' [714]
5 Rafter location 3 Stiffeners per Body Sheet
6 Vertical Seam 9
7 16 3/4'' [425] 5
8
8 9-23848 Mid Roof Clip 3
9 56 1/4'' [1 429]
10 39-20073 Bin Seal Bolt 5/16 x 1"
11 39-20152 Flange Nut 5/16" 2
12 39-20020 Hex Nut 5/16"
13 39-20101 5/16'' x 1 1/4'' Flat Washer
MCB1484i 13
Rafter Set Assembly BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
12
4
5
2
Item Description
1 Upper Rafter
2 Middle Rafter
3 Lower Rafter
SIDE VIEW 4 Compression Ring Bracket
5 Compression Ring
6 Rafter Attachment Stiffener
7 Roof Anchor Bracket
7 11 9 See Figures 10-12
3 8 Tension Strap/Slot
9 Wind Ring hole
Figure 13 . Rafter Assembly Overview
10 Top Body Sheet
8 11 Roof Rib
12 See Figures 15 and 16.
6
Compression Ring
Assemble the four (4) Web Channels in the Compression Ring as shown in
Figure 14. Use 1/2 x 1 1/2'' Bin Seal Bolts (Item 5, 39-40991), 1/2'' Flat
Washers (Item 6, 39-20211) and 1/2'' Hex Nuts (Item 7, 39-20022).
The Compression Ring is in one piece with center Web Channels
10 assembled flush with top side of Compression Ring.
3
5
Item Description
1 Compression Ring 6
2 Web Channel 2
7
3 60'' [1 524] I.D.
4 24'' [610]
5 Bolt, Bin Seal 1/2 x 1 1/2'' 4
6 Washer, 1/2 x 1''
7 Nut, 1/2'' Hex
1
Figure 14. 48' and 54' Compression Ring Assembly
14 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Rafter Set Assembly
1
3 6
TOP VIEW
*
2
*
4
* *
*
5
*
1C
1B
1A
SIDE VIEW
Item Description
Rafter Set
1A Lower Rafter
Figure 15. 1B Middle Rafter
48' [14 630] Dia. Rafter Set Assembly 1C Upper Rafter
2 Compression Ring
3 X-Brace
4 Tie Brace
5 Tension Strap
6 Wind Ring
MCB1484i 15
Rafter Set Assembly BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
3
6 1
TOP VIEW
* 2
* *
*
*
5
1C
1B
1A Item Description
SIDE VIEW Rafter Set
1A Lower Rafter
1B Middle Rafter
Figure 16. 1C Upper Rafter
54' [16 459] Dia. Rafter Set Assembly 2 Compression Ring
3 X-Brace
4 Tie Brace
5 Tension Strap
6 Wind Ring
16 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Rafter Set Assembly
5/16'' Flat Washers are used only on the Middle Rafter (to shim the Nut to the same
height as the Upper and Lower Rafter).
5
4
4
6
7
3
MCB1484i 17
Rafter Set Assembly BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Lift and attach the upper end of the Upper Rafter/Compression Ring Bracket to the
Compression Ring using (2) 1/2'' x 1'' Hex Head Gr. 8 Bolts and 1/2'' Hex Nuts. See
Figures 18 and 19.
4
5
1
Figure 19.
Top Rafter-to-Compression Ring Attachment
2
6
7 6
UNDERSIDE VIEW
7
8
1
Leave the two (2) Bracket-to-Compression Ring Bolts loose until the Roof Panels are on.
18 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Rafter Set Assembly
3 9
3
6
6
7
8
9
7
8
TOP VIEWS
INSIDE VIEW
*
7 * 3
**
SIDE VIEW
8
** 9
6
Item Description
1 Upper Rafter
2 Middle Rafter
3 Lower Rafter
4 Compression Ring Bracket
5 Compression Ring
6 Rafter Attachment Stiffener
7 Roof Anchor Bracket
8 Tension Strap
9 Top Body Sheet
* notch in Lower Rafter
** Tension Strap slot
Figure 21. Lower Rafter-to-Stiffener Attachment
MCB1484i 19
Rafter Bracing BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Rafter Bracing
Connect the X-Braces (Items 8 and 9) to the Upper Rafter just above the Middle
Rafter connection. Use 5/16'' Hex Head Bolts and 5/16'' Hex Nuts.Connect the Tie
Braces (Item 7) to the Middle Rafter, above the Lower-Middle Rafter Connection.
