Professional Documents
Culture Documents
Nqs Post Verification Visit Review Document
Nqs Post Verification Visit Review Document
Please detail progress in meeting the standards that the Verifier determined the school was ‘working towards’ at the time of your NQS
verification review. Complete this only for those standards that were ‘working towards’ at the time of the NQS audit, not those that were met.
2.1 – Each child’s health is promoted. Meeting Meeting 1. Practices as reviewed are
continuing
2. NQS verification report
review by ECE staff and
Principal.
3. Current practices reviewed
annually in QIP.
Recommendations from review
implemented.
2.2 – Healthy eating and physical activity are Meeting Meeting 1. Practices as reviewed are
embedded in the program for children. continuing
2. NQS verification report review by
ECE staff and Principal.
3. Current practices reviewed
annually in QIP.
Recommendations from review
implemented.
2.3 – Each child is protected. Meeting Meeting 1. Practices as reviewed are
continuing
2. NQS verification report review by
ECE staff and Principal.
3. Current practices reviewed
annually in QIP.
Recommendations from review
implemented.
3.1 – The design and location of the premises is Working Working Towards 1. Practices as reviewed are
appropriate for the operation of a service. Towards continuing
2. NQS verification report review by
ECE staff and Principal.
3. Current practices reviewed
annually in QIP.
4. School design and space still
makes outdoor space difficult to
implement on a consistent basis.
5. Sustainaability is a focus for
the school through QIP
documentation.
3.2 – The environment is inclusive, promotes Working Working Towards Outodor spaces and sustainability is still
competence, independent exploration and Towards is goal for the school and present on
learning through play. QIP and school improvement
documentation.
3.3 – The service takes an active role in caring Working Working Towards Outodor spaces and sustainability is still
for its environment and contributes to a Towards is goal for the school and present on
sustainable future QIP and school improvement
documentation.
4.1 – Staffing arrangements enhance children’s Working Meeting Staffing ratio and arrangements are in
learning and development and ensure their Towards line with standard. Working towards was
safety and wellbeing. given at the time, due to an absence of
staff, since review staff turnover and
upskilling has occurred.
4.2 – Educators, coordinators and staff Working Meeting Staffing ratio and arrangements are in
members are respectful and ethnical. Towards line with standard. Working towards was
given at the time, due to an absence of
staff, since review staff turnover and
upskilling has occurred.
5.1 – Respectful and equitable relationships are Meeting Meeting 1. Practices as reviewed are
developed and maintained with each child. continuing
2. NQS verification report review by
ECE staff and Principal.
3. Current practices reviewed
annually in QIP.
5.2 – Each child is supported to build and Meeting Meeting 1. Practices as reviewed are
maintain sensitive and responsive relationships continuing
with other children and adults. 2. NQS verification report review by
ECE staff and Principal.
3. Current practices reviewed
annually in QIP.
6.2 – Families are supported in their parenting Meeting 1. Practices as reviewed are
role and their values and beliefs about child continuing
rearing are respected. 2. NQS verification report review by
ECE staff and Principal.
3. Current practices reviewed
annually in QIP.
6.3 – The service collaborates with other Meeting 1. Practices as reviewed are
organizations and service providers to enhance continuing
children’s learning and wellbeing. 2. NQS verification report review by
ECE staff and Principal.
3. Current practices reviewed
annually in QIP.
7.1 – Effective leadership promotes a positive Working Working Towards 1. Practices as reviewed are
organizational culture and builds a professional Towards continuing
learning community. 2. NQS verification report review by
ECE staff and Principal.
3. Current practices reviewed
annually in QIP.
4. Recommendations are currently
being implemented and refined.
7.2 – There is a commitment to continuous Working Working Towards 1. Practices as reviewed are
improvement. Towards continuing
2. NQS verification report review by
ECE staff and Principal.
3. Current practices reviewed
annually in QIP.
4. Recommendations are currently
being implemented and refined
7.3 – Administrative systems enable the Working Working Towards 1. Practices as reviewed are
effective management of a quality service. Towards continuing
2. NQS verification report review by
ECE staff and Principal.
3. Current practices reviewed
annually in QIP.
4. Recommendations are currently
being implemented and refined
The Curriculum Team will be providing professional learning for early years during 2020.
Please indicate what professional learning you would appreciate being offered to assist
you in meeting the needs of children in your school.
1. Current examples of high quality practice in CEWA schools would be useful for
staff to access via teams or otherwise.
2. Using Stream or similar to engage Staff in PD would be particularly useful for
regional areas.
Return to Pam Parr at Early-Years@cewa.edu.au by 21 February 2020.