L&T HYDROCARBON

HRRL-EPCC-03-PFCCU
BAR BENDING
NAME OF STRUCTURE :
DRAWING NO :
LOCATION :
CUTTING
SI.NO DESCRIPTION BAR DIA OF SHAPE LENGTH
MARK BAR
(M)

FOR 600mm D
2d LAPPING WITHOUT STAGGERING

1 Main Vertical -Bottom A 16 150 8.976


8850

2 Main Vertical -Bottom B 20 150 8.968


8850

3 Main Vertical -Top A 25 8.270


8330

4 Main Vertical -Top B 25 8.575


8650
2d LAPPING WITH STAGGERING

1 Main Vertical -Bottom A 16 150 5.976


5850

2 Main Vertical -Bottom B 20 150 8.968


8850

3 Main Vertical -Top A 25 11.270


11330

4 Main Vertical -Top B 25 8.575


8650
1d LAPPING WITH STAGGERING
1 Main Vertical -Bottom A 16 150 5.976
5850

2 Main Vertical -Bottom B 20 150 7.968


7850

3 Main Vertical -Top A 25 10.630


10690

4 Main Vertical -Top B 25 8.775


8850
MECHANICAL CUPLER WITH THREADING

1 Main Vertical -Bottom A 16 150 7.496


7370

2 Main Vertical -Bottom B 20 150 8.288


8170

3 Main Vertical -Top A 25 8.510


8570

4 Main Vertical -Top B 25 7.695


7770
&T HYDROCARBON ENGINEERING LTD
RL-EPCC-03-PFCCU AND PRU-RAJASTHAN
BAR BENDING SHEDULE-(BBS)
REPORT NO :
DATE :

TOTAL TOTAL LENGTH(M)-DIA WISE


NO OF NO OF TOTAL LENGTH
MEMBER SET NOS 8 12 16 20 25
(M)

FOR 600mm DIA , 15M LENGTH

1 3 3 26.928 26.928

1 3 3 26.904 26.904

1 3 3 24.81 24.81

1 3 3 25.725 25.725

1 3 3 17.928 17.928

1 3 3 26.904 26.904

1 3 3 33.81 33.81

1 3 3 25.725 25.725
1 3 3 17.928 17.928

1 3 3 23.904 23.904

1 3 3 31.89 31.89

1 3 3 26.325 26.325

1 3 3 22.488 22.488

1 3 3 24.864 24.864

1 3 3 25.53 25.53

1 3 3 23.085 23.085
DIA WISE ROD BALANCE
REMARKS LENTH CUT PIECE
32 40 (M) (M)

12 3.024

12 3.032

12 3.730

12 3.425

12 6.024

12 3.032

12 0.730

12 3.425
12 6.024

12 4.032

12 1.370

12 3.225

12 4.504

12 3.712

12 3.490

12 4.305
L&T HYDROCARBON
HRRL-EPCC-03-PFCCU
BAR BENDING
NAME OF STRUCTURE :
DRAWING NO :
LOCATION :
CUTTING
SI.NO DESCRIPTION BAR DIA OF SHAPE LENGTH
MARK BAR
(M)

FOR 750mm D
2d LAPPING WITHOUT STAGGERING

1 Main Vertical -Bottom A 16 150 8.726


8600

2 Main Vertical -Bottom B 20 150 8.718


8600

3 Main Vertical -Top A 25 8.520


8580

4 Main Vertical -Top B 25 8.825


8900
2d LAPPING WITH STAGGERING

1 Main Vertical -Bottom A 16 150 5.976


5850

2 Main Vertical -Bottom B 20 150 8.718


8600

3 Main Vertical -Top A 25 11.270


11330

4 Main Vertical -Top B 25 8.825


8900
1d LAPPING WITH STAGGERING
1 Main Vertical -Bottom A 16 150 8.726
8600

2 Main Vertical -Bottom B 20 150 7.968


7850

3 Main Vertical -Top A 25 7.880


7940

4 Main Vertical -Top B 25 8.775


8850
MECHANICAL CUPLER WITH THREADING

1 Main Vertical -Bottom A 16 150 8.246


8120

2 Main Vertical -Bottom B 20 150 7.238


7120

3 Main Vertical -Top A 25 7.760


7820

4 Main Vertical -Top B 25 8.745


8820
&T HYDROCARBON ENGINEERING LTD
RL-EPCC-03-PFCCU AND PRU-RAJASTHAN
BAR BENDING SHEDULE-(BBS)
REPORT NO :
DATE :

TOTAL TOTAL LENGTH(M)-DIA WISE


NO OF NO OF TOTAL LENGTH
MEMBER SET NOS 8 12 16 20 25
(M)

FOR 750mm DIA , 15M LENGTH

1 4 4 34.904 34.904

1 4 4 34.872 34.872

1 4 4 34.08 34.08

1 4 4 35.3 35.3

1 4 4 23.904 23.904

1 4 4 34.872 34.872

1 4 4 45.08 45.08

1 4 4 35.3 35.3
1 4 4 34.904 34.904

1 4 4 31.872 31.872

1 4 4 31.52 31.52

1 4 4 35.1 35.1

1 4 4 32.984 32.984

1 4 4 28.952 28.952

1 4 4 31.04 31.04

1 4 4 34.98 34.98
DIA WISE ROD BALANCE
REMARKS LENTH CUT PIECE
32 40 (M) (M)

12 3.274

12 3.282

12 3.480

12 3.175

12 6.024

12 3.282

12 0.730

12 3.175
12 3.274

12 4.032

12 4.120

12 3.225

12 3.754

12 4.762

12 4.240

12 3.255