Use the same hardware as with X-Braces.
1 8
7
1484-13 10/98
16 15 Item Description
1 Compression Ring
2
2 Upper Rafter
3 Middle Rafter
11 4 Lower Rafter
5 Stiffener
8 6 Tension Strap
7 Tie Brace
8 X-Braces
9 See Figure 21.
10 Wind Ring
13 11 See Figures 19 and 20.
3 16 15 Lower-to-Middle Rafter
12 connection. See Figure 17.
13 Middle-to-Upper Rafter
connection. See Figure 18.
14 5/16'' Hex Nut
10 15 5/16'' Hex Head Bolt
8
14
15
12
4 IMPORTANT!
After complete assembly of the
Rafters, Braces, and X-Braces,
MAKE SURE RAFTERS ARE
5 SQUARED UP by sighting across
6 Rafters from outside the Bin.
9
Figure 22. Rafter Bracing Overview (Underside)
20 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Rafter Bracing
Wind Rings
Wind Ring Tubes go under the Roof Panels in the holes at the Lower-to-Middle
Rafter Connection. See Figure 22 also.
As soon as four adjacent Rafters are installed, a Wind Ring Tube may be slid through
the holes in the Rafters.
3
4
2
1
5
3
SIDE VIEW
UNDERSIDE VIEW
Figure 23. Wind Ring Installation in Rafters Figure 24. Wind Ring Bracket
Installation to Rib between Rafters
Item Description
1 Lower Rafter
2 Middle Rafter
3 Wind Ring Tube
4 Wind Ring Bracket
5 Roof Panel
Slide one Wind Ring Bracket over the Wind Ring and between each Rafter at this
time. This Bracket attaches to the Rib halfway between the Rafters and Bolts into the
Rib using the Roof hardware. See Figure 24.
Slide a Wind Ring Clamp (438050) onto the end of the Wind Ring and tighten, using
the hardware shown in Figure 25. Install two Self-Drilling Screws, Key 7, (39-
20126) into each Clamp. The last piece of Wind Ring Tube may need to be field-cut
after all the Braces and Rafters are in.
5 3 4
1
2 7
4
1
7
4
6 3 6
Item Part No. Description Figure 25.
1 9-49779-XX Wind Ring Tube Wind Ring Clamp
2 438050 Tube Splicer/Clamp
3 39-20361 Square Washer
4 39-20058 5/16" Flat Washer
5 39-20114 3/8" Hex Nut
6 39-39747 3/8 x 2" Hex Head Bolt Gr. 8
7 39-20126 #10-16 Self-Drilling Screw
MCB1484i 21
Roof Sheeting BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Roof Sheeting
IMPORTANT! After complete assembly of the Rafters, Braces, and X-Braces, MAKE
SURE RAFTERS ARE SQUARED UP by sighting across Rafters from
outside the bin.
Assembly Overview
END VIEW
Begin Roof sheeting by choosing the Manhole Panel and Ladder/Handrail location.
Start left of the Manhole and go clockwise or left. Continue this process around the
grain bin, aligning holes with a drift punch and tightening the Bolts (from
underneath) in the ribs as you go, finishing with the Manhole Panel, both ribs on top.
Roof Ribs directly over a Rafter attach to the Bolt already installed, with a 5/16''
Weatherseal Washer and 5/16'' Hex Nut outside.
It may work better to install the two (2) Roof Panels that attach to each Rafter first,
then go around again, filling in the other two.
Adding Roof Ladder Rungs now will make Roof access easier.
At the lower end of the Roof Panel, use 5/16 x 1'' Bin Seal Bolts and Flange Nuts to
bolt the Roof Panel to the Roof Anchor Brackets.
22 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Roof Sheeting
The top two holes in the Rib do not get Bolts at this time. Transitions will bolt over
this hole later.
Continue adding Roof Panels, using 5/16'' x 1'' Hex Head Gr. 8 Bin Seal Bolts
outside and a 5/16'' Hex Nut on the inside.
IMPORTANT! Remember to install Vents in the Roof Panels before bolting Roof
Panels to the Roof Sub-Structure.
Install the Walk Ring and Stiffener Ring at this time as well. Refer to the
Planning notes on Page 9, and assembly instructions on Pages 24-25 in
this Manual.
Be sure to attach the Wind Ring Bracket to the Rib between Rafters.
