1.0 SCOPE 4
2.0 PURPOSE 4
3.0 DEFINITIONS 4
4.0 ABBREVIATIONS 5
5.0 REFERENCES 5
7.6 RECORDS 8
1.0 SCOPE
This procedure applies to the corrective and preventive action process.
The process applies to strategic and control process activities as defined in
accordance with ISO 9001:2008 section 8.5.3 and 8.5.4
The system, processes, and terminology defined in this procedure as per
ISO9001.
2.0 PURPOSE
This procedure defines and describes the corrective and preventive action process
that applies throughout the Greenville’s INSTALLATION OF ERES 0.25 MTPA LNG
PLANT 1 AND 2 project.
3.0 DEFINITIONS
Quality: degree to which a set of inherent characteristics fulfils requirements.
Corrective action: action to eliminate the cause of a detected nonconformity or
other undesirable situation.
Improvement: activity to increase the ability to fulfill requirements.
Non-conformance or nonconformity: non-fulfillment of a requirement.
Preventive action: action to eliminate the cause of a potential nonconformity or
other undesirable potential situation.
Requirement: need or expectation that is stated, generally implied or obligatory.
4.0 ABBREVIATIONS
IAR Improvement Action Requests
NCR Nonconformance Report
IM/DCC Information Management Document Control
Centre
5.0 REFERENCES
IOX-QAC-GEN-0001-000 Management Systems Manual
ISO 9001:2008 Quality Management Systems
IOX-QAC-GEN-0002-000 Audit Procedure
IOX-QAC-GEN-0003-000 Control of Non-Conformance
IAR ORIGINATOR
Responsible for improvement or preventive action identification, definition, raising
the IAR and for forwarding to the responsible project quality lead authorities.
Responsible for ensuring the effective application of this procedure and to further
ensure the integration of this process with other continual improvement processes.
IM/DCC
Responsible for the IAR numbering system, allocation of numbers, and
maintenance of the IAR Register.
Responsible for maintaining associated records, and IAR information to relevant
parties including recipients throughout INSTALLATION OF ERES 0.25 MTPA LNG
PLANT 1 AND 2 project lifecycle.
IM/DCC provide numbers and maintain the numbering system, transmit and
distribute IARs, and maintain the IAR register containing revision number(R01),
sheet number(001), area identifier(IAR).
7.6 RECORDS
IAR records are part of the IRON OX Projects demonstration of the continual
improvement process. Full records relating to IARs shall be maintained
IRON OX Project IM/DCC shall maintain copies of records related to IARs, and
these shall be made available to the for senior management for review.