You are on page 1of 1

165 165 NOMENCLATURE

11 COOLING WATER SUPPLY 36 NITROGEN


12 COOLING WATER RETURN 37 BOILER FEED WATER HP
3/4"-D 13 38 BOILER FEED WATER MP
160 3/4"-V 3/4"-V 160 14 38A BOILER FEED WATER LP
3/4"-V
15 39 FRESH WATER
16 TEMPERED WATER SUPPLY 40 DEMINERALIZED WATER
3/4"-D 3/4"-D 3/4"-D 3/4"-D 17 TEMPERED WATER RETURN 41 GLAND COOLING WATER SUPPLY
155 155 18 PLANT AIR 42 GLAND COOLING WATER RETURN
PRV 19 INSTRUMENT AIR 43A GLAND OIL SUPPLY LP
XXX
20 43B GLAND OIL SUPPLY MP
21 43C GLAND OIL SUPPLY HP
150 1" 150
22 44 GLAND OIL RETURN
23 CONDENSATE ATMOSPHERIC 45 FUEL OIL TYPE 2 SUPPLY
8"x6" 24 OILY CONDENSATE 46 FUEL OIL TYPE 2 RETURN
PRV 25 POTABLE / DRINKING WATER 47 FUEL OIL SUPPLY
3/4" XXX 3/4"-D 26 OILY WATER SEWER 48 FUEL OIL RETURN
145 26 145
3/4"-D 27 NON OILY WATER SEWER 49A FUEL GAS LP
28 SANITARY SEWER 49B FUEL GAS HP
29 FIRE WATER 50 DISCHARGE TO GRADE
30A FLUSHING OIL 51 ACID FLARE
140 140
OPEN END 26 30B START-UP OIL 52 SEA WATER SUPPLY
6" 6" 6"
31 PUMP-OUT 53 SEA WATER RETURN
31B MeOH PUMP-OUT 54 SERVICE WATER
FT 32 STEAM OUT 55 SLOPS HEADER
XXX
135 135 33 BLOWDOWN 56 PSVs DISCHARGE HEADER TO TOWER
BATTETY LIMIT 34 FLARE 57 DEAERATED WATER
UNIT-3400
TO
34A FLARE 1972 58 INTERNAL RECYCLE STREAM
8758A, 8764B, FROM P-8701J 6"
8716 A/B
35 TO ATMOSPHERE AT SAFE LOCATION

4"
130 130
DESIGN DATA

4"x3"
OPEN END
3/4"-V

M
6"

4"x3"
125 125

6" 6" 6"

3"

4"
BATTETY LIMIT
UNIT-2400 TO FROM HGO
P-8716 A/B P-8716 A/B
120 120

6"x4"
OPEN END
3/4"-V

6"
BLENDER U-8450
115 3/4"-D 115

HEADER
110 3" 2" 110

2"

105 105

100 100
3/4"

95
B.F. 95
3/4"-V 3"

6" 8"x6"

90 26 3/4" 90

3/4"-V

85 3/4"-V 3/4"-D 3/4"-D 3/4"-D 85

TO
8"x6" BLENDER
8400

J-8838
TGO
80 6" 80

6"

START UP U-3100 6"


6"x4"
75
3/4"-V 75

LINE
LGO
3/4"-D
START UP U-3900
3/4"-V 6"x4"

DIESEL OIL
HEADER
70 6" 70 NOTES
3"

TO LCCO
3/4"-V MANIFOLD

8"
65 65
OPEN
3/4"-V
3/4"-V
END

6"
3"

60 60
3/4"-V.-OPEN END
(TYP x2)
TO HGO
LIC 4002
3/4"-V 3/4"-V U-4100

55 55

3/4"-D 3/4"-D

50 50
3/4"-V

3/4"-V
45 45
3/4"-D
3/4"-V

3/4"-D
40 40
3/4"-V

PRV
35 88056 35

30 30

26

25 25
8"

EVG EVG

DATE DESCRIPTION PREPARED DRAWN CHECKED APPROVED


20 FROM 20
P-8808 APPROVED FOR CONSTRUCTION

DWG REV. DATE


THIS DOCUMENT IS THE PROPERTY OF ASPROFOS S.A. AND IT
SHALL NOT BE REPRODUCED, COPIED OR USED FOR ANY
engineering PROPOSE OTHER THAN THAT FOR WHICH IT IS SPECIFICALLY
FURNISHED.

15 15
SIGNATURE ..........................................................

PC CODE: C:\USERS\ATHANASIADIS\DESKTOP\H.G.O..DWG
ENGINEERING FLOW DIAGRAM CONTRACT No:
AF- -
10 10 UNIT-8800, 8700
HEADER LINE HGO
SUPERSEDED BY:

SUPERSEDES THE:

SHEET REVISION
5 5
SCALE AF. DWG No: ......of......

SHEET REVISION

CLIENT DWG No: ......of......

1 1
PAPER SIZE

You might also like