6
4
7
2
END VIEW
Item Description
1 1 Roof Panel
2 Pipe Spacer
3 Rafter
4 5/16'' Hex Nut
3 5 Hex Head Gr. 5 Bolt 5/16 x 2''
6 5/16'' Weatherseal Washer
5/16'' Flat Washer
7
(Middle Rafter only)
MCB1484i 23
Walk Ring and Stiffener Rings BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Tubing
Tubing to assemble the Rings can be inserted into the Brackets as the Roof Panels are
being assembled, or the Tubing can be inserted later. See Figure 28.
Connections
Assemble Rings by slipping Tubing ends over Expanders and Joiners. Expanders and
Tube Splices are alternated between Tube connections.
Expanders are 6'' [152] long for Walk Rings and 8'' [203] for Stiffener Rings.
The Walk Ring uses five 6'' Expanders (9-14576) and five Tube Splices (9-12797).
The 48' Stiffener Ring uses eleven 8'' Expanders (9-12796) and twelve Tube (13)
Splices (9-12797).
The 54' Stiffener Ring uses twelve 8'' Expanders (9-12796) and thirteen Tube (13)
Splices (9-12797).
CAUTION! Never try to adjust the Expander Nuts beyond the staked area of 2" [51]
maximum between Nuts.
Nuts on Expanders MUST be together in the center of the Expander
during assembly of the Stiffener Ring.
When the roof assembly is complete, turn Nuts on the Expanders to tighten the
Stiffener Ring slightly.
1 1
4A
or
5 2
6 or 6
3 4B 7
2
1 END VIEW
OUTSIDE VIEW
2 6 7
SIDE VIEW
MCB1484i 25
Roof Ladder BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Roof Ladder
Ladder Rungs
The Outside Ladder (Item 1, Figure 31) is located under the Roof Ladder. Never
center Ladders over sidewall Stiffeners. The Inside Ladder is located under the
Manhole. Refer to your Ladder Manual Supplement.
IMPORTANT! Ladder Rungs attach to the Roof Panel LEFT of the Manhole. Do NOT
attach a Ladder Rung in the FOURTH hole down, where the Walk Ring
will be attached. Do NOT attach a Ladder Rung in the eleventh hole
down (48') or the twelfth hole down (54'), where the Stiffener Ring will
be attached.
The 48' [14 630] Roof Ladder made of a set of eleven (11) Rungs which are
packaged in a Roof Ladder Kit
The 54' [16 459] Roof Ladder is made of a set of thirteen (13) Rungs.
Rungs connect to the tops of Roof Ribs and decrease in length as they go toward the
top of the Roof.
The last two digits of the Rung Part Number denote the length of the Rung in inches.
48' Roof 54' Roof
Roof Length Ladder Roof Length
Rib Rung Part Rib
Hole in. mm No. Hole in. mm
9-19808 3 8'' [203]
3 9'' [229] 9-19809
4 Walk Ring 4 Walk Ring
9-19811 5 11'' [279]
5 13'' [330] 9-19813 6 13'' [330]
6 14'' [356] 9-19814 7 14'' [356]
7 16'' [406] 9-19816 8 16'' [406]
8 18'' [457] 9-19818 9 18'' [457]
9-19819 10 19'' [483]
9 20'' [508] 9-19820
10 21'' [533] 9-19821 11 21'' [533]
11 Stiffener Ring 12 Stiffener Ring
24'' [610] 9-19824 13 24'' [610]
12 25'' [635] 9-19825 14 25'' [635]
13 27'' [686] 9-19827 15 27'' [686]
14 28'' [711] 9-19828 16 28'' [711]
15 30'' [762] 9-19830 17 30'' [762]
Rungs are attached with the regular Roof Hardware, 5/16 x 1'' Bin Seal Bolts and Hex
Nuts, and a Weatherseal Washer between the Rung and Roof Rib.
Proceed down the Roof Panel installing Rungs. Place the proper length Rung in the
proper set of Bolt holes down from the top of the Roof.
Install a Walk Ring Bracket on every other Rib.
Install a Stiffener Ring Bracket on every rib.
Pre-assemble all the Ladder Rungs by inserting the hardware through the oblong
hole, with an additional Weatherseal Washer (steel side toward the Rung) below the
Rung. When Bolts and Washers have been inserted, lay out the Rungs by length as
shown in Figure 32 for ease in installation.
