The document outlines maintenance work done from January 2021, including repairs to various machines like blenders, grinders, and mixers. Issues addressed included worn parts like bearings, belts, and covers. The work was performed across different sections for sealing, grinding, mixing, quality control, and storage areas by maintenance personnel over several days.
The document outlines maintenance work done from January 2021, including repairs to various machines like blenders, grinders, and mixers. Issues addressed included worn parts like bearings, belts, and covers. The work was performed across different sections for sealing, grinding, mixing, quality control, and storage areas by maintenance personnel over several days.
The document outlines maintenance work done from January 2021, including repairs to various machines like blenders, grinders, and mixers. Issues addressed included worn parts like bearings, belts, and covers. The work was performed across different sections for sealing, grinding, mixing, quality control, and storage areas by maintenance personnel over several days.
MAINTENANCE WORK SEASONING + FLAVOR SECTION FROM JANUARY 2021
REPAIRING REPAIRING REPRIRING WORKING
S.NO MACHINE ISSUE CATEGORY PERSON TIME CONDITION 1 Small Sealer Machine Electrical + Mechanical Sealing Heater Burn Arsalan 2 Days OK 2 Grinding Machine ( OLD) Mechanical Motor Belt ( C-100) Damaged Anwar 1 Day OK 3 Mixing Blender 500 KG ( Seasoning) Mechanical Shraft Baring leakage AKBAR BHAI 5 Days OK 4 S.S Grinding Machine Mechanical Cloth Fitting Hopper New With High Tapper Zubair 4 Days OK 5 Lightening Bulbs Electrical Bulb Fuse and Holders replaced damage one ASIM 2 Days OK 6 Mixing Blender 500 KG ( Flavor) Mechanical Shraft Baring leakage AKBAR BHAI 5 Days OK 7 Liquid Flavor Mixer 300 KG Mechanical Motor Cover S.S Zubair 10 Days OK 8 Mixing Blender Stair NEW Mechanical New Stair orderd Zubair IN PROGRESS -- 9 CCTV Camera Installed NEW Electrical NEW Installed -- -- OK 10 NEW pallets 15 PCS ( seasoning + flavor) -- -- -- -- -- 11 New Insectecuters Inslatted Electrical NEW Installed ASIM 2 Days Ok 12 Homogenizer Machine + Motor Mechanical For Repairing AKBAR BHAI IN PROGRESS -- 13 Grinding Machine Clothes -- Grinding Machine New Clothes Sewed ( 10 PCS) Taylor 1 Day OK MAINTENANCE WORK JAM SECTION 15 PULP room AC repairment Electrical ASIM OK 16 MAINTENANCE WORK RAW MATERIAL STORE 18 New install insect -o-killer -- NEW Installed sir mohiuddin ali -- OK 19 Wooden new cabinet wall clockforindocument store -- NEW Installed sir mohiuddin ali -- OK 20 -- NEW Installed -- -- OK 21 floor repairing work -- Repairing aslam perviaz -- OK MAINTENANCE WORK QUALITY DEPARTMENT 23 EXUAST FAN Electrical NEW Installed ASIM ALI -- OK 24 FAN Electrical NEW Installed ASIM ALI -- OK 25 AREA FOR SAMPLE STORAGE -- -- ASIM ALI -- OK 26 Wooden cabinet for document -- NEW Installed sir mohiuddin ali -- OK 27 Homogenizer Machine Electrical -- sir mohiuddin ali -- OK 28 WALL CLOCK -- NEW Installed ASIM ALI -- OK