Gadhi Rural Municiplity

Office of The Ruial Municipality Executive


Aurabani, Sunsari
1 No Province, Nepal
Gadhi Rural Municiplity

Project Name :- Khop Kendra Madheli,Jamuwa


Place :-Gadhi Gaupalika-01,jamuwa
Name of Contractor:- GAUTAM CONSTRUCTION
Component:- Toilet construction also Dismental, Repair & Maintenance work of khop kendra jamuwa,Madheli

S.
Description of Items No. Length Breadth Height Quantity Unit Rate (NRs) Amount (NRs) Remarks
No.
Dismantling of one door & two windows job 5000 5000
1 Earth Work Excavation for Foundation works
Wall- Long 2 1.37 0.25 0.46 0.32
Wall- short 2 1.22 0.25 0.46 0.28
Soak pit 1 3.14 0.46 1.22 1.76
2 Stone Soling with compaction Total 2.36 cum 476.76 1124.79
Wall- Long 2 1.37 0.25 0.69
Wall- short 2 1.22 0.25 0.61
Floor 1 0.92 1.37 1.26
total 2.55 Sqm 3751.88 9572.47
Brick masonry work in foundation & below plinth level along with of 1st class
3 chimneyburnt bricks & const. of brick wall using cement & sand mortar 1:4
including curing
Upto Plinth Wall- Long 2 1.37 0.25 1.22 0.85
Upto plinth Wall- short 2 1.22 0.25 1.22 0.74
Above Plinth Wall- Long 2 1.37 0.13 2.44 0.85
Above plinth Wall- short 2 1.22 0.13 2.44 0.76
Deduction for door 1 0.76 0.13 1.83 -0.18
total 3.02 cum 14366.89 43345.33
Plain Cement Concrete work [1:2:4] in foundation with cement, sand and
4 aggregate including mixing ,laying complete
Wall- Long 2 1.37 0.25 0.15 0.1029
Wall- short 2 1.22 0.25 0.15 0.09
Floor 1 0.92 1.37 0.15 0.19
Total 0.38 cum 13124.95 5032.89
12.5 mm thick cement plaster in 1:4 cement & sand outside & inside of toilet
5 walls including perfect line & level curing before plastering & after plastering
cleaning of sand as per specification
Wall- Long 4 1.22 0.25 1.22 1.49
Wall- short 4 1.37 0.13 2.44 1.70
Deduction for door 1 1.22 0.13 2.44 -0.38
Total 2.81 sqm 431.73 1212.43
Torsteel steel bars (Grade 500 ) reinforcement work including straightening,
cleaning, cutting, bending, binding with 20 SWG annealed wire & fixing in
6 position as works as per specification, drawing & instruction of site engineer.
Approved brands of steel bars.

At four corner Total 26.97 kg 124.24 3350.75


7 26 gauge coloured C.G.I. Sheet roofing all Complete
1 1.83 1.52 2.79
Sub Total 2.79 sqm 0.00
Supply and applying one coat primer and two coats of Imalsan Plastic Paint internal
and external wall at any level, finished smooth including supply of materials, labour,
8 watering, preparation of base, painting, curing etc., all complete as p

outside wall 2 1.22 2.44 5.95


outside wall 2 1.37 2.44 6.69
Inside wall 2 1.12 2.44 5.47
Inside wall 2 0.97 2.44 4.73
deduction for door both sided 2 0.76 1.83 -2.78
Sub Total 22.84 sqm 315.03 7194.78
9 UPVC Door 100mm*60mm with top & bottom UPVC pannel 1
Sub Total 0.00 0.00 0.00
Aluminium framed casement door oneway openable Aluminium natural
10 andoised 101.6mm*45mm*1.5mm,board 9mm laminated 1

11 Installing 18'' pan set 1


Sub Total 0.00 N0s 0.00 0.00
12 RCC Ring 36'' dia. & 12'' height 4 N0s
13 RCC Ring 36'' dia. Cover 1 N0s
14 4'' dia HDP pipe 1 N0s
Total Amount 75833.44
13% vat 146666.87
Income Tax 1.5% Diduct 19066.69
Net Total Paybaybal Amount NRs. 2200.00
163533.56