26 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Roof Ladder
Item Description
1 Ladder Rung
2 Roof Rib
3 5/16'' Weatherseal Washer
4 Hex Head Bolt 5/16 x 1''
5 5/16'' Hex Nut (under Rib)
1
1
4
2 3
5
11
11
15
14
6
Detail
Detail 3
2
Item Description
2 Ladder Rung
3 Roof Rib
RIGHT SIDE 4 Bin Wall
12 6 Manhole
7 First Roof Panel (left of Manhole)
11 Handrail (9-13037 Farm Bin only)
12 Handrail Brace (9-28650 Farm Bin only)
14 5/16'' Weatherseal Washer
Figure 33. Roof Ladder Handrail and Brace
15 5/16 x 1'' Bin Seal Bolt
On 48' [14 630] and 54' [16 459] diameter Grain Bins, the Roof Ladder Handrail is
is only used on Farm Bins without a Ladder Cage. (continued)
MCB1484i 27
Roof Ladder BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
The Roof Ladder Handrail is installed on right side of the bottom Roof Ladder Rung
(bottom Roof Rib hole).
Field drill a 3/8" [9.5] diameter hole 13" [330] from the centerline of the bottom roof rib
hole to attach the Handrail to the Roof Rib. A Neoprene Washer goes between the
Handrail and Roof Rib. Attach with a 5/16 x 1" Bin Seal Bolt and Hex Nut.
See Figure 34.
The Handrail Brace is attached to the Handrail in the hole provided. The other end of the
Brace is attached to the bolt securing the Roof Anchor Bracket.
NOTE: The Handrail is only used on Farm Bins without a Ladder Cage.
* Place a 5/16" Flat Washer under both the Bolt head and under the Nut as shown in
Figure 34 Detail.
3 3
2 TOP VIEW
(Handrail and Brace
4 7 8 not shown)
6
9
13
1
15
11 5 3
18
14 2
2 18 16
3 6
12
16 10 11
12 17
2
3 11
15
7
2 14
3 16
Item Description Item Description
1 Outside Ladder 10 Distance Between Rungs 20.675'' [575]
2 Ladder Rung 11 Handrail (9-13037 Farm Bin only)
3 Roof Rib 12 Handrail Brace (9-28650 Farm Bin only)
4 Bin Wall 13 Roof Anchor Bracket
5 Inside Ladder 14 5/16'' Weatherseal Washer
6 Manhole 15 5/16 x 1'' Bin Seal Bolt
7 First Roof Panel (left of Manhole) 16 5/16'' Hex Nut
8 Manhole Height 35'' [889] 17 5/16 x 2'' Hex Head Bolt
9 Manhole, max. width 18'' [457] 18 5/16'' Flat Washer
Figure 33. Roof, Ladder, and Handrail
28 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Flat Top Roof
TOP VIEW
8 11
5
1 6
2 10
15 4
7 14
12
13
Figure 36.
MCB1484i 29
Flat Top Roof BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
54' Overview
13 4
8 TOP VIEW
11
14
6
3
7
10
15
1
9
2
12
30 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Flat Top Roof
8
9 18
17
15 16
19
1
16 20
6 19
16
19
21 20
22 14 16 19
18 19
MCB1484i 31
Flat Top Roof BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Transition Assembly
Transition Panels go between the Flat Top Roof and the top edge of the Roof Panel.
IMPORTANT! Correct placement of the FIRST Transition Panel in relation to the Roof
Stairs or Ladder is CRITICAL.
The first Transition Panel is centered over the Rafter that extends from under the
Roof Ladder. This Panel covers the (eight on 48' / six on 54' ) Roof Panels.
1 1
2
TOP VIEW 2
1
2
6
7
3 UNDERSIDE VIEW WITHOUT ROOF PANELS
Item Description
1 1 Transition Panel
2 Upper Rafter
3 28'' [711]
TOP VIEW
2 4 Roof Ladder Rung
5 Roof Panel
* 6 Compression Ring
7 Roof Top
Figure 38. Transition Assembly
4 5
The Transition Ladder attaches to Transition seams and aligns with the Roof Ladder.
32 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Flat Top Roof
6
Detail
7
8 Item Description
1 Upper Rafter
3 2 Roof Transition Panel
15
3 Flat Top Roof Panel
4 Compression Ring Assy.
5 Fillhole Plate
2
16 6 Guard Rail Post
7 Toe Board
8 Post Bracket
15 9 Kneebrace Tube
16
10 Guard Rail Tube
EXTERIOR VIEW 11 Roof Panel (Rib)
12 Transition Ladder Rung
13 Transition Ladder Rail
14 Transition Ladder Bracket
15 5/16'' Hex Nut
10
16 5/16 x 1'' Bin Seal Bolt
10
6
4
3 9
Figure 40. Guard Rail Assembly
(Fillhole Plate not shown)
12
13
2
8
12
14
MCB1484i 33
Flat Top Roof BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Assemble the Kneebrace Supports to the Transition Panel on each side of the
Transition Ladder. See Transition Ladder assembly.
Assemble the Guard Rail Posts to the Post Bracket previously installed. One 5/16 x
1'' Bolt goes through Toe Board, Post and Bracket. See Detail to Figure 40.
Assemble Kneebrace to hole in center of Transition with Bolt Head under Panel.
Assemble top end of Kneebrace to top of Post, along with a Guard Rail.
Fill in the Center Guard Rails. Tighten all Bolts.
1 1
4
3
3
4
8
8
2
EXTERIOR, LOOKING TOWARD FILLHOLE 13
5
10 12
10
5
9
11
6 7
34 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Flat Top Roof
Roof Flashing
The Roof Flashing is attached at the top of the Roof Panel.
The 3 3/4'' [95.3] wide Foam Rubber Seal is placed over the open end of the Roof
Panel, from inside the bin. Notch the Seal to fit around the Rafter.
Place Roof Flashing spanning two Roof Ribs. Insert the Flashing between the
Transition and the Roof Ribs as shown below. Hold slight pressure down against the
Rubber Seal while a 7/32 x 3/4'' Drill Screw is installed through the Transition and
Flashing 3 1/4'' [82.6] from the lower edge of the Flashing.*
Bend the outer section down between Ribs to prevent birds from entering the bin.
Item Part No. Description
1 varies Roof Flashing
3 Pres-Stik Foam Rubber
4 2 9-15601 Seal 3/8 x 3 3/4'' [9.5 x 95]
* 1 3 varies Roof Transition Panel
2 4 varies Flat Top Panel
5
5 Roof Rib
6 3 1/4'' [82.6]
7 39-20126 #10 x 3/4'' Drill Screw
7
6
MCB1484i 35
Manhole BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Manhole
16
2 10 16 3
1 18 18
17
19 20
15 19
4 7 12
16
17
5 11
Detail B 14
8
Detail A
13
19
12 10
Hinge Detail A 16
16 17
10
17 18
19
11
15
13 13
14
Catch Detail B
16
17
Figure 43. Roof Manhole Assembly and Installation
18 (Refer to the Item Table on the Facing Page.)
20
19
11
36 MCB1484i
BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459] Removal of Center Support
1. Assemble the Catch and Lower Hinges to the Manhole Collar with 5/16 x 1'' Bin
Seal Bolts and Hex Nuts. Bolt heads are inside the Collar.
2. Assemble the Latch Assembly to outside of the Manhole Lid with a 5/16 x 3/4''
Hex Bolt (head on outside). A Weatherseal Washer (rubber side next to the
underside of the Lid) and a Lock Nut are on the inside of the Cover.
3. Assemble the Lid to the Collar with the Upper Hinge sitting on top of the Lower
Hinge. Use 5/16 x 3/4" Hex Head Bolts and Lock Nuts.
4. To assemble the Lid to the Collar, set the Upper Hinge on top of the Lower Hinge.
Insert a 5/16 x 3/4" Hex Bolt from the top down and fasten with Lock Nuts.
MCB1484i 37
Parts Listing: 48' and 54' Commercial Roof BROCK® Commercial Grain Bin Roof 48' and 54' [14 630 and 16 459]
Roof Hardware
48' 54'
Where Used Bolt Bolt Description Washer / Pipe Spacer Nut Nut Qty.
Part No. Part No. Description Part No. Description
Stiffener to Tie Strap 39-20070 Bolt, Hex 5/16''-18 x 1'' #8 39-20020 Hex 5/16'' 64 72
Lower Rafter to Middle 39-20070 Bolt, Hex 5/16''-18 x 1'' #8 39-20020 Hex 5/16'' 128 144
Rafter
Middle Rafter to Upper 39-20070 Bolt, Hex 5/16''-18x 1'' #8 39-20020 Hex 5/16'' 128 144
Rafter
Upper Rafter to Comp. Ring 39-20070 Bolt, Hex 5/16''-18x 1'' #8 39-20020 Hex 5/16'' 64 72
Bracket
Bracket to Compression 39-40991 Bolt, Hex 1/2''- x 1 1/2'' #8 32 36
Ring 39-20022 Hex 1/2''-13
39-40991 Bolt, Hex 1/2''- x 1 1/2'' #8 32 36
Web Channel to Channel 39-40991 Bolt, Hex 1/2''- x 1 1/2'' #8 39-20211 Flat 1/2'' 39-20022 Hex 1/2''-13 8 8
Wind Ring Clamp 39-39747 Bolt, Hex 3/8''x 2'' #8 39-20114 Hex 3/8'' 18 18
Wind Ring Clamp to Wind 39-20361 Square 12 12
Ring Tube 39-20126 Screw, #10-16 x 3/4''
095013 Flat 3/8 24 24
X-Brace to Rafter 39-20070 Bolt, Hex 5/16''-18 x 1'' #8 39-20020 Hex 5/16'' 30 30
Tie Brace to Rafter 39-20070 Bolt, Hex 5/16''-18 x 1'' #8 39-20020 Hex 5/16'' 16 18
Body Sheet to Eave Clip 39-20073 Bolt, HHBS 5/16''-18 x 1'' #8' 39-20101 Washer,
5/16 x 1 1/4'' 39-20020 Hex 5/16'' 192 216
Eave Clip to Roof Panel 39-20073 Bolt, HHBS 5/16''-18 x 1'' #8 39-20152 Flange 5/16'' 192 216
Roof Panel to Stiffener/ 39-20079 Neoprene 5/16'' 96 120
Walk Ring Bracket
Rafter to Roof Panel to Roof 39-37484 Bolt, HHCPS 5/16''-18 x 9-38309 Pipe Spacer 39-20020 Hex 5/16'' 224 294
Panel 2'' #5 39-20155 Weatherseal 5/16'' 39-20020 Hex 5/16'' 224 306
Mid Rafter to Roof Panel to 39-20058 Flat 5/16 x 7/8''' 96 108
Roof Panel
Roof Panel to Roof Panel 39-20073 Bolt, HHBS 5/16''-18 x 1'' #8 39-20020 Hex 5/16'' 736 918
Transition to Transition and 39-20073 Bolt, HHBS 5/16''-18 x 1'' #8 39-20020 Hex 5/16'' 40 66
center w/no Knee Brace
Transition to Flat Top 39-20073 Bolt, HHBS 5/16''-18 x 1'' #8'' 39-20020 Hex 5/16'' 96 96
Flat Top to Flat Top 39-20073 Bolt, HHBS 5/16''-18 x 1'' #8 39-20020 Hex 5/16'' 64 64
Flat Top to Collar 39-20073 Bolt, HHBS 5/16''-18 x 1'' #8 39-20020 Hex 5/16'' 16 16
Guard Rail Post to Knee
Brace, Guard Rail, Toe 39-20070 Bolt, Hex 5/16''-18 x 1''#8 39-20152 Flange 5/16'' 40 24
Board & Bracket
39-37484 Bolt, HHBS 5/16''-18 x 1 3/4'' #8 9-38309 Pipe Spacer 39-20020 Hex 5/16'' 8 6
Knee Brace to Transition 39-20079 Neoprene 5/16'' 39-20152 Flange 5/16'' 8 6
39-20070 Bolt, Hex 5/16''-18 x 1'' #8 39-20152 Flange 5/16'' 6
Transition Ladder Bracket 39-20073 Bolt, HHBS 5/16''-18 x 1'' #8 39-20020 Hex 5/16'' 4 4
to Rungs
Transition Ladder Bracket 39-20073 Bolt, HHBS 5/16''-18 x 1'' #8 39-20079 Neoprene 5/16'' 39-20020 Hex 5/16'' 8
to Transition 39-20079 Neoprene 5/16'' 8
Transition to Flashing 39-20126 Screw, #10-16 x 3/4'' 64 72
MCB1484i 39
Different by Design™
BROCK GRAIN SYSTEMS
A Division of CTB Inc.
P.O. Box 2000 • Milford, Indiana 46542-2000 • U.S.A.
Phone (574) 658-4191 • Fax (574) 658-4133
e-mail: brock@brockmfg.com • Internet: http//www.brockmfg.com
and
7400 East Thirteenth Street, Kansas City, Missouri 64126 U.S.A.
Phone (816) 968-6101
Fax (816) 968-6272 TLX: 